![Page 1: Transmittal of the Meeting Materials for the NRC's Meeting ...ENCLOSURE 1 Docket No. 52-021 MHI Ref: UAP-HF-09206 MITSUBISHI HEAVY INDUSTRIES, LTD. AFFIDAVIT I, Yoshiki Ogata, state](https://reader034.vdocuments.site/reader034/viewer/2022042803/5f4bb90b78a0e2619845e9bb/html5/thumbnails/1.jpg)
AtMITSUBISHI HEAVY INDUSTRIES, LTD.
16-5, KONAN 2-CHOME, MINATO-KU
TOKYO, JAPANApril 27, 2009 ,
Document Control DeskU.S. Nuclear Regulatory CommissionWashington, DC 20555-0001
Attention: Mr. Jeffrey A. CioccoDocket No. 52-021
MHI Ref: UAP-HF-09206
Subject: Transmittal of the meeting materials for the NRC's Meeting for PRA Modelof US-APWR
With this letter, Mitsubishi Heavy Industries, Ltd. ("MHI") transmits to the U.S. NuclearRegulatory Commission ("NRC") the meeting materials that have been presented during theNRC's meeting for PRA model of US-APWR. The meeting was held on April 14th through15th at Washington, U.S.
The enclosed meeting materials contain information that MHI considers proprietary, andtherefore the materials should be withheld from disclosure pursuant to 10 C.F.R. § 2.390(a)(4) as trade secrets and commercial or financial information which is privileged orconfidential. In accordance with the NRC submittal procedures, this letter includes anAffidavit (Enclosure 1) that identifies' the reasons MHI respectfully requests that all materialsdesignated as "Proprietary" in Enclosure 1 be withheld from disclosure pursuant to 10 C.F.R.§ 2.390 (a)(4).
Please contact Dr. C. Keith Paulson, Senior Technical Manager, Mitsubishi Nuclear EnergySystems, Inc. if the NRC has questions concerning any aspect of this submittal. His contactinformation is provided below.
Sincerely,
Yoshiki Ogata,General Manager-APWR Promoting DepartmentMitsubishi Heavy Industries, LTD.
Enclosures:
1. Affidavit of Yoshiki Ogata
2. Meeting material "I&C Presentation for PRA model" (Proprietary version)
3. Meeting material "I&C Presentation for PRA model" (Non-Proprietary version)
![Page 2: Transmittal of the Meeting Materials for the NRC's Meeting ...ENCLOSURE 1 Docket No. 52-021 MHI Ref: UAP-HF-09206 MITSUBISHI HEAVY INDUSTRIES, LTD. AFFIDAVIT I, Yoshiki Ogata, state](https://reader034.vdocuments.site/reader034/viewer/2022042803/5f4bb90b78a0e2619845e9bb/html5/thumbnails/2.jpg)
CC: J. A. CioccoC. K. Paulson
Contact InformationC. Keith Paulson, Senior Technical ManagerMitsubishi Nuclear Energy Systems, Inc.300 Oxford Drive, Suite 301Monroeville, PA 15146E-mail: [email protected]: (412) 373-6466
![Page 3: Transmittal of the Meeting Materials for the NRC's Meeting ...ENCLOSURE 1 Docket No. 52-021 MHI Ref: UAP-HF-09206 MITSUBISHI HEAVY INDUSTRIES, LTD. AFFIDAVIT I, Yoshiki Ogata, state](https://reader034.vdocuments.site/reader034/viewer/2022042803/5f4bb90b78a0e2619845e9bb/html5/thumbnails/3.jpg)
ENCLOSURE 1Docket No. 52-021
MHI Ref: UAP-HF-09206
MITSUBISHI HEAVY INDUSTRIES, LTD.
AFFIDAVIT
I, Yoshiki Ogata, state as follows:
1. I am General Manager, APWR Promoting Department, of Mitsubishi Heavy Industries,LTD ("MHI"), and have been delegated the function of reviewing MHI's US-APWRdocumentation to determine whether it contains information that should be withheld frompublic disclosure pursuant to 10 C.F.R. § 2.390 (a)(4) as trade secrets and commercial orfinancial information which is privileged or confidential.
2. In accordance with my responsibilities, I have reviewed the enclosed document entitled"Meeting material I&C Presentation for PRA model" dated April 2009, and havedetermined that portions of the document contain proprietary information that should bewithheld from public disclosure. Those pages containing proprietary information areidentified with the label "Proprietary" on the top of the page and the proprietary informationhas been bracketed with an open and closed bracket as shown here "[ ]". The firstpage of the document indicates that all information identified as "Proprietary" should bewithheld from public disclosure pursuant to 10 C.F.R. § 2.390 (a)(4).
3. The information identified as proprietary in the enclosed document has in the past been,and will continue to be, held in confidence by MHI and its disclosure outside the companyis limited to regulatory bodies, customers and potential customers, and their agents,suppliers, and licensees, and others with a legitimate need for the information, and isalways subject to suitable measures to protect it from unauthorized use or disclosure.
4. The basis for holding the referenced information confidential is that it describes theunique design of I&C system, developed by MHI and not used in the exact form by any ofMHI's competitors. This information was developed at significant cost to MHI, since itrequired the performance of Research and Development and detailed design for itssoftware and hardware extending over several years.
5. The referenced information is being furnished to the Nuclear Regulatory Commission("NRC") in confidence and solely for the purpose of information to the NRC staff.
6. The referenced information is not available in public sources and could not be gatheredreadily from other publicly available information. Other than through the provisions inparagraph 3 above, MHI knows of no way the information could be lawfully acquired byorganizations or individuals outside of MHI.
