Triconboston Wind Power Project (Pakistan) Prepared by Triconboston Consulting Corporation (Private) Limited for the Asian Development Bank This environmental and social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “Terms of Use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
Page 1 of 33
IFC PROJECT No: 38229
TRICON BOSTON CONSULTING CORP PVT LTD 150 MW WIND FARM PROJECT
JHIMPIR, THATTA, SINDH. PAKISTAN
ENVIRONMENTAL AND SOCIAL PERFORMANCE
ANNUAL MONITORING REPORT (AMR)
REPORTING PERIOD: July 2019 - June 2020
AMR Completion Date: September 28, 2020
Submitted to
Environment, Social and Governance Department
2121 Pennsylvania Avenue, NW
Washington, DC 20433 USA
www.ifc.org/sustainability
Page 2 of 33
AMR SECTION I
INTRODUCTION
IFC’s Investment Agreement requires for the Tricon Boston Consulting Corp. Pvt. Ltd. (TBCC), 3 x 49.735 MW Wind
farm projects, to prepare a comprehensive Annual Monitoring Report (AMR) on the Environmental and Social (E&S)
performance of its facilities and operations. This document comprises IFC’s preferred format for E&S performance reporting. This report for the period July 2019 To June 2020 is supplemented with annexes mainly related to Birds
Monitoring Report (BMR), Stakeholders Engagement Meetings (SEM) records, Grievance Records, Internal EHS and
CSR Audit Reports, EHS Inspection Reports, Training Evidences and CSR implementation evidences as appropriate
in order to ensure that all relevant information on project performance is reported.
Contents:
• Project Information
• Client’s Representation Statement by Sponsor authorized representative
• Summary of Key E&S Aspects during the Reporting Period
o Compliance Evaluation
o Major Environmental and Social Achievements
o Major Challenges and Issues
• Key Project Implementation data relevant to E&S Performance Evaluation
• Compliance with IFC Performance Standards
• Action Plan Status and Update
• Deviations/non-compliances
• Client’s Feedback
Page 3 of 33
AMR SECTION II
Project Information
Project Name 3 x 49.735 MW Triconboston Wind Power Projects
Project Scope Construction & Operation of 3 x 49.735 MW Wind Farm
Current Stage Operations Phase
Project Chief Operating Officer Khalid Aslam
Head of Operations Zeeshan Wali
TBCC Compliance Incharge Jawahar Lal
Admin & HR Manager Junaid Nizamani
O&M Contractor General Electric
O&M HSE Manager Arif Malik
HSE & CSR
Independent Monitoring Company
Arch Associates
Project Operational Status during COVID-19
Triconboston Consulting Corp Pvt Ltd Projects A, B, C remained Operational during the period when the
Government initiated a complete lockdown (with the exception of essential services including food,
pharmaceuticals and the power sector) from March 22, 2020 which continued till May 07, 2020. Following
May 07, 2020, Government relaxed the lockdown conditions selectively.
All the E&S monitoring requirements mainly the EHS Inspections, Birds Monitoring, EHS Audits etc
continued during lockdown as well.
Page 4 of 33
AMR SECTION I
INTRODUCTION
IFC’s Common Terms Agreement requires for Triconboston Consulting Corporation Pvt. Ltd. (TBCC) project to
prepare a comprehensive Annual Monitoring Report (AMR) on the environmental and social (E&S) performance of
its facilities and operations. This document comprises IFC’s preferred format for E&S performance reporting for the
period June 2019 to July 2020. The following template may be supplemented with annexes as appropriate to
ensure all relevant information on project performance is reported.
Contents:
• Project Information
• Client’s Representation Statement by Sponsor authorized representative
• Summary of Key E&S Aspects during the Reporting Period
• Action Plan Status and Update
• Deviations/non-compliances
Page 5 of 33
AMR SECTION II
Client’s Representation Statement by Sponsor authorized representative
I Khalid Aslam in my role of Chief Operating Officer and representing Triconboston Consulting Corporation Pvt Ltd
certify that
a) The Project is in compliance with all applicable E & S Requirements as described in the Common Terms
Agreement, and all actions required to be undertaken pursuant to the Environmental and Social Action Plan
(ESAP) and any subsequent supplemental action plans.
b) Beyond what is reported in this AMR for the current reporting period, in relation to the Project, to the best of
my knowledge, after due inquiry, there are no:
• Circumstances or occurrences that have given or would give rise to violations of E &S and labor Laws or E
&S and labor Claims;
• Social unrest, local population disruption or negative NGO attention due to the project
• Material social or environmental risks or issues in relation to the Project other than those identified by the
E&S Assessment and the Environmental and Social Review Summary.
• Existing or threatened complaint, order, directive, claim, citation or notice from any Authority.
• Any written communication from any Person, in either case, concerning the Project's failure to comply with
any matter covered by the Performance Standards;
• Ongoing or, threatened, strikes, slowdowns or work stoppages by employees of the Borrower or any
contractor or subcontractor with respect to the Project;
c) All information contained in this AMR is true, complete and accurate in all respects at the time of submission
and no such document or material omitted any information the omission of which would have made such
document or material misleading.
d) There have not been any new company activities (e.g. expansions, construction works, etc) that could generate
adverse environmental effects and there have been no new ESIA studies, audits, or E&S action plans conducted
by or on behalf of Tricon Boston Consulting Corporation, with respect to any Environmental or Social
standards/regulation/ applicable to the Project that IFC has not been notified of
Sep 28, 2020
Signature Date
Page 6 of 33
AMR SECTION III
(a) Summary of Key E&S Aspects during the Reporting Period
This section aims to identify the key E&S progress/activities/incidents during the Reporting period (include
Summary of Key Findings for the Reporting Period e.g. non-compliances, significant incidents, social unrest,
significant improvements/initiatives regarding E&S performance)
Key Project Implementation Data
Start of Construction 04 Aug 2017
Start of Commercial Operation Date Tricon-A: 15 August 2018
Tricon-B: 14 September 2018
Tricon-C: 10 Sep 2018
Gross Electricity Generation Capacity 3 x 49.735 MW (Total: 149.205 MW)
Net Electricity Generation Capacity 3 x 49.735 MW (Total: 149.205 MW)
Gross Electricity Generated during Review Period 370.11 GWh
Net Electricity Generated during Review Period 360.06 GWh
Plant Capacity Factor %
(–Gross Electricity generated (GWh/year) / Gross electricity
generation capacity MW x 8,760 hour/year)
28.32%
Please report on:
• Compliance with ESMP
o Currently Issue 1 of Operational Phase ESMP is followed for
implementation. The following areas has been updated w.r.t Operation
Phase
▪ Environmental and Social Management Plan
▪ Stakeholders Engagement Plan implementation based on IFC Guidelines
considering COVID-19
▪ Birds Monitoring Plan based on IFC Protocol for Carcass collection and
preservation
▪ Organization Structure and Job Descriptions
▪ Training Plans
▪ System Procedures related to O&M activities
▪ Emergency Preparedness and Response Plan
o Inspection and Auditing methods are used to monitor compliance against ESMP.
o O&M Operator follows the procedure of HSE incidents recording and reports the HSE
Statistics monthly basis including near misses (Refer Annexure-4).
o Summary of Compliance Status monitoring through Inspections performed by O&M
Operator and Independent Monitoring Consultant (IMC) and Auditing performed by
Independent Monitoring Consultant is shown below while the sample of EHS Inspection
Reports by O&M Operator and IMC are attached in Annexure 4 & 5 along with EHS
Statistics
Page 7 of 33
o During the review period, E&S Management System audit was performed in Feb 2020.
