FINAL REPORT MARCH 2005 REPORT NO. 04-04A TRANSPORTABILITY TESTING OF THE M872 A4 SEMI-TRAILER, TP-94-01, REVISION 2, JUNE 2004 "TRANSPORTABILITY TESTING PROCEDURES" Prepared for: Distribution Unlimited: Program Executive Office Combat Support & Combat Service Support 6501 E. 11-Mile Rd ATTN: SFAE-CSS-TV-TR Mail Stop 440 Warren, MI 48397-5000 VALIDATION ENGINEERING DIVISION MCALESTER, OKLAHOMA 74501-9053

Upload: vuque

Post on 14-Feb-2017

224 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Transportability Testing of the M872 A4 Semi-Trailer, TP-94-01

FINAL REPORTMARCH 2005

REPORT NO. 04-04A

TRANSPORTABILITY TESTINGOF THE M872 A4 SEMI-TRAILER,

TP-94-01, REVISION 2, JUNE 2004"TRANSPORTABILITY TESTING PROCEDURES"

Prepared for: Distribution Unlimited:

Program Executive OfficeCombat Support & Combat Service Support6501 E. 11-Mile RdATTN: SFAE-CSS-TV-TRMail Stop 440Warren, MI 48397-5000

VALIDATION ENGINEERING DIVISIONMCALESTER, OKLAHOMA 74501-9053

Page 2: Transportability Testing of the M872 A4 Semi-Trailer, TP-94-01

DFEPARTMENT OF THE ARMYUS ARMY DEFENSE AMMUNITION CENTER

I C TREE ROAD

REPLY TO MCALESTER, OK 74501-9053ATTENTION Of

SJMAC-DEV (70-1pp) 13 April 2005

MEMORANDUM FOR SEE DISTRIBUTION

SUBJECT: Report No. 04-04A, "Transportability Testing of the M872 A4 Semi-Trailer,TP-94-01, Revision 2, June 2004 "Transportability Testing Procedures"

1. Enclosed please find subject report dated March 2005.

2. The POC is the undersigned, SJMAC-DEV, DSN 956-8908.

FOR THE DIRECTOR:

Encl /JERR W. BEAVERas Chief, Validation Engineering Division

DISTRIBUTION:

Commander,US Army Tank-automotive and Armaments Command (SFAE-CSS-TV-TR), John Yee,Mail Stop 440, 6501 E. 11-Mile Road, Warren, MI 48397-5000

Transportation Engineering Agency (MTTE-DPE) Mr. Lloyd Cato, Military TrafficManagement Command, 720 Thimble Shoals Blvd, Suite 130, Newport News, VA 23606-2574

ARDEC Logistics Research & Engineering Directorate (AMSRD-AAR-AIL-P) Al Galonski,Bldg 455, Picatinny Arsenal, NJ 07806-5001

U.S. Army Joint Munitions Command (AMSJM-TI) Richard Nesbitt, Rock Island, IL61299-6000

ARDEC Logistics Research & Engineering Directorate (AMSRD-AAR-AIL-P-(R))Dave Piskorik, Rock Island, IL 61299-7300

U.S. Army Aviation & Missile Command (AMSAM-MMC-MM-DT), Redstone Arsenal, AL35898-5070

U.S. Army Materiel Command (AMSAM-LG), 5001 Eisenhower Avenue, Alexandria, VA22333-0001

(CONT)

Page 3: Transportability Testing of the M872 A4 Semi-Trailer, TP-94-01

SJMAC-DEVSUBJECT: Report No. 04-04A, "Transportability Testing of the M872 A4 Semi-Trailer,TP-94-01, Revision 2, June 2004 "Transportability Testing Procedures"

DISTRIBUTION (CONT):~/rector,

Defense Technical Information Center, 8725 John J. Kingman Road, Suite 0944, Fort Belvoir,VA 22060-6218

Commandant,U.S. Army Ordnance Missile & Munitions Center & School

(ATSK-CMT-Z), James Kisner, Redstone Arsenal, AL 35897-6095U.S. Army Transportation School (ATSP-CDT), Fort Eustis, VA 23604

2

Page 4: Transportability Testing of the M872 A4 Semi-Trailer, TP-94-01

"AVAILABILTY NOTICE

A copy of this report will be furnished each attendee on automatic distribution.

Additional copies or authority for reprinting may be obtained by written request

from:

DirectorU.S. Army Defense Ammunition CenterATTN: SJMAC-DEV1 C Tree Road, Bldg. 35McAlester, OK 74501-9053

DISTRIBUTION INSTRUCTIONS

Destroy this report when no longer needed. Do not return.

Citation of trade names in this report does not constitute an official endorsement.

The information contained herein will not be used for advertising purposes.

