Transparency
GRI SSE -- 7th Stakeholder Group MeetingVienna, 16 October 2009
Andrea ĆirlićováGTE+ Senior Adviser
• Transparency Platform
• Transparency requirements under Regulation (EC) 715/2009
• Transparency Guidelines to be annexed to Regulation (EC) 1775/2005
• Transparency Platform
gas-roads.eu
History
Phase 1
Phase 2
Development
17 November 2008
TSO-related informationCapacity & tariff informationSearch functionality
Further development & fine-tuning; TP ‘enlargement‘ *
CAM InformationBalancing Model information
17 March 2009
2 April 2009
Capacity display in kWh/d
Actual flows (allocations)Nominations/renominationsInterruptionsDownload facility
27 May 2009
* 17+10 TSOs represented on TP on 16 October 2009
November 2008
June 2008
gas-roads.eu
gas-roads.eu
Participating TSOs (1)
Participating TSOs (2)
TP Demonstration (1)
TP Demonstration (2)
TP Demonstration (3)
Phase 3
gas-roads.eu
Way Forward
TP development in 2009-2010 (1)
• Improving the data quality (‘added value of the information‘) & quantity
• Coordination of and support to TSOs in implementing voluntary transparency at the national level
• Attracting non-participating TSOs to join the project
gas-roads.eu
TP development in 2009-2010 (2)
• Enhancing user-friendliness
• Extending the scope of information provided• Using the TP as a way to comply with Regulation (EC) 715/2009‘s
transparency obligations?
• Introducing more interactive elements, e.g. database-search for aggregated information relating to the transmission systems, incl. possibly data collected for the development of TYNDP
• Supporting the participation of other infrastructure operators
gas-roads.eu
Based on feedback; issues raised at Transparency Workshop on 30 Sep 2009
Long-term Objective
gas-roads.eu
• Creation of extensive database
• Creation of interactive tool
• For network users
• For TSOs
• For ACER / MSs
• Commission
Considering that the data may be used by consultancies to sell transparency-related
services, should the use of certain TP services be charged?
• Transparency requirements under Regulation (EC) 715/2009
Regulation (EC) 715/2009
• Published in the Official Journal on 14 August 2009
• Applicable as of 3 March 2011 (repeals Regulation (EC) 1775/2005)
• Additional transparency obligations vis-à-vis TSOs
• New transparency obligations vis-à-vis SSOs and LNG SOs
• To ensure consistent implementation of the transparency obligations by TSOs, GTE+ has undertaken to define a common European approach by specifying the deliverables and recommends all its members as well as other TSOs to implement them
Transparency Obligations• 3-minus rule not applicable any more
• “The transmission system operator shall make public ex-ante and ex-post supply and demand information, based on nominations, forecasts and realised flows in and out of the system. The national regulatory authority shall ensure that all such information is made public. The level of detail of the information that is made public shall reflect the information available to the transmission system operator.The transmission system operator shall make public measures taken as well as costs incurred and revenue generated to balance the system.The market participants concerned shall provide the transmission system operator with the data referred to in this Article.”
• “Each LNG and storage system operator shall make public the amount of gas in each storage or LNG facility, or group of storage facilities if that corresponds to the way in which the access is offered to system users, inflows and outflows, and the available storage and LNG facility capacities, including for those facilities exempted from third-party access. That information shall also be communicated to the transmission system operator, which shall make it public on an aggregated level per system or subsystem defined by the relevant points. The information shall be updated at least daily.” ** Publication may be restricted for a certain time period if the aggregate information refers to only one user, and an exemption has been granted by the NRA on the basis of a request by the storage user.
Ex-ante Supply
* To be published at 6 p.m. CET
If the TSO is obliged, under national regulatory rules, to provide its own supply forecast, such forecast will be published along with the ex-ante supply information as specified above.
Ex-ante supply information* In kWh/d
Aggregated nominations at entries (as specified in the rows below)
Aggregated nominations at IPs with other transmission systems (incl.
balancing zones within the same transmission system) or between
market areas
Aggregated nominations at IPs with storage systems
Aggregated nominations at IPs with production facilities
Aggregated nominations at IPs with LNG terminals
Supply forecast by TSO In kWh/d
Supply forecast
Ex-ante Demand
If the TSO is obliged, under national regulatory rules, to provide its own demand forecast, such forecast will be published along with the ex-ante demand information as specified above.