Total five non-conformances were identified of which two were major in nature and
three were minor. Due to pandemic, project was operating with lean structure and
these audit findings were not closed during the review period.
o From Mar 2020-June 2020, during the lockdown imposed by Government,
0
5
10
15
20
25
30
35
40
Jul-19 Aug-19 Sep-19 Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20 Jun-20
TBC-A-HSE Statistics
Total No of Violation Open Closed
0
5
10
15
20
25
30
35
40
45
Jul-19 Aug-19 Sep-19 Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20 Jun-20
TBC-B-HSE Statistics
Total No of Violation Open Closed
0
10
20
30
40
50
60
70
Jul-19 Aug-19 Sep-19 Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20 Jun-20
TBC-C-HSE Statistics
Total No of Violation Open Closed
Page 8 of 33
Independent Auditing was not performed however Independent Inspections continued
during the lockdown period.
o Triconboston plans to perform detailed analysis of HSE Statistics on Quarterly basis
and identify the HSE Violations trend and HSE Violations close out time. Based on
these analyses, training needs will be identified, and Turn Around Time (TAT) will be
established for different type of HSE violations.
• Regular ornithological monitoring reports / on-site bird monitoring data
o Birds Monitoring Reports (BMR) for the period July 2019-Jun 2020 are
attached in Annexure -1. There was no mortality identified during the review
period. First Quarter 2020 data reflects the back migration while April-June
2020 data shows decline in bird population and number of species observed
in the area mainly due to high temperature in the area during summer.
o During the review period, 41 species of birds were recorded from Tricon
Boston projects, including IUCN declared Endangered (EN) and Vulnerable
(VU) species of Eagles and Falcons. Steppe Eagle population has reduced in
the project area while the same species is recorded in neighboring projects in
the same monitoring period. Similarly, Cream colored courser is not recorded
within the project area during the entire monitoring period though earlier
during the construction phase and in first year of operation, it was recorded
at Project C in good numbers.
o Details of monitoring data recorded through Vantage Point method and
Ground Search method and analysis and commentary on data can be found
in the quarterly Birds Monitoring Reports in Annexure-1
o Based on the recent IFC Supplementary Studies of Super Six projects carried
during the period Dec 2019-May 2020 and report issued in June 2020,
IFC Biodiversity Consultant has advised to change the data reporting
template and record the data as “ Target” and “ Non-Target” Species and monitor the flight height of target species in relation to rotor height. The
revised templates and data recording and analysis will be implemented from
upcoming migratory season of 2020-2021
o IFC has advised to implement the carcass preservation procedure and for
this purpose protocol to implement the program has been shared.
o A training session of local consultant by IFC Biodiversity Expert has been
planned during upcoming migratory season and protocol will be
implemented post training.
• Progress in ESAP implementation and any updates in relations to ESAP action items
o All the ESAP items have been closed and currently in compliance status.
• Major Environmental and Social Achievements
o Using ISO standards, initiation of development and implementation of
Quality, Environment, Occupational Health & Safety, Social, Energy and
Asset Management Systems development as single integrated management
system in Tricon Boston Consulting Corp Pvt Ltd
o Fully Equipped Clinic with ambulatory support to handle the emergencies
has been established at Tricon Boston site. The clinic will cater to both,
personal working at project site as well as to Tricon Boston neighborhood
community.
o Adequate preventive and monitoring measures were implemented from the
start of COVID-19 and plant operations were not closed any day due to
pandemic. SOP for COVID-19 Preventive Measures is included in Annexure-
8
Page 9 of 33
• Major Challenges and Issues for the company
o Cost Effective waste management as due to absence of Sindh Environmental
Protection Agency (SEPA) authorized /approved Waste Management
Company in the local vicinity, the cost of waste disposal through urban
center based SEPA approved waste management companies is high.
o Inclusion of O&M Contractor w.r.t. E&S implementation and their
willingness to offer compliance records for third party/independent
verification
o Effective Implementation of COVID-19 Precautionary measures at Site and
TBCCPL has taken effective Monitoring Measures as mentioned in Annexure
-08
Project Status
Select the status of the project and provide a brief description of the developments in relation to the project over
the reporting period. For example, has construction been started or completed, has new equipment been installed,
has production capacity increased, or is the investment in new projects considered?
❑Design ❑Construction ❑ Expansion ❑Operation ❑ Closure ❑ Other (specify)
Currently project is in Operation Phase Since September 2018
PS1: Assessment and Management of Environmental and Social Risks and Impacts
Please provide details on the status of the following voluntary Management systems certification schemes at your
facility, provide details below?
Not being
considered
Future
consideration
Planning to
implement
Currently
Implementing
Successfully
implemented
Date of
certification/
re-certification
ISO 9001-Quality Management
System
❑ ❑ ❑ ❑ ❑ ❑
ISO 14001-Environment
Management System
❑ ❑ ❑ ❑ ❑ ❑
OHSAS 18001-Occupational
Health & Safety Management
System
❑ ❑ ❑ ❑ ❑ ❑
ISO 50001-Energy
Management System
❑ ❑ ❑ ❑ ❑ ❑
SA 8000-Social Accountability
Management System
❑ ❑ ❑ ❑ ❑ ❑
Other
• Identification of Risks and Impacts: Based on the actual operation of the Company
during the reporting year, please provide a summary of the key risks and impacts that
the Company was faced with and the actions taken.
o Formal implementation of CSR initiatives
o Improvement in Local Labor Laws compliance level by O & M Contractor and
Sub Contractors including Security Contractor
o Implementation of COVID-19 precautionary measures for Business as Usual.
In order to ensure compliance, existing IMC HSE Inspections and Monthly
Compliance reports submitted to TBC Admin have been updated to include
records / status of COVID-19 precautionary measures compliance
Page 10 of 33
• Describe any changes in the organizational structure to manage environment, health
and safety, labor and social aspects during the reporting period. Describe number of
personnel in charge of E&S issues.
o For the Operational Phase, organizational structure of TBC has been revised mainly
w.r.t. E & S Compliance. Assistant Admin and Manager Admin has now been re-
designated as “Compliance Manager and Incharge” with major responsibility of E & S
Implementation and Monitoring of Social aspects compliance. Compliance Incharge and
Administration Manager of Triconboston and HSE Manager of O&M Contractor oversee
E&S issues.
o Independent Monitoring Consultant (IMC) performs HSE Inspections of O&M Contractor
activities, E&S Audit of TBC and O&M including compliance verification against Security
Management Plan
• Describe the level of environmental, social and health and safety training provided to
staff. Provide annex with list of topics, hours of training and number of participants.
o Annex-3 provides List of Trainings conducted during the period July 2019 - June 2020,
Attendance Sheets and Training Records. Below is summary of Trainings conducted
S:
No
Training Participants
Waste Management
Triconboston & O&M Contractor
HSE Inspection and Auditing
COVID-19 Precautions
Mess Hygiene Requirements
Electrical Safety and Manual Load Handling
First Aid and CPR
• During the reporting period, are you aware of any events that may have caused
damage; brought about injuries or fatalities or other health problems; attracted the
attention of outside parties; affected project labor or adjacent populations; affected
cultural property; or created liabilities for your company?
Yes No
Provide details Not Applicable
o No damage to any asset, injury to any human or any health issue occurred
at project site during the review period. Also, during the latter half of review
period (Mar – Jun 2020), visitation to project site was stopped for external
parties.
