transport database and information systems …€¦ · united nations wp.30 135th session –...

19
Economic Commission for Europe UNITED NATIONS Working Party on Customs Questions affecting Transport 135 st session 1 -4 October 2013 Cost Benefit Analysis of the eTIR system Summary, limitations and recommendations Agenda item 7.b.i André Sceia

Upload: others

Post on 09-Jul-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TRANSPORT DATABASE AND INFORMATION SYSTEMS …€¦ · United Nations WP.30 135th session – Geneva– Oct 2013 Economic Commission for Europe 13 Results of the CBA 0 10000000 20000000

Economic Commission

for Europe

UNITED

NATIONS

Working Party on Customs Questions affecting Transport 135st session

1 -4 October 2013

Cost Benefit Analysis of the eTIR system

Summary, limitations and recommendations Agenda item 7.b.i

André Sceia

Page 2: TRANSPORT DATABASE AND INFORMATION SYSTEMS …€¦ · United Nations WP.30 135th session – Geneva– Oct 2013 Economic Commission for Europe 13 Results of the CBA 0 10000000 20000000

United Nations

WP.30 135th session – Geneva– Oct 2013

Economic

Commission

for Europe

2

Outline

Informal document GE.1 No.2 (2013)

Summary of the CBA

Assessment

Recommendations

Page 3: TRANSPORT DATABASE AND INFORMATION SYSTEMS …€¦ · United Nations WP.30 135th session – Geneva– Oct 2013 Economic Commission for Europe 13 Results of the CBA 0 10000000 20000000

United Nations

WP.30 135th session – Geneva– Oct 2013

Economic

Commission

for Europe

3

Outline

Summary of the CBA

– Technical options

– Scenarios

– Costs

– Benefits

– Results

Assessment

Recommendations

Page 4: TRANSPORT DATABASE AND INFORMATION SYSTEMS …€¦ · United Nations WP.30 135th session – Geneva– Oct 2013 Economic Commission for Europe 13 Results of the CBA 0 10000000 20000000

United Nations

WP.30 135th session – Geneva– Oct 2013

Economic

Commission

for Europe

4

Technological options

At premises

UNOG

UNICC

IaaS (Infrastructure as a Service

PaaS (Platform as a Service

SaaS (Software as a Service)

Page 5: TRANSPORT DATABASE AND INFORMATION SYSTEMS …€¦ · United Nations WP.30 135th session – Geneva– Oct 2013 Economic Commission for Europe 13 Results of the CBA 0 10000000 20000000

United Nations

WP.30 135th session – Geneva– Oct 2013

Economic

Commission

for Europe

5

Scenarios

Year 1 2 3 4 5 6 7 8 9 10 11 12

N° of CP 3 3 3 5 10 10 5 5 5 4 4

0

500

1000

1500

2000

2500

3000

1 2 3 4 5 6 7 8 9 10 11 12

Scenario 1

Scenario 2

Page 6: TRANSPORT DATABASE AND INFORMATION SYSTEMS …€¦ · United Nations WP.30 135th session – Geneva– Oct 2013 Economic Commission for Europe 13 Results of the CBA 0 10000000 20000000

United Nations

WP.30 135th session – Geneva– Oct 2013

Economic

Commission

for Europe

6

Costs

Development costs

Initial costs

Operational and hosting costs

Helpdesk costs

Costs to adapt national applications

Page 7: TRANSPORT DATABASE AND INFORMATION SYSTEMS …€¦ · United Nations WP.30 135th session – Geneva– Oct 2013 Economic Commission for Europe 13 Results of the CBA 0 10000000 20000000

United Nations

WP.30 135th session – Geneva– Oct 2013

Economic

Commission

for Europe

7

Development costs

kernel (ensuring the

electronic exchange of

eTIR messages),

the web base user

interface, which would

serve as backup to the

kernel, and

the administration

console.

924 800 – 1 127 000 USD

Page 8: TRANSPORT DATABASE AND INFORMATION SYSTEMS …€¦ · United Nations WP.30 135th session – Geneva– Oct 2013 Economic Commission for Europe 13 Results of the CBA 0 10000000 20000000

United Nations

WP.30 135th session – Geneva– Oct 2013

Economic

Commission

for Europe

8

Initial Costs

Min Max

At premises 1,255,000 1,450,000

UNOG 681,500 792,500

UNICC 632,000 743,000

IaaS 632,000 743,000

PaaS 142,000 183,000

SaaS 10,000 15,000

Page 9: TRANSPORT DATABASE AND INFORMATION SYSTEMS …€¦ · United Nations WP.30 135th session – Geneva– Oct 2013 Economic Commission for Europe 13 Results of the CBA 0 10000000 20000000

United Nations

WP.30 135th session – Geneva– Oct 2013

Economic

Commission

for Europe

9

Operational and hosting costs

Min Max

At premises 340,419 526,059

UNOG 194,739 243,259

UNICC 167,719 257,059

IaaS 113,402 153,126

PaaS 159,116 180,816

SaaS 1,500,000 3,000,000

Page 10: TRANSPORT DATABASE AND INFORMATION SYSTEMS …€¦ · United Nations WP.30 135th session – Geneva– Oct 2013 Economic Commission for Europe 13 Results of the CBA 0 10000000 20000000

United Nations

WP.30 135th session – Geneva– Oct 2013

Economic

Commission

for Europe

10

Helpdesk costs

Minimal helpdesk: 2 IT specialists working

40 hours a week.