7. Public disclosure of the referenced information would assist competitors of MHI in theirdesign of new nuclear power plants without incurring the costs or risks associated withthe design and testing of the subject systems. Therefore, disclosure of the informationcontained in the referenced document would have the following negative impacts on thecompetitive position of MHI in the U.S. nuclear plant market:
![Page 4: Transmittal of the Meeting Materials for the NRC's Meeting ...ENCLOSURE 1 Docket No. 52-021 MHI Ref: UAP-HF-09206 MITSUBISHI HEAVY INDUSTRIES, LTD. AFFIDAVIT I, Yoshiki Ogata, state](https://reader034.vdocuments.site/reader034/viewer/2022042803/5f4bb90b78a0e2619845e9bb/html5/thumbnails/4.jpg)
A. Loss of competitive advantage due to the costs associated with development ofthe I&C system. Providing public access to such information permits competitorsto duplicate or mimic the I&C system design without incurring the associatedcosts.
B. Loss of competitive advantage of the US-APWR created by benefits of enhancedplant safety, and reduced operation and maintenance costs associated with theI&C system.
I declare under penalty of perjury that the foregoing affidavit and the matters stated thereinare true and correct to the best of my knowledge, information and belief.
Executed on this 27th day of April, 2009.
Yoshiki Ogata,General Manager-APWR Promoting Department
Mitsubishi Heavy Industries, LTD.
![Page 5: Transmittal of the Meeting Materials for the NRC's Meeting ...ENCLOSURE 1 Docket No. 52-021 MHI Ref: UAP-HF-09206 MITSUBISHI HEAVY INDUSTRIES, LTD. AFFIDAVIT I, Yoshiki Ogata, state](https://reader034.vdocuments.site/reader034/viewer/2022042803/5f4bb90b78a0e2619845e9bb/html5/thumbnails/5.jpg)
Docket No. 52-021MHI Ref: UAP-HF-09206
Enclosure 3
UAP-HF-09206Docket No. 52-021
Meeting material "I&C Presentation for PRA model"
April 2009(Non-Proprietary)
![Page 6: Transmittal of the Meeting Materials for the NRC's Meeting ...ENCLOSURE 1 Docket No. 52-021 MHI Ref: UAP-HF-09206 MITSUBISHI HEAVY INDUSTRIES, LTD. AFFIDAVIT I, Yoshiki Ogata, state](https://reader034.vdocuments.site/reader034/viewer/2022042803/5f4bb90b78a0e2619845e9bb/html5/thumbnails/6.jpg)
UZoAPwRI&C System Presentation
for PRA Model
Mitsubishi Heavy Industries, Ltd.
0
![Page 7: Transmittal of the Meeting Materials for the NRC's Meeting ...ENCLOSURE 1 Docket No. 52-021 MHI Ref: UAP-HF-09206 MITSUBISHI HEAVY INDUSTRIES, LTD. AFFIDAVIT I, Yoshiki Ogata, state](https://reader034.vdocuments.site/reader034/viewer/2022042803/5f4bb90b78a0e2619845e9bb/html5/thumbnails/7.jpg)
Contents
SSystem and Function of I&C System,/Overall Architecture/Reactor Trip System/ ESF System
SConfiguration of Digital I&C System/ Reactor Trip System/ ESF System (S signal as example)
SDiverse Actuation SystemV1 Configuration of DAS
v" Shared Portion between DAS and PSMS
SUnavailability Calculation/ Calculation Equationv' Bypass Model in PRA/ Unavailability of RTB
1
![Page 8: Transmittal of the Meeting Materials for the NRC's Meeting ...ENCLOSURE 1 Docket No. 52-021 MHI Ref: UAP-HF-09206 MITSUBISHI HEAVY INDUSTRIES, LTD. AFFIDAVIT I, Yoshiki Ogata, state](https://reader034.vdocuments.site/reader034/viewer/2022042803/5f4bb90b78a0e2619845e9bb/html5/thumbnails/8.jpg)
US-APWR I&C Overall Architecture
7.Z. -7. - HSIlCnimputer System-DAS PSMS .. PCM Protects&,ControSystemr-- " Ic RoomA. ID1 : Conventionl Type or Diverse SystemI- an~ntrl Rom MCR- - --.. . Cosol Ad---Con-- > Hardwired (HW) LneDies aeyVUTanA----- Consolle Advisor C eonsol: Point-to-point Data Link
Mulib Drop Signal Network (Redundant)HS Pane,.- ;l ý1 ""Eý
HSI Panel :IO Network (Redundant)
Opeato Io IT Network
Safety VDU ISainBs EOIF ComputerPI I ro c e s o r T ra in A - D o pi r ain g L p
System Level Conventional Switch Alarm Operational Procedure parne lVDU (A) VDU (0) VDU (P) PanelES VDU (TSC) Panel (rsc) II
Acuaio AN "mLre Aar rcs UnitESF Actuation Reactor Trip Computer
System Breaker SI-tIe Syst m p Syter Comontr... .. .. .... .IL- .- - .-- -, - .- -. -. - - ----------- -iI- + -: - . . . . . . . .. I- - - -- -- - -- -' - -- -' -- -- " -• . . .-
,~~~~ ....... ... . ... . 7- .. . "'LpMS~Ii e , o -1 Ii R c Tubn
I II D. TrEd nIDiSp" '/O, : "Sy A emIO
, -- ,, ua -SF S
.. ve ... T"~mponentsaeA S nReactor & Turbine Plant Non-safety CompoGeneants o(M/ Cnsole ensorContro Valve, Mot rVa ves, oleoi V ranvs to etc
Set)stumnr ProtePu VavesetionC
DAS : Diverse Actuation System PSMS : Protection and Safety Monitoring System HSIS : Human System Interface System PCMS : Plant Control and Monitoring System
DCD Section 7.1, Figure 7.1-1
2
![Page 9: Transmittal of the Meeting Materials for the NRC's Meeting ...ENCLOSURE 1 Docket No. 52-021 MHI Ref: UAP-HF-09206 MITSUBISHI HEAVY INDUSTRIES, LTD. AFFIDAVIT I, Yoshiki Ogata, state](https://reader034.vdocuments.site/reader034/viewer/2022042803/5f4bb90b78a0e2619845e9bb/html5/thumbnails/9.jpg)
US-APWR I&C Overall Architecture
SI&C system of the US-APWR consists of four systems./ Protection and Safety Monitoring System (PSMS)$ Plant Control and Monitoring System (PCMS)/ Human System Interface System (HSIS)/ Diverse Actuation System (DAS)
SProtection and Safety Monitoring System;v/ Encompasses safety-related I&C system.