Page 5: Transportability Testing of the M872 A4 Semi-Trailer, TP-94-01

REPORT NO. 04-04A MARCH 2005TRANSPORTABILITY TESTING OF THE

M872 A4 SEMI-TRAILER, TP-94-01, REV. 2, JUNE 2004"TRANSPORTABILITY TESTING PROCEDURES"

ABSTRACT

The U.S. Army Defense Ammunition Center (DAC), Validation Engineering

Division (SJMAC-DEV), was tasked by the Program Manager Trailers to conduct

transportability testing on the M872 A4 Semi-Trailer manufactured by Talbert

Manufacturing, Inc., Rensselaer, Indiana. The testing was conducted in

accordance with TP-94-01, Revision 2, June 2004 "Transportability Testing

Procedures." The testing included Hazard Course, Road Trip, Panic Stops, and

Washboard Course.

The objective of the testing was to evaluate the M872 A4 Semi-Trailer when

transportability tested in accordance with TP-94-01, Revision 2, June 2004.

The significant changes in the currently tested trailer over the previously

tested trailer included:

a. Relocation of the tie-down rings from the trailer deck to the trailer side rail.

b. Removal of the steel side channels and replacing them with wood deck

boards. The trailer now has a full width wood deck.

The M872 A4 Semi-Trailer tie-down rings and anchors performed adequately

during testing. The test loads were effectively and efficiently secured utilizing the

tie-down provisions as designed. As currently designed, the M872 A4 Semi-

Trailer is adequate for transport of bulk ammunition.

Prepared by: Reviewed by:

PHILIP W. BARICKMAN JERRY W. BEAVERLead Validation Engineer Chief, Validation Engineering Division

Page 6: Transportability Testing of the M872 A4 Semi-Trailer, TP-94-01

U.S. ARMY DEFENSE AMMUNITION CENTER

VALIDATION ENGINEERING DIVISIONMCALESTER, OK 74501-9053

REPORT NO. 04-04ATRANSPORTABILITY TESTING OF THE M872 A4 SEMI-TRAILER,

TP-94-01, REVISION 2, JUNE 2004 "TRANSPORTABILITY TESTINGPROCEDURES"

TABLE OF CONTENTS

PART PAGE NO.

1. INTRO DUCTIO N ............................................................................................. 1-1A. BACKG RO UND ........................................................................................... 1-1B. AUTHO RITY ................................................................................................ 1-1C . O BJECTIVE ................................................................................................ 1-1D. CO NCLUSIO N ............................................................................................ 1-1

2. ATTENDEES .................................................................................................... 2-1

3. TEST EQ UIPM ENT .......................................................................................... 3-1

4. TEST PRO CEDURES .................................................................................... 4-1A. RAIL TEST ................................................................................................. 4-1B. O N/O FF ROAD TESTS .............................................................................. 4-3

1. HAZARD CO URSE .............................................................................. 4-32. ROAD TRIP ......................................................................................... 4-43. PANIC STO PS ...................................................................................... 4-44. W ASHBOARD CO URSE ..................................................................... 4-4

C. O CEAN-GO ING VESSEL TEST ............................................................... 4-4

5. TEST RESULTS .............................................................................................. 5-15.1 TESTING DATE -28 O CTO BER 2004 .......................................................... 5-1

A. O N/O FF ROAD TESTS .......................................................................... 5-21. HAZARD CO URSE ............................................................................. 5-22. ROAD TRIP ......................................................................................... 5-33. PANIC STO PS .................................................................................... 5-34. HAZARD CO URSE ............................................................................ 5-35. W ASHBOARD CO URSE .................................................................... 5-3

B. CO NCLUSIO N .......................................................................................... 5-4

Page 7: Transportability Testing of the M872 A4 Semi-Trailer, TP-94-01

5.2 TESTING DATE -2 NO VEM BER 2004 .......................................................... 5-5A. O N/O FF ROAD TESTS ............................................................................ 5-5

1. HAZARD CO URSE ............................................................................. 5-52. ROAD TRIP ......................................................................................... 5-63. PA NIC STO PS .................................................................................... 5-74. HAZARD CO URSE ............................................................................ 5-75. W ASHBOARD CO URSE .................................................................... 5-7

B. CO NCLUSIO N .......................................................................................... 5-8

5.3 TESTING DATE -3 NO VEM BER 2004 .......................................................... 5-9

6. DRAW ING S ...................................................................................................... 6-1

Page 8: Transportability Testing of the M872 A4 Semi-Trailer, TP-94-01

PART 1 - INTRODUCTION

A. BACKGROUND. The U.S. Army Defense Ammunition Center (DAC), Validation

Engineering Division (SJMAC-DEV), was tasked by the Program Manager Trailers to

conduct transportability testing on the M872 A4 Semi-Trailer manufactured by Talbert

Manufacturing, Inc., Rensselaer, Indiana. The testing was conducted in accordance

with TP-94-01, Revision 2, June 2004 "Transportability Testing Procedures."