• Stakeholders Engagement---Describe any ongoing public consultation and disclosure,
liaison with non-governmental organizations (NGOs), civil society, local communities,
or public relations efforts on environmental and social aspects
o Currently regular engagement with local communities is in place. This
engagement is done formally as well as informally. During informal
engagements done by Community Liaison Officer (CLO) of Triconboston
Page 11 of 33
Consulting, feedback including grievances are sought and documented. For
formal engagements, stakeholder’s engagement meetings are planned,
community is informed and meeting conducted either at project site or at
neighboring village. Two (02) Stakeholders Engagement meetings have been
conducted till June 2020. Annex-6 has record of Stakeholder meetings and
summary of Meetings is provided below
➢ During Stakeholder Engagement Meetings Locals were asked for
any Grievances and received response that Locals are aware from
Grievance Handling System of TBCCPL and Complaint Boxes are
installed and they informed if any Grievances they will drop it in
Complaint Box for further resolution
➢ Compliance In-charge during Stakeholder Engagement informed
Locals that IMC will conduct Training Session on COVID-19
Precautions in Neighboring Villages in the month of July 2020
➢ Due to the local cultural constraints, women do not participate in
the Stakeholder’s Engagement meetings.
➢ As mentioned on page 6, Stakeholders Engagement Plan based
on IFC guidelines for COVID-19 has been updated however as the
IFC guideline was received in May 2020 therefore compliance
evidences will be shared in next reporting period AMR
➢ Summary of two stakeholders meeting (meeting 3 & 4) are
included in below table and details of meeting records (minutes,
pictures and attendance records) is referred in Annex-6
Meeting 3 dated Nov 12, 2019
S # Discussion Action Decided Action
Date:
Action By
/ Status
1 Training on Hygiene
Improvement
Mr. Jawahar Lal informed that Training will be conducted
on Hygiene Improvement by IMC in Next Month December
2019
IMC/TBCCPL
Team
2 CSR Works Update by
TBCCPL
Mr. Jawahar Lal briefed regarding CSR Works carried out
by TBCCPL and is now focusing on following CSR Works
School Renovation
Medical Camp /Ambulatory Services at Free of Cost to
Neighboring Villages
Provision of Water to Neighboring Villages
Operation of 3 Schools in Neighboring Community
Hiring of 3 School Teachers by TBCCPL
Feb 2020 IMC/TBCCPL
Team
3 Grievances and Status
Mr. Jawahar Lal informed that Grievance Management
System is developed as well as Grievance Boxes are
installed at different locations of TBCCPL and Locals are
encouraged to contact in case of any Grievance
December
2019
IMC/TBCCPL
Team
Page 12 of 33
Meeting 4 dated Feb 02, 2020
S # Discussion Action Decided Action
Date
Action By
/ Status
1 Awareness about COVID-19
Mr. Jawahar and Waseem Ali from IMC informed
during Stakeholder Engagement Meeting to all
participants about COVID-19 Precautions and
encouraged ALL Stakeholder to must wear Face
Mask and Use Hand Sanitizers
On-Going Community
Residents
2
CSR Works Update by TBCCPL.
Completion Status of
different CSR initiatives were
shared with the participants
Mr. Jawahar Lal informed to ALL that TBCCPL is
committed and working on CSR activities based on
Actual Needs and has set Objective for Continual
Improvement in CSR Works
Completion
by Dec 2020
TBCCPL
Team
3 Cleaning of Water Storage
Tanks
Mr. Jawahar Lal informed to ALL Locals that Cleaning
of Water Tanks needs to be ensured in each Village
on Monthly Basis.
Completion
by Dec 2020
TBCCPL
Team
• Briefly describe new initiatives implemented during the reporting period or additional
managerial efforts on E&S aspects (e.g. Energy/water savings, sustainability report,
waste minimization, etc)
o Implementation of ISO 50001 Standard under UNIDO EnMS/REEE program
and with the objective of reducing Energy Losses (reducing plant auxiliary
load) identified through Energy Audit
o Implementation of Quality, Environment and Occupational Health and
Safety Management System is in process. Due to COVID-19, the
implementation process was on HOLD as the Consultant were not allowed
to visit the project site. With the relaxation in lock down, the activities have
resumed and likely to be completed by end June 2021.
Page 13 of 33
Environmental & Social Performance Annual Monitoring Report-2017-18
3 x 49.735 MW Wind Power Projects
• Briefly describe the number and type of comments and/or grievances
received by the Company in relation to E&S Issues? How many have been
resolved and how many are pending? (Please attach a table with grievance
redress registry)
o During the reporting period of July 2019-June 2020, total Three (3)
grievances were recorded and out of these two were internal
grievance. All the grievances have been closed during the reporting
phase. The summary of Grievance Handling is detailed below
Reporting
Date
Reporte
d By
Source &
Nature of
Grievance
Grievance Details
Action Taken Status Root Cause
Apr 5, 2020 Murad
Palari
External /
Actual
Water Tanker Contractor did not supply water to
neighboring village on time during April 2020
Water Tanker
Contractor was
informed to intimate
Admin in advance if
there is any delay in
water delivery.
Admin arranged water
supply from other water
contractor
Closed
in May Due to lockdown, Water Tanker Contractor
vehicles water delivery frequency was reduced
temporarily.
May 5, 2020 Siddiqui
Sarki
Internal /
Actual
Salary of April received late after 07 Days Employee was paid
salary after he submit
the leave application
Closed
in May This was because employee did not submit the
leave request required before issuance of salary
Jun 7, 2020 Mir
Mustafa
Internal /
Actual
Food Quality / Safety of Security Mess not found
as per Standard
Food Contractor/ Chef
was advised to use the
food ingredients in
moderate quantities
Closed
in Jun Due to use of more spice and oil, employee was
facing health problem
During the period July 2019 to June 2020, community did not raise
any grievances related to O&M Contractor activities performed at
project site. (Annexure -07)
Formal recording of verbal grievances has been identified by IMC as
area for improvement and advised TBC Admin to play active role in
the resolution of external as well as internal grievances. Procedure
for Internal and External Grievances Handling will be amended to
incorporate recording of verbal grievances received from project
employees or community on Grievance Form.
• Provide an update on consultation, if any, with IUCN, WWF, Sindh Wildlife
Department, Sindh Environmental Protection Agency (SEPA) and Sindh
Forestry Department.
o No consultation with IUCN, WWF, Sindh Wildlife Department,
Page 14 of 33
Environmental & Social Performance Annual Monitoring Report-2017-18
3 x 49.735 MW Wind Power Projects
Sindh Environmental Protection Agency (SEPA) and Sindh Forestry
Department was done during the reporting period. All
Government offices of SEPA, Sindh Forest Department, Sindh
Wildlife were closed during the period from March-June 2020.
These departments were reluctant to have virtual stakeholders
meeting during this period
o As the upcoming IFC Study regarding development of Joint
Management and Monitoring Framework (JMMF) is scheduled to
start from Jan 2021 and the TORs of study requires Stakeholder
Consultation with SEPA, Sindh Forest Department, Sindh Wildlife
and other Stakeholders, this platform will be used to have the
consultation meeting in first Quarter 2021
o The upcoming Joint Management and Monitoring Framework
(JMMF) TORs requires identification of both type of Environmental
and Social aspects which will be managed by the projects
collectively and at individual level. Currently all the projects are
executing Community work under Corporate Social Responsibility
at individual level.
