Tray Factory Considerations
Jean-Francois GenatUC
LAPD Collaboration Meeting, June 10-11th 2010, Argonne.
![Page 2: Tray Factory Considerations Jean-Francois Genat UC LAPD Collaboration Meeting, June 10-11 th 2010, Argonne. 1](https://reader036.vdocuments.site/reader036/viewer/2022062518/56649e905503460f94b95116/html5/thumbnails/2.jpg)
2
Outline
- Tile and Tray- On-Tray electronics- Tray assembly- Plans
LAPD Collaboration Meeting, June 10-11th 2010, Argonne.
![Page 3: Tray Factory Considerations Jean-Francois Genat UC LAPD Collaboration Meeting, June 10-11 th 2010, Argonne. 1](https://reader036.vdocuments.site/reader036/viewer/2022062518/56649e905503460f94b95116/html5/thumbnails/3.jpg)
3
Tiles and Tray
6-Tiles Trays
From Rich Northrop
LAPD Collaboration Meeting, June 10-11th 2010, Argonne.
![Page 4: Tray Factory Considerations Jean-Francois Genat UC LAPD Collaboration Meeting, June 10-11 th 2010, Argonne. 1](https://reader036.vdocuments.site/reader036/viewer/2022062518/56649e905503460f94b95116/html5/thumbnails/4.jpg)
4
Tile structure
LAPD Collaboration Meeting, June 10-11th 2010, Argonne.
Inside out: grounded anode strips on top of glass
HV divider uses spacers as passive components.Single HV connection on top
From Rich Northrop (vertical dimensions not final)
From Joe Gregar
![Page 5: Tray Factory Considerations Jean-Francois Genat UC LAPD Collaboration Meeting, June 10-11 th 2010, Argonne. 1](https://reader036.vdocuments.site/reader036/viewer/2022062518/56649e905503460f94b95116/html5/thumbnails/5.jpg)
5
Tray structure
2-Tile tray
LAPD Collaboration Meeting, June 10-11th 2010, Argonne.
![Page 6: Tray Factory Considerations Jean-Francois Genat UC LAPD Collaboration Meeting, June 10-11 th 2010, Argonne. 1](https://reader036.vdocuments.site/reader036/viewer/2022062518/56649e905503460f94b95116/html5/thumbnails/6.jpg)
6
Tray overall layout
LAPD Collaboration Meeting, June 10-11th 2010, Argonne.
![Page 7: Tray Factory Considerations Jean-Francois Genat UC LAPD Collaboration Meeting, June 10-11 th 2010, Argonne. 1](https://reader036.vdocuments.site/reader036/viewer/2022062518/56649e905503460f94b95116/html5/thumbnails/7.jpg)
7
On Tray Electronics- Analog board
- Front-end Chips- Jitter cleaner(s)- LV decouplings caps- Interface connector to digital board
- Digital board- FPGA- Optical interfaces to DAQ - LV decouplings caps- Interface connector to analog board
- High Voltages- One single HV access to tile on top- One SHV single access/tray- Teflon insulated HV wires running on-tray- Single RC decoupling for each tile
LAPD Collaboration Meeting, June 10-11th 2010, Argonne.
![Page 8: Tray Factory Considerations Jean-Francois Genat UC LAPD Collaboration Meeting, June 10-11 th 2010, Argonne. 1](https://reader036.vdocuments.site/reader036/viewer/2022062518/56649e905503460f94b95116/html5/thumbnails/8.jpg)
8LAPD Collaboration Meeting, June 10-11th 2010, Argonne.
See Eric Oberla and Herve Grabas talks
Electronics layout
![Page 9: Tray Factory Considerations Jean-Francois Genat UC LAPD Collaboration Meeting, June 10-11 th 2010, Argonne. 1](https://reader036.vdocuments.site/reader036/viewer/2022062518/56649e905503460f94b95116/html5/thumbnails/9.jpg)
9
Tray assembly
Tile to PCB: Double sticky tapePCB to Honeycomb: Double sticky tapeAnode plane to anode plane: Copper foil soldered
LAPD Collaboration Meeting, June 10-11th 2010, Argonne.
![Page 10: Tray Factory Considerations Jean-Francois Genat UC LAPD Collaboration Meeting, June 10-11 th 2010, Argonne. 1](https://reader036.vdocuments.site/reader036/viewer/2022062518/56649e905503460f94b95116/html5/thumbnails/10.jpg)
10LAPD Collaboration Meeting, June 10-11th 2010, Argonne.
Ballpark for costs
Estimation for 15 x 6-tile trays (MCP not included) of 16 “ x 24 “(equivalent to a 22” diameter PMT)
Sampling ASIC: 10 $/ch
64-channel/row (16 chips) ASICs 1,300 $
Glass = 3,000 $ (Rich Northrop)
Honeycomb+ PCB = 600 $ (Rich Northrop)
Total = 5,000 $ x 4 (Henry’s factor) <= 20 k$
![Page 11: Tray Factory Considerations Jean-Francois Genat UC LAPD Collaboration Meeting, June 10-11 th 2010, Argonne. 1](https://reader036.vdocuments.site/reader036/viewer/2022062518/56649e905503460f94b95116/html5/thumbnails/11.jpg)
11LAPD Collaboration Meeting, June 10-11th 2010, Argonne.
First tests with a small (30mm diameter) commercial MCP in vacuum, read with the 8” x 8” inside-out transmission lines scheme
Tests with a laser with or without a photo-cathode Check the signals at two ends
-First: SMAs + oscilloscope,- Actual cards with sampling ASICs and FPGA
Need :- The MCP- A fully functional tray (vacuum, HV access on top , anodes). - The ALD processed spacers for HV distribution.
Plans towards a tray
![Page 12: Tray Factory Considerations Jean-Francois Genat UC LAPD Collaboration Meeting, June 10-11 th 2010, Argonne. 1](https://reader036.vdocuments.site/reader036/viewer/2022062518/56649e905503460f94b95116/html5/thumbnails/12.jpg)
12
Extra slides
![Page 13: Tray Factory Considerations Jean-Francois Genat UC LAPD Collaboration Meeting, June 10-11 th 2010, Argonne. 1](https://reader036.vdocuments.site/reader036/viewer/2022062518/56649e905503460f94b95116/html5/thumbnails/13.jpg)
LAPD Collaboration Meeting, June 10-11th 2010, Argonne.13
![Page 14: Tray Factory Considerations Jean-Francois Genat UC LAPD Collaboration Meeting, June 10-11 th 2010, Argonne. 1](https://reader036.vdocuments.site/reader036/viewer/2022062518/56649e905503460f94b95116/html5/thumbnails/14.jpg)
14
Tile assembly
LAPD Collaboration Meeting, June 10-11th 2010, Argonne.
Inside out structure
![Page 15: Tray Factory Considerations Jean-Francois Genat UC LAPD Collaboration Meeting, June 10-11 th 2010, Argonne. 1](https://reader036.vdocuments.site/reader036/viewer/2022062518/56649e905503460f94b95116/html5/thumbnails/15.jpg)
15
First Glass Box (May 18th J. Gregar)
LAPD Collaboration Meeting, June 10-11th 2010, Argonne.