B. AUTHORITY. This test was conducted lAW mission responsibilities delegated by

the U.S. Army Joint Munitions Command (JMC), Rock Island, IL. Reference is made to

the following:

1. AR 740-1, 15 June 2001, Storage and Supply Activity Operation.

2. OSC-R, 10-23, Mission and Major Functions of U.S. Army Defense Ammunition

Center (DAC) 21 Nov 2000.

C. OBJECTIVE. The objective of the testing was to evaluate the M872 A4 Semi-

Trailer, when transportability tested in accordance with TP-94-01, Revision 2, June

2004.

D. CONCLUSION. The significant changes in the currently tested trailer over the

previously tested trailer included:

1. Relocation of the tie-down rings from the trailer deck to the trailer side rail.

2. Removal of the steel side channels and replacing them with wood deck boards.

The trailer now has a full width wood deck.

The M872 A4 Semi-Trailer tie-down rings and anchors performed adequately during

testing. The test loads utilized were effectively and efficiently secured using the tie-

down provisions as designed. As, currently designed the M872 A4 Semi-Trailer is

adequate for transport of bulk ammunition.

1-1

Page 9: Transportability Testing of the M872 A4 Semi-Trailer, TP-94-01

PART 2 - ATTENDEES

ATTENDEE MAILING ADDRESS

Philip Barickman DirectorDSN 956-8992 U.S. Army Defense Ammunition Center(918) 420-8992 ATTN: SJMAC-DEV

1 C Tree Road, Bldg. 35McAlester, OK 74501-9053

Patrick Dougherty DirectorDSN 956-8225 U.S. Army Defense Ammunition Center(918) 420-8225 ATTN: SJMAC-DET

1 C Tree Road, Bldg. 35McAlester, OK 74501-9053

John Yee U.S. Army Tank-automotive andDSN 786-6561 Armaments Command(586) 574-6561 6501 E. 11-Mile Road

SFAE-CSS-TV-TR, Mail Stop 440Warren, MI 48397-5000

2-1

Page 10: Transportability Testing of the M872 A4 Semi-Trailer, TP-94-01

PART 3 - TEST EQUIPMENT

1. M872 A4 Semi-Trailer

Manufactured by: Talbert Manufacturing, Inc., Rensselaer, Indiana

Date of Manufacture: 1/23/2003

VIN 40FEO 443041022949

Capacity: 34 ton

Weight: 19,860 pounds

2. Truck, Tractor, MTV, M 1088 Al

NSN: 2320 01 447 3893

Weight: 19,340 pounds

3-1

Page 11: Transportability Testing of the M872 A4 Semi-Trailer, TP-94-01

PART 4 - TEST PROCEDURES

The test procedures outlined in this section were extracted from TP-94-01,

"Transportability Testing Procedures," Revision 2, June 2004, for validating

tactical vehicles and outloading procedures used for shipping munitions by

tactical truck, railcar, and ocean-going vessel.

Inert (non-explosive) items were used to build the load. The test loads

were prepared using the blocking and bracing procedures proposed for use with

munitions (see Part 6 for procedures). The weight and physical characteristics

(weights, physical dimensions, center of gravity, etc.) of the test loads were

similar to live (explosive) ammunition. The following tests identified are normally

required for transportability certification. However, not all tests will be required

for some specific items.

A. RAIL TEST. RAIL IMPACT TEST METHOD. The test load or vehicle will be

secured to a flatcar. The equipment needed to perform the test will include the

specimen (hammer) car, four empty railroad cars connected together to serve as

the anvil, and a railroad locomotive. The anvil cars will be positioned on a level

section of track with air and hand brakes set and with draft gears compressed.

The locomotive unit will push the specimen car toward the anvil at a

predetermined speed, then disconnect from the specimen car approximately 50

yards away from the anvil cars allowing the specimen car to roll freely along the

track until it strikes the anvil. This will constitute an impact. Impacting will be

accomplished at speeds of 4, 6, and 8.1 mph in one direction and at a speed of

8.1 mph in the reverse direction. The tolerance for the speeds is plus 0.5 mph,

minus 0.5 mph for the 4 mph and 6 mph impacts, and plus 0.5 mph, minus 0 mph

for the 8.1 mph impacts. The impact speeds will be determined by using an

electronic counter to measure the time for the specimen car to traverse an 11-

foot distance immediately prior to contact with the anvil cars (see Figure 1).