Initial costs: 24 500 – 44 000 USD

Operating and personnel costs :

126 180 - 216 600 USD/year

Page 11: TRANSPORT DATABASE AND INFORMATION SYSTEMS …€¦ · United Nations WP.30 135th session – Geneva– Oct 2013 Economic Commission for Europe 13 Results of the CBA 0 10000000 20000000

United Nations

WP.30 135th session – Geneva– Oct 2013

Economic

Commission

for Europe

11

Costs to adapt national applications

Update national IT system

integrating eTIR web services in the national applications

developing web

services

120 000 – 150 000 USD/Country

Page 12: TRANSPORT DATABASE AND INFORMATION SYSTEMS …€¦ · United Nations WP.30 135th session – Geneva– Oct 2013 Economic Commission for Europe 13 Results of the CBA 0 10000000 20000000

United Nations

WP.30 135th session – Geneva– Oct 2013

Economic

Commission

for Europe

12

Benefits

For Customs: 1.44 USD / Transport

For the guarantee chain: 2 USD / Transport

For holders: 5.5 USD / Transport

Page 13: TRANSPORT DATABASE AND INFORMATION SYSTEMS …€¦ · United Nations WP.30 135th session – Geneva– Oct 2013 Economic Commission for Europe 13 Results of the CBA 0 10000000 20000000

United Nations

WP.30 135th session – Geneva– Oct 2013

Economic

Commission

for Europe

13

Results of the CBA

0

10000000

20000000

30000000

40000000

50000000

60000000

70000000

80000000

0%

100%

200%

300%

400%

500%

600%

Scenario 1

0

5000000

10000000

15000000

20000000

25000000

30000000

0%

50%

100%

150%

200%

250%

300%

Scenario 2

Net present value(right)

Overall ROI (left)

Page 14: TRANSPORT DATABASE AND INFORMATION SYSTEMS …€¦ · United Nations WP.30 135th session – Geneva– Oct 2013 Economic Commission for Europe 13 Results of the CBA 0 10000000 20000000

United Nations

WP.30 135th session – Geneva– Oct 2013

Economic

Commission

for Europe

14

Outline

Summary of the CBA

Assessment

– General and scope

– Methodological aspects

Recommendations

Page 15: TRANSPORT DATABASE AND INFORMATION SYSTEMS …€¦ · United Nations WP.30 135th session – Geneva– Oct 2013 Economic Commission for Europe 13 Results of the CBA 0 10000000 20000000

United Nations

WP.30 135th session – Geneva– Oct 2013

Economic

Commission

for Europe

15

General and scope assessment

Good assumptions (eTIR RM), tech. options

Simple scenarios

Missing indirect benefits

Missing costs for holders and guarantee

chain

Missing “of the shelf” technological option

Labour costs too low for Geneva

Page 16: TRANSPORT DATABASE AND INFORMATION SYSTEMS …€¦ · United Nations WP.30 135th session – Geneva– Oct 2013 Economic Commission for Europe 13 Results of the CBA 0 10000000 20000000

United Nations

WP.30 135th session – Geneva– Oct 2013

Economic

Commission

for Europe

16

Methodological aspects

Function point analysis

Detailed cost analysis (incl. risk factors)

ROI and NPV (5% disc. rate)

CBA based on unit costs

Page 17: TRANSPORT DATABASE AND INFORMATION SYSTEMS …€¦ · United Nations WP.30 135th session – Geneva– Oct 2013 Economic Commission for Europe 13 Results of the CBA 0 10000000 20000000

United Nations

WP.30 135th session – Geneva– Oct 2013

Economic

Commission

for Europe

17

Outline

Summary of the CBA

Assessment

Recommendations

Page 18: TRANSPORT DATABASE AND INFORMATION SYSTEMS …€¦ · United Nations WP.30 135th session – Geneva– Oct 2013 Economic Commission for Europe 13 Results of the CBA 0 10000000 20000000

United Nations

WP.30 135th session – Geneva– Oct 2013

Economic

Commission

for Europe

18

Recommendations

Considering that the eTIR project seems to be highly profitable, it is

recommended that the eTIR system should be implemented as soon as

possible, including at national level, right after the required legal provisions,

the technical specifications and the project roadmap are finalized and agreed

on.

Considering the commercial sensibility of the data that will be handled by the

eTIR international system and in view of the relatively small costs differences

with the cloud solution recommended in the CBA, it is recommended that the

eTIR international system be hosted at UNICC or UNOG data centres;

Considering the availability on the market of message broker software,

including open source solutions, it is recommended to consider the use of

“off the shelf” solutions for the development of the eTIR international

system.

Considering the large benefits for TIR Carnet holders, a potential avenue to

explore for the financing of the eTIR international system seems to be through

a contributory system per TIR transport, similar to the one used for

TIRExB.

Page 19: TRANSPORT DATABASE AND INFORMATION SYSTEMS …€¦ · United Nations WP.30 135th session – Geneva– Oct 2013 Economic Commission for Europe 13 Results of the CBA 0 10000000 20000000

United Nations

WP.30 135th session – Geneva– Oct 2013

Economic

Commission

for Europe

19

Contacts

UNECE/TIR SECRETARIAT

Transport Division

8-14, Avenue de la Paix

CH-1211 Geneva 10

Switzerland

Phone: +41 22 917 13 13

Fax: +41 22 917 06 14

Email: [email protected]