Ex-ante demand information* In kWh/d
Aggregated nominations at exits (as specified in the rows below)
Aggregated nominations at IPs with other transmission systems (incl. balancing
zones within the same transmission system) or between market areas
Aggregated nominations at IPs with storage systems
Aggregated nominations at IPs with LNG terminals (if applicable)
Demand forecast by TSO In kWh/d
Demand forecast
* To be published at 6 p.m. CET
The information on ex-ante demand will be extended by Aggregate Nominations at IPs with distribution systems if such nominations are available to the TSO, or by any comparable figure if supplied by suppliers to the TSO.
Ex-ante Supply and Demand
• The information on ex-ante supply and demand will be accompanied by the following note if applicable:
The ex-ante supply and demand information needs to considered in the light of the following system specificities: (1)network users are allowed to nominate imbalances;
(2) network users are allowed to nominate virtual counter flows at the IPs between TS-DS (the Aggregate Nomination will be published under ex-ante supply information);
(3) one or more storage facilities are connected to the relevant distribution networks;
(4) one or more production facilities are connected to the relevant distribution networks.
Ex-post Supply
*To be published within 48 hours after the end of the relevant Gas-Day on preliminary basis and by M+30 (working days) as validated figures..
Ex-post supply information* In kWh/d
Aggregated allocations at entries (as specified in the rows below)
Aggregated allocations at IPs with other transmission systems (incl.
balancing zones within the same transmission system) or between market
areas
Aggregated allocations at IPs with storage systems
Aggregated allocations at IPs with production facilities
Aggregated allocations at IPs with LNG terminals
Ex-post Demand
Ex-post demand information* In kWh/d
Aggregated allocations at exits (as specified in the rows below)
Aggregated allocations at IPs with other transmission systems (incl. balancing
zones within the same transmission system) or between market areas
Aggregated allocations at IPs with storage systems
Aggregated allocations at IPs with LNG terminals (if applicable)
Aggregated allocations at IPs with distribution systems and directly connected
customers
*To be published within 48 hours after the end of the relevant Gas-Day on preliminary basis and by M+30 (working days) as validated figures..
Balancing Info
Dynamic type of information should be defined at the national level to reflect the specificities of the respective balancing regime.
Storage & LNG InfoStorage data* Units*
Daily aggregated amount of gas in storage facilities per (sub)system in kWh or m3
Daily aggregated inflows and aggregated outflows in and from storage facilities per (sub)system
in kWh or m3
Daily available capacities at storage facilities aggregated per (sub)system
LNG data* Units
Daily aggregated amount of gas in LNG facilities per (sub)system in kWh or m3
Daily aggregated inflows and aggregated outflows in and from LNG facilities per (sub)system
in kWh or m3
Daily available capacities at LNG facilities aggregated per (sub)system
A joint meeting will be yet held with GSE and GLE to discuss the exact form of publishing aggregated available capacities and the communication format.
Conclusions
• 3rd energy package has brought some more explicit transparency provisions but considerable room for interpretation still remains– Transparency provisions primarily define what information should
be published NOT always who the originator of the information is (e.g. forecasts), which is subject to a subsidiarity principle and needs to be decided at the national level
• GTE+ has attempted to define a common European approach to implementation to ensure consistency and comparability of information
• GTE+ is ready to further work on this issue with all stakeholdersNote: The implementation of the transparency obligations should be considered
along with the implementation of other obligations under both Regulation (EC) 715/2009 and Directive 2009/73/EC.
• Transparency Guidelines to be annexed to Regulation (EC) 1775/2005
State of Play
• Final draft Transparency Guidelines in Commission‘s inter-service consultation
• Comitology procedure to be started in November
• Due to the legal construct for transition between 2nd and 3rd energy package provisions, timeline for the whole process, incl. implementation, is far from clear
• The final draft guidelines‘ transparency requirements are more extensive than originally envisaged in the text presented at MF in May 2009– The implementation of such requirements is likely to call for a
substantial amount of time and money