• Provide a summary of complaints, if applicable, from the Social Compliant
Register (SCR) that you have committed to develop to document all
complaints received from the local communities or any other stakeholder
and to take action and implement the mitigation measure.
o Annex-7 includes records related to Internal and External
grievances received from local communities and workers and their
resolution. Summary is mentioned above on page 13
PS2. Labour and Working Conditions
Have you changed your Human Resources (HR) policies, procedures or working conditions during the
reporting period?
• ❑Yes ❑No Provide details
Provide the following information regarding your workforce: Numbers provided as on 30 June 2020
Site # of direct
employees
# female
direct
employees
# employees
terminated
# employees
hired
#
Contractor
employees
Project Site
(Total) 72 3 0 1 182
Project Owner 27 2 0 1 47
EPC Contractor
(HydroChina)
10 1 0 0 120
O & M Contractor
GE
35 0 0 0 15
Page 15 of 33
Environmental & Social Performance Annual Monitoring Report-2017-18
3 x 49.735 MW Wind Power Projects
• Retrenchment: If the Company undertook any involuntary
retrenchment during the reporting year, please provide
retrenchment data including a copy of the retrenchment plan.
o Triconboston Consulting and Operation and Maintenance
Contractor did not make any retrenchment during the reporting
period due to COVID-19. The project is currently under
warranty period. By Dec 2020, this warranty period will end,
and HydroChina will reassign its resources to other under
construction projects in the Jhimpir region.
• Grievance Mechanism: Please provide a summary of the latest
grievance mechanism in effect for workers to raise workplace
concerns (also indicate nature of EHS and social issues raised by
workers, communities and other stakeholders during the reporting
period, and the nature of corrective actions taken, its outcome and
status).
o For Internal and External Grievance Mechanism, following
methods are used by workers. As the workers are employed
by EPC Contractor (HydroChina) and O&M Contractor (GE),
therefore, their verbal grievances are recorded by Admin &
HR Heads of HydroChina and GE and written grievances are
filed in the Grievance file. In case of no action from the EPC
or O&M Contractor, workers approach Admin & HR Heads
of Triconboston (TBC). TBC Admin & HR Heads interact with
the respective Contractor HR & Admin Heads to investigate
the grievances and ensure speedy resolution.
o Community related grievances are received by Admin & HR
Head of who records / documents the grievances (if received
verbally) and investigates as per the documented procedure
and work towards its resolutions. Grievances are also
received during the Stakeholders Engagement meetings.
Resolution result of all the community grievances is also
shared in the Stakeholders Engagement meetings.
Child Labor / Forced Labor: Please state whether the Company remained compliant with the
Child Labor and Forced Labor requirements of the Performance Standards.
o Triconboston Consulting and O&M Contractor and Sub-Contractor
remained compliant with the IFC Child Labor and Forced Labor
requirements during the reporting period. Tricon Boston Consulting has
placed Child Labor Prohibition sign boards in local language at different
locations for information of local communities and sub-contractors
Page 16 of 33
Environmental & Social Performance Annual Monitoring Report-2017-18
3 x 49.735 MW Wind Power Projects
Occupational Health and Safety
• Describe the main changes implemented in terms of Occupational Health and
Safety (OHS) during the reporting period, e.g. identification of hazards,
substitution of chemicals, new controls, etc.
o Since this is the 2nd operational year of the projects, therefore no
changes have been made in the systems and plans
developed/upgraded for operational phase e.g. Environment and
Social Management Plan (ESMP), Stakeholders Engagement Plan
(SEP) etc. However internal audit observations will help in
identification of changes in systems and plans in order to improve
effectiveness of compliance.
• Please provide details (description, pictures,) on the accommodation
standards if the construction camp is to be established for the workforce on
the site
o Currently Project is in Operational Phase and construction camp
for workers accommodation is not in use for any project related
activity.
o There is a marked difference in number of persons present during
construction phase ( e.g., 1713 in 2018) compared to Operational
phase as currently during the reporting period Jul 2019-Jun 2020
total persons are 254
Occupational Health and Safety Indicators
Report Total numbers for each
parameter
This reporting period Reporting period – Previous
year
Direct
employees
Contractor
employees
Direct employees Contractor
employees
Total number of Employees 27 227 34 92
Male Employees 27 227 34 92
Female Employees 0 0 0 0
Total Number of Direct Workers 27 45
Total Number of workers who are
members of workers organization
47 135
Name of Workers Organization
Total man-hours worked – Annual 220524
Total number of lost time occupational
injuries
0 0 0 0
Total number of lost workdays due to
injuries
0 0 0 0
Page 17 of 33
Environmental & Social Performance Annual Monitoring Report-2017-18
3 x 49.735 MW Wind Power Projects
Number of fatalities 0 0 0 0
Occupational Health and Safety Performance (Construction / Operation Phase) (IFC E&S DOTS
Indicator)
Item Number Target
Employees Contractors Total
A: Fatalities:3 0 0 0 0
B: Total Lost Time Accidents
(including vehicular):4
0 0 0 N.A.
C: Total number of lost workdays
resulting from incidents: 5
0 0 0 N.A.
D: Total man-hours worked this
reporting period:
0 0 0 N.A.
E: Incidence during this reporting
period:
(Note: Incidence = total lost
workdays / total hours worked)
0 0 0 N.A.
F: Lost Time Injury Frequency 0 0 0 11.0 or less
Rate (construction phase)
(Number of lost time accidents x 4.5 or less
(operational phase)
1,000,000 hours / total man-
hours worked = injuries per
million hours worked)
G: Lost Time Severity Rate
(Total Lost workdays x 1,000,000
hours / total man-hours worked
= lost workdays per million hours
worked)
0 0 0 N.A.
• Provide details for the non-fatal injuries during this reporting period
None to report
Page 18 of 33
Environmental & Social Performance Annual Monitoring Report-2017-18
3 x 49.735 MW Wind Power Projects
Company or
contractor
employee?
Total
workdays
lost
Description of injury5 Cause of accident Corrective measures
to prevent
reoccurrence
Project Owner 0 NA NA NA
EPC & O&M
Contractor
0 NA NA NA
EPC & O&M
Contractor
Sub-Contractor
0 NA NA NA
Describe in detail fatalities and vehicle accidents, including corrective
measures (provide copies of OHS investigation and respective corrective
plan).
None to Report
Improvement Trend of Occupational Health and Safety Performance
Item 2017 2018 2019 2020
A: Fatalities:
[Employees] [Contractors] [Total]
0 0 0 0
B: Total Lost Time Accidents (including vehicular):
[Employees] [Contractors] [Total]
0 0 0 0
C: Total number of lost workdays resulting from incidents:
[Employees] [Contractors] [Total]
0 0 0 0
D: Total man-hours worked this reporting period:
[Employees] [Contractors] [Total]
0 0 0 220524 (July
2019-Jun 2020)
E: Incidence during this reporting period:
[Employees] [Contractors] [Total]
0 0 0 02
F: Lost Time Injury Frequency Rate
[Employees] [Contractors] [Total]
0 0 0 0
G: Lost Time Severity Rate
[Employees] [Contractors] [Total]
0 0 0 0
Date
of
Incident
Type of Incident
(drop down list)
Brief
Description of
Incident
Fatalities
? (Y/N)
# of
Fatalities
Preventive measures taken
after the incident
NA NA NA 0 0 NA
Page 19 of 33
Environmental & Social Performance Annual Monitoring Report-2017-18
3 x 49.735 MW Wind Power Projects
Workers Engaged by Third Parties: Please provide a summary of how the Company is managing and
monitoring the performance of third-party employees in relation to the requirements of the Performance
Standards.
• TBC performs through IMC Quarterly audit of O&M Contractor and Sub-Contractor
for HSE and Social Accountability (HR & Admin) systems implementation.
Similarly, TBC binds O&M Contractor to perform audits of its sub-contractors
and report the audit results and performance ratings.
PS3. Resource Efficiency and Pollution Prevention
• Provide the following environmental monitoring data for this reporting period. If you already have
all the data requested available in another format, this can be submitted instead. Please provide
a scaled facility map showing the precise locations of all monitoring points.
o IMC advised EPC Contractor/O and M Contractor to perform Noise Monitoring on
Monthly basis and report the results in the Monthly HSE Performance Reports. Annex-
12 includes Noise Monitoring Reports for the period July 2019 to June 2020. Refer to
page 4 of the Noise Monitoring reports.
o The coordinates of the receptors are as follows
▪ Lakhmeer Palari Village-1 at Project C (67 51’ 28.40” E, 25 2’ 36.90” N) ▪ Lakhmeer Palari Village-2 at Project C (67 51’ 10.10” E, 25 2’ 36.80” N) ▪ Murad Ali Palari Village at Project B (67 47’ 55.00” E, 25 4’ 30.20” N) ▪ Siddiq Sarki Village at Project A (67 50’ 14.20” E, 25 1’ 40.90” N)
o In order to verify the accuracy of the noise measurement data, reading from two similar
noise monitoring meters is taken at the same receptor and time and compared (Internal
Calibration method)
o In June 2020, one data point exceeded the permissible limit however no corrective
action was taken due to the following reasons
▪ The area was experiencing higher background noise due to start of construction
activities in neighboring wind farm projects.
▪ It was an isolated data compared to the whole data set of one year
o Nighttime data at some receptors mainly near villages is not taken due to cultural
limitations as during summers the villagers families sleep in the open (compound of
villages).
o IFC method including Night Time measurement was followed during the Baseline Noise
Study and later on during Construction phase, during IFC Supervision visit, they were
presented the Baseline Noise Study data showing minimal background noise during
night and distance of villages from the nearest WTG and limitation to measure Noise
Data during night near the village receptors. Beside the villages, there is no sensitive
receptor within and near the project area.
Page 20 of 33
Environmental & Social Performance Annual Monitoring Report-2017-18
3 x 49.735 MW Wind Power Projects
Ambient Noise Residential, Institutional or Educational Monitoring Point Location:
Ambient Noise Industrial or Commercial Monitoring Point Location8:
Ambient Noise Parameters Collection
Frequency
WBG/IFC
Maximum
Levels
(WBG/IFC Units)
TBCC Performance
(WBG/IFC Units)
Annual average of
quarterly samples
Pakistani
Maximum Levels
(Pakistani Units)
TBCC Performance
(Pakistani Units)
Annual average of
quarterly samples
Nearest Residential,
Institutional or Educational
Receptors
Daytime (07:00-22:00 hours) Quarterly 55 dB(A) 50 dB(A) dB(A) 50 dB(A)
Nearest Residential,
Institutional or Educational
Receptors
Nighttime (22:00-07:00 hours) Quarterly 45 dB(A) 42 dB(A) dB(A) 42 dB(A)
Nearest Industrial or
Commercial Receptors
Daytime (07:00-22:00 hours) Quarterly 70 dB(A) 62 dB(A) dB(A) 62 dB(A)
Nearest Industrial or
Commercial Receptors Nighttime (22:00-07:00 hours) Quarterly 70 dB(A) 62 dB(A) dB(A) 62 dB(A)
Distance from the site
boundary to the closest noise
receptors m Mentioned in Noise Monitoring Reports
Green House Gases
• Whilst this is a carbon friendly project that may generate carbon credits,
please provide an approximate measurement of total GHG emissions
from the project (e.g., vehicles, generators etc.)
o GHG emissions avoidance of the Project (IFC E&S DOTS Indicator)
Based on the total power exported to grid (360.06 GWh) during
the reporting period, the CO2 emission avoidance based on Grid
factor of 0.6174 tCO2e / MWh is 222, 301 tCO2e. The project
has not applied for Carbon credits under Clean Development
Mechanism (CDM)
o Estimated CO2 Emissions from Mobile Sources (Gasoline Vehicles)
Total
number
of
vehicles
Total
length of
distance
travelled
(km)
Gasoline
consumed
Gasoline
vehicle
efficiency
(litre /
km)
CO2
emissions
factor
(kgCO2/TJ-
LHV)
CO2
emissions
(tonCO2) (litre) (TJ -
LHV)
63046 2.68
kg/Liter
168 Tons CO2
Page 21 of 33
Environmental & Social Performance Annual Monitoring Report-2017-18
3 x 49.735 MW Wind Power Projects
During the reporting period, Project did not maintain the vehicle wise fuel
consumption. Also, total fuel consumption per month was recorded without
breakdown for Gasoline and Diesel. Therefore, for the emission calculation,
CO2 emission factor for Diesel is used instead of Gasoline. In the next
reporting year, data will be reported with more detailed analysis w.r.t.
gasoline and diesel and fuel efficiency of gasoline and diesel vehicles.
Air Emissions Management Plan
During the reporting period, emission testing of backup generator at Project A,
B & C was done. Similarly, Ambient Air Quality at all three projects was
monitored as per the planned frequency. Reports of Air Quality and Emission
Testing are included in Annexure-4.
Erosion and Sediment Control Plan
As part of Erosion and Sediment Control plan during Operational phase,
Inspection of Access Roads, Water Causeways and Culverts were not performed
by the project team after last year monsoon season.
Spill Prevention and Response Plan
During the reporting period, mock drill of spillage control was performed.
Records of mock drill are included in Annexure-14
Resource Efficiency – Water Conservation Measures: During appraisal of the
Project, about [●] m3 per day of water was estimated to be required during the operational phase of the Project, and considering the general scarcity of water in the
region, the Company was planning to adopt water conservation measures including
using recycled water as much as possible. Please provide a summary of the water
conservation measures implemented during the reporting year.
o Compared to construction phase, water consumption quantity in operational
phase is not significant. Plant operations and maintenance activities do not require
water and all water requirement is limited to the accommodation building. As
water is purchased to meet the accommodation building requirements, therefore
water consumption data is recorded. We have started to record Water
Consumption Data properly in order to identify the Water Conservation Measures.
As Water Conservation Objective is developed for the Year 2021 with Action Plan,
it will be reported in Next AMR. Also, water conservation objective will be linked
with the Biodiversity Management and Monitoring Plan specifically w.r.t. use of
janitorial water for plantation of IUCN threatened species Guggul
Pollution Prevention – Waste: Please provide a summary of non-hazardous and
hazardous waste generation and minimization activities using the table below.
Please add a summary description of major recycling activities conducted.
Waste and Hazardous Materials
Triconboston ESMP has ensured that O and M Contractor collects and quantifies
Page 22 of 33
Environmental & Social Performance Annual Monitoring Report-2017-18
3 x 49.735 MW Wind Power Projects
the disposed waste. Since Jan 2019 O and M Contractor has started quantification
of waste however due to COVID-19, waste collection frequency decreased at
project site and its weight was not adequately documented due to strict
implementation of COVID-19 preventive measures, external contractors / parties
were not allowed to enter substation buildings. Therefore, waste collections were
primarily done from outside the substation, without recording.
To improve the documentation of Waste Management activity as per the Raw
Materials, Hazardous and Non-Hazardous Waste Management Plan, following
actions will be implemented from July 2020 and status of compliance will be
reported in next reporting period
o Audit of Waste Management Company Management Systems
o On-Site Verification of Disposal Activities at approved Disposal Sites
o Monitoring of Solid and Wastewater Collection and Disposal Activities by
Independent Monitoring Consultant
6.11 Solid Waste Management
Solid Waste refers to non-liquid, non-soluble materials that contain complex
substances. Examples of solid waste include sewage sludge, agricultural refuse,
demolition wastes, and mining residues, some which are applicable only to specific
sectors.7
TBCC is required to monitor methods of collection, storage, handling, recycling,
reuse and/or disposal of solid waste, and report these methods and measured
quantities to IFC. Please complete the information below.
IMC, as a result of formal audits of Waste Management Plan, proposed number of practical actions for
improving the current state of hazardous and non-hazardous handling and solid and liquid waste
collection, quantification and disposal of waste including monitoring of waste disposal activities
performed by Waste Management Company.
Solid Waste Type
Includes
description
Annual
Quantity
TBCC Method of Storage, Handling and/or
Treatment
Waste from
Kitchen and
accommodation
building
including offices
60,000 kg
from Project
A, B & C
All the waste (paper, plastic, metal etc.) are collected from the
source by sweepers. In the waste yard, paper, plastic, and
metal waste are stored in separate large size drums. No
treatment of any waste is performed. Similarly, any waste if
generated at the WTG locations is collected and stored in the
waste yard.
Solid Waste Management Summary
Page 23 of 33
Environmental & Social Performance Annual Monitoring Report-2017-18
3 x 49.735 MW Wind Power Projects
Solid Waste Type
(Same as Above,
Description not
Included)
TBCC Method of Recycling, Reuse or
Disposal
Waste from
Kitchen and
accommodation
building
including offices
Presently TBCC is not using any option of Reuse or Disposal and all the waste
collected at the project site is sold to Waste Disposal company who further sell
the plastic and metal waste to contractors/middle men collecting waste for the
recycled industry. Oil and Grease waste generated at WTG during maintenance
activity has not been sold to any contractor and presently stored at the site. This
waste is under the administrative control of O&M Contractor and in future it will
be sold to contractor/middlemen who further sell to Lubricating plant for
extraction of baseline from these wastes.
6.11. HAZARDOUS MATERIALS MANAGEMENT
Hazardous materials are those materials that represent an excessive risk to
property, the environment or human health because of their physical and/or
chemical characteristics. Examples include explosives, toxic or flammable
gases, flammable liquids and solids, oxidizing substances, radioactive
materials and corrosive substances.
Presently no Hazardous and Hazardous waste is recycled at the project site and sold to Waste
Management Company
• Non-hazardous and Hazardous Waste Minimization Activities
Item Non-hazardous waste Hazardous waste
Generated
(ton)
Re-
cycled
(ton)
Disposed
(ton)
Recycling
ratio (%)
Generated
(ton)
Re-
cycled
(ton)
Disposed
(ton)
Recycling
ratio (%)
A B C=A-B D=B/A E F G=E-F H=F/E
5450 0 5450 0 200 0 200 0
Waste Quantity for the year 2019 were adequately documented but due to limited access to
project site and restricted number of persons working at project site during COVID-19, waste
quantities collected by Waste Disposal companies were not adequately documented
• Please add a summary description of major recycling activities conducted.
o No recycling activity done at the project site during the review period
• TBCC is required to monitor methods of collection, storage and disposal
of hazardous materials9, and report these methods and measured
quantities to IFC. Please refer to the Hazardous Materials Management
guideline for additional information.
Page 24 of 33
Environmental & Social Performance Annual Monitoring Report-2017-18
3 x 49.735 MW Wind Power Projects
1. Please update us on your Hazardous Materials Management Program. You
should include your Emergency Preparedness and Response Plans, and if
available, your Hazardous Materials Risk Management Plan, Hazardous
Materials Transportation Plan and/or Hazardous Waste Management Plan.
Hazardous Material Management Plan is included in the annexure of
Environment and Social Action Plan
1.2 Pollution Prevention – Liquid Effluent Monitoring Results: For the diesel generators
installed for emergency power supply to be operated only as back-up, please provide
a summary of how the small quantity of oil/oily water was treated by oil/water
separator during the reporting year.
• Oil/Grease from the generator is collected but not drained but stored separately and then
handled as per Waste Management Plan implemented by O and M Operator.
1.3 Pollution Prevention – Noise: Please provide a summary of the noise monitoring results showing
that the monitored ambient noise levels at Project affected communities were in compliance with
Pakistan noise standards and IFC EHS Guideline noise limits of 45 dBA nighttime and 55 dBA
daytime.
o During the operational phase, Noise Monitoring w.r.t. WTGs is performed for Tricon A, B &
C and data attached in Annex-12. Details of Noise Monitoring is mentioned on page 19
1.4 Pollution Prevention – Shadow flicker: Please provide a summary of the shadow
flicker monitoring results and evaluation of the accumulated exposure on residential
properties/hamlets against recommended criteria of 30 hours per year, and whether
additional mitigation measures were determined to be necessary, and if so, how they
were implemented.
o Shadow Flickering is monitored as per the plan mentioned in ESMP. As the
project site does not have any sensitive human and ecological receptor,
therefore Flickering is measured at defined distances from the base of WTG. The
last measurement point for flickering are the villages (coordinates mentioned
on page 19).
o The direction of Shadow flickering changes as the rotor direction changes but
the defined distance from the base of WTG remains the same.
o The data of exposure to residential population is not included in the report
because all the nearest villages are at least 200 meters away from the project
boundary and from the nearest WTG, the distance is minimum 500 meters.
Considering the length of blade around 51.5 meter and rotor diameter of 103
meter, no shadow is noted at the boundary of villages.
o Results of Shadow Flickering data is included in Annexure-12
Page 25 of 33
Environmental & Social Performance Annual Monitoring Report-2017-18
3 x 49.735 MW Wind Power Projects
PS4 - Community Health, Safety and Security
• Using the table below list and briefly describe any new initiatives implemented in relation to
community health and safety during the reporting period. Include risk assessments, new
infrastructure and equipment; hazardous materials and safety management, transportation and
exposure to disease.
• Fully equipped Clinic has been established at Triconboston to manage the
emergencies related to project employees and to neighborhood villages.
• During the reporting period any emergency drills have been conducted with community
participation? Are the communities aware of the emergency response plans?
o Fire Drills and Emergency Evacuation Drills were conducted in Reporting
Period and records are mentioned in Annexure-16
S.# Nature of Drill Date Status
1 Fire Emergency Mock Drill Feb 28, 2020 Conducted
2 Injury Burn Response Mock Dec 06, 2019 Conducted
3 Oil Spillage Mock Drill Sep 04, 2019 Conducted
4 Oil Spillage Mock Drill May 19, 2020 Conducted
• Please describe any changes in the Company’s engagement with private/public security forces during the reporting period and any corresponding agreements.
o No change in TBC engagement with private / public security forces.
• Implementation of key actions for community health and safety: Please provide a
summary of the planned key mitigation measures of the following during the
reporting year:
• Cordoning off the construction site from free public access;
o No physical barrier is erected to prevent access of local villagers. Only work
sites are e.g. WTG, Sub-Station etc. are properly barricaded to prevent
free public access due to safety of the public and the people working at
the site.
o Security Guards and watchmen have been trained to prevent movement
of public /non-related persons to the construction site.
• Placing information boards about public safety hazards and emergency contact
information in the Project area in the local language;
o Safety sign boards are placed at the work sites. Contact Numbers are
displayed at the TSF entrance / reception.
Mitigation Measure Expected or actual date
of Implementation Planned future
mitigation efforts?
None
Page 26 of 33
Environmental & Social Performance Annual Monitoring Report-2017-18
3 x 49.735 MW Wind Power Projects
• Ensuring that construction phase workers are housed in labor accommodation
facilities built at least 1km from any communities.
o Project is now under Operational phase and workers accommodation for
construction workers is not applicable
• Providing health and safety training to raise awareness about STDs and HIV;
o Not yet conducted and is planned in last Quarter of 2020
• Maintaining worker behavior standards;
o Admin Officer of O &M Operator and TBCCPL ensure discipline within the
project boundary.
• Requiring each contractor to ensure that communities be advised in advance of
project progress and near-term activities where transport issues have the potential
to impact local communities.
o Community Liaison Officer of TBC informs local villagers during informal
interactions. This is also done through stakeholder’s engagement meetings
record is attached in Annex-6
b) Implementation of key actions for security personnel management: Please provide a
summary of the planned key mitigation measures of the following during the
reporting year:
• Providing necessary trainings to the security staff about the appropriate use of
force where applicable toward workers and affected communities in line with IFC
PS4.
• Triconboston has developed a Security Management Plan (SMP) based on
IFC PS 4 and all measures, as defined in the SMP, are implemented at site
through third party security company
PS6 – Biodiversity Conservation and Sustainable Management of Living Natural Resources
Birds Monitoring and Turbine Shutdown System
(i) Please provide detailed summaries of all birds monitoring data, bird strikes, shutdown orders
as per the requirements of the ESAP and the EMP (as appropriate use the template below to
report this information).
• During the reporting period, no bird collisions and mortality were recorded
(ii) Please provide summary of monitoring undertaken (name of consultants (if used), hours and
frequency of monitoring techniques and survey methodologies used for birds.
• Arch Associates is performing the Ornithological studies. An Ex-WWF Ornithologist
and three surveyors perform the monitoring activities based on the Birds Monitoring
Plan. Birds Monitoring Plan is developed using the Scottish Natural Heritage guideline
(referred by IFC in EHS Guideline for Wind farms Aug 2015)
• Each vantage point is monitored for three hours for each session during the week. In
total the monitoring is divided into three sessions i.e. morning, afternoon and
Page 27 of 33
Environmental & Social Performance Annual Monitoring Report-2017-18
3 x 49.735 MW Wind Power Projects
evening. From July 2020, new template has been adopted for recording of Birds data
with distinction of target and non-target species.
Biodiversity Value Key Performance Indicator Comment
Collision Risk Analysis summary Bird mortality (wintering,
migratory, breeding species).
List species killed and
conservation status
Annexure-1
Turbine shutdown System
TBCC will retain an
Independent Ornithological
Expert (IOE) to establish a
monitoring program that would
contain an agreed protocol for
mitigation measures, including
the reduction of the speed of
the turbines or, potentially, for
the turbines to be temporarily
turned off should a migrant
flock be observed to be
approaching either site.
Date and duration
Specify whether species are
resident, migratory, breeding or
over-wintering in the area
• Please attach monitoring reports and data as necessary
Implementation status of the key actions: Please provide the implementation status / key findings and
follow-up actions of the following:
• [Bird monitoring activities by a bird monitoring consultant ([name]) retained by the Company];
o Triconboston has retained Arch Associates (AA) as consultant for performing the
ornithological studies. An Ex.WWF Ornithologist and three surveyors perform the birds
monitoring using the Vantage Point methodology as per Scottish Natural Heritage
protocols.
• Detailed and prolonged studies on the impacts on birds to be conducted during the migratory
season of birds (October – March) and the bird monitoring report issued by [name];
o Birds monitoring studies were conducted as per the Birds Monitoring Plan and each
season Birds Monitoring report is attached in Annex-1
• Bird mortality count in the immediate vicinity to establish any links between the wind turbines
and birds mortality for two years starting from the commissioning of the wind farm;
o Birds Monitoring activities using Vantage Point and Ground search methods were
conducted during the review period. Few Birds mortality events were recorded during
the review period however their carcasses were not preserved as IFC guidelines for
carcass preservation was received in Aug 2020. Also based on the new birds monitoring
methodology prescribed by IFC and implemented in IFC Super Six projects, Birds
Page 28 of 33
Environmental & Social Performance Annual Monitoring Report-2017-18
3 x 49.735 MW Wind Power Projects
monitoring activities including data collection and recording have been amended from
July 2020
• Review of the results and recommendations of the [bird monitoring study], and the need for
additional mitigation measures beyond what were described in the [Final Initial Environmental
Examination Update].
o IFC Biodiversity Expert has advised to start the process of carcass collection and
preservation as per the protocol developed by IFC.
o A formal training of Biodiversity Consultant has been planned by IFC on methods of
Fatality monitoring, carcass collection and preservation and Fatality Estimation
Software GenEst use
(iii) What changes, if any are being proposed to the EMP based on this monitoring?
• None, based on the monitoring period (July 2019 – June 2020)
(iv) Summary of any coordination or engagement with any local or international bird NGOs/
conservation organizations.
• No consultation with IUCN, WWF, Sindh Wildlife Department, Sindh
Environmental Protection Agency (SEPA) and Sindh Forestry Department
was done during the reporting period. At the moment its unlikely to have
this meeting at project site due to COVID-19 and once the IFC protocol
advises to resume the normal method of Stakeholders Engagement, this
meeting will be planned.
• As the upcoming IFC Study regarding development of Joint Management
and Monitoring Framework (JMMF) is scheduled to start from Jan 2021
and the TORs of study requires Stakeholder Consultation with SEPA, Sindh
Forest Department, Sindh Wildlife and other Stakeholders, this platform
will be used to have the consultation meeting in first Quarter 2021
(vi) Please summarize any changes in Pakistani law relating to any Environmental Matter
concerning the Project
• Recent No Objection Certificate (NOC) issued by Sindh Environmental Protection
Agency (SEPA) to wind farms, explicitly mention the IFC Performance Standards as the
criteria for compliance w.r.t. EHS.
(vii) Please provide a summary of any changes to the Jhimpir wind corridor area and any new
regulatory action associated with the area including management requirements or restrictions.
• Currently ten new wind farms are under construction in neighborhood of Tricon
Boston and out of these 10, six are IFC Super Six projects
• Rainfall of 2019 and 2020 has impacted the Flora and Fauna Biodiversity positively
with agriculture activities happening in the area due to water availability
(viii) Please provide a summary of any agricultural crop management restrictions or controls that
TBCC has required/ implemented to control or mitigate risks to biodiversity
Page 29 of 33
Environmental & Social Performance Annual Monitoring Report-2017-18
3 x 49.735 MW Wind Power Projects
• As the Jhimpir Wind Region biodiversity has completely changed after regular rainfall
in 2019 and 2020, therefore formal Biodiversity Assessment will be done and
completed by Dec 2020
Using the table below describe any new activities or expansions that have increased the project footprint
into new areas of habitat during the reporting period.
New activity/expansion Total area covered Habitat type
No new activity Same as per original
plan/layout
During the Due-Diligence and Construction phase, IFC did not recommend any formal Biodiversity
Assessment of Project area. However, as the new studies at IFC Super Six projects and other under
construction projects have revealed the presence of IUCN threatened botanical specie Commiphora
wightii (Guggul), therefore now Tricon Boston will undertake the Biodiversity Assessment to determine
the presence of Guggul. As the Jhimpir Wind Region biodiversity has completely changed after regular
rainfall in 2019 and 2020, therefore formal Biodiversity Assessment will be done and completed by Dec
2020. Formal Biodiversity Management and Monitoring Plan and results of plantation will be reporting
in next reporting period
Using the table below provide details of (deforestation i.e. removing the plantation) conducted during
the reporting period.