4-1

Page 12: Transportability Testing of the M872 A4 Semi-Trailer, TP-94-01

Luzz L

X LU

-j

uif~~ mih 2

U) uJ U) -

Q 0. 0Z~W Z UU

zIL 0 x

U)~ I--, - O

WJ I 0 'U

<0 0<~

o o CO

M U, CýLn

0 oc -

0u00 LLz w

4-2

Page 13: Transportability Testing of the M872 A4 Semi-Trailer, TP-94-01

B. ON/OFF ROAD TEST.

1. HAZARD COURSE. The test load or vehicle will be transported over the

200-foot-long segment of concrete-paved road consisting of two series of railroad

ties projecting 6 inches above the level of the road surface. The hazard course

will be traversed two times (see Figure 2).

VtV V

8 ft. CENTER SPACING

~~0& 6"x90I, ' "LN

6" 6" 9"TE - L N

CONCRET SURFACECure kec

a. The first series of 6 ties are spaced on 1 0-foot centers and alternately

positioned on opposite sides of the road centerline for a distance of 50 feet.

b. Following the first series of ties, a paved roadway of 75 feet separates

the first and second series of railroad ties.

4-3

Page 14: Transportability Testing of the M872 A4 Semi-Trailer, TP-94-01

c. The second series of 7 ties are spaced on 8-foot centers and

alternately positioned on opposite sides of the road centerline for a distance of 48

feet.

d. The test load is driven across the hazard course at speeds that will

produce the most violent vertical and side-to-side rolling reaction obtainable in

traversing the hazard course (approximately 5 mph).

2. ROAD TRIP. The test load or vehicle will be transported for a distance

of 30 miles over a combination of roads surfaced with gravel, concrete, and

asphalt. The test route will include curves, comers, railroad crossings and stops

and starts. The test load or vehicle will travel at the maximum speed for the

particular road being traversed, except as limited by legal restrictions.

3. PANIC STOPS. During the road trip, the test load or vehicle will be

subjected to three (3) full airbrake stops while traveling in the forward direction

and one in the reverse direction while traveling down a 7 percent grade. The first

three stops are at 5, 10, and 15 mph while the stop in the reverse direction is

approximately 5 mph. This testing will not be required if the Rail Impact Test is

performed.

4. WASHBOARD COURSE. The test load or vehicle will be driven over

the washboard course (see Figure 3) at a speed that produces the most violent

response in the vertical direction.

C. OCEAN-GOING VESSEL TEST. 80-DEGREE TILT TEST. The test load

(specimen) shall be positioned on level terrain with the bottom corner fittings

resting on timbers so the entire container is supported solely by the bottom

corner fittings. The timbers shall be oriented parallel to the end rails of the

container and extend 2 feet beyond the corner fittings on each side. Using two

mobile cranes and appropriate rigging, the container shall be rotated (tilted) using

the bottom corner fittings on one side as a fulcrum. The rigging (slings) of one

4-4

Page 15: Transportability Testing of the M872 A4 Semi-Trailer, TP-94-01

crane shall be attached to the bottom corner fittings of the long side and the

rigging (slings) of the second crane shall be attached to the top corner fittings on

the opposite side. The tilting shall be accomplished by lifting the bottom corner

fittings with the first crane so the container rotates about the opposite bottom

corner fittings (fulcrum). Lifting/rotating by the first crane is continued until the

center of gravity passes over the fulcrum, at which point the second crane shall

provide support to the container and lower the container to the 80 degrees, plus

or minus 2 degrees position. Rotation shall be accomplished smoothly at a slow

speed so the container sidewall is subjected only to the static force of the interior

load. The crane booms shall be adjusted to maintain a rear vertical suspension

of the rigging at all times. In the case of end-opening type containers, at least

one door (lower side of tilted container) must be closed and fastened throughout

the test. The container shall be held in the tilted position for a minimum of two

minutes. At which time, observations of both the container structure and the

interior load shall be made. When the test is completed, the container shall be

returned to its upright position using the same manner and care in handling.

CNRT SURFACASECTO

01

4-54

0426.5" 2" .4

.4 .04.

4 s 0.4 'J.4 7-PCL E4

* 4-5

Page 16: Transportability Testing of the M872 A4 Semi-Trailer, TP-94-01

PART 5 - TEST RESULTS

5.1

Testing Date: 1 March 2005

Test Specimen: M872 A4 Semi-Trailer

Payload: Four MLRS Pods

Test Gross Weight: 60,200 pounds (including the M872 A4 Semi-Trailer, M1088

Tractor and the MLRS Pods)

Payload Weight: 21,000 pounds

Photo 1. MLRS Pods on the M872 A4 Semi-Trailer

5-1

Page 17: Transportability Testing of the M872 A4 Semi-Trailer, TP-94-01

A. ONIOFF ROAD TESTS.

1. HAZARD COURSE.

.. . . .. ......

Photo 2. Hazard Course Testing of the M872 A4 Semi-Trailerwith the MLRS Pods

IPass No. IElapsed Time IAvg. Velocity (mph)1 31 Seconds 4.9

2 29 Seconds 5.3

Figure 4.

Remarks:

1. Figure 4 lists the average speeds of the test load through the Hazard Course.

2. Inspection following the completion of Pass #2 revealed that the pods moved

0.25 inches toward the front on the passenger side.

5-2

Page 18: Transportability Testing of the M872 A4 Semi-Trailer, TP-94-01

2. ROAD TRIP:

Remarks:

1. The Road Trip was conducted between the Road Hazard Course Passes #2

and #3.

2. Inspection following the Road Trip revealed that the pods moved an additional

0.25 inches toward the passenger side.

3. PANIC STOPS:

Remarks:

1. The panic stops were conducted during the Road Trip.

2. Inspection following the completion of the forward 5 mph stop revealed that

the pods moved 0.25 inches toward the front on the driver's side and 0.25 inches

toward the rear on the passenger side.

4. HAZARD COURSE:

IPass No. IElapsed Time Ag.elct(mhI3 33 Seconds 4.64 31 Seconds 4.9

Figure 5.Remarks:

1. Figure 5 lists the average speeds of the test load through the Hazard Course.

2. Inspection following the completion of Pass #3 revealed that the pods had

moved 0.25 inches toward the passenger side.

5. WASHBOARD COURSE:

Remark: Inspection following the completion of the Washboard Course revealed

that the pods moved 0.25-0.75 inches toward the passenger side and 0-0.25

inches toward the front.

5-3

Page 19: Transportability Testing of the M872 A4 Semi-Trailer, TP-94-01

Photo 3. Washboard Course Testing of the M872 A4 Semi-Trailerwith the MLRS Pods.

B. CONCLUSION:

1. The semi-trailer tie-down rings and anchors performed adequately during

testing.

2. The wood deck width on the semi-trailer was adequate to support the

MLRS Pods.

5-4

Page 20: Transportability Testing of the M872 A4 Semi-Trailer, TP-94-01

5.2

Testing Date: 2 March 2005

Test Specimen: M872 A4 Semi-Trailer

Payload: Eighteen Pallets of 155MM Separate Loading Projectiles

Test Gross Weight: 54,740 pounds (including the M872 A4 Semi-trailer, M1088

tractor, and the 155MM SLP)

Payload Weight: 15,540 pounds

Photo 4. 155MM Separate Loading Projectileson the M872 A4 Semi-Trailer

A. ON/OFF ROAD TESTS.

1. HAZARD COURSE.

5-5

Page 21: Transportability Testing of the M872 A4 Semi-Trailer, TP-94-01

Photo 5. Hazard Course Testing of the M872 A4 Semi-Trailerwith the 155MM Separate Loading Projectiles

IPass No. IElapsed Time IAvg. Velocity (mph)f1 29 Seconds 5.3

2 28 Seconds 5.5

Figure 6.

Remarks:

1. Figure 6 lists the average speeds of the test load through the Hazard Course.

2. Inspections following Pass #2 revealed that the payload had moved 0.25

inches toward the front on the driver's side.

2. ROAD TRIP:

Remarks:

1. The Road Trip was conducted between the Road Hazard Course Passes #2

and #3.

2. Inspection following the completion of the Road Trip revealed no additional

movement.

5-6

Page 22: Transportability Testing of the M872 A4 Semi-Trailer, TP-94-01

3. PANIC STOPS:

Remarks:

1. The panic stops were performed during the Road Trip.

2. Inspection following the completion of the panic stops revealed no additional

movement.

4. HAZARD COURSE:

M Pass No. IElapsed Time IAvg. Velocity (mh)3 25 Seconds 6.14 27 Seconds 5.7

Figure 7.Remarks:

1. Figure 7 lists the average speeds of the test load through the Hazard Course.

2. Inspection following Pass #3 revealed that the payload had moved 0.25-0.5

inches toward the rear of the trailer.

3. Inspection following Pass #4 revealed that the payload had moved an

additional 0.25 inches toward the rear of the trailer on the passenger side.

5. WASHBOARD COURSE:

Remark: Inspection following the completion of the Washboard Course testing

revealed that the payload had moved an additional 0.5 inches toward the rear on

the driver's side and 0.5 inches toward the front on the passenger side. The

payload also moved 0.25 inches toward the passenger side.

5-7

Page 23: Transportability Testing of the M872 A4 Semi-Trailer, TP-94-01

Photo 6. Washboard Course Testing of the M872 A4 Semi-Trailer withthe 155MM Separate Loading Projectiles

D. CONCLUSION:

1. The semi-trailer tie-down rings and anchors performed adequately during

testing.

2. The flat wooden deck on the trailer had sufficient width so that the 155MM

Separate Loading Projectiles could be loaded six pallets per row in accordance

with drawing 1948 4901/1 "Loading Tie Down, and Unloading Procedures for

Separate Loading Projectiles in/on Tactical Vehicles," page 18.

5-8

Page 24: Transportability Testing of the M872 A4 Semi-Trailer, TP-94-01

5.3

Testing Date: 3 March 2005

Test Specimen: M872 A4 Semi-Trailer

Purpose: Determine if two Container Roll-In/Out Platforms (CROPs) could be

secured to the M872 A4 Semi-Trailer.

Sequence of Events:

a. The empty CROP was loaded onto the front of the trailer using a

forklift. The CROP could not be secured to the M872 A4 Semi-

Trailer due to the CROP interfered with the forward deck recessed

tie-downs.

b. The empty CROP was loaded on the rear of the trailer using a

forklift. The CROP interfered with using the recessed tie-downs in

the center of the trailer. Also, at the end of the trailer there was not

sufficient room to secure and tighten the chains and binders.

c. An empty CROP was loaded onto the trailer using the PLS Truck.

The CROP could not be placed far enough forward to secure the

CROP at the rear of the trailer. The CROP interfered with using the

recessed tiedowns at the end of the trailer.

d. A loaded CROP (24,700 pounds) could not be loaded onto the

trailer using the PLS Truck. The rollers on the CROP would drop

into the channel of the recessed tie-down rings and misalign when

the CROP contacted the end of the deck boards. The CROP could

not be properly aligned on the trailer and overhung the side of the

trailer.

5-9

Page 25: Transportability Testing of the M872 A4 Semi-Trailer, TP-94-01

Photo 7. Interference of CROP with the Recessed Tiedowns

Observation: As designed, the M872 A4 Semi-Trailer cannot transport two

CROPs.

5-10

Page 26: Transportability Testing of the M872 A4 Semi-Trailer, TP-94-01

PART 6- DRAWINGS

The following drawing represents the load configuration that was subjected to

the test criteria.

6-1

Page 27: Transportability Testing of the M872 A4 Semi-Trailer, TP-94-01

MLRS

LOADING, TIEDOWN, AND UNLOADINGPROCEDURES FOR THE ROCKETPOD/CONTAINER (RP/C) FOR THEMULTIPLE LAUNCH ROCKET SYSTEMIN/ON TACTICAL VEHICLES

ITEN PAGE(S)

EN6tAL NOTES AND IMATERIAL SPECIFICATIONS- - -- - - - - - - - - --- 2CONTAINER DETAILS- - - - - - - - --------------------------------- 3LOAD GUIDANCE NOTES AND CHARTS- ---- 4-3TIEDOWN PROCENUES FOR ONE CONTAINER ------------------------ 6TIEOOWN PROCEIUES FOR TWO CONTAINES (METHOD I) -- 7TIEDOWN PROCURES FOR TWO CONTAINES (MIETHOD II) -8aTIEDOWN PROCEOLURES FOR THE CONTAIlSNES------ 9TIEDOWN PROCJMRES FOR FOUR ANIOR EIGHT CONTAINERS (METH0D I) ---- 10,11TIEDOWN PROCES FOR FOUN ANDA'R EIGlT CONTAINERS- (METHOD II) ---- 12,13PECIAL TIEDOIN PRDCURES FOR LOAnINS ONE THOUGH

FOUR CONTAI"NS ON THE I0-TON N'77AUl HEIITT -------------- ---- 14-1ISPECIAL TIDOWN PRONURES FOR LOADING ONE ANe WOCONTAINE=S ON THE 1 1-TON HE19 T ------------------------- 19-20SPECIAL TIBIOWN PROCEDURES FOR LOADING ONE THOUGHFOUR CONTAII•RS ON THE 11-TON IIUSAI HEMAT -------------------- 21-24DETAILS ------------------------------------------------- 25-32

U.S. ARMY MATERIEL COMMAND DRAWING.ra U.S. mw Now 1UI iK -o

B. LEON"W J. SIMONS

myý IN WIWSDU Gm wa, U.S. OZYIII IVuuzON Imi m om II IIIII-I

= •"FEBRUARY 1982U.S. fmu muim MO SDu•.2w• wL I l IIII

DO NOT SCALE I 19 48 8152 GIII7RSISEE THE REVISION LISTING ON PAGE 3

PROJECT WI 725-60

Page 28: Transportability Testing of the M872 A4 Semi-Trailer, TP-94-01

LIF/r .W FITTING UUTEUTT EAI ASINLE~TL

PAE 3. PSITON @ ASUUYASM DEANCOHM3

50*3~~~~~a POSk 5 ~l I NF~ATE 4.BTYPE it MON muM 1ES :

(70OKUT LOCATIM USMN, AS T liSEEm *wLOAD GJIDNCE SIWP 5

EAC SINAMT). IBLT( ).DlA

SNDICATE MSTHE KAIEY U AMSE 4 US

DOWN TRIA , ( SlPOINAI' TILY A (B.MO (SE T. CTAITLAFT TIEWN ASSEMBV. ONSPRI TO. PR-OWS PRW AT TMN PROMUS U

INMCOS ADUSTALE, SlOE O ADJAENTF TO AH UIFT/T1W FMITIDSCLFF SLEEES ON WD U TiEW lOIN CONTAINR ATD IN L0INEERICALYSTRAP TIMM ASOMY SEE SECIAL NOTES AND 5 NPAGOE 13.FST

TOAGE V513. PSTION 0 ADSSEBYAH A T O! IF N8)AAS PSIN L STANDM VRAE T TINE PLCEATTOLABOTTOM OF ASMSLY SE PCA E ON PON.

-0 STRAP 'UEOO ASSBY (4 RO). DTLLASlOK VIL CEEONSIST TOF AW STRAUWEPS 11 UOE7Oie WT EINCIRCL ATL NE CONTAINER ATE. THMESIVORTE NON-RAIDET. DII C S1~TOA SF TIEEAT MW MONS. TAKE UP MISSM 14iI STRAP 5NOE RATCHET TIGHT. MWM. DOTE 0 MSTHE

SE 11RLMM'r FN XON PAME 2.

PAMAT LOATON MIGK TOTIFl A TETEI3 AN OOPPOSIT SIM CF;a.P~lMSTA Slr

Page 29: Transportability Testing of the M872 A4 Semi-Trailer, TP-94-01

1. A MAXDI LO O IMW CUITAII ItSH INA 22-1/2-15N 1M1 NME1NIUl NYIUVl dUSIC x OFW WIDE BY 34, LIG. - X G' X 30* QI lM)..• /,/ " EACH PmB: TO THE

2. 1HE WD.E 3S0N VAS 30AU AS TiW MLY AND XofPMimvn'OdVROWS 011OF OW ODWSUSS 3i4O1 HIM A SLWMET IF NAILS.UWMITY OF TIMM AI.IM LOCATIO ON THE 16L. MAYa UB 70 T1O WUT 1. LOWD 14.

3. FOIT1 11i0 STACKS OF W pNA F"I AT ALOCATII THAT VIJ. ALLOV SM A•S 10 a 1 r-V X F XK W (2 M).P31130r AT 116E AWMI•TE LOCATIN SUM. NOTE NAIL BE0 PIKE TO THE"INXT 116 AFT W OF 7W6 COADM M POANTZI 2' X W PIEM V,•10d1MA U6 IUARD 00 OF 71E WOU0.E. AISlN TH1T NAILS.IN fADC~M PlS O 6 101r CWNTAMU AM NATO 116MA INJ 1411 ON OTHTOP 116W CIAIW.

4. P3115611 TWSl1P AUJKLIE A AM TOSPAGNASSNJE C AS L~DUl 0 1111. 4 .rxrxw I

S. 116 H T A1 Y A P • -W iN TO PIt U.116 SM F~M s TO I0 ZSTII1T F sITH6 W4ADSHS - WdPUWT. PU-P31113 amVE6E FLOOR ANAOR 91 TOP OF A ON3TAlW AS LOGAOB 1ON PI I=.

SPMUC ASSEISY C

6. THE 1AW ASO.Y A PIKES• ME 1 =MlO TO SPAPERA-SYT

CIETW OP 11O LlPT/r M5 FI17105 0 LATERALLYADACWlA DIMI. FI.-POIITiN 16M3PIES AT11TE LCATIUOS SWO AS LGAOM PR031.

7. IFTELODIS WINRM M O ANU HIMEOUMU SE1 N= 7 ON PAS 4, NOTE 11AT THE

AIlWIU LOA D6 116 3 W)2 II. 1M6T7S OFS ICWADMi. DE TO COATADW I51.

0. A TOTAL. OF a STRAP TIMM A6.SSLIESWE -OEDR 6 LOAD M1. ABOVE.

iETADW E.Oi, 2 X 4° X 5--,.7 (C 2 li).NAIL To 10116 IIMT PiK•E V-lod NAILS.

SlwoD Pum~ To FIRST I'miWD-lOd NAILS M THR Pm

TOTO ~ V'S-w (NAILS

CWtADM -------- -------- 31,744 LISMAN ----------------- -1 .LO

TOTAL X -----------" 2,35 LIS (1U•1M)

EIGHT 1ZONTAVIUS (IETHOG ID, rpM 131

PROJECT GIH 725-90

Page 30: Transportability Testing of the M872 A4 Semi-Trailer, TP-94-01

LOADING, TIEDOWN, AND UNLOADINGPROCEDURES FOR SEPARATE LOADINGPROJECTILES IN/ON TACTICAL VEHICLES

WMAL m.0115 A MMII *l4. SPICIFICATIONSIlWMID INi""SICUEMIT OF PALIETI3D SWAPNAU LOA01NG 1•1SC.... 6-19

SWCUUMINIET 0 L005 SEPARIA 10MO1G P*OACTItLS . .. 9SiCURKIM OF LO K A0I0 N PAUTlInD SIP IN TRIUC,

TACTICAL. HEAVY EPANOID MOIIiUTY I HNI1T).WICKr M" NION M40 w ~4

SICUMMT OF LOM lMIMI SIP IN 7W".OOS PROJ'CTILI IMStRAINT SYSM I LPS)" V 44-Si

TI T PROCEURO,$S CPICTE WITHIN THIS DIAWING ARE Lth

FOR I-HIGIWAY USL HOWM. THEY MAY ALSO KUM FOR N•41IGHWAY USE, IF DESIKA i i - i

_________ ARMY AMC DRAWING__....... •JANUARY 1986

19 401/1CA

00MC CA01- 2CAE 70

Page 31: Transportability Testing of the M872 A4 Semi-Trailer, TP-94-01

LpaIIC UMOIP

A. MAMMA= LO" OP SONIrf-A PA MUSP UWm SIP U SHOW 04 ASSIIIIMA, 3640M. MIS, NW#W ONAONIU OP 4W~b1 (@0 IV4 VAN. S4 MOPS 4 WOW. I WMO40 A MIRE @•AsWVlI SOmS

w N. @m va, I POP aNcf. w vaUN "m 41. €. e uMaa UN4A•141E1UICM A rvWA O4IY, AND SS OOIrla DWAONIC, WUG u4WI A 10S41CN GUAM4Nff OP TMC04 AN-. I5, k=ATM £4045 tHE IM WAY N VIM POP A MAlL CP FPMIML LOe.

3. A ?MTAL OP flVWV4WO WEE SelF 1IN AMEOMUS All ROO1MSWC

4. THE we4 36556 MIAP It poll45l APMINIS vwid flm LOOM OPMIE WIt#. MEG, THI @J&D4W OP ~MUM No4 UNO MWY UCMwie s AS Ens. POP lUMPS. "mO "ON mn" M115365FWJE PALIUS VeN APOs @45 vOw OP P55 PMLES. in msPM MOP

U @4 Mel 4.

6-

MOM 15656 iOWO @ 55I OP Nin @43 O P US

WiSE, TOA UEP I M ASI ( 116555lI), K mE0 AP 1t4 UN".1.

1 SU Sl 0=I MI. SESIE $PON" mm 01

I MOPS 9 Allnd•1Is S* @41Mel S.4 ALOPE ?la AIIS 19I @4 PASS . MO

lm(fi=A m•II•wfr).oww"II)

(55 GE~In MOPSA Sm Is am powS.

5565 OP.~( We sum wwoHE ASO. cC aW 4m. wwSML wme SNA vO one4MOM A 1(6054 MESCON 04 obe OP ofta 4084 fWlO PAULSE@

OP. TOP Ah =&A" MCHO 0 WMUP ENDS SME IN TH MEK.U. TiI3L~~~TAK UP15 INII EHOP IN MAP50me01311101m N L. sall 13 Sf5

NON W6 '3 MiS ON AO# 2. 50M1 MOPS .MIS '0to o W MNl NS. 914 MOPS ( @4 POM 1. NUAS VIO PER MOP S Si

(LOIS EKIMEC AOP 11101000) Ml PASSNCPIN".AC "tPMC

S.TIH3 flU 0AM "M MOMP SONH TWO TWOUW IMp OP. 1(3554UP40

40C N110*3 MAi fl" 'N3 vAg MW III PAGL VMSF '5 APO

@4 lUMe REETHEWIOPP@1I11tIi S•Li1155

S. iONS IRARAI 1 1 @4 14"6 MD OW P. TW -AIE)M SE HM

401 (4946 m 4h 0 03wo)"Il1.s wn

UINM AS SHOW 46 S

NOWW SL - 0 - 004U