tRANspoRtAtIoN Adopted CApItAL IMpRoVeMeNt pRoGRAM FIsCAL YeAR 2019 Colorado Street & Fair Oaks Avenue Looking East, 1910

Upload: others

Post on 24-Jul-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: tRANspoRtAtIoN - Pasadena, California€¦ · was completed for the intersections of Orange Grove Boulevard at Manzanita Avenue, Villa Street at Madison Avenue, Orange Grove Boulevard

tRANspoRtAtIoN

A d o p t e d C A p I t A L I M p R o V e M e N t p R o G R A M F I s C A L Y e A R 2 0 1 9

Colorado Street & Fair Oaks Avenue Looking East, 1910

Page 2: tRANspoRtAtIoN - Pasadena, California€¦ · was completed for the intersections of Orange Grove Boulevard at Manzanita Avenue, Villa Street at Madison Avenue, Orange Grove Boulevard

000120,00090,000288,190498,190Pasadena Bicycle Program FY 2016 - 2020 (75075)1

00000455,300455,300Pedestrian Safety Enhancements at Signalized Intersections (75047)2

000075,000656,500731,500Pedestrian Crossing Enhancements Program (75083)3

100,0000000200,000300,000Enhancements to Metro Gold Line Allen Station - Concept Study(75092)

4

275,00000075,000417,000767,000Arterials Speed Management Program (75605)5

0000100,000720,974820,974Citywide Complete Streets Program FY 2016 - 2020 (75076)6

0003,397,1142,080,4091,034,4776,512,000Complete Streets Project - Union Street Cycle Track - Phase I(75087)

7

0000100,0002,626,6132,726,613Complete Streets Project - Cordova St. from Hill Ave. to Arroyo Pkwy.(75052)

8

0000225,000100,000325,000Complete Streets Project - Lida St. between Knollwood Dr. andLancashire Pl. (75074)

9

1,800,000000071,0001,871,000Complete Streets Project - Avenue 64 from Colorado Blvd. to SouthCity Limits (75077)

10

200,0000000100,000300,000Complete Streets Project - N. Hill Ave. from North City Limit to VillaSt. - Concept Study (75093)

11

425,00000000425,000Complete Streets Project - Sunnyslope Ave. at Estado St. -Construction Phase

12

00000265,000265,000Mid-block Traffic Signal and Crosswalk at 1790 N. Fair Oaks Ave.(75096)

13

0000129,0000129,000Traffic Signal Improvements at Colorado Blvd. and Bonnie Ave.(75104)

14

0000546,00075,000621,000Traffic Signal at Garfield Ave. and Washington Blvd. (75091)15

699,00000075,0000774,000Traffic Signal at Fair Oaks Ave. and Bellevue Dr. (75098)16

416,00000065,0000481,000Traffic Signal at Orange Grove Blvd. and Sunnyslope Ave. (75099)17

440,00000060,0000500,000Traffic Signal at Orange Grove Blvd. and Craig Ave. (75097)18

646,00000000646,000Traffic Signal at Green St. and Holliston Ave.19

200,00000000200,000Traffic Signal Operations and Maintenance Assessment20

000004,198,9614,198,961Intelligent Transportation System (ITS) Project - Phase I (75701)21

000005,711,9085,711,908Gold Line Phase I - Project Enhancements (75506)22

00050,000100,000271,861421,861Mobility Corridor Improvements FY 2016 - 2020 (75079)23

00030,00030,00090,000150,000Old Pasadena Traffic Improvement - FY 2016 - 2020 (75080)24

440,9600000834,0401,275,000Transportation System Safety Enhancements Project (75089)25

00000160,000160,000Left Turn Signal Phasing at Fair Oaks Ave. and Colorado Blvd.(75090)

26

FY 2019 - 2023 Capital Improvement Program

Priority

TotalEstimated

CostsDescription

AppropriatedThroughFY 2018

AdoptedFY 2019

ProposedFY 2020

ProposedFY 2021

ProposedFY 2022

ProposedFY 2023

and Beyond

Transportation

5 - Summary(75090)

Page 3: tRANspoRtAtIoN - Pasadena, California€¦ · was completed for the intersections of Orange Grove Boulevard at Manzanita Avenue, Villa Street at Madison Avenue, Orange Grove Boulevard

00000160,000160,000

Description26

000001,622,0001,622,000Mobility Corridors - Rose Bowl Access Systems (75084)27

000001,447,1911,447,191Implement Bus Signal Priority System on Pasadena Transit Buses(75094)

28

000002,071,7662,071,766Adaptive Traffic Control Network - Phase II (75095)29

2,745,5000000386,9283,132,428Implementation of Citywide Transportation Performance MonitoringNetwork (75602)

30

00000770,000770,000Traffic Signal Indication Safety Improvements - Phase II (75709)31

000238,31850,00086,682375,000Intelligent Transportation System (ITS) EquipmentUpgrades/Replacement - FY 2016 - 2020 (75078)

32

1,100,000000377,878674,6382,152,516Purchase of Dial-A-Ride Vehicles (75086)33

7,600,0000001,207,4434,305,05113,112,494Purchase of Replacement Transit Vehicles and Expansion Fixed-Route Transit Vehicles (75085)

34

30,815,00000002,185,00033,000,000Construction of Transit Operations Maintenance Facility (75707)35

300,0000000323,500623,500Bus Stop Improvement Program (75900)36

89,573,202 48,202,460003,835,4325,385,73032,149,580Total

FY 2019 - 2023 Capital Improvement Program

Priority

TotalEstimated

Costs

AppropriatedThroughFY 2018

AdoptedFY 2019

ProposedFY 2020

ProposedFY 2021

ProposedFY 2022

ProposedFY 2023

and Beyond

Transportation

5 - Summary

Page 4: tRANspoRtAtIoN - Pasadena, California€¦ · was completed for the intersections of Orange Grove Boulevard at Manzanita Avenue, Villa Street at Madison Avenue, Orange Grove Boulevard

Priority TotalEstimated

Costs

Description AppropriatedThroughFY 2018

AdoptedFY 2019

ProposedFY 2020

ProposedFY 2021

ProposedFY 2022

ProposedFY 2023

and BeyondPasadena Bicycle Program FY 2016 - 202075075

Project No.

1

0000018,19018,190Measure R Transportation Fund

000120,00090,000270,000480,000TDA Article 3

498,190 000120,00090,000288,190Total

DESCRIPTION: This project provides for the implementation of the Bicycle Transportation Plan, additionalon-street bike parking, the retrofit of existing bike-way facilities to meet current Caltrans standards, andimplementation of a bicycle safety and outreach program.

JUSTIFICATION: This project will promote bicycle safety and travel throughout the City.

SCHEDULE: Implementation of the Bicycle Transportation Plan will continue in FY 2019.

RELATIONSHIP TO GENERAL PLAN: This project is consistent with Mobility Element Policy 2.8 bydeveloping and maintaining a comprehensive and integrated system of bike-ways and increasing thenumber of bicycle racks at major destinations to promote bicycle riding for commuting and recreation. Theproject is also consistent with Land Use Element Policy 20.3 by promoting the use of non-motorizedmodes of transportation, such as bicycles within the City.

IMPACT ON THE NORTHWEST: Portions of this project are located in Northwest Pasadena which is anarea that has been targeted for revitalization.

HISTORY: This project was created and initially funded in FY 2016.

Existing Bikeway

FY 2019 - 2023 Capital Improvement ProgramTransportation

Pasadena Bicycle Program FY 2016 - 202075075

5.1 Responsible Department:Transportation Department

Page 5: tRANspoRtAtIoN - Pasadena, California€¦ · was completed for the intersections of Orange Grove Boulevard at Manzanita Avenue, Villa Street at Madison Avenue, Orange Grove Boulevard

Priority TotalEstimated

Costs

Description AppropriatedThroughFY 2018

AdoptedFY 2019

ProposedFY 2020

ProposedFY 2021

ProposedFY 2022

ProposedFY 2023

and BeyondPedestrian Safety Enhancements at SignalizedIntersections

75047

Project No.

2

00000409,500409,500Highway Safety Improvement Grant

0000045,50045,500Parking Meter Revenue - Old Pasadena

00000300300Private Capital

455,300 00000455,300Total

DESCRIPTION: This project will install pedestrian safety enhancements including pedestrian bulb-outs,curb ramps, improved crosswalk visibility and associated striping to enhance pedestrian safety at FairOaks Avenue and Colorado Boulevard, and Lake Avenue and Mountain Street.

JUSTIFICATION: Through a comprehensive pedestrian safety study that focused on pedestrian safety atsignalized intersections, these two locations were selected for pedestrian safety enhancements to addresshigh pedestrian and motorist volumes.

SCHEDULE: Construction will begin when environmental clearance is obtained by Caltrans.

RELATIONSHIP TO GENERAL PLAN: The project is consistent with Mobility Element Policy 2.7 bypromoting improvements for pedestrians to support vibrant and active streets and major places of activity.The project is consistent with Land Use Element Objective 21 (Circulation) by making Pasadena a citywhere there are effective and convenient alternatives to using cars; and Policy 21.10(Bicycles/Pedestrians) by promoting the use of non-motorized modes of transportation, such as bicyclesand walking within the city.

IMPACT ON THE NORTHWEST: Portions of this project are located in Northwest Pasadena which is anarea that has been targeted for revitalization.

HISTORY: This project was created in FY 2012 and fully funded in FY 2013.

Fair Oaks Avenue and Colorado Boulevard

FY 2019 - 2023 Capital Improvement ProgramTransportation

Pedestrian Safety Enhancements at Signalized Intersections75047

5.2 Responsible Department:Transportation Department

Page 6: tRANspoRtAtIoN - Pasadena, California€¦ · was completed for the intersections of Orange Grove Boulevard at Manzanita Avenue, Villa Street at Madison Avenue, Orange Grove Boulevard

Priority TotalEstimated

Costs

Description AppropriatedThroughFY 2018

AdoptedFY 2019

ProposedFY 2020

ProposedFY 2021

ProposedFY 2022

ProposedFY 2023

and BeyondPedestrian Crossing Enhancements Program75083

Project No.

3

000075,000075,000Gas Tax

00000342,500342,500Measure R Transportation Fund

00000314,000314,000Reserve for Key Projects

731,500 000075,000656,500Total

DESCRIPTION: This project provides for the installation of enhancements to uncontrolled markedcrosswalks, including the design and installation of enhanced pedestrian signage with lights, pedestriantraffic signals, bulb outs, enhanced crosswalk markings and other pedestrian safety enhancements.Existing uncontrolled marked crosswalks will also be evaluated to determine if warrants for enhancedcrosswalk warning devices are met.

JUSTIFICATION: This project would address potential safety hazards for pedestrians attempting to crossat non-signalized or non-stop controlled crosswalk locations. The project would also reduce potentialsafety risks for pedestrians attempting to cross at uncontrolled marked crosswalks, consistent with theCity’s Complete Streets vision.

SCHEDULE: In FY 2019, construction will be completed at the following locations that have beenidentified for rectangular rapid flashing beacon (RRFB) installation: Orange Grove Boulevard at ManzanitaAvenue, Villa Street at Madison Avenue, Orange Grove Boulevard at Sunnyslope Avenue, and Los RoblesAvenue at Buckeye Street. In addition, design and construction for RRFB installation at the crosswalk ofDel Mar Boulevard and Michigan Avenue will be completed.

RELATIONSHIP TO GENERAL PLAN: This project is consistent with Mobility Element Policy 3.2 byapplying traffic management measures to control vehicular traffic speeds and volumes on local andcollector streets within residential neighborhoods to assure safe and orderly traffic flows. The project isalso consistent with Policy 4.4 by designing intersections and operating multimodal corridors to achievesafe interaction for all modes of travel particularly for pedestrians and bicycle users.

IMPACT ON THE NORTHWEST: A portion of this project is located in Northwest Pasadena which is anarea targeted for revitalization.

HISTORY: This project was created in FY 2016 and fully funded in FY 2019. In FY 2018, RRFB wereinstalled at Marengo Avenue at Fillmore Street and Villa Street at Euclid Avenue. In addition, RRFB designwas completed for the intersections of Orange Grove Boulevard at Manzanita Avenue, Villa Street atMadison Avenue, Orange Grove Boulevard at Sunnyslope Avenue, Los Robles Avenue at Buckeye Street,and Raymond Avenue at Bellevue Street.