" Reactor Trip System
" Engineered Safety Features (ESF) System/ Has configuration of four redundant trains./ Includes
" Reactor Protection System (RPS)* ESF Actuation System (EFSAS)* Safety Logic System (SLS)" Safety Grade HSIS
V/ Continuously checked by self-diagnosis function.
3
![Page 10: Transmittal of the Meeting Materials for the NRC's Meeting ...ENCLOSURE 1 Docket No. 52-021 MHI Ref: UAP-HF-09206 MITSUBISHI HEAVY INDUSTRIES, LTD. AFFIDAVIT I, Yoshiki Ogata, state](https://reader034.vdocuments.site/reader034/viewer/2022042803/5f4bb90b78a0e2619845e9bb/html5/thumbnails/10.jpg)
Reactor Trip System
Sensor
7HSIS Computers
The shared use oflprocess signal
Toot._er Im System
Acuaio Fromss [Alarmon E- signai nal Safety tSyte 'i Pgn.
IUi B s T
ESlFomoterTre aftyBu (, 5 B
Covnio S itchUSyBus
f ataionsnl DStca to eter'enal ovre
E 7F Acuto Systemo ASUSysUSinerac
Train I . ............
Isolaio poin
DC Seto772 iur .-
i!i
JE0TE0 ID0 BUS TE/ 0 IBS - - -----....-.- --- --- -- -Sae. u! ea.toi Protetinsssem Ar
.. . . . I.............. ..-----.-----...... SaafetyBBu
ES Fro ote Tri ----------------c --------------- (TrainC)
Esig a PAM signa Tt e T an ,M anual trip -Saf'ety -Bus -, ' (T anB
. .... .. J J _J ., .,actor , 1i IsigalSystem Level Notei ,i, i Conventional Switch i :Bus
I • / ' • I :Data-Link
----- Hard wvired• ~~~~~~~~~Reactor Trip Breaker (A to D)Elcraltopi oneerr
EFataonsignal iOptical to eleclrical converter
S ESF Actuation System A :BU inefe! .. . ........ ] Isolation point
DCD Section 7.2, Figure 7.2-1
4
![Page 11: Transmittal of the Meeting Materials for the NRC's Meeting ...ENCLOSURE 1 Docket No. 52-021 MHI Ref: UAP-HF-09206 MITSUBISHI HEAVY INDUSTRIES, LTD. AFFIDAVIT I, Yoshiki Ogata, state](https://reader034.vdocuments.site/reader034/viewer/2022042803/5f4bb90b78a0e2619845e9bb/html5/thumbnails/11.jpg)
Reactor Trip SystemLow SG Water Level
Reactor Protection System A
A/ I Functional allocation
i' E/, 1To other
E -RPS TrainsE/0
._1 From otherEO RPS Trains
From other functions
2/4 - To-]I To eachESFAS TrainJ
Fin
------Gr.1--'5°----J--
-.-_---- --- ...................... .......
High Pressurizer Pressure
} Sensor} Input Part(from Sensor)
Processing Part
(in RPS)
Output Part
(to RTB)
Unit bus, Safety BusIFrom other RPS TrainsI
i V '. 'II B1,82 C1,C2 D1,D2
V VRTB-A1 RTB-B1 RTB-A2 RTB-C2
RT1-C1 RTB-] RTB-B12 RTB-D_
Reactor Trip Breaker
DCD Section 7.2, Figure 7.2-8
5
![Page 12: Transmittal of the Meeting Materials for the NRC's Meeting ...ENCLOSURE 1 Docket No. 52-021 MHI Ref: UAP-HF-09206 MITSUBISHI HEAVY INDUSTRIES, LTD. AFFIDAVIT I, Yoshiki Ogata, state](https://reader034.vdocuments.site/reader034/viewer/2022042803/5f4bb90b78a0e2619845e9bb/html5/thumbnails/12.jpg)
Reactoy Trip, System
Reactor Trip System consists of;'(Sensor/Reactor Protection System (RPS)/Reactor Trip Breaker (RTB)
SDesign Features of RPS/RPS has two controller groups with functional
diversity which process diverse variables forreactor trip. (see next sheet)
v/Two controller groups are separated from eachother, from sensor to output module.
'(Manual initiation function is provided such thatautomatic process part of RPS is bypassed.