Site Total area
cleared of
mangroves/
plantation
Type of species
lost Total area
replanted Type of
species
planted
Replanted
mangroves for
commercial
use Y/N
None
As IFC has increased its focus on other aspects of Biodiveristy mainly Flora after reporting of IUCN
threatened species in Jhimpir area an Ecological Assessment will be conducted to identify the presence
of this and other species in Tricon Boston project area and based on the assessment results, Biodiveristy
Monitoring and Management Plan will be developed and implemented with focus on adaptive
measures.
To determine the approximate area for Guggul plantation, following method will be used:
• Determine the area used by Sub-Station, Access Roads and WTG in projects A, B & C
• Using Google Earth, determine the historical plantation cover in project A, B & C
• Determine the required area for plantation
• Select the area for plantation
• Explore the use of janitorial wastewater (after getting water Quality results from Agriculture
University) for plantation of Guggul
1.5 Corporate sustainability activities: Please provide a summary of the Company’s corporate sustainability activities (e.g. corporate social responsibility activities,
corporate community support activities, corporate sustainability reporting activities),
if conducted during the reporting year.
Page 30 of 33
Environmental & Social Performance Annual Monitoring Report-2017-18
3 x 49.735 MW Wind Power Projects
o Some of CSR initiatives which were started from Construction phase are still continued
during operational phase mainly those related to provision of water to neighboring
community and support in running of three schools in neighboring villages. Also, from
Operational phase, neighboring villages are facilitated in medical service by providing them
access to Clinic established at project site in partnership with O&M operator.
1. Implementation status of the Environmental and Social Action Plan (ESAP): Please provide a summary
of the implementation status of the ESAP using the table below. Please add relevant supporting
documents / reports as necessary.
ESAP (included in IFC’s Environmental and Social Review Summary, disclosed on [date])
Task Title & Description Anticipated
Completion
Date
Implementation
Status
No. 1: The Company will get the Social Environment Health & Safety
Policy signed by its management, and will display at its corporate
office, the project operation site and at the Company’s website.
Completed Policies related to
Environment,
Occupational Health
& Safety and Social
Responsibility are
displayed at
different locations
within project site.
No. 2: The Company will monitor the CPPA-G’s [and National Transmission and Dispatch Company (NTDC) Limited’s] progress of their Environmental Impact Assessments for associated
transmission lines and a substation that are needed for
successful implementation of the Project.
Completed NTDC
Environmental
Study conducted
and copy will be
sought from NTDC
or Sindh
Environmental
Protection Agency (SEPA) office or confirmation from SEPA will be sought
Page 31 of 33
Environmental & Social Performance Annual Monitoring Report-2017-18
3 x 49.735 MW Wind Power Projects
No. 3: The Company will update the Corporate Social Responsibility
(CSR) program to meet the requirement of the Sindh EPA IEE
approval of [date].
Dec 2020 Community
Development Plan /
Corporate Social
Responsibility (CSR)
Plan has been
developed with
different short- and
long-term action
items. The plan is
yet to be presented
to Sapphire Group
board for approval
and budget
allocation. Due to COVID-19, review of
plan was delayed and now it will be presented for review
and approval by year end
No. 4: The Company will appoint (i) EHS Manager and Community
Relationship Officer prior to start of the construction, and (ii)
Engineering and EHS Manager, prior to start of the operation.
Completed Condition complied
during construction
phase and in
continued implementation
during Operational
Phase
No. 5: The Company will establish its HR policy and procedures in
line with IFC Performance Standard 2.
Completed Developed and
Implemented.
No. 6: The Company will develop an Employment Plan which defines
requirements and procedures on identifying and developing
employment opportunities, managing employees, recording and
reporting employment data, terminating work contracts, and other
labor-related issues, with an aim to enhance local employment. The
Plan will include a skill development program to help enhance
employability of the local population, and a local hiring program to
ensure that unskilled and semi-skilled labor be hired from the local
communities.
Completed As the project is
now in Operational
Phase therefore
modalities of
construction phase
Employment Plan
are not applicable.
Skill development
plan is now covered
under CSR Plan
workforce
employment
human resource
policies and
procedures are
addressed in HR
Manual
Page 32 of 33
Environmental & Social Performance Annual Monitoring Report-2017-18
3 x 49.735 MW Wind Power Projects
No. 7: The Company will prepare the storm water diversion plan
that will help to increase irrigation of the surrounding open area for
the local villagers.
Completed Storm Water
Diversion Plan has
been developed and
its implementation
will be monitored
by IMC. Also review
of effectiveness of
these plans is in
process based on
heavy monsoon
rains experienced in
Aug - Sep 2020
No. 8: The Company will review the results and recommendations
of the bird monitoring study to be conducted by [name to be
provided], and determine the need for additional mitigation
measures beyond what were described in the [date] IEE Update
(e.g. operational turbine shut-off).
Completed Birds Monitoring
Plan will be updated
once IFC Updated
CIA study is
completed and
thresholds for
different species is
defined in the
report and
applicable for all
wind farms
No. 9: The Company will re-engage with the IUCN / Completed Not applicable now
as IFC is planning to
have updated CIA of
Jhimpir wind Region
and development of
Joint Monitoring &
Management
Framework beside
Fatality Monitoring
Studies
2. Implementation status of the Environmental and Social Management Plan:
Please provide a summary of the implementation status of the following:
3.1 Implementation status of the [“Proposed Environmental and Social Management Plan for the TBCCL Wind Energy Project”]. (Please attach copies or relevant audit reports and or monitoring results).
o Refer to Annex-4 (HSE Inspection Records), Annex-5 (HSE and
HR/Admin Audits), Anex-13 (EPC/O&M Contractor and Sub-Contractor
HSE Performance Reports)
3.2 Implementation status of [(Mitigation Measures) of the Shadow Flicker
Study Report of 150 MW Wind Power Project of TBCCL].
o As there is no immediate human settlement or any sensitive receptor
Page 33 of 33
Environmental & Social Performance Annual Monitoring Report-2017-18
3 x 49.735 MW Wind Power Projects
within 500 meters of WTGs, no negative impact of flicker was observed
nor reported by neighboring local community during stakeholder’s consultation. Shadow Flicker Study reports are attached in Annex-12
3.3 Implementation status of [Stakeholder Engagement Plan, Tricon Boston
Consulting Corporation (Private) Limited].
o During the review period, two meetings have been conducted.
Evidences of stakeholder meetings are attached in Annex-6.
3. Conclusion/Recommendation (Please provide summary assessment of Company’s performance and suggested next steps)
o Based on the recent IFC guidelines on COVID-19, Environmental and Social Management
Plan and Stakeholders Management Plan will be amended to incorporate the IFC
guideline requirements.
o As the sub-contractor of O&M Contractor is being replaced, formal training sessions for
the new sub-contractor needs to be planned and executed.
o As IFC is now focusing flora Biodiversity and planning to implement the Joint Monitoring
& Management Framework (JMMF), Triconboston should per Flora Biodiversity Risk
Assessment due to recent changes in Biodiversity and identify any mitigation measures
if applicable
o As the local community use the project access roads and watchmen in the project area
are from the neighboring villages, it is extremely important to energize the Stakeholders
Engagement Process with the local community and train and educate them on
precautions related to COVID-19 in order to protect the community and project
operations and human capital.