Rapid Rectangular Flashing Beacon

FY 2019 - 2023 Capital Improvement ProgramTransportation

Pedestrian Crossing Enhancements Program75083

5.3 Responsible Department:Transportation Department

Page 7: tRANspoRtAtIoN - Pasadena, California€¦ · was completed for the intersections of Orange Grove Boulevard at Manzanita Avenue, Villa Street at Madison Avenue, Orange Grove Boulevard

Priority TotalEstimated

Costs

Description AppropriatedThroughFY 2018

AdoptedFY 2019

ProposedFY 2020

ProposedFY 2021

ProposedFY 2022

ProposedFY 2023

and BeyondEnhancements to Metro Gold Line Allen Station -Concept Study

75092

Project No.

4

00000200,000200,000Reserve for Key Projects

100,00000000100,000Unfunded

300,000 100,0000000200,000Total

DESCRIPTION: This project provides for a concept study to develop pedestrian safety enhancementsalong Allen Avenue from Villa Street to Colorado Boulevard to enhance the safety and walk-ability of thisvital pedestrian connection to the Metro Gold Line Allen Station. Enhancements include: widening thesidewalk on Allen Avenue, north of Walnut Street; constructing curb extensions/bulb outs at intersections;upgrading traffic signal hardware including traffic signal controllers and cabinets to provide enhancedpedestrian and bicyclist safety features; and modifying roadway signing and striping to reduce speedingand encourage non-auto travel along this corridor. The initial phase of this project involves public outreachand the completion of a concept study, which includes preliminary engineering and an environmentalreview.

JUSTIFICATION: This project will enhance pedestrian safety for frequent users of the Metro Gold LineAllen Station. It is expected this station will be more frequently used as it is becoming an increasinglyimportant transit connector for commuters. In addition, this project will promote the City's guiding principleof the newly adopted Land Use Element to "allow people to circulate safely without cars."

SCHEDULE: Concept study and community outreach will be completed in FY 2019.

RELATIONSHIP TO GENERAL PLAN: This project is consistent with Mobility Element Policy 1.7 bydesigning streets to achieve safe interaction for all modes of travel particularly for pedestrians and bicycleusers. This project is also consistent with Policy 1.26 by continuing to coordinate with other governmentalagencies in the area, including municipalities, Southen California Association of Governments, Metro andthe San Gabriel Council of Governments to address issues of mutual concern related to the transportationsystem; and Policy 2.3 by providing convenient, safe and accessible transit stops.

HISTORY: This project was created in FY 2017 and initially funded in FY 2018.

Allen Avenue

FY 2019 - 2023 Capital Improvement ProgramTransportation

Enhancements to Metro Gold Line Allen Station - Concept Study75092

5.4 Responsible Department:Transportation Department

Page 8: tRANspoRtAtIoN - Pasadena, California€¦ · was completed for the intersections of Orange Grove Boulevard at Manzanita Avenue, Villa Street at Madison Avenue, Orange Grove Boulevard

Priority TotalEstimated

Costs

Description AppropriatedThroughFY 2018

AdoptedFY 2019

ProposedFY 2020

ProposedFY 2021

ProposedFY 2022

ProposedFY 2023

and BeyondArterials Speed Management Program75605

Project No.

5

000075,000257,000332,000Gas Tax

0000050,00050,000Measure R Transportation Fund

0000010,00010,000Private Capital

00000100,000100,000Reserve for Key Projects

275,00000000275,000Unfunded

767,000 275,00000075,000417,000Total

DESCRIPTION: This project provides for the installation of permanent and trailer-mounted speedmanagement devices such as electronic speed limit signs or full electronic changeable message boardsthat will promote compliance to posted speed limits. The program will be aimed at managing vehicularspeed along major arterial and collector streets but can be used on local streets, near schools, seniorcenters, and other high pedestrian or high bicycle use areas at up to 50 locations citywide.

JUSTIFICATION: Vehicular speeding is a major concern citywide. A significant number of traffic collisionsin the City are related to unsafe speeds. Streets with speed limits that promote self-compliance wouldimprove traffic safety and reduce the burden for providing continuing police enforcement citywide. A speedmanagement program is also consistent with the 2015 Mobility Element of the General Plan to managethe speed of travel at or below that speed limit.

SCHEDULE: In FY 2019, additional arterial speed management strategies will be implemented includingthe installation of up to four speed feedback signs.

RELATIONSHIP TO GENERAL PLAN: This project is consistent with the Mobility Element Policy 3.2 byapplying traffic management measures to control vehicular traffic speeds and volumes on local andcollector streets within residential neighborhoods to assure safe and orderly traffic flows. This project isalso consistent with Policy 4.1 by developing and implementing appropriate traffic management measuresand improved directional signage to keep traffic on designated major multi-modal corridors and toaccommodate the needs of users along the corridor and the needs of multi-modal and peak-hourtravelers.

IMPACT ON THE NORTHWEST: Portions of this project are located in Northwest Pasadena which is anarea that has been targeted for revitalization.

HISTORY: This project was created in FY 2010 and initially funded in FY 2011. In FY 2013, ten permanentelectronic speed feedback signs were installed. In FY 2016, six permanent electronic speed feedbacksigns were installed. In FY 2017, four electronic feedback signs were installed. In FY 2018, eight electronicspeed feedback signs were installed.

Electronic Speed Limit Sign

FY 2019 - 2023 Capital Improvement ProgramTransportation

Arterials Speed Management Program75605

5.5 Responsible Department:Transportation Department

Page 9: tRANspoRtAtIoN - Pasadena, California€¦ · was completed for the intersections of Orange Grove Boulevard at Manzanita Avenue, Villa Street at Madison Avenue, Orange Grove Boulevard

Priority TotalEstimated

Costs

Description AppropriatedThroughFY 2018

AdoptedFY 2019

ProposedFY 2020

ProposedFY 2021

ProposedFY 2022

ProposedFY 2023

and BeyondCitywide Complete Streets Program FY 2016 - 202075076

Project No.

6

0000100,000549,148649,148Gas Tax

00000100,000100,000Measure R Transportation Fund

0000071,82671,826Private Capital

820,974 0000100,000720,974Total

DESCRIPTION: The Citywide Complete Streets Program is a comprehensive process for managing trafficvolume, travel speeds and traffic-related noise in the City's residential neighborhoods. The program reliesheavily on community input to determine the best-suited traffic management measures for a particularneighborhood. Specific measures include reconfiguration or installation of roadway striping, alteration ofsignal timing, installation of regulatory or warning signs, and installation of traffic-calming devices.

JUSTIFICATION: Through-traffic, the speed and noise of cars, and the lack of available on-street parkingin neighborhoods negatively affects people living along a street. The negative impacts of excessive traffic,including noise, dust, air pollution, vibration, traffic collisions, and decreased bicycle and pedestrian safety,reduce quality of life in residential areas. This program was developed to address these concerns throughthe implementation of traffic-calming measures on residential streets. Travel speeds and traffic volumesare generally reduced after traffic-calming measures are installed. These measures often result in fewerand less severe traffic collisions, and an increase in neighborhood activities such as walking, bicycling andchildren playing in front yards.

SCHEDULE: In FY 2019, ongoing work including speed hump investigations, preferential parking programand neighborhood traffic management program will continue.

RELATIONSHIP TO GENERAL PLAN: This project is consistent with the Mobility Element of the GeneralPlan by protecting neighborhoods and helping to promote and improve traffic safety within the City.

IMPACT ON THE NORTHWEST: A portion of this project will address traffic concerns in NorthwestPasadena neighborhoods.

SPECIAL CONSIDERATION: The cost to implement appropriate traffic-calming measures, identified andapproved through extensive public outreach, has increased. The cost increases are attributed to risingconstruction costs and the increase in demand for additional traffic-calming installations. Anticipatedimprovements in current areas are expected to exceed available funding.

HISTORY: This project was created in FY 2016 and fully funded in FY 2019.

Traffic Management Installations

FY 2019 - 2023 Capital Improvement ProgramTransportation

Citywide Complete Streets Program FY 2016 - 202075076

5.6 Responsible Department:Transportation Department

Page 10: tRANspoRtAtIoN - Pasadena, California€¦ · was completed for the intersections of Orange Grove Boulevard at Manzanita Avenue, Villa Street at Madison Avenue, Orange Grove Boulevard

Priority TotalEstimated

Costs

Description AppropriatedThroughFY 2018

AdoptedFY 2019

ProposedFY 2020

ProposedFY 2021

ProposedFY 2022

ProposedFY 2023

and BeyondComplete Streets Project - Union Street Cycle Track -Phase I

75087

Project No.

7

0003,199,114542,88603,742,000ATP Cycle 3

00000289,000289,000Measure R Transportation Fund

00001,312,123745,4772,057,600MTA Grant - Federal Flexible CMAQ Funds

0000225,4000225,400Traffic Reduction Fee

000198,00000198,000Unfunded

6,512,000 0003,397,1142,080,4091,034,477Total

DESCRIPTION: This project provides for a protected bicycle lane (cycle track) on Union Street from HillAvenue to Arroyo Parkway, which will provide an alternative mode of travel connecting Metro Gold Linestations to major institutions and employment centers.

JUSTIFICATION: The project is consistent with adopted Mobility Element Guiding Principles to promote ahealthy family community where people can circulate without cars.

SCHEDULE: Design will continue in FY 2019.

RELATIONSHIP TO GENERAL PLAN: This project is consistent with Mobility Element Policy 2.8 bydeveloping and maintaining a comprehensive and integrated system of bikeways and increased bicycleracks at major destinations to promote bicycle riding for commuting and recreation. The project is alsoconsistent with Policy 4.4 by designing intersections and operating multi-modal corridors to achieve safeinteraction for all modes of travel particularly for pedestrians and bicycle users.

SPECIAL CONSIDERATION: A Metro grant of $5,799,600 was awarded to this project in March 2017.Metro recommended $3,742,000 in ATP Cycle 3 funds and $2,057,600 in CMAQ funds that will require alocal match of $514,400.

HISTORY: This project was created in FY 2016 and initially funded in FY 2017.

Union St. Bikeway

FY 2019 - 2023 Capital Improvement ProgramTransportation

Complete Streets Project - Union Street Cycle Track - Phase I75087

5.7 Responsible Department:Transportation Department

Page 11: tRANspoRtAtIoN - Pasadena, California€¦ · was completed for the intersections of Orange Grove Boulevard at Manzanita Avenue, Villa Street at Madison Avenue, Orange Grove Boulevard

Priority TotalEstimated

Costs

Description AppropriatedThroughFY 2018

AdoptedFY 2019

ProposedFY 2020

ProposedFY 2021

ProposedFY 2022

ProposedFY 2023

and BeyondComplete Streets Project - Cordova St. from Hill Ave.to Arroyo Pkwy.

75052

Project No.

8

0000049,00049,000Gas Tax

00000457,500457,500Measure R Transportation Fund

000002,115,0002,115,000MTA Grant - State Transportation Improvement Program - TE

000005,1135,113Private Capital

0000100,0000100,000Traffic Reduction Fee

2,726,613 0000100,0002,626,613Total

DESCRIPTION: This project provides for a vehicular-oriented street to be converted into a complete streetby removing two vehicular traffic lanes to accommodate pedestrian and bicycle facilities. The streetconfiguration will consist of pedestrian curb extensions to shorten crossing times, bike lanes in bothdirections, a painted median and one lane of traffic in each direction. This project will also incorporatestormwater capture installations to comply with the National Pollutant Discharge Elimination System permitprogram.

JUSTIFICATION: This project will deemphasize car trips while promoting bicycling and walking trips aswell as facilitate the implementation of the bicycle network included within the City's Bicycle Master Plan.In addition, the project will enhance the investments made in both local and regional transit systems andfurther support and encourage a mix of alternative transportation modes.

SCHEDULE: Design will continue in FY 2019.

RELATIONSHIP TO GENERAL PLAN: This project is consistent with the Land Use Element Policy 21.10by promoting the use of non-motorized modes of transportation, such as bicycles and walking within theCity. The project is also consistent with Mobility Element Policy 4.4 by designing intersections andoperating multi-modal corridors to achieve safe interaction for all modes of travel, particularly forpedestrians and bicycle users.

SPECIAL CONSIDERATION: A Metro grant of $2,115,000 was awarded to this project and requires alocal match of $611,613.

HISTORY: This project was created in FY 2011 and initially funded in FY 2014. In FY 2016, the projectname changed from "Cordova Street Road Diet" to "Complete Streets Project - Cordova Street from HillAve to Arroyo Parkway." This project was fully funded in FY 2019.

Cordova Street Concept

FY 2019 - 2023 Capital Improvement ProgramTransportation

Complete Streets Project - Cordova St. from Hill Ave. to Arroyo Pkwy.75052

5.8 Responsible Department:Transportation Department

Page 12: tRANspoRtAtIoN - Pasadena, California€¦ · was completed for the intersections of Orange Grove Boulevard at Manzanita Avenue, Villa Street at Madison Avenue, Orange Grove Boulevard

Priority TotalEstimated

Costs

Description AppropriatedThroughFY 2018

AdoptedFY 2019

ProposedFY 2020

ProposedFY 2021

ProposedFY 2022

ProposedFY 2023

and BeyondComplete Streets Project - Lida St. between KnollwoodDr. and Lancashire Pl.

75074

Project No.

9

000025,000100,000125,000Gas Tax

0000200,0000200,000Traffic Reduction Fee

325,000 0000225,000100,000Total

DESCRIPTION: This project provides for the narrowing of the roadway width of Lida Street to slowvehicles while retaining existing bike lanes. Lida Street is a minor arterial with a speed limit of 25 mph.Lida Street between Knollwood Drive and Lancashire Place was selected to be a part of the pilot projectfor the City’s new Complete Streets Program. A landscaped median island between Knollwood Drive andLancashire Place is planned.

JUSTIFICATION: This segment of Lida Street has a 25 mph speed limit. Speed count data show vehiclestravel well above the speed limit. There have been multiple incidents where cars have lost control anddriven onto lawns and into walls of residences. This street is used as a cut-through street for residentsfrom Glendale. Students and faculty of the Art Center North Campus use Lida Street and it is also used byrecreational and commuter bicyclists. The proposed median islands meet the goals of the CompleteStreets Program by improving safety of all users of the street by slowing down vehicular traffic.

SCHEDULE: Construction will be completed in FY 2019.

RELATIONSHIP TO GENERAL PLAN: This project is consistent with the Mobility Element Policy 3.2 ofthe General Plan which seeks to apply traffic management measures to control vehicular traffic speedsand volumes on local and collector streets within residential neighborhoods to assure safe and orderlytraffic flows.

SPECIAL CONSIDERATION: Department of Transportation staff have met frequently with the leadershipboard of the Linda Vista-Annandale Neighborhood Association to develop the best solutions for all users ofLida Street including pedestrians and bicyclists.

HISTORY: This project was created in FY 2015 and initially funded in FY 2016. The project was fullyfunded in FY 2019.

Lida Street Median Island - Concept

FY 2019 - 2023 Capital Improvement ProgramTransportation

Complete Streets Project - Lida St. between Knollwood Dr. and Lancashire Pl.75074

5.9 Responsible Department:Transportation Department

Page 13: tRANspoRtAtIoN - Pasadena, California€¦ · was completed for the intersections of Orange Grove Boulevard at Manzanita Avenue, Villa Street at Madison Avenue, Orange Grove Boulevard

Priority TotalEstimated

Costs

Description AppropriatedThroughFY 2018

AdoptedFY 2019

ProposedFY 2020

ProposedFY 2021

ProposedFY 2022

ProposedFY 2023

and BeyondComplete Streets Project - Avenue 64 from ColoradoBlvd. to South City Limits

75077

Project No.

10

0000071,00071,000Gas Tax

1,800,000000001,800,000Unfunded

1,871,000 1,800,000000071,000Total

DESCRIPTION: This project provides for the installation of bulb-outs/median islands at Avenue 64 andChurch Street, Avenue 64 and Melrose Avenue, and Avenue 64 and Nithsdale Road. This project alsoprovides for a traffic signal at Avenue 64 and Nithsdale Road. In addition, small median islands will beinstalled on Avenue 64 south of Burleigh Drive.

JUSTIFICATION: Avenue 64 is a residential street lined with single-family homes. Although the postedspeed limit is 35 mph, the 85th speed percentile reaches 44 mph along some segments of the street. Thisproject was identified as a result of public concerns that Avenue 64 is being used as a cut-through routefrom neighboring cities resulting in speed-related collisions and poor pedestrian safety. Avenue 64 is aminor arterial that serves as a regional connector due to the lack of nearby highway/freeway connectors.The installation of small median islands on Avenue 64, south of Burleigh Drive, is in response to vehiclesusing the two-way left-turn lane as a passing lane.

SCHEDULE: Preliminary design will continue in FY 2019.

RELATIONSHIP TO GENERAL PLAN: This project is consistent with the Mobility Element Policy 3.2 ofthe General Plan which seeks to apply traffic management measures to control vehicular traffic speedsand volumes on local and collector streets within residential neighborhoods to assure safe and orderlytraffic flows.

SPECIAL CONSIDERATION: The Department of Transportation has received numerous requests toinstall marked crosswalks along Avenue 64 to enhance pedestrian safety. After a thorough trafficinvestigation, the recommended project improvements, traffic signal, curb extension, median island, etc.,were identified as the best improvements to address safety concerns and achieve the desired safetyenhancements along Avenue 64.

HISTORY: This project was created in FY 2015 and initially funded in FY 2016. In FY 2016, the name ofthe project was changed from "Arterial Speed Management and Safety Improvements - Ave 64 fromColorado Blvd to South City Limits" to "Complete Streets Project - Ave 64 from Colorado Blvd to SouthCity Limits."

Avenue 64

FY 2019 - 2023 Capital Improvement ProgramTransportation

Complete Streets Project - Avenue 64 from Colorado Blvd. to South City Limits75077

5.10 Responsible Department:Transportation Department

Page 14: tRANspoRtAtIoN - Pasadena, California€¦ · was completed for the intersections of Orange Grove Boulevard at Manzanita Avenue, Villa Street at Madison Avenue, Orange Grove Boulevard

Priority TotalEstimated

Costs

Description AppropriatedThroughFY 2018

AdoptedFY 2019

ProposedFY 2020

ProposedFY 2021

ProposedFY 2022

ProposedFY 2023

and BeyondComplete Streets Project - N. Hill Ave. from North CityLimit to Villa St. - Concept Study

75093

Project No.

11

00000100,000100,000Reserve for Key Projects

200,00000000200,000Unfunded

300,000 200,0000000100,000Total

DESCRIPTION: This project provides for a concept study for the installation of traffic calming elementsincluding roundabouts at the intersections of Hill Avenue at Topeka Street and Hill Avenue at ElizabethStreet. In addition, the following intersections will be treated with bulb-outs: Hill Avenue at Villa Street,Orange Grove Boulevard, Mountain Street, Washington Boulevard, Howard Street, Ashbury Drive,Whitefield Road, Casa Grande Street, Loma Vista Street, Paloma Street, Las Lunas Street, and MonteVista Street.

JUSTIFICATION: Hill Avenue is a residential street lined with single-family homes, townhomes andapartments. Although the posted speed on Hill Street north of Washington Boulevard is posted at 30 mph,the 85th percentile reaches 40 mph. Hill Avenue north of Washington Boulevard carries about 9,000 cartrips per day, while south of Washington Boulevard carries on average 16,800 car trips per day. North HillAvenue has one lane of traffic in each direction and does not have a two-way left turn median whichmakes it very difficult for residents to enter and exit their driveways. The installation of the traffic calmingelements will help to change driver behavior and calm traffic on the roadway.

SCHEDULE: Design will continue in FY 2019.

RELATIONSHIP TO GENERAL PLAN: This project is consistent with Land Use Element Policy 18.5(Land Use-Mobility Compatibility) by managing vehicle traffic volumes and speeds to improve theircompatibility with the character of the adjacent land uses, the function of the street(s), and bicycle andpedestrian traffic. The project is also consistent with Mobility Element Policy 1.12 by applying trafficmanagement measures to manage vehicular speeds as a function of designated street type to ensure safeand orderly movement of all modes of travel.

SPECIAL CONSIDERATION: The scope and total estimated cost of this project will be determined afterthe concept study is completed.

HISTORY: This project was created and initially funded in FY 2018.

N. Hill Avenue

FY 2019 - 2023 Capital Improvement ProgramTransportation

Complete Streets Project - N. Hill Ave. from North City Limit to Villa St. - Concept Study75093

5.11 Responsible Department:Transportation Department

Page 15: tRANspoRtAtIoN - Pasadena, California€¦ · was completed for the intersections of Orange Grove Boulevard at Manzanita Avenue, Villa Street at Madison Avenue, Orange Grove Boulevard

Priority TotalEstimated

Costs

Description AppropriatedThroughFY 2018

AdoptedFY 2019

ProposedFY 2020

ProposedFY 2021

ProposedFY 2022

ProposedFY 2023

and BeyondComplete Streets Project - Sunnyslope Ave. at EstadoSt. - Construction Phase

Project No.

12

425,00000000425,000Unfunded

425,000 425,00000000Total

DESCRIPTION: This project provides for the installation of bulb-outs/median island and new curb rampsat the intersection of Sunnlyslope Avenue and Estado Street.

JUSTIFICATION: The intersection Sunnyslope Avenue and Estado Street is a gateway intersection to theDaisy Avenue/Villa Street residential neighborhood. This project was identified as a result of publicconcerns that vehicle traffic from Sunnyslope Avenue is causing cut-through traffic and speeding concernswithin the Daisy Avenue/Villa Street neighborhood.

SCHEDULE: Construction will begin when funding is identified.

RELATIONSHIP TO GENERAL PLAN: This project is consistent with the Mobility Element of the GeneralPlan by protecting neighborhoods and helping to promote and improve traffic safety within the City.

HISTORY: This project was created FY 2019 and is currently unfunded. Design was completed in FY 2017as part of project 75076 - Citywide Complete Streets Program FY 2016-2020.

Sunnyslope Ave. at Estado St.

FY 2019 - 2023 Capital Improvement ProgramTransportation

Complete Streets Project - Sunnyslope Ave. at Estado St. - Construction Phase

5.12 Responsible Department:Transportation Department

Page 16: tRANspoRtAtIoN - Pasadena, California€¦ · was completed for the intersections of Orange Grove Boulevard at Manzanita Avenue, Villa Street at Madison Avenue, Orange Grove Boulevard

Priority TotalEstimated

Costs

Description AppropriatedThroughFY 2018

AdoptedFY 2019

ProposedFY 2020

ProposedFY 2021

ProposedFY 2022

ProposedFY 2023

and BeyondMid-block Traffic Signal and Crosswalk at 1790 N. FairOaks Ave.

75096

Project No.

13

0000065,00065,000Gas Tax

00000200,000200,000Reserve for Key Projects

265,000 00000265,000Total

DESCRIPTION: This project provides for the installation of a new mid-block traffic signal and crosswalk onNorth Fair Oaks Avenue, north of Fair Oaks Drive at 1790 North Fair Oaks Avenue.

JUSTIFICATION: Pedestrian crossing activity on Fair Oaks Avenue, between Tremont Street and HowardStreet, warrants the installation of a marked crosswalk based on the Pasadena Pedestrian CrossingTreatment Guidance Report. Based on the roadway geometry, traffic volumes and traffic speeds, thecrosswalk should be controlled by a mid-block traffic signal. The proposed signal at this location willenhance the safety of pedestrians crossing Fair Oaks Avenue and will be connected to the traffic signalnetwork, allowing signal coordination to minimize motorist delay while providing a controlled pedestriancrossing of Fair Oaks Avenue.

SCHEDULE: Construction will be completed in FY 2019.

RELATIONSHIP TO GENERAL PLAN: This project is consistent with Land Use Element Policy 18.5(Land Use-Mobility Compatibility) of the General Plan by managing vehicle traffic volumes and speeds toimprove their compatibility with the character of the adjacent land uses, the function of the street(s), andbicycle and pedestrian traffic. This project is also consistent with Mobility Element Policy 1.7 by designingstreets to achieve safe interaction for all modes of travel particularly for pedestrians and bicycle users.

IMPACT ON NORTHWEST: This project is located in Northwest Pasadena which is an area that has beentargeted for revitalization.

HISTORY: This project was created and fully funded in FY 2018.

1790 N. Fair Oaks Ave.

FY 2019 - 2023 Capital Improvement ProgramTransportation

Mid-block Traffic Signal and Crosswalk at 1790 N. Fair Oaks Ave.75096

5.13 Responsible Department:Transportation Department

Page 17: tRANspoRtAtIoN - Pasadena, California€¦ · was completed for the intersections of Orange Grove Boulevard at Manzanita Avenue, Villa Street at Madison Avenue, Orange Grove Boulevard

Priority TotalEstimated

Costs

Description AppropriatedThroughFY 2018

AdoptedFY 2019

ProposedFY 2020

ProposedFY 2021

ProposedFY 2022

ProposedFY 2023

and BeyondTraffic Signal Improvements at Colorado Blvd. andBonnie Ave.

75104

Project No.

14

0000129,0000129,000Gas Tax

129,000 0000129,0000Total

DESCRIPTION: This project provides for the installation of a protected-permissive flashing yellow arrow atwestbound Colorado Boulevard at Bonnie Avenue and an overlap phase for the eastbound right turn.

JUSTIFICATION: A traffic investigation of vehicular and pedestrian volumes and collision historydetermined that a protected-permissive left turn traffic signal phase should be installed for westboundColorado Boulevard at Bonnie Avenue. In addition, the eastbound right turn should be modified to includean overlap phase with the existing northbound left turn.

SCHEDULE: Design will be completed in FY 2019.

RELATIONSHIP TO GENERAL PLAN: This project is consistent with Mobility Element Program 3.10(Enhance Signalized Intersections for all Road Users) by considering the volume of school children, theelderly, and persons with disabilities in intersection design and traffic signal control equipment.

HISTORY: This project was created and fully funded in FY 2019.

Colorado Blvd. and Bonnie Ave.

FY 2019 - 2023 Capital Improvement ProgramTransportation

Traffic Signal Improvements at Colorado Blvd. and Bonnie Ave.75104

5.14 Responsible Department:Transportation Department

Page 18: tRANspoRtAtIoN - Pasadena, California€¦ · was completed for the intersections of Orange Grove Boulevard at Manzanita Avenue, Villa Street at Madison Avenue, Orange Grove Boulevard

Priority TotalEstimated

Costs

Description AppropriatedThroughFY 2018

AdoptedFY 2019

ProposedFY 2020

ProposedFY 2021

ProposedFY 2022

ProposedFY 2023

and BeyondTraffic Signal at Garfield Ave. and Washington Blvd.75091

Project No.

15

0000146,0000146,000Measure M

0000075,00075,000Reserve for Key Projects

0000400,0000400,000Road Maintenance and Rehabilitation Account (SB 1)

621,000 0000546,00075,000Total

DESCRIPTION: This project provides for the installation of a traffic signal at the intersection of GarfieldAvenue and Washington Boulevard.

JUSTIFICATION: The intersection meets traffic signal warrants per the California Manual on UniformTraffic Control Devices (MUTCD). Installation of a traffic signal at this intersection will reduce delays andenhance safety for motorists and pedestrians.

SCHEDULE: Construction will begin in FY 2019

RELATIONSHIP TO GENERAL PLAN: This project is consistent with Mobility Element Policy 1.7 bydesigning streets to achieve safe interaction for all modes of travel particularly for pedestrians and bicycleusers; and Policy 1.12 applying traffic management measures to manage vehicular speeds as a functionof designated street type to ensure safe and orderly movement of all modes of travel.

IMPACT ON THE NORTHWEST: This project is located in Northwest Pasadena which is an area that hasbeen targeted for revitalization.

HISTORY: This project was created in FY 2017 and initially funded in FY 2018. In FY 2018, design wascompleted. The project was fully funded in FY 2019.

Garfield Ave and Washington Blvd.

FY 2019 - 2023 Capital Improvement ProgramTransportation

Traffic Signal at Garfield Ave. and Washington Blvd.75091

5.15 Responsible Department:Transportation Department

Page 19: tRANspoRtAtIoN - Pasadena, California€¦ · was completed for the intersections of Orange Grove Boulevard at Manzanita Avenue, Villa Street at Madison Avenue, Orange Grove Boulevard

Priority TotalEstimated

Costs

Description AppropriatedThroughFY 2018

AdoptedFY 2019

ProposedFY 2020

ProposedFY 2021

ProposedFY 2022

ProposedFY 2023

and BeyondTraffic Signal at Fair Oaks Ave. and Bellevue Dr.75098

Project No.

16

000075,000075,000Measure M

699,00000000699,000Unfunded

774,000 699,00000075,0000Total

DESCRIPTION: This project provides for the installation of a traffic signal at the intersection of Fair OaksAvenue and Bellevue Drive.

JUSTIFICATION: Two marked uncontrolled crosswalks currently exists at the intersection of BellevueDrive and Fair Oaks Avenue. This crosswalk serves students walking to Waverly School as well as otherbusinesses in the area. This intersection is approximately 800' north of California Boulevard and 800'south of Del Mar Boulevard. A traffic signal installed at this location will enhance pedestrian safety.

SCHEDULE: The design of this project will be completed in FY 2019.

RELATIONSHIP TO GENERAL PLAN: This project is consistent with Mobility Element Program 3.10(Enhance Signalized Intersections for all Road Users) by considering the volume of school children, theelderly, and persons with disabilities in intersection design and traffic signal control equipment.

HISTORY: This project was created and initially funded in FY 2019.

Fair Oaks Ave. at Bellevue Dr.

FY 2019 - 2023 Capital Improvement ProgramTransportation

Traffic Signal at Fair Oaks Ave. and Bellevue Dr.75098

5.16 Responsible Department:Transportation Department

Page 20: tRANspoRtAtIoN - Pasadena, California€¦ · was completed for the intersections of Orange Grove Boulevard at Manzanita Avenue, Villa Street at Madison Avenue, Orange Grove Boulevard

Priority TotalEstimated

Costs

Description AppropriatedThroughFY 2018

AdoptedFY 2019

ProposedFY 2020

ProposedFY 2021

ProposedFY 2022

ProposedFY 2023

and BeyondTraffic Signal at Orange Grove Blvd. and SunnyslopeAve.

75099

Project No.

17

000065,000065,000Measure M

416,00000000416,000Unfunded

481,000 416,00000065,0000Total

DESCRIPTION: This project provides for the installation of a new traffic signal at Orange Grove Boulevardand Sunnyslope Avenue.

JUSTIFICATION: The installation of a traffic signal meets the traffic signal warrants under the SystemWarrants category. The proposed signal will provide a controlled pedestrian crossing along a half-mileuninterrupted segment of Orange Grove Boulevard between Sierra Madre Boulevard and Sierra MadreVilla Avenue. The signal will also provide traffic platooning and gaps to allow for additional crossingopportunities at the other unmarked or uncontrolled crosswalks along this stretch of roadway.

SCHEDULE: The design of this project will be completed in FY 2019.

RELATIONSHIP TO GENERAL PLAN: This project is consistent with the Mobility Element Policy 2.7 ofthe General Plan to promote improvements for pedestrians to support vibrant and active streets and majorplaces of activity.

SPECIAL CONSIDERATION: An alternate location of the traffic signal is at the intersection of OrangeGrove Boulevard and Canyon Wash Drive/Vina Vieja Park Driveway. However, due to the proximity ofOrange Grove Boulevard and Sunnyslope Avenue, and Orange Grove Boulevard and Canyon WashDrive, only one of the two intersections will be equipped with a traffic signal. The potential traffic signal atOrange Grove Boulevard and Canyon Wash Drive/Vina Vieja Park Driveway will be further evaluated aftera decision is made regarding the potential expansion of the Vina Vieja Park area to provide additionalrecreational facilities.

HISTORY: This project was created in FY 2015 and initially funded in FY 2019.

Orange Grove Blvd. at Sunnyslope Ave.

FY 2019 - 2023 Capital Improvement ProgramTransportation

Traffic Signal at Orange Grove Blvd. and Sunnyslope Ave.75099

5.17 Responsible Department:Transportation Department

Page 21: tRANspoRtAtIoN - Pasadena, California€¦ · was completed for the intersections of Orange Grove Boulevard at Manzanita Avenue, Villa Street at Madison Avenue, Orange Grove Boulevard

Priority TotalEstimated

Costs

Description AppropriatedThroughFY 2018

AdoptedFY 2019

ProposedFY 2020

ProposedFY 2021

ProposedFY 2022

ProposedFY 2023

and BeyondTraffic Signal at Orange Grove Blvd. and Craig Ave.75097

Project No.

18

000060,000060,000Measure M

440,00000000440,000Unfunded

500,000 440,00000060,0000Total

DESCRIPTION: This project provides for the installation of a traffic signal at the intersection of OrangeGrove Boulevard and Craig Avenue.

JUSTIFICATION: The intersection of Orange Grove Boulevard and Craig Avenue is located near the mid-point of an almost one-mile uninterrupted segment of Orange Grove Boulevard (between Allen Avenueand Altadena Drive). This intersection meets the coordinated signal systems warrant as defined in theCalifornia Manual on Uniform Traffic Control Devices, and provides a right-of-way control point to grouptraffic and improve traffic flow. Craig Avenue is identified as a Bicycle Boulevard in the Mobility Element ofthe General Plan, and installing a traffic signal at this intersection provides a controlled crossing point forbicyclists and pedestrians. In 2017, the City received a request to re-evaluate the potential for a trafficsignal at this intersection due to collisions at the intersections. A new traffic signal warrants analysis wasconducted and the traffic signal still meets the coordinated signal systems warrant.

SCHEDULE: The design of this project will be completed in FY 2019.

RELATIONSHIP TO GENERAL PLAN: This project is consistent with Mobility Element 3.9 (MinimizeStreet Widening along Corridors and Consider Alternatives) by providing safety improvements, improvingpedestrian and bicycle access, and integrating plans for transit, traffic and pedestrian circulation. Theproject is also consistent with Mobility Element Program 3.10 (Enhance Signalized Intersections for allRoad Users) by designing intersections to provide a safe and efficient flow of vehicles, pedestrians andbicycles.

HISTORY: This project was created and initially funded in 2019. The original project was created in FY2006 and fully funded in FY 2007. However, due to opposition of the project from a group of residents, theproject was never constructed and interim safety enhancements were installed in lieu of the traffic signal.Enhancements included restricting the northbound through and northbound left turn movement from CraigAvenue, creating a northbound right turn only at the intersection of Craig Avenue and Orange GroveBoulevard. In addition, an intersection ahead sign, supplemented by a beacon, was installed on OrangeGrove Boulevard for the eastbound approach to the intersection.

Orange Grove Blvd. at Craig Ave.

FY 2019 - 2023 Capital Improvement ProgramTransportation

Traffic Signal at Orange Grove Blvd. and Craig Ave.75097

5.18 Responsible Department:Transportation Department

Page 22: tRANspoRtAtIoN - Pasadena, California€¦ · was completed for the intersections of Orange Grove Boulevard at Manzanita Avenue, Villa Street at Madison Avenue, Orange Grove Boulevard

Priority TotalEstimated

Costs

Description AppropriatedThroughFY 2018

AdoptedFY 2019

ProposedFY 2020

ProposedFY 2021

ProposedFY 2022

ProposedFY 2023

and BeyondTraffic Signal at Green St. and Holliston Ave.

Project No.

19

646,00000000646,000Unfunded

646,000 646,00000000Total

DESCRIPTION: This project provides for the installation of a traffic signal at the intersection of GreenStreet and Holliston Avenue.

JUSTIFICATION: Two marked uncontrolled crosswalks currently exist allowing pedestrians to cross atGreen Street and Holliston Avenue. This intersection is adjacent to Pasadena City College and wasidentified in the Bicycle Plan as a Roseway, connecting the upcoming Union Street Cycle Track to thecurrent Cordova Street bike lanes. A traffic signal at this location will enhance pedestrian and bicyclistsafety.

SCHEDULE: This project will begin when funding is identified.

RELATIONSHIP TO GENERAL PLAN: This project is consistent with Mobility Element Program 3.10(Enhance Signalized Intersections for all Road Users) by considering the volume of school children, theelderly, and persons with disabilities in intersection design and traffic signal control equipment. Program3.10 also calls for designing intersections to provide a safe and efficient flow of vehicles, pedestrians andbicycles.

HISTORY: This project was created in FY 2019 and is currently unfunded.

Green St. at Holliston Ave.

FY 2019 - 2023 Capital Improvement ProgramTransportation

Traffic Signal at Green St. and Holliston Ave.

5.19 Responsible Department:Transportation Department

Page 23: tRANspoRtAtIoN - Pasadena, California€¦ · was completed for the intersections of Orange Grove Boulevard at Manzanita Avenue, Villa Street at Madison Avenue, Orange Grove Boulevard

Priority TotalEstimated

Costs

Description AppropriatedThroughFY 2018

AdoptedFY 2019

ProposedFY 2020

ProposedFY 2021

ProposedFY 2022

ProposedFY 2023

and BeyondTraffic Signal Operations and MaintenanceAssessment

Project No.

20

200,00000000200,000Unfunded

200,000 200,00000000Total

DESCRIPTION: This project provides for a Traffic Signal Operations and Maintenance Assessment thatwill develop a traffic signal infrastructure maintenance and operations plan, and incorporate the fundingrequired to systematically upgrade the aging traffic signal infrastructure. This project also provides aninventory and assessment of the current traffic signal infrastructure including life expectancy of existingtraffic signal equipment, traffic signal poles and signal equipment, safety lighting, ADA accessibility, vehicledetection, signal controllers, closed circuit television, in-roadway lighting and communications.

JUSTIFICATION: In the past 40 years, traffic signal hardware in Pasadena has been installed to facilitatesafe and efficient movement of people and goods throughout the City. Traffic signals play an integral roleand it is critical to define the needs for equipment replacement and prioritization of projects. In addition,intelligent transportation systems were added to further enhance the operation of the traffic signals andmuch of the infrastructure is nearing the end of its useful life. Video detection camera systems are failingand outdated traffic signal controller cabinets do not have the functionality or space required to meet thedemand of new equipment needs. Lastly, traffic signal mast arms installed on concrete street lights havethe potential of failing in high wind conditions and therefore require systematic replacement of precastconcrete street light poles utilized for traffic signal purposes.

SCHEDULE: This project will begin when funding is identified.

RELATIONSHIP TO GENERAL PLAN: This project is consistent with Mobility Element Policy 1.12 toassist with applying traffic management measures to manage vehicular speeds as a function ofdesignated street type to ensure safe and orderly movement of all modes of travel.

IMPACT ON THE NORTHWEST: Portions of this project are located in Northwest Pasadena which is alocation that has been targeted from revitalization.

HISTORY: This project was created in FY 2019 and is currently unfunded.

Traffic Signal at Colorado Blvd. and Garfield Ave.

FY 2019 - 2023 Capital Improvement ProgramTransportation

Traffic Signal Operations and Maintenance Assessment

5.20 Responsible Department:Transportation Department

Page 24: tRANspoRtAtIoN - Pasadena, California€¦ · was completed for the intersections of Orange Grove Boulevard at Manzanita Avenue, Villa Street at Madison Avenue, Orange Grove Boulevard

Priority TotalEstimated

Costs

Description AppropriatedThroughFY 2018

AdoptedFY 2019

ProposedFY 2020

ProposedFY 2021

ProposedFY 2022

ProposedFY 2023

and BeyondIntelligent Transportation System (ITS) Project - PhaseI

75701

Project No.

21

00000836,000836,000FTA 5309c

00000810,200810,200Gold Line Surplus Funds

0000070,00070,000Measure R Transportation Fund

00000683,150683,150MTA Grant - Federal Flexible CMAQ Funds

000001,799,6111,799,611SAFTEA-LU

4,198,961 000004,198,961Total

DESCRIPTION: This project provides for the installation of conduit and fiber optic communication lines ontop priority arterial segments and the upgrade of control equipment at the Traffic Management Center(TMC). It also provides for the installation of a transit vehicle arrival information system with signs at majorPasadena Transit bus stops that will show the arrival time of the next Pasadena Transit vehicle. It willinclude an enhanced passenger information program to supplement the Pasadena Transit Vehicle ArrivalInformation System with interactive voice response and wayside signs. This project will also provide forthe installation of vehicle counters at up to five City-owned parking garages (Delacey, Schoolhouse,Marriott, Del Mar Station, and Holly Street) as well as the installation of changeable message signs at keyentry points that would indicate the real-time availability of the parking spaces at the various public parkinggarages.

JUSTIFICATION: This work is necessary to complete some of the fiber optic communication segmentsidentified in the Intelligent Transportation System (ITS) portion of the National Transportation Bill HR 5394(Rogan Projects). This fiber optic communication system will support the expansion of the current trafficcontrol system and lay the groundwork to support future advances in ITS technology that demand a highercommunication bandwidth. This project will provide the integration of the Public Parking AvailabilityInformation System to the City’s TMC which will provide an integrated approach to managing traffic.

SCHEDULE: Project on hold pending prioritization and funding for each component.

RELATIONSHIP TO GENERAL PLAN: This project is consistent with the Mobility Element Objective 4.5by improving and stabilizing the flow of traffic on established mobility corridors. The project is alsoconsistent with Public Facilities Element Objective 6 by the continued provision of a high level of designquality in all public streets.

HISTORY: This project was created in FY 2007 and fully funded in FY 2011.

Traffic Management Center

FY 2019 - 2023 Capital Improvement ProgramTransportation

Intelligent Transportation System (ITS) Project - Phase I75701

5.21 Responsible Department:Transportation Department

Page 25: tRANspoRtAtIoN - Pasadena, California€¦ · was completed for the intersections of Orange Grove Boulevard at Manzanita Avenue, Villa Street at Madison Avenue, Orange Grove Boulevard

Priority TotalEstimated

Costs

Description AppropriatedThroughFY 2018

AdoptedFY 2019

ProposedFY 2020

ProposedFY 2021

ProposedFY 2022

ProposedFY 2023

and BeyondGold Line Phase I - Project Enhancements75506

Project No.

22

000003,719,8003,719,800Gold Line Surplus Funds

00000551,000551,000Light Rail Reserves (Prop. A/C)

0000074,81574,815Metropolitan Transportation Authority

000001,356,2931,356,293MTA Grant - Federal Flexible CMAQ Funds

0000010,00010,000Private Capital - Rotary Club of Pasadena

5,711,908 000005,711,908Total

DESCRIPTION: This project provides for the following enhancement projects along the Gold Line routeand stations.

1. Noise Mitigation for Freeway Stations (75513) COMPLETED

Mitigate the noise from the freeway for passengers waiting for Gold Line trains. The project reduced noiselevels at three Gold Line stations along the 210 Freeway: Lake Avenue, Allen Avenue, and Sierra MadreVilla Avenue. Metro funded and installed a train arrival system for all Gold Line stations.

2. Improvement to Metro Right-of-Way Between Green Street and Holly Street (75516) COMPLETED

Improve Metro right-of-way with special colored concrete pavement, pedestrian lights, landscaping,benches, and trash receptacles per the Old Pasadena Streetscapes and Alley Walkways Plan. This willimprove pedestrian travel from the Memorial Park Station into Old Pasadena. The updated estimated costis $1.845 million. Temporary improvements consisting of asphalt leveling course, pots, benches, trashreceptacles, and bike racks were installed in FY 2010 per a temporary agreement with Metro.

3. Pasadena Light Rail Train (LRT) Tracking and Network Monitoring System (75517)

Upgrade the existing Pasadena LRT Automated Traffic Control System by integrating standard train-tracking capabilities as well as monitoring of all transportation systems associated with the PasadenaMetro Gold Line. The estimated cost is $1,835,000 and includes the following elements: Development of agrade crossing interface module and implementation of enhanced or serial communication between thetraffic signal control software and the railroad grade crossing controller at the three Metro Gold Line at-grade crossings of Glenarm Street, California Boulevard and Del Mar Boulevard ($530,000);

Installation of an adaptive traffic control system along major corridors adjacent to the at-grade crossings ofthe Metro Gold Line at Raymond Avenue, Arroyo Parkway and Marengo Avenue ($350,000); Design andinstallation of intersection improvements including vehicle detection/actuation at the intersection ofMarengo Avenue and Glenarm Street ($420,000);

Upgrade traffic signal controllers for the traffic signals with existing interconnection to the Metro Gold Line

Fillmore Station Plaza

FY 2019 - 2023 Capital Improvement ProgramTransportation

Gold Line Phase I - Project Enhancements75506

5.22 Responsible Department:Public Works Department

Page 26: tRANspoRtAtIoN - Pasadena, California€¦ · was completed for the intersections of Orange Grove Boulevard at Manzanita Avenue, Villa Street at Madison Avenue, Orange Grove Boulevard

FY 2019 - 2023 Capital Improvement ProgramTransportation

Gold Line Phase I - Project Enhancements75506

at-grade crossings. Eight intersections on both sides of the grade crossings of Glenarm Street, CaliforniaBoulevard and Del Mar Boulevard will be equipped with upgraded traffic signal controller software andassociated hardware to allow for enhanced or serial interface communication with the at-grade crossing. Inaddition, six other intersections along these corridors will be modified for adaptive traffic control($460,000); and conduct a review of the at-grade crossing preemption time and for preliminary design ofadvanced pedestrian preemption ($75,000).

4. Allen Avenue Station Improvements (75520) COMPLETED

Installed landscaping, bike racks, pedestrian lights and widened sidewalks.

5. Vehicle Arrival Information

Install real-time transit arrival system on Pasadena Transit bus system. Because traffic variations,breakdowns, and day-to-day problems can interrupt service, the system is designed to keep riders onschedule. The arrival system will use satellite technology and advanced computer modeling to trackvehicles along their routes. Each bus or vehicle will be fitted with a satellite tracking system and interactivedevices that will be installed at various bus stops throughout the City that will provide the estimated realtime arrival of Pasadena Transit buses. The allocation of Gold Line Surplus Funds is $810,200. This willbe done as part of project 75701 - Intelligent Transportation System Project - Phase I.

6. Fillmore Station Pedestrian Plaza - Raymond Avenue to Station and Fillmore Street Improvements(75510) COMPLETED

Closure of Fillmore Street from Raymond Avenue east to cul-de-sac to include: Remove existing street,modify existing drainage system, and construct decorative walkways, lighting, benches, bike racks, andkiosks for enhancement of Fillmore Station. Install a new traffic signal at Fair Oaks Avenue and FillmoreStreet for pedestrians traveling between Fillmore Station and the Huntington Hospital area.

7. Traffic Signal Upgrades for Automated Traffic Control System (ATCS) Intersections (75509)COMPLETED

Upgrade 20 signalized intersections with battery backup, 8-inch to 12-inch traffic signal head conversion,and LED upgrades. This will improve traffic safety at three at-grade crossings (Del Mar Boulevard,California Avenue, and Glenarm Street) in case of power outages within the ATCS.

Install Flashing Yellow Arrow Protected/ Permissive operations at signalized intersections along ArroyoParkway at Glenarm Street, Del Mar Boulevard, and California Boulevard. This operation will simplifytraffic signal phase sequences needed to mitigate traffic queues upon train arrivals. This new signaldisplay has also been demonstrated as less confusing and easily understood by motorists, and thus couldimprove traffic safety, as well as intersection efficiency.

8. Information Kiosks (75515) COMPLETED

Install intermodal way-finding information kiosks at Gold Line stations. The City of Pasadena engaged thedesign services of an environmental graphic design firm to develop a free-standing information kiosk to be

5.22 Responsible Department:Public Works Department

Page 27: tRANspoRtAtIoN - Pasadena, California€¦ · was completed for the intersections of Orange Grove Boulevard at Manzanita Avenue, Villa Street at Madison Avenue, Orange Grove Boulevard

FY 2019 - 2023 Capital Improvement ProgramTransportation

Gold Line Phase I - Project Enhancements75506

located adjacent to the six Pasadena Metro Gold Line stations and throughout the various businessdistricts in the City. The kiosks will provide information related to the Gold Line transit system, directions toactivities and events throughout the various business districts, and promote City of Pasadena-sponsoredevents. The kiosks will exhibit an electronic interface (i.e., LED monitor, CPU, input interface) and staticgraphic information. The kiosks will also provide storage areas for limited printed materials. The initialinstallation will focus on the six Pasadena Gold Line stations.

9. Street Improvements on Halstead Street from Electric Drive to Sierra Madre Villa Station COMPLETED

(75518) - Improve safety and traffic circulation for pedestrian and vehicular access leading to the GoldLine station by doing removing existing cross and longitudinal gutters at Foothill Boulevard and HalsteadStreet and construct new cross gutters and other miscellaneous street improvements at the intersection.

10. Pedestrian Lighting Near Gold Line Stations (75519) COMPLETED

Install pedestrian lighting on Raymond Avenue between Glenarm Street and California Boulevard; and onAllen Avenue between Colorado Boulevard and Corson Street. This enhancement was being done undertwo separate CIP projects - "South Fair Oaks Specific Plan" and the "East Colorado Specific Plan" andtherefore not included in the total estimated project cost of this project.

11. Pedestrian Access Enhancements to the Metro Gold Line Memorial Park Station and Metro Right-of-Way Between Green Street and Holly Street (75523)

Install enhancements to the pedestrian access corridor to the Metro Gold Line Memorial Park Station atstreet crossings and intersections adjacent to the Metro right-of-way between Green Street and HollyStreet. The proposed enhancements include the installation of raised crosswalks on Union Street andGreen Street, where they intersect the Metro right-of-way. The project includes enhancements to the HollyStreet intersection of the Metro right-of-way with pedestrian crossing and access improvements, such as araised crosswalk, and a potential pedestrian access plaza with a vehicular closure. In addition, the projectincludes modifications to the intersection of Holly Street and Arroyo Parkway to increase the sidewalk areaat the intersection through the installation of bulb outs and re-align the crosswalks at this intersection.

JUSTIFICATION: This project allows for enhancements that will improve safety and traffic circulation forpedestrian and vehicular traffic along the Gold Line route and stations, thereby improving ridership.

SCHEDULE: Construction on the Light Rail Train Tracking and Network System will be completed in FY2019.

RELATIONSHIP TO GENERAL PLAN: This project is consistent with Mobility Element Objective 4.2 byimproving the pedestrian environment and Objective 4.5 by improving and stabilizing the flow of traffic onlocal streets. In addition, the project is also consistent with Land Use Element Policy 19.2 by reducingtraffic congestion and protecting residential neighborhoods from traffic impacts.

SPECIAL CONSIDERATION: On August 23, 2004, the City Council approved $5,415,000 of Gold LineSurplus Funds from the Los Angeles to Pasadena Metro Blue Line Construction Authority to be allocatedto Gold Line projects. A total of $3,719,800 has been appropriated to this project.

5.22 Responsible Department:Public Works Department

Page 28: tRANspoRtAtIoN - Pasadena, California€¦ · was completed for the intersections of Orange Grove Boulevard at Manzanita Avenue, Villa Street at Madison Avenue, Orange Grove Boulevard

FY 2019 - 2023 Capital Improvement ProgramTransportation

Gold Line Phase I - Project Enhancements75506

HISTORY: This project was created in FY 2005 and fully funded in FY 2014.

5.22 Responsible Department:Public Works Department

Page 29: tRANspoRtAtIoN - Pasadena, California€¦ · was completed for the intersections of Orange Grove Boulevard at Manzanita Avenue, Villa Street at Madison Avenue, Orange Grove Boulevard

Priority TotalEstimated

Costs

Description AppropriatedThroughFY 2018

AdoptedFY 2019

ProposedFY 2020

ProposedFY 2021

ProposedFY 2022

ProposedFY 2023

and BeyondMobility Corridor Improvements FY 2016 - 202075079

Project No.

23

00050,000100,00075,023225,023Gas Tax

0000096,83896,838Private Capital

00000100,000100,000Traffic Reduction Fee

421,861 00050,000100,000271,861Total

DESCRIPTION: This project will increase the capacity of the mobility corridors as defined in the MobilityElement of the General Plan. Examples of actions that might be taken include: (1) adding turning lanes atkey intersections; (2) providing traffic signal coordination and installing turn signals as necessary; (3)providing enhanced coordination between the Gold Line Light Rail crossings and signals on mobilitycorridors; and (4) Caltrans Connector Corridors Project.

JUSTIFICATION: The establishment of mobility corridors will allow for the development of transportationstrategies to facilitate the flow of traffic along these corridors.

SCHEDULE: This project will supplement the Caltrans Connected Corridor Project. Caltrans received aMetro Grant to install various ITS improvements to participating cities in the I-210 Integrated CorridorManagement Project. In Pasadena, approximately $1.5M ITS improvements will be installed along theparallel mobility corridors. In FY 2019, the Mobility corridor project will be utilized to cover City staff time inthe plan checking and inspection of Caltrans improvements within Pasadena.

RELATIONSHIP TO GENERAL PLAN: This project is consistent with the Mobility Element of the GeneralPlan by providing for implementation of the objective which established principal mobility corridors withinthe City.

IMPACT ON THE NORTHWEST: Approximately twenty percent of this project is located in NorthwestPasadena which is an area that has been targeted for revitalization.

SPECIAL CONSIDERATION: This project will be implemented simultaneous to the Citywide CompleteStreet Program. As traffic is diverted from local neighborhood streets, the nearby mobility corridors will bemodified to accommodate additional traffic. Special system/coordination programs, communicationlinkages and localized improvements will be developed at Gold Line crossings of mobility corridors andadjacent signalized intersections. This project may also be utilized to cover City staff time for planchecking and inspection of Caltrans improvements in future years.

HISTORY: This project was created and received initial funding in FY 2016.

Colorado Boulevard

FY 2019 - 2023 Capital Improvement ProgramTransportation

Mobility Corridor Improvements FY 2016 - 202075079

5.23 Responsible Department:Transportation Department

Page 30: tRANspoRtAtIoN - Pasadena, California€¦ · was completed for the intersections of Orange Grove Boulevard at Manzanita Avenue, Villa Street at Madison Avenue, Orange Grove Boulevard

Priority TotalEstimated

Costs

Description AppropriatedThroughFY 2018

AdoptedFY 2019

ProposedFY 2020

ProposedFY 2021

ProposedFY 2022

ProposedFY 2023

and BeyondOld Pasadena Traffic Improvement - FY 2016 - 202075080

Project No.

24

00030,00030,00090,000150,000Parking Meter Revenue - Old Pasadena

150,000 00030,00030,00090,000Total

DESCRIPTION: This project provides for mitigation of parking and traffic impacts and issues needed inOld Pasadena which may include the following: (1) special traffic control devices; (2) installation of specialsigns, striping and traffic signal operations; (3) on-street parking related enhancements; and/or (4)construction of traffic islands and minor curbside traffic improvements.

JUSTIFICATION: Due to the increase in business and special-event activity in the Old Pasadena area,additional traffic mitigation and parking management measures are frequently requested by thebusinesses in the area or are identified by staff.

SCHEDULE: Preliminary design for mid-block crosswalks in Old Pasadena will begin in FY 2019.

RELATIONSHIP TO GENERAL PLAN: This project is consistent with the Mobility Element by improvingthe safety of the pedestrian environment.

HISTORY: This project was created and received initial funding in FY 2016.

115 E. Colorado Blvd.

FY 2019 - 2023 Capital Improvement ProgramTransportation

Old Pasadena Traffic Improvement - FY 2016 - 202075080

5.24 Responsible Department:Transportation Department

Page 31: tRANspoRtAtIoN - Pasadena, California€¦ · was completed for the intersections of Orange Grove Boulevard at Manzanita Avenue, Villa Street at Madison Avenue, Orange Grove Boulevard

Priority TotalEstimated

Costs

Description AppropriatedThroughFY 2018

AdoptedFY 2019

ProposedFY 2020

ProposedFY 2021

ProposedFY 2022

ProposedFY 2023

and BeyondTransportation System Safety Enhancements Project75089

Project No.

25

00000559,040559,040Highway Safety Improvement Grant

0000075,00075,000Measure R Transportation Fund

00000200,000200,000Traffic Reduction Fee

440,96000000440,960Unfunded

1,275,000 440,9600000834,040Total

DESCRIPTION: This project will provide for geometric modifications and enhancements to variouslocations in the City identified to be experiencing higher than average traffic collisions compared to similarlocations. The current funding will provide for modifications to the intersections of Lincoln Avenue andForest Avenue, and Lincoln Avenue and Mountain Street, which will include the addition of bulbouts,roadway restriping and traffic signal modifications to enhance traffic safety for all users. In addition, theproject will include enhancements to the intersection of Lake Avenue and Orange Grove Boulevard.Additional safety enhancements at other locations will be designed as funding becomes available.

JUSTIFICATION: In September 2015, a safety study was conducted that identified potential safetyenhancements at high collision intersections in Pasadena. This project will design and construct safetyenhancements at the intersections of Lincoln Avenue and Forest Avenue, and Lincoln Avenue andMountain Street, as identified in that report. The project has potential to reduce the likelihood of trafficcollisions at intersections with high collision rates by facility type. Lake Avenue and Orange Grove wasanother intersection identified that will benefit for traffic safety enhancements.

SCHEDULE: In FY 2019, design of enhancements at each intersection will be completed and constructionis scheduled to begin.

RELATIONSHIP TO GENERAL PLAN: This project is consistent with Land Use Element policy 18.5(Land Use-Mobility Compatibility) by managing vehicle traffic volumes and speeds to improve theircompatibility with the character of the adjacent land uses, the function of the street(s), and bicycle andpedestrian traffic. The project is also consistent with Mobility Element Policy 1.7 by designing streets toachieve safe interaction for all modes of travel particularly for pedestrians and bicycle users; and Policy1.19 developing measures to reduce conflict areas for bicyclists such as driveways and right turn lanes.

IMPACT ON THE NORTHWEST: This project is located in Northwest Pasadena which is an area that hasbeen targeted for revitalization.

HISTORY: This project was created and initially funded in FY 2017.

Lincoln Ave. and Mountain St.

FY 2019 - 2023 Capital Improvement ProgramTransportation

Transportation System Safety Enhancements Project75089

5.25 Responsible Department:Transportation Department

Page 32: tRANspoRtAtIoN - Pasadena, California€¦ · was completed for the intersections of Orange Grove Boulevard at Manzanita Avenue, Villa Street at Madison Avenue, Orange Grove Boulevard

Priority TotalEstimated

Costs

Description AppropriatedThroughFY 2018

AdoptedFY 2019

ProposedFY 2020

ProposedFY 2021

ProposedFY 2022

ProposedFY 2023

and BeyondLeft Turn Signal Phasing at Fair Oaks Ave. andColorado Blvd.

75090

Project No.

26

0000040,00040,000Old Pasadena Parking Fund

00000120,000120,000Traffic Reduction Fee

160,000 00000160,000Total

DESCRIPTION: This project will install protected left-turn traffic phases at the signalized intersection ofFair Oaks Avenue and Colorado Boulevard.

JUSTIFICATION: This intersection was identified, via a protected left-turn warrants analysis, as acandidate for protected left-turn based on left-turn delay.

SCHEDULE: Construction will begin when environmental clearance is obtained by Caltrans.

RELATIONSHIP TO GENERAL PLAN: This project is consistent with Mobility Element Policy 1.10 bycontinuously evaluating the operation of the City's transportation system to manage the speed of travel ator below the speed limit, and manage queues at intersections and develop improvements to increasesafety of all transportation services; and Policy 1.24 by ensuring predictable transit travel times byproviding traffic signal system priority measures.

HISTORY: This project was created and fully funded in FY 2017.

Left Turn Signal

FY 2019 - 2023 Capital Improvement ProgramTransportation

Left Turn Signal Phasing at Fair Oaks Ave. and Colorado Blvd.75090

5.26 Responsible Department:Transportation Department

Page 33: tRANspoRtAtIoN - Pasadena, California€¦ · was completed for the intersections of Orange Grove Boulevard at Manzanita Avenue, Villa Street at Madison Avenue, Orange Grove Boulevard

Priority TotalEstimated

Costs

Description AppropriatedThroughFY 2018

AdoptedFY 2019

ProposedFY 2020

ProposedFY 2021

ProposedFY 2022

ProposedFY 2023

and BeyondMobility Corridors - Rose Bowl Access Systems75084

Project No.

27

00000324,000324,000Measure R Transportation Fund

000001,298,0001,298,000MTA Grant - Proposition C

1,622,000 000001,622,000Total

DESCRIPTION: This project provides for upgrades to the following segments within three mobilitycorridors:

1. Colorado Boulevard - Harkness Avenue to Sierra Madre Villa Avenue2. Lincoln Avenue - Montana Street to Mountain Street3. Orange Grove Boulevard - Green Street to Columbia Street

The street segments will be upgraded with new 332 traffic signal cabinets, advanced 2,070 traffic signalcontrollers, new vehicular detection systems and advanced communication systems for connectivity to theCity’s Traffic Management Center.

JUSTIFICATION: These specific mobility corridor arterial segments are identified among the primarygroup of streets utilized for vehicular traffic entering and exiting the Rose Bowl area during events.Colorado Boulevard serves as the main passage for visitors from easterly communities, while LincolnAvenue brings traffic from the north and Orange Grove from the south, via Interstate 210 and State Route110. These proposed upgrades from basic traffic signal intersection hardware will make implementation ofefficient signal timing and higher levels of signal control and automation possible, translating intodecreased vehicular traffic delays and increased mobility through these corridors. Likewise, theseadvancements allow for more sensitive signal timing control during regular non-peak traffic and weekendperiods, thus preserving normal levels of urban street mobility.

SCHEDULE: Construction will continue in FY 2019.

RELATIONSHIP TO GENERAL PLAN: This project is consistent with Mobility Element Policy 3.1 bymaking the most efficient use of major corridors and discouraging auto and truck traffic from using localstreets to bypass congested intersections. The project is also consistent with Policy 4.5 by ensuring safeand efficient travel and traffic management throughout the City, while providing adequate access for allusers.

IMPACT ON THE NORTHWEST: A portion of this project is located in Northwest Pasadena which is anarea that has been targeted for revitalization.

SPECIAL CONSIDERATION: This project received $1,298,000 in the 2011 Metro Call for Projects. Thesefunds were received in FY 2017 and require a local match of $324,520.

HISTORY: This project was created in FY 2012 and fully funded in FY 2018.

Traffic Signal Controller/Traffic Signal Cabinet

FY 2019 - 2023 Capital Improvement ProgramTransportation

Mobility Corridors - Rose Bowl Access Systems75084

5.27 Responsible Department:Transportation Department

Page 34: tRANspoRtAtIoN - Pasadena, California€¦ · was completed for the intersections of Orange Grove Boulevard at Manzanita Avenue, Villa Street at Madison Avenue, Orange Grove Boulevard

Priority TotalEstimated

Costs

Description AppropriatedThroughFY 2018

AdoptedFY 2019

ProposedFY 2020

ProposedFY 2021

ProposedFY 2022

ProposedFY 2023

and BeyondImplement Bus Signal Priority System on PasadenaTransit Buses

75094

Project No.

28

000001,157,6471,157,647MTA Grant - Proposition C

00000243,224243,224Proposition A (Transit) - Future Capital Projects Reserve

0000046,32046,320Traffic Reduction Fee

1,447,191 000001,447,191Total

DESCRIPTION: This project provides for the installation of transponders that are compatible withMetropolitan Transit Authority Rapid Bus technology on all Pasadena Transit buses to provide transitsignal priority. The project includes on-board equipment on the entire Pasadena Transit fleet andinstallation of transit signal priority equipment on 42 intersections along five corridors.

JUSTIFICATION: This project will help ensure reliability of bus schedules and quality of service.

SCHEDULE: Design will begin in FY 2019.

RELATIONSHIP TO THE GENERAL PLAN: This project is consistent with the Mobility Element Objective4.1 and 4.2 by improving pedestrian environment, increasing the availability and use of transit, andimproving and stabilizing the flow of traffic on local streets.

IMPACT ON THE NORTHWEST: Portions of this project are located in Northwest Pasadena which is anarea that has been targeted for revitalization.

SPECIAL CONSIDERATION: This project received $1,157,647 through the 2013 Metro Call for Projects.The funds were received in FY 2018 and required a local match of $289,544.

HISTORY: This project was created in FY 2004 and fully funded in FY 2018.

Pasadena Transit

FY 2019 - 2023 Capital Improvement ProgramTransportation

Implement Bus Signal Priority System on Pasadena Transit Buses75094

5.28 Responsible Department:Transportation Department

Page 35: tRANspoRtAtIoN - Pasadena, California€¦ · was completed for the intersections of Orange Grove Boulevard at Manzanita Avenue, Villa Street at Madison Avenue, Orange Grove Boulevard

Priority TotalEstimated

Costs

Description AppropriatedThroughFY 2018

AdoptedFY 2019

ProposedFY 2020

ProposedFY 2021

ProposedFY 2022

ProposedFY 2023

and BeyondAdaptive Traffic Control Network - Phase II75095

Project No.

29

000001,657,4131,657,413MTA Grant - Proposition C

00000414,353414,353Traffic Reduction Fee

2,071,766 000002,071,766Total

DESCRIPTION: This project provides for the expansion of the City's existing Adaptive Traffic Control(ATC) capabilities on South Fair Oaks Avenue to four arterial segments, allowing for adaptive traffic controlcapabilities within the mobility corridor network. The following are the corridor segments proposed for thisproject: California Boulevard, St. John Avenue to Lake Avenue; Del Mar Boulevard, St. John Avenue toOak Knoll Avenue; Lake Avenue, San Pasqual Street to Orange Grove Boulevard; and Foothill Boulevard,Sierra Madre Boulevard to Michillinda Avenue.

JUSTIFICATION: Since 1999, the City has used a time-of-day or time-based traffic plan scheduling formanaging street traffic which worked well under fairly predictable traffic patterns. In recent years, however,poor levels of service on the adjacent freeway system created unpredictable traffic patterns. As a result, in2012, the City launched its initial Adaptive Traffic Control System installation on the southern portion ofFair Oaks Avenue, the major corridor adjacent to the 710 freeway gap. The City proposes to expand theoriginal ATC deployment into four mobility corridor segments that will expand the benefits of adaptivetraffic control to cover a network of signals serving as main mobility corridors throughout the City.

SCHEDULE: Design will begin in FY 2019.

RELATIONSHIP TO GENERAL PLAN: This project is consistent with the Mobility Element Policy 1.23 ofthe General Plan by promoting continuous improvements in addressing safety features in the design anddelivery of all ongoing transportation services. It is also consistent with Policy 4.6 which seeks to upgradethe Traffic Management Center and deploy advanced technology along multimodal corridors at congestedintersections and at key places of pedestrian and bicycle activity to improve overall system performanceand user safety.

IMPACT ON THE NORTHWEST: A portion of this project is located in Northwest Pasadena which is anarea that has been targeted for revitalization.

SPECIAL CONSIDERATION: This project received $2,088,219 in the 2013 Metro Call for Projects. Thefunds were received in FY 2018 and required a local match of $414,353.

HISTORY: This project was created in FY 2015 and fully funded in FY 2018.

SCATS Access Interface

FY 2019 - 2023 Capital Improvement ProgramTransportation

Adaptive Traffic Control Network - Phase II75095

5.29 Responsible Department:Transportation Department

Page 36: tRANspoRtAtIoN - Pasadena, California€¦ · was completed for the intersections of Orange Grove Boulevard at Manzanita Avenue, Villa Street at Madison Avenue, Orange Grove Boulevard

Priority TotalEstimated

Costs

Description AppropriatedThroughFY 2018

AdoptedFY 2019

ProposedFY 2020

ProposedFY 2021

ProposedFY 2022

ProposedFY 2023

and BeyondImplementation of Citywide TransportationPerformance Monitoring Network

75602

Project No.

30

0000025,00025,000Gas Tax

00000361,928361,928Private Capital

2,745,500000002,745,500Unfunded

3,132,428 2,745,5000000386,928Total

DESCRIPTION: This project provides for the implementation of a Citywide transportation performancemonitoring network that will continuously monitor minor arterials, collectors and other "gateways" by linkingthem to the City's Traffic Management Center (TMC). The automated system will be designed to performaccurately with low maintenance costs, which is far superior to costly manual data collection. The projectwill have two phases: the pilot phase located on Orange Grove Boulevard and a citywide implementationphase based on the results of the pilot program.

JUSTIFICATION: Over the years the City has built an extensive communications network along majorarterials that link to the City's TMC. This project will utilize the existing transportation communicationsystem or expand the system wherever necessary to ultimately monitor the movement of traffic throughthe City.

SCHEDULE: Staff will continue implementation of the Live Traffic Data high resolution data collection andreporting in FY 2019.

RELATIONSHIP TO GENERAL PLAN: This project is consistent with the Mobility Element Policy 4.8 byexpanding the TMC capabilities to provide priority treatment and monitoring of transit vehicles at trafficsignals on major streets along with the use of advanced communication systems to provide additionaltraveler information services and monitoring of traffic and transit services by using automated vehiclelocation technology.

SPECIAL CONSIDERATION: Future plans of this monitoring system will include disseminating Citywidetraffic/transit information with historical/archived traffic information on the internet. Additional informationmay be collected for transit services and non-auto uses. The City will also continue to pursue fundingopportunities for additional performance monitoring tools.

HISTORY: This project was created and initially funded in FY 2006. The pilot program on Orange GroveBoulevard was implemented in FY 2012. In FY 2017, the citywide implementation of a performancemonitoring network began.

Traffic Management Center

FY 2019 - 2023 Capital Improvement ProgramTransportation

Implementation of Citywide Transportation Performance Monitoring Network75602

5.30 Responsible Department:Transportation Department

Page 37: tRANspoRtAtIoN - Pasadena, California€¦ · was completed for the intersections of Orange Grove Boulevard at Manzanita Avenue, Villa Street at Madison Avenue, Orange Grove Boulevard

Priority TotalEstimated

Costs

Description AppropriatedThroughFY 2018

AdoptedFY 2019

ProposedFY 2020

ProposedFY 2021

ProposedFY 2022

ProposedFY 2023

and BeyondTraffic Signal Indication Safety Improvements - PhaseII

75709

Project No.

31

0000020,00020,000Private Capital

00000750,000750,000Public Benefit Charge (Power Fund)

770,000 00000770,000Total

DESCRIPTION: This project provides for the systematic replacement of light-emitting diode (LED) trafficsignal indicators, pedestrian signals and safety lighting along various routes.

JUSTIFICATION: In FY 2005, the City replaced all incandescent traffic signal indicators and pedestriansignals with LED indicators to reduce energy consumption and enhance safety. LED indicators begin todim or partially fail as they reach the end of their life cycle. Unlike incandescent bulbs that burn out at theirpoint of failure, LED indicators fail incrementally over time. The light output may be less than required,strings or clusters of LEDs may fail, or the indicator may begin to flicker. This project will enable the City toevaluate the current condition of LED indicators by measuring light output and replacing indicators that arefailing.

SCHEDULE: This project will continue in FY 2019.

RELATIONSHIP TO GENERAL PLAN: This project is consistent with the Public Facilities ElementObjective 6 by the continued provision of a high level of design quality in all public streets. In addition, theproject is consistent with Public Facilities Element Objective 5 by encouraging a high level of maintenanceof existing facilities to ensure public safety.

IMPACT ON THE NORTHWEST: Portions of this project are located in Northwest Pasadena which is anarea that has been targeted for revitalization.

HISTORY: This project was created in FY 2005 and fully funded in FY 2009.

Traffic Signal

FY 2019 - 2023 Capital Improvement ProgramTransportation

Traffic Signal Indication Safety Improvements - Phase II75709

5.31 Responsible Department:Public Works Department

Page 38: tRANspoRtAtIoN - Pasadena, California€¦ · was completed for the intersections of Orange Grove Boulevard at Manzanita Avenue, Villa Street at Madison Avenue, Orange Grove Boulevard

Priority TotalEstimated

Costs

Description AppropriatedThroughFY 2018

AdoptedFY 2019

ProposedFY 2020

ProposedFY 2021

ProposedFY 2022

ProposedFY 2023

and BeyondIntelligent Transportation System (ITS) EquipmentUpgrades/Replacement - FY 2016 - 2020

75078

Project No.

32

000100,00050,00061,682211,682Gas Tax

0000025,00025,000Private Capital

000138,31800138,318Unfunded

375,000 000238,31850,00086,682Total

DESCRIPTION: This project will upgrade, repair, replace or install Intelligent Transportation System (ITS)components including but not limited to the following: closed circuit television (CCTV) cameras,changeable message signs (CMS), in-roadway warning lights (IRWL), video detection systems (VDS),fiber optic cable communication systems, wireless communication systems, count-down pedestriansignals, miscellaneous traffic management center equipment and other smart traffic control devices toimprove the traffic mobility and safety along the City’s mobility corridors.

JUSTIFICATION: Many of the City’s ITS elements were implemented in the early 1990s and areincreasingly becoming more difficult and expensive to operate. Due to rapid advancements in technology,many of these components have ceased to function not only due to lack of funds, but also because theyhave become obsolete by today’s standards. Many parts or vendors that originally supplied the equipmentare no longer available. In addition, because of the high demand to make Pasadena's existing roadnetwork as efficient as possible, the City has installed many more ITS devices without appropriatingcapital costs for preserving the system’s operability. Currently, the City has over 40 CCTV systems, 11CMS, 80 VDS and approximately 25 miles of fiber optic system. Plans have been approved to install atleast 24 more CCTV cameras, two CMS, eight miles of fiber optic cable and a number of additional VDS.The Metro Rapid Bus system is also being deployed, which will require specialized smart traffic signalequipment. This project is crucial to ensure traffic management functionality is maintained during day-to-day functions and special events, incidents on the freeway, construction detours and other nonrecurringevents. This will also be critical in maintaining safety for those ITS devices intended to provide additionalprotection to pedestrians such as the IRWL systems, flashing beacons and countdown pedestrian signals.

SCHEDULE: This project will continue in FY 2019.

RELATIONSHIP TO GENERAL PLAN: This project is consistent with the Mobility Element Objective 4.5by improving and stabilizing the flow of traffic on established mobility corridors. It is also consistent withPublic Facilities Element Objective 6 by the continued provision of a high level of design quality in allpublic streets.

HISTORY: This project was created and initially funded in FY 2016.

Closed Circuit TV Camera

FY 2019 - 2023 Capital Improvement ProgramTransportation

Intelligent Transportation System (ITS) Equipment Upgrades/Replacement - FY 2016 - 202075078

5.32 Responsible Department:Transportation Department

Page 39: tRANspoRtAtIoN - Pasadena, California€¦ · was completed for the intersections of Orange Grove Boulevard at Manzanita Avenue, Villa Street at Madison Avenue, Orange Grove Boulevard

Priority TotalEstimated

Costs

Description AppropriatedThroughFY 2018

AdoptedFY 2019

ProposedFY 2020

ProposedFY 2021

ProposedFY 2022

ProposedFY 2023

and BeyondPurchase of Dial-A-Ride Vehicles75086

Project No.

33

0000268,869524,700793,569FTA 5310 Enhanced Mobility of People with Disabilities

0000032,25832,258Private Capital

0000109,009117,680226,689Proposition A/C Local Return Funds

1,100,000000001,100,000Unfunded

2,152,516 1,100,000000377,878674,638Total

DESCRIPTION: This project provides for the purchase of replacement paratransit vehicles for the City'sDial-A-Ride program.

JUSTIFICATION: The paratransit vehicles will enable the Pasadena Dial-A-Ride program to continue toprovide transportation services to seniors and persons with disabilities within the Pasadena Dial-A-Rideservice area. As funding becomes available to increase operations, additional vehicles need to bepurchased to provide the service; as transit vehicles age, they need to be replaced.

SCHEDULE: The four remaining replacement vehicles will be purchased and are anticipated to be inservice in FY 2019.

RELATIONSHIP TO GENERAL PLAN: This project is consistent with the Mobility Element Policy 1.9 bypromoting the enhancement of attractive, convenient non-auto services providing access to neighborhooddistricts, community and regional centers, and mixed-use boulevards.

IMPACT ON THE NORTHWEST: Pasadena Dial-A-Ride vehicles provide service to Northwest Pasadenawhich is an area that has been targeted for revitalization.

SPECIAL CONSIDERATION: In FY 2017, the City received $524,700 through a 2015 Federal TransitAdministration (FTA) 5310 grant. In FY 2019, the City will receive $268,869 through a 2017 FTA 5310grant that requires a local match of $29,875 and an additional $79,134 for on-board equipment.

HISTORY: This project was created in FY 2014 and initially funded in FY 2017. Seven of the 11replacement vehicles and two expansion vehicles were purchased and delivered in FY 2017.

Paratransit Vehicle

FY 2019 - 2023 Capital Improvement ProgramTransportation

Purchase of Dial-A-Ride Vehicles75086

5.33 Responsible Department:Transportation Department

Page 40: tRANspoRtAtIoN - Pasadena, California€¦ · was completed for the intersections of Orange Grove Boulevard at Manzanita Avenue, Villa Street at Madison Avenue, Orange Grove Boulevard

Priority TotalEstimated

Costs

Description AppropriatedThroughFY 2018

AdoptedFY 2019

ProposedFY 2020

ProposedFY 2021

ProposedFY 2022

ProposedFY 2023

and BeyondPurchase of Replacement Transit Vehicles andExpansion Fixed-Route Transit Vehicles

75085

Project No.

34

0000862,8300862,830FTA 5316 Job Access and Reverse Commute Program Grant

000002,420,5272,420,527MTA Grant - Federal Flexible CMAQ Funds

00000105,946105,946Private Capital

0000344,6131,778,5782,123,191Proposition A/C Local Return Funds

7,600,000000007,600,000Unfunded

13,112,494 7,600,0000001,207,4434,305,051Total

DESCRIPTION: This project provides for the purchase of replacement transit vehicles and expansiontransit vehicles for the City of Pasadena's fixed-route transit system.

JUSTIFICATION: These fixed-route transit vehicle purchases include replacing aging vehicles and addingvehicles into the existing fleet to help address overcrowding on the higher demand routes.

SCHEDULE: Two of the four outstanding replacement vehicles will be purchased and are anticipated fordelivery in FY 2019. The remaining vehicles will be purchased when funding is identified.

RELATIONSHIP TO GENERAL PLAN: This project is consistent with Mobility Element Policy 1.9 bypromoting the enhancement of attractive, convenient, non-auto services providing access to neighborhooddistricts, community and regional centers, and mixed-use boulevards. The project is also consistent withPolicy 1.14 by recognizing the distinctive transportation needs of the community and delivering appropriatetransportation services.

IMPACT ON THE NORTHWEST: Pasadena transit vehicles provide service to Northwest Pasadena whichis an area that has been targeted for revitalization.

SPECIAL CONSIDERATION: In FY 2016, $1,055,950 was awarded to the City through the 2013 MetroCall for Projects and required a local match of $690,358. In FY 2017, $1,364,577 was awarded throughthe 2015 Metro Call for Projects and required a local match of $966,762. In FY 2019, $862,830 will beawarded to the City through a Federal Transit Administration 5316 grant and requires a local match of$215,710 and an additional $128,903 for on board equipment.

HISTORY: This project was created and initially funded in FY 2016. In FY 2017, four 32-foot compressednatural gas replacement vehicles were purchased and delivered. Four 35-foot expansion vehicles werepurchased and delivered in FY 2018.

Pasadena Transit Vehicle

FY 2019 - 2023 Capital Improvement ProgramTransportation

Purchase of Replacement Transit Vehicles and Expansion Fixed-Route Transit Vehicles75085

5.34 Responsible Department:Transportation Department

Page 41: tRANspoRtAtIoN - Pasadena, California€¦ · was completed for the intersections of Orange Grove Boulevard at Manzanita Avenue, Villa Street at Madison Avenue, Orange Grove Boulevard

Priority TotalEstimated

Costs

Description AppropriatedThroughFY 2018

AdoptedFY 2019

ProposedFY 2020

ProposedFY 2021

ProposedFY 2022

ProposedFY 2023

and BeyondConstruction of Transit Operations MaintenanceFacility

75707

Project No.

35

000002,185,0002,185,000Traffic Reduction Fee

30,815,0000000030,815,000Unfunded

33,000,000 30,815,00000002,185,000Total

DESCRIPTION: This project provides for the construction of a Transit Operations and MaintenanceFacility (TOMF) at 2180 East Foothill Boulevard. The proposed transit facility will support operations andmaintenance of the Pasadena Transit and Dial-A-Ride services fleet, including accommodating 30compressed natural gas buses and 15 paratransit vehicles.

JUSTIFICATION: The existing bus yard at 303 North Allen Avenue is leased and operated by the City'stransit service contractor. This location has always served as the bus yard used by the contractors whohave operated the City's transit services. Several issues with the current bus yard have made it imperativefor the City to locate and construct a TOMF. Due to the growth in local transit services, the existing busyard is no longer large enough to store all of the Pasadena Transit buses and Dial-A-Ride vehicles. Thesize constraint of the current bus yard has resulted in having to store and operate a number of buses outof facilities several miles away; additional expenses are incurred in order to lease the additional vehiclestorage space. Furthermore, there is no assurance that the current bus yard site will be available in thefuture as a bus yard because it is privately owned. The proposed TOMF will address the existingdeficiencies of the current bus yard by providing a single site that can accommodate storage, cleaning,fueling, maintenance and dispatching of all the Pasadena Transit buses and Dial-A-Ride vehicles. Theproposed TOMF will eliminate over 175 miles of daily deadhead (non-revenue) miles that are required tosimply fuel the vehicles. By owning the TOMF and not requiring the service contractor to provide anoperations and maintenance facility, the City may also be able to secure a reduced hourly contract rate bytaking the leasing cost out of a contractor’s rate.

SCHEDULE: In FY 2019, design will be completed. Construction will begin when funding is identified.

RELATIONSHIP TO GENERAL PLAN: This project is consistent with Land Use Element Policy 14.4 byincreasing access to and linkages among community service facilities. The project is consistent with Policy20.4 by promoting mobility for those who do not drive, particularly seniors, youth and the disabled. Inaddition, the project is consistent with Objective 21 by making Pasadena a city where there are effectiveand convenient alternatives to using cars. The project is consistent with the 2004 Mobility Element Policy1.3 by developing convenient access between affordable housing, employment and access to services.Also, the project is consistent with Policy 1.9 by promoting the enhancement of attractive, convenient, non-auto services providing access to neighborhood districts, community and regional centers, and mixed-useboulevards. Further, the project is consistent with Policy 1.14 by recognizing the distinctive transportationneeds of the community and delivering appropriate transportation services developed through publicoutreach programs. Finally, the project is consistent with Policy 2.3 by seeking funding to expand thePasadena Transit service to provide increased local transit service throughout the community.

Rendering of Transit Operations and Maintenance Facility

FY 2019 - 2023 Capital Improvement ProgramTransportation

Construction of Transit Operations Maintenance Facility75707

5.35 Responsible Department:Transportation Department

Page 42: tRANspoRtAtIoN - Pasadena, California€¦ · was completed for the intersections of Orange Grove Boulevard at Manzanita Avenue, Villa Street at Madison Avenue, Orange Grove Boulevard

FY 2019 - 2023 Capital Improvement ProgramTransportation

Construction of Transit Operations Maintenance Facility75707

SPECIAL CONSIDERATION: Staff is actively seeking grant funding for this project.

IMPACT ON THE NORTHWEST: The ability to expand the Pasadena Transit bus service by providingincreased capacity for operating and maintenance of the bus fleet will benefit residents in NorthwestPasadena. Specifically, the new Transit Operations and Maintenance Facility will allow the City to provideadditional service and more frequent buses during the peak hours on the routes serving the Northwest.

HISTORY: This project was created in FY 2007 and initially funded in FY 2015.

5.35 Responsible Department:Transportation Department

Page 43: tRANspoRtAtIoN - Pasadena, California€¦ · was completed for the intersections of Orange Grove Boulevard at Manzanita Avenue, Villa Street at Madison Avenue, Orange Grove Boulevard

Priority TotalEstimated

Costs

Description AppropriatedThroughFY 2018

AdoptedFY 2019

ProposedFY 2020

ProposedFY 2021

ProposedFY 2022

ProposedFY 2023

and BeyondBus Stop Improvement Program75900

Project No.

36

0000023,50023,500Private Capital

300,0000000300,000600,000Proposition A (Transit)

623,500 300,0000000323,500Total

DESCRIPTION: This project provides for the installation of new bus benches, bus stop amenities andconcrete paving at various bus stop locations throughout the City. The project also includes thereplacement of outdated bus stop signs and the purchase of new information components and wayfindingsignage; the purchase and installation of bus benches and trash receptacles; and the installation and/orrepair of sidewalks and parkways at, and/or adjacent to, bus stops to improve pedestrian access. Otheramenities include bus stop signage to clearly identify stop locations.

JUSTIFICATION: One of the City's adopted Mobility Element core objectives is the encouragement of non-auto travel. The proposed program will address several implementation strategies discussed in theMobility Element to promote this objective: 1) the improvement of bus stops; 2) provide improved publicinformation with transit user information and wayfinding signage; and 3) the promotion of pedestrianlinkages. The benches will provide seating for the bus riders. The concrete bus pads will provide safefooting for passengers as they enter and exit the buses.

SCHEDULE: This is an ongoing annual project. Work will be completed on an as-needed basis.

RELATIONSHIP TO GENERAL PLAN: This project is consistent with the Mobility Element in decreasingreliance on automobiles by providing street amenities such as shelters, benches, etc.

IMPACT ON THE NORTHWEST: Portions of this project are located in Northwest Pasadena which is anarea that has been targeted for revitalization.

HISTORY: This project was created and initially funded in FY 2000.

Bus Bench

FY 2019 - 2023 Capital Improvement ProgramTransportation

Bus Stop Improvement Program75900

5.36 Responsible Department:Transportation Department