6
![Page 13: Transmittal of the Meeting Materials for the NRC's Meeting ...ENCLOSURE 1 Docket No. 52-021 MHI Ref: UAP-HF-09206 MITSUBISHI HEAVY INDUSTRIES, LTD. AFFIDAVIT I, Yoshiki Ogata, state](https://reader034.vdocuments.site/reader034/viewer/2022042803/5f4bb90b78a0e2619845e9bb/html5/thumbnails/13.jpg)
Diverse Parameters in TwoSeparate Controller Groups
Group 1 Group 2 Remark
Over Power A T High Power Range Over Power ProtectionHigh Power Range Neutron Flux Neutron FluxRate
Low RCP Speed Low Reactor Coolant Core Heat RemovalOver Temperature A T Flow Protection
Low PressurizerPressure
Low SG Water Level High Pressurizer Loss of Heat SinkHigh Pressurizer Water Level Pressure Protection
High Source Range Neutron Flux High Power Range Nuclear StartupHigh Intermediate Range Neutron Flux (Low ProtectionNeutron Flux Setpoint)
High Pressurizer Water Level High Pressurizer Primary Over PressurePressure Protection
DCD Section 7.2, Table 7.2-5
7
![Page 14: Transmittal of the Meeting Materials for the NRC's Meeting ...ENCLOSURE 1 Docket No. 52-021 MHI Ref: UAP-HF-09206 MITSUBISHI HEAVY INDUSTRIES, LTD. AFFIDAVIT I, Yoshiki Ogata, state](https://reader034.vdocuments.site/reader034/viewer/2022042803/5f4bb90b78a0e2619845e9bb/html5/thumbnails/14.jpg)
ESF System
System LevelConventional Switch
Safety Bus (Train A)
BU Rie~dundant BUS Safety Logi SytMsLs ss Gr.,I Gr.,2 Gr. 3
sub-system •ll sub--system 1A2(CPU WA1) (CPU 1A2)
I/0 or I/O with Priority Logic so
S------- Diverse Actuation SystemAutomatic actuation signal|Manual actuation signal
Note
- : Bus
- Data-Link
: Hard wired
:/O Electrical to optical converter or
Optical to electrical converter
BUS BUS interface
49 Isolation pointLocal, Swichgear, Motor control center, etc.
0
DCD Section 7.3, Figure 7.3-1
8
![Page 15: Transmittal of the Meeting Materials for the NRC's Meeting ...ENCLOSURE 1 Docket No. 52-021 MHI Ref: UAP-HF-09206 MITSUBISHI HEAVY INDUSTRIES, LTD. AFFIDAVIT I, Yoshiki Ogata, state](https://reader034.vdocuments.site/reader034/viewer/2022042803/5f4bb90b78a0e2619845e9bb/html5/thumbnails/15.jpg)
ESF System
ESF System consists of;,/ SensorV'Reactor Protection System (RPS)v/ ESF Actuation System (ESFAS)/ Safety Logic System (SLS)
SDesign Features of ESF Systemv/ RPS for ESF System is not considered of functional diversity.v/ SLS has two or three controller groups with functional diversity
which controls different components from each other group.'(Manual component control is provided from Safety/Operational
VDUs to SLS via Communication System such that automaticprocess part of RPS and ESFAS is bypassed.
'(So that, some kind of functional diversity can be appliedbetween automatic and manual ESF actuation function.
v/ESFAS and each group of SLS have two redundant controllers.Same application software is implemented in these redundantcontrollers.
S
![Page 16: Transmittal of the Meeting Materials for the NRC's Meeting ...ENCLOSURE 1 Docket No. 52-021 MHI Ref: UAP-HF-09206 MITSUBISHI HEAVY INDUSTRIES, LTD. AFFIDAVIT I, Yoshiki Ogata, state](https://reader034.vdocuments.site/reader034/viewer/2022042803/5f4bb90b78a0e2619845e9bb/html5/thumbnails/16.jpg)
Configuration of RTS
PRA Report, Figure 6.A.12-1
10
![Page 17: Transmittal of the Meeting Materials for the NRC's Meeting ...ENCLOSURE 1 Docket No. 52-021 MHI Ref: UAP-HF-09206 MITSUBISHI HEAVY INDUSTRIES, LTD. AFFIDAVIT I, Yoshiki Ogata, state](https://reader034.vdocuments.site/reader034/viewer/2022042803/5f4bb90b78a0e2619845e9bb/html5/thumbnails/17.jpg)
Configuration of RTS
11
![Page 18: Transmittal of the Meeting Materials for the NRC's Meeting ...ENCLOSURE 1 Docket No. 52-021 MHI Ref: UAP-HF-09206 MITSUBISHI HEAVY INDUSTRIES, LTD. AFFIDAVIT I, Yoshiki Ogata, state](https://reader034.vdocuments.site/reader034/viewer/2022042803/5f4bb90b78a0e2619845e9bb/html5/thumbnails/18.jpg)
Configuration of RTS
12
![Page 19: Transmittal of the Meeting Materials for the NRC's Meeting ...ENCLOSURE 1 Docket No. 52-021 MHI Ref: UAP-HF-09206 MITSUBISHI HEAVY INDUSTRIES, LTD. AFFIDAVIT I, Yoshiki Ogata, state](https://reader034.vdocuments.site/reader034/viewer/2022042803/5f4bb90b78a0e2619845e9bb/html5/thumbnails/19.jpg)
Configuration of RTS
Sensor~RPS
/ Input part/Processing part/Communication part
between other RPS trains"'Output part/Power supply
SReactor Trip Breaker
For each of twovariables to
consider functionaldiversity
'I
13
![Page 20: Transmittal of the Meeting Materials for the NRC's Meeting ...ENCLOSURE 1 Docket No. 52-021 MHI Ref: UAP-HF-09206 MITSUBISHI HEAVY INDUSTRIES, LTD. AFFIDAVIT I, Yoshiki Ogata, state](https://reader034.vdocuments.site/reader034/viewer/2022042803/5f4bb90b78a0e2619845e9bb/html5/thumbnails/20.jpg)
Configuration of RTS
) Sensor~RPS
I nnput partv Distribution module
e Analog input (A/l) module
* Repeater module
/Processing part
-/Communication part between other RPS trains
v/Output part/ Power supply
SReactor Trip Breaker
14
![Page 21: Transmittal of the Meeting Materials for the NRC's Meeting ...ENCLOSURE 1 Docket No. 52-021 MHI Ref: UAP-HF-09206 MITSUBISHI HEAVY INDUSTRIES, LTD. AFFIDAVIT I, Yoshiki Ogata, state](https://reader034.vdocuments.site/reader034/viewer/2022042803/5f4bb90b78a0e2619845e9bb/html5/thumbnails/21.jpg)
Configuration of RTS
) Sensor~RPS
v, Input part
/Processing part* CPU module" System management module* Network I/F module (for Unit Bus and Safety Bus)
/Communication part between other RPS trains
v/Output part
V Power supply
> Reactor Trip Breaker
15
![Page 22: Transmittal of the Meeting Materials for the NRC's Meeting ...ENCLOSURE 1 Docket No. 52-021 MHI Ref: UAP-HF-09206 MITSUBISHI HEAVY INDUSTRIES, LTD. AFFIDAVIT I, Yoshiki Ogata, state](https://reader034.vdocuments.site/reader034/viewer/2022042803/5f4bb90b78a0e2619845e9bb/html5/thumbnails/22.jpg)
Configuration of RTS
Sensor~RPS
/ Input part
v/Processing part
- Communication part between other RPSe Bus master module (for input and output)
* E/O module (for input and output of three
/Output part
/Power supply
SReactor Trip Breaker
trains
trains)
16
![Page 23: Transmittal of the Meeting Materials for the NRC's Meeting ...ENCLOSURE 1 Docket No. 52-021 MHI Ref: UAP-HF-09206 MITSUBISHI HEAVY INDUSTRIES, LTD. AFFIDAVIT I, Yoshiki Ogata, state](https://reader034.vdocuments.site/reader034/viewer/2022042803/5f4bb90b78a0e2619845e9bb/html5/thumbnails/23.jpg)
Configuration of RTS
Sensor~RPS
/Input part
/Processing part
"Communication part between other RPS trains
/Output part" Repeater module" Digital output (D/O) module* Distribution module
/ Power supply
> Reactor Trip Breaker
17
![Page 24: Transmittal of the Meeting Materials for the NRC's Meeting ...ENCLOSURE 1 Docket No. 52-021 MHI Ref: UAP-HF-09206 MITSUBISHI HEAVY INDUSTRIES, LTD. AFFIDAVIT I, Yoshiki Ogata, state](https://reader034.vdocuments.site/reader034/viewer/2022042803/5f4bb90b78a0e2619845e9bb/html5/thumbnails/24.jpg)
Configuration of RTS
ý>Sensor~RPS
/Input part
-/Processing part
,/Communication part between other RPS trains
'(Output part
'(Power supply* CPU power module (main and back up)
I/O power module (main and back up)
SReactor Trip Breaker
18
![Page 25: Transmittal of the Meeting Materials for the NRC's Meeting ...ENCLOSURE 1 Docket No. 52-021 MHI Ref: UAP-HF-09206 MITSUBISHI HEAVY INDUSTRIES, LTD. AFFIDAVIT I, Yoshiki Ogata, state](https://reader034.vdocuments.site/reader034/viewer/2022042803/5f4bb90b78a0e2619845e9bb/html5/thumbnails/25.jpg)
Configuration of ESF System
~2PRA Report, Figure 6.A.13-1
19
![Page 26: Transmittal of the Meeting Materials for the NRC's Meeting ...ENCLOSURE 1 Docket No. 52-021 MHI Ref: UAP-HF-09206 MITSUBISHI HEAVY INDUSTRIES, LTD. AFFIDAVIT I, Yoshiki Ogata, state](https://reader034.vdocuments.site/reader034/viewer/2022042803/5f4bb90b78a0e2619845e9bb/html5/thumbnails/26.jpg)
Configuration of ESF System
PRA Report, Figure 6.A.13-1
20
![Page 27: Transmittal of the Meeting Materials for the NRC's Meeting ...ENCLOSURE 1 Docket No. 52-021 MHI Ref: UAP-HF-09206 MITSUBISHI HEAVY INDUSTRIES, LTD. AFFIDAVIT I, Yoshiki Ogata, state](https://reader034.vdocuments.site/reader034/viewer/2022042803/5f4bb90b78a0e2619845e9bb/html5/thumbnails/27.jpg)
Configuration of ESF System
ý>Sensor~RPS
/ Input part
-/Processing part
/ Communication part
between other RPS trains
/Output parto Bus master module
o E/O module (for four train ESFAS)
/Power supply
21
![Page 28: Transmittal of the Meeting Materials for the NRC's Meeting ...ENCLOSURE 1 Docket No. 52-021 MHI Ref: UAP-HF-09206 MITSUBISHI HEAVY INDUSTRIES, LTD. AFFIDAVIT I, Yoshiki Ogata, state](https://reader034.vdocuments.site/reader034/viewer/2022042803/5f4bb90b78a0e2619845e9bb/html5/thumbnails/28.jpg)
Configuration of ESF System
SESFAS/ Input part
* E/O module" Bus master module
/Processing part* CPU module" System management module" Network I/F module (for Safety Bus)
v/Output part* Optical switch
/Power supply* CPU power module (main and back up)* I/0 power module (main and back up)
Redundantportion
22
![Page 29: Transmittal of the Meeting Materials for the NRC's Meeting ...ENCLOSURE 1 Docket No. 52-021 MHI Ref: UAP-HF-09206 MITSUBISHI HEAVY INDUSTRIES, LTD. AFFIDAVIT I, Yoshiki Ogata, state](https://reader034.vdocuments.site/reader034/viewer/2022042803/5f4bb90b78a0e2619845e9bb/html5/thumbnails/29.jpg)
Configuration of ESF System
SLS/ Input part
e Optical switch
v/Processing part" CPU module
" System management module* Network I/F module (for Safety Bus)
/Output part* Repeater module
/Power supply* CPU power module (main and back up)
e I/0 power module (main and back up) )
Redundantportion
23
![Page 30: Transmittal of the Meeting Materials for the NRC's Meeting ...ENCLOSURE 1 Docket No. 52-021 MHI Ref: UAP-HF-09206 MITSUBISHI HEAVY INDUSTRIES, LTD. AFFIDAVIT I, Yoshiki Ogata, state](https://reader034.vdocuments.site/reader034/viewer/2022042803/5f4bb90b78a0e2619845e9bb/html5/thumbnails/30.jpg)
Configuration of DASr~
MUAP-07006, Figure 6.0-1
24
![Page 31: Transmittal of the Meeting Materials for the NRC's Meeting ...ENCLOSURE 1 Docket No. 52-021 MHI Ref: UAP-HF-09206 MITSUBISHI HEAVY INDUSTRIES, LTD. AFFIDAVIT I, Yoshiki Ogata, state](https://reader034.vdocuments.site/reader034/viewer/2022042803/5f4bb90b78a0e2619845e9bb/html5/thumbnails/31.jpg)
Configuration of DAS
SDAS consists of;V Automatic actuation partv, Manual actuation part
SBoth parts have two subsystems.
Two subsystems are configured with 2-out-of-2 toprevent spurious actuation.
SEach subsystem includes internal redundancy (1-out-of-2) for logic and output module to enhancethe reliability.
SNo single failure of DAS component cause tospurious actuation or failure to actuate.
25
![Page 32: Transmittal of the Meeting Materials for the NRC's Meeting ...ENCLOSURE 1 Docket No. 52-021 MHI Ref: UAP-HF-09206 MITSUBISHI HEAVY INDUSTRIES, LTD. AFFIDAVIT I, Yoshiki Ogata, state](https://reader034.vdocuments.site/reader034/viewer/2022042803/5f4bb90b78a0e2619845e9bb/html5/thumbnails/32.jpg)
Configuration of DAS
> Automatic actuation part:
> Diverse Automatic Actuation Cabinet(DAAC)v/Two subsystems
/Input from sensor signal via isolation module
/Bistable, voting logic, and output to SLS
-/Output module is relay as "energized to actuate"
/Combine automatic actuation and manualactuation with hardwired circuit.
26
![Page 33: Transmittal of the Meeting Materials for the NRC's Meeting ...ENCLOSURE 1 Docket No. 52-021 MHI Ref: UAP-HF-09206 MITSUBISHI HEAVY INDUSTRIES, LTD. AFFIDAVIT I, Yoshiki Ogata, state](https://reader034.vdocuments.site/reader034/viewer/2022042803/5f4bb90b78a0e2619845e9bb/html5/thumbnails/33.jpg)
Configuration of DAS
> Manual actuation part:
SDiverse HSI Panel (DHP)v" Have all controls of DAS manual functionv/ Provide required monitoring function
SPower Breaker for DHPv, Permit all DHP control by closing breaker
27
![Page 34: Transmittal of the Meeting Materials for the NRC's Meeting ...ENCLOSURE 1 Docket No. 52-021 MHI Ref: UAP-HF-09206 MITSUBISHI HEAVY INDUSTRIES, LTD. AFFIDAVIT I, Yoshiki Ogata, state](https://reader034.vdocuments.site/reader034/viewer/2022042803/5f4bb90b78a0e2619845e9bb/html5/thumbnails/34.jpg)
Model of DAS Reactor Trip
28
![Page 35: Transmittal of the Meeting Materials for the NRC's Meeting ...ENCLOSURE 1 Docket No. 52-021 MHI Ref: UAP-HF-09206 MITSUBISHI HEAVY INDUSTRIES, LTD. AFFIDAVIT I, Yoshiki Ogata, state](https://reader034.vdocuments.site/reader034/viewer/2022042803/5f4bb90b78a0e2619845e9bb/html5/thumbnails/35.jpg)
Model of DAS Reactor Trip
29
![Page 36: Transmittal of the Meeting Materials for the NRC's Meeting ...ENCLOSURE 1 Docket No. 52-021 MHI Ref: UAP-HF-09206 MITSUBISHI HEAVY INDUSTRIES, LTD. AFFIDAVIT I, Yoshiki Ogata, state](https://reader034.vdocuments.site/reader034/viewer/2022042803/5f4bb90b78a0e2619845e9bb/html5/thumbnails/36.jpg)
Unavailability Calculation
> Calculation Equation
UA=1- MTBFMTBF + (1 - SDR) +MTTR
2
v UA: Unavailability [/demand]
/ MTBF (Mean time between failures [hr])
/SDR (Self-diagnosis rate)V T (Test interval [hr])
/MTTR (Mean time to repair [hr])
30
![Page 37: Transmittal of the Meeting Materials for the NRC's Meeting ...ENCLOSURE 1 Docket No. 52-021 MHI Ref: UAP-HF-09206 MITSUBISHI HEAVY INDUSTRIES, LTD. AFFIDAVIT I, Yoshiki Ogata, state](https://reader034.vdocuments.site/reader034/viewer/2022042803/5f4bb90b78a0e2619845e9bb/html5/thumbnails/37.jpg)
Unavailability Calculation
) Calculation Equation
UA~1- MTBFMTBF + Down Time
Down Time = (1 - SDR)(T + MTTR) + SDR MTTR2
= (1- SDR) +MTTR2
SDownTime consists of;* Mean time to detect failure (MTDF)* Mean time to repair (MTTR)
v/ For failure undetected by self-diagnosis* MTDF = T/2* DownTime = T/2 + MTTR
,/ For failure detected by self-diagnosis* MTDF = Self-diagnosis interval << MTTR* DownTime = MTTR
31
![Page 38: Transmittal of the Meeting Materials for the NRC's Meeting ...ENCLOSURE 1 Docket No. 52-021 MHI Ref: UAP-HF-09206 MITSUBISHI HEAVY INDUSTRIES, LTD. AFFIDAVIT I, Yoshiki Ogata, state](https://reader034.vdocuments.site/reader034/viewer/2022042803/5f4bb90b78a0e2619845e9bb/html5/thumbnails/38.jpg)
Unavailability Calculation
SMTBF (Mean time- between failures [hr])v' The mean time of available period.
/Inverse value of failure rate [/hr] is used./Failure rate of sensor is based on industry experience data./ Failure rate of other component is estimated based on MIL
standard for each module.
> SDR (Self-diagnosis rate)v/ The rate that self-diagnosis function detects failures.v/ SDR of digital component is estimated as 100% based on
failure mode analysis of MELTAC platform./90% SDR is used in PRA to conservative assumption for
digital device./ 0% SDR is used for conventional device.
32
![Page 39: Transmittal of the Meeting Materials for the NRC's Meeting ...ENCLOSURE 1 Docket No. 52-021 MHI Ref: UAP-HF-09206 MITSUBISHI HEAVY INDUSTRIES, LTD. AFFIDAVIT I, Yoshiki Ogata, state](https://reader034.vdocuments.site/reader034/viewer/2022042803/5f4bb90b78a0e2619845e9bb/html5/thumbnails/39.jpg)
Unavailability Calculation
T (Test interval [hr])vThe interval period of time of surveillance./Surveillance can detect failures which were
undetected by self-diagnosis./Test interval is based on the surveillance
frequency in Technical Specification.
SMTTR (Mean time to repair [hr])/ The out-of-service period of time including time to
repair and bypass time.v/Time to repair is based on the Completion Time in
Technical Specification.
33
![Page 40: Transmittal of the Meeting Materials for the NRC's Meeting ...ENCLOSURE 1 Docket No. 52-021 MHI Ref: UAP-HF-09206 MITSUBISHI HEAVY INDUSTRIES, LTD. AFFIDAVIT I, Yoshiki Ogata, state](https://reader034.vdocuments.site/reader034/viewer/2022042803/5f4bb90b78a0e2619845e9bb/html5/thumbnails/40.jpg)
Bypass Model in PRA
SBypass time is conservatively assessed inMTTR of Unavailability calculation/To simplify Fault Tree.
SFor example of sensor,/MTTR of first channel is one year (8760hr).
,/MTTR of other channel is equal to CompletionTime plus bypass time (72hr+12hr).
/Average MTTR = (8760+84+84+84)/4 [hr]
SUnlimited bypass of Reactor Trip Breakeris modeled in Fault Tree./To avoid too conservative CCF value of RTB.
34
![Page 41: Transmittal of the Meeting Materials for the NRC's Meeting ...ENCLOSURE 1 Docket No. 52-021 MHI Ref: UAP-HF-09206 MITSUBISHI HEAVY INDUSTRIES, LTD. AFFIDAVIT I, Yoshiki Ogata, state](https://reader034.vdocuments.site/reader034/viewer/2022042803/5f4bb90b78a0e2619845e9bb/html5/thumbnails/41.jpg)
Unavailability of RTB
All trip mechanism of each train of RTB are testedevery 124 days, and manual trip function of RTBis tested every year in STS NUREG-1431.
SFor US-APWR, surveillance interval of RTB isextended from STS, as follows.
/ Four trains changed from two trains on staggered basis.
/Manual, shunt and UV functions are separately tested.
Days 62 62 62 62 62 62 62 62 62 62 62 62 62
Train A B C D A B C D A B C D A
uv X X X X X
Shunt X X X X
Manual X X X X
Mech. X X X X X X X X X X X X X
35
![Page 42: Transmittal of the Meeting Materials for the NRC's Meeting ...ENCLOSURE 1 Docket No. 52-021 MHI Ref: UAP-HF-09206 MITSUBISHI HEAVY INDUSTRIES, LTD. AFFIDAVIT I, Yoshiki Ogata, state](https://reader034.vdocuments.site/reader034/viewer/2022042803/5f4bb90b78a0e2619845e9bb/html5/thumbnails/42.jpg)
Unavailability of RTB
Therefore, unavailability of RTB iscalculated from NUREG 6928 to includethese extension of surveillance interval,
/ Mechanical, UV and shunt function is calculatedrespectively.
/Failure rate [/hr] is calculated from unavailabilitydata [/d] in NUREG with STS data.
/ Unavailability [/d] for US-APWR is calculated fromabove failure rate [/hr] with US-APWR data.
/ Unavailability of RTB is integrated with data ofmechanical, UV and shunt function.
This calculated value will be reflected innext revision of PRA.
36
![Page 43: Transmittal of the Meeting Materials for the NRC's Meeting ...ENCLOSURE 1 Docket No. 52-021 MHI Ref: UAP-HF-09206 MITSUBISHI HEAVY INDUSTRIES, LTD. AFFIDAVIT I, Yoshiki Ogata, state](https://reader034.vdocuments.site/reader034/viewer/2022042803/5f4bb90b78a0e2619845e9bb/html5/thumbnails/43.jpg)
Unavailability of RTB
SUnavailability data of RTB in NUREGUnavailability of mechanical: UA'M=1.5E-5 /dUnavailability of UV coil: UA'uv=4.OE-4 /dUnavailability of Shunt coil: UA's=3.OE-4 /d
Calculation of failure rate [/hr] of RTB2 1,5xE-5x2
AM -UA'M x- = = 1. OIE-8/hrT 124x24
4 -UA'-vx2= 4.OxE-4x2 - 2.69E- 7 / hrT 124 x 24
2 3.OxE-4x2Acs = UA's X-- = = 2.02E - 7 / hr
T 124x24
Where; UA= A T/2, then A =UAx2/TT=Test interval in STS (124 days)
37
![Page 44: Transmittal of the Meeting Materials for the NRC's Meeting ...ENCLOSURE 1 Docket No. 52-021 MHI Ref: UAP-HF-09206 MITSUBISHI HEAVY INDUSTRIES, LTD. AFFIDAVIT I, Yoshiki Ogata, state](https://reader034.vdocuments.site/reader034/viewer/2022042803/5f4bb90b78a0e2619845e9bb/html5/thumbnails/44.jpg)
Unavailability of RTB
> Calculation of unavailability for US-APWR
UAM = 1.O1E -8x( 5 9 52 +24)=32
.03E-5/d
UAUV = 2.69E-7x(17856 +
248) = 2.4 1E-3/d
UAS- 8x17856 + 48) = 1.81E - 3 / d
2
UAR TB- UAM + UAUV .UAs
- 3.03E-5 +2.41E-3x1.81E-3
-3.03E- 5 + 4.36E- 6 - 3.47E- 5
3.5E- 5 / d
38
![Page 45: Transmittal of the Meeting Materials for the NRC's Meeting ...ENCLOSURE 1 Docket No. 52-021 MHI Ref: UAP-HF-09206 MITSUBISHI HEAVY INDUSTRIES, LTD. AFFIDAVIT I, Yoshiki Ogata, state](https://reader034.vdocuments.site/reader034/viewer/2022042803/5f4bb90b78a0e2619845e9bb/html5/thumbnails/45.jpg)
Planned changes to the PRA model
MHI plans to update digital I&C portion ofthe PRA model in 2009
Types of changes include/ Incorporate RAI response commitments,
Reflect design changes, and
,/Amend model based on MHI self check
/ Reflect amended reliability parameters
SSystems to be updated/ Reactor trip system
,/ ESF system
,/DAS
39
![Page 46: Transmittal of the Meeting Materials for the NRC's Meeting ...ENCLOSURE 1 Docket No. 52-021 MHI Ref: UAP-HF-09206 MITSUBISHI HEAVY INDUSTRIES, LTD. AFFIDAVIT I, Yoshiki Ogata, state](https://reader034.vdocuments.site/reader034/viewer/2022042803/5f4bb90b78a0e2619845e9bb/html5/thumbnails/46.jpg)
Planned changes to the PRA model
General changes
) Revise unavailability of I&C hardwarecomponents
SModel RPS communication part in detail
SIncorporate dependency of power supplymodule (RAI 19-28)
SConsider dependency of sensors used inreactor trip system and EFS system (RAI19-38)
40
![Page 47: Transmittal of the Meeting Materials for the NRC's Meeting ...ENCLOSURE 1 Docket No. 52-021 MHI Ref: UAP-HF-09206 MITSUBISHI HEAVY INDUSTRIES, LTD. AFFIDAVIT I, Yoshiki Ogata, state](https://reader034.vdocuments.site/reader034/viewer/2022042803/5f4bb90b78a0e2619845e9bb/html5/thumbnails/47.jpg)
Planned changes to the PRA model
Reactor protection system
SModel 2 groups of the RPS part/Failure combinations of group 1 and 2 are
adequately modeled
SDependency with power supply module/Failure of power supply is eliminated since such
failure cause reactor trip
Apply re-estimated reactor tripunavailability
41
![Page 48: Transmittal of the Meeting Materials for the NRC's Meeting ...ENCLOSURE 1 Docket No. 52-021 MHI Ref: UAP-HF-09206 MITSUBISHI HEAVY INDUSTRIES, LTD. AFFIDAVIT I, Yoshiki Ogata, state](https://reader034.vdocuments.site/reader034/viewer/2022042803/5f4bb90b78a0e2619845e9bb/html5/thumbnails/48.jpg)
Planned changes to the PRA model
ESF systemSConsider application softwaredