TRENCHLESS TECHNOLOGY ROADSHOW May 28-29, 2014 – Scotiabank Convention Centre, Niagara Falls, ON
Brian Thorogood – EnvirologicsDr. Rizwan Younis ‐ University of Waterloo
Cities in North America may have 100s of kilometers of these aging, congested pipes
Tuberculation found in metal water distribution pipes
Our municipal water pipes are reaching the end of their useable lives
Why should we care about the condition of these pipes?• Main breaks, service outage• Damage to infrastructure • Poor water quality • Reduced fire flows• Increased energy costs to
pump water through pipes
Good News: Trenchless linings offer cost‐effective renewal solutions
They are required to extend the life of the pipe for several decades
However, these solutions require that you first clean and prepare the pipe for lining
Foam Pigs
Current Cleaning Methods ‐ AWWA M28
Drag Scraping
Power Boring
Water Jetting
Current Cleaning Methods – AWWA M28
Challenges:
• Foul a lot of clean water and generate wet waste
• Current methods can damage services connections, joints and
pipe wall
• Often slow to achieve results, requiring multiple passes
• Linings such as coal tar or bitumen may not be fully removed
• Pipe may be cleaned but not fully prepared for liner bond
• Proper cleaning and preparation helps to prevent liner leaks and structural failures
• Clean – reduces stress concentration points in liner• Prepared – high degree of surface cleanliness and
dryness to ensure liner bonding to pipe wall
Left – cleaned pipe
Right – cleaned and prepared, ready for liner
bond
Clean and Prepared Pipe is Desired Result
Tomahawk™ System – A Novel Solution
In‐ground watermainup to 450’ long
Standard vacuum truckPatent‐Pending Tomahawk™ System
Video link
• Removes tuberculation and old bitumen or coal tar linings
• Waterless, dust‐free process • Dries the pipe for immediate bonding• Faster and more efficient than drag scraping, power
boring or water jetting • Target cleans service connections for superior
bonding
AdvantageFast, Dry, Bonded
Trenchless Rehab
Small 4’ x 8’ pits to access underground pipe Minimal surface disruption over “dig and replace”
Small 4’ x 8’ access pits
• After cleaning, the Tomahawk Scout™ is instantly deployed without connection changeover to help inspect and prepare the pipe
• Airstream driven, integrated CCTV camera and abrasive deflector
Pipe PreparationConcurrent Cleaning, Drying and Inspection
Pipe Preparation Using Tomahawk Scout™
② Draw (vaculate) pooled water and debris from joints
and crevices
③ Vaculate trapped water or debris from service connections
① Target clean along pipe, at joints, around service connections
Check out envirologics.ca for actual video
• Pipe cleaned and prepared in USA and Canadian municipalities
• Same Day Return to Service• 4” to 8” diameter pipe• Up to 450 feet• 30% tuberculation• 45° elbows
Proven Capability
Pilot Projects Results:
Removes Corrosion and Coal Tar Lining
Removes Tuberculation and Bitumen Lining(same day return to service)
Removes Tuberculation From Unlined Pipe(same day return to service)
“The Tomahawk is an effective trenchless system that quickly removes tuberculation and bitumen lining from cast‐iron pipes. The pipe is left clean and dry, ready for lining.”
John Campbell, City of Saint John Engineering
Advantage – Same Day Return to ServiceNo costly service bypass piping
save up to 30% of project costMinimal surface disruption, short duration
reduces inconvenience to residentsReduction in project timeline
no bypass piping setup, disinfection, approval, operation and teardown
MOE will be publishing an interpretative document that will include a statement that rehabilitated watermains can be reinstated under a boil water advisory following disinfection according to AWWA C651. This will open the door for “same day return to service” in Ontario – to be issued summer of 2014
(OWWA Conference, London on May 5, 2014)
• 250mm (10 ”) to 300mm (12”) diameter pipe sizes
• > 30% tuberculation• Cleaning hydrant laterals• Cleaning and drying asbestos cement
pipe – stop by booth #30 to discuss• Integrated airborne polymer lining
Developing CapabilityAlthough the Tomahawk cleaning system is commercially available
in 2014, Envirologics is committed to ongoing development
The Future – Tomahawk Airborne Lining
Inject lining material into airstream
The Future – Tomahawk Airborne Lining
Research Partnership
•Possible Influence Factors (operational parameters)• Pipe diameter, pipe length, geometric and physical features (bends, appurtenances, etc.)
• Temperature, airflow pattern, air pressure, volume and moisture ratio
• Crushed stone (shape, size, etc.)•Ultimate Objective: Optimization of Operational Parameters
•Phase 1: Develop and test an instrumentation system to measure some of the above parameters
Phase 1 Project (2012 – 13)
Instrumentation of the Pipe Cleaning Technology
• RH Sensors
• Pressure Transducers
• Thermocouple
• Pitot tube
30
• Data Acquisition System
Field Testing of the Instrumentation System
Field Testing
32
Field Testing
33
Pilot Project – City of Cambridge
34
Pilot Project – Lab testing
Flexural Test
35
Tensile Test Bond Strength
Novel Water Technology for Liveable Communities• Three year project (2014 – 17)
• Optimize the Tomahawk cleaning, preparation and airborne lining process and to develop liner design and quality standards
• The City of Waterloo will host the beta site
36
Task 1: Pipe Cleaning Technology• Parametric Analysis (Dr. David Johnson, Mechanical and Mechatronics Engineering)
• Flow of aggregates in air stream• Wind tunnel testing
• Development/modification of uWaterloo test facility• Improved deflector and camera system
• Modifications to data acquisition system based on the analysis of field operational data
• Field validation
37
Task 2: Development of an in Air Stream Polymeric Lining System• Develop Polymeric and Urethane Linings
• uWaterloo test facility to develop application method and system
• Field Trials
38
Task 3: Development of in‐service performance needs• Liner Design Tool
• Lab and Field Test Program
•QA/QC Procedures
39
Task 4 – Numerical Simulations for Scout Deflector and Camera Design• Literature and state of practice review• Improve camera system• Development of uWaterloo test facility• Wind tunnel testing• Field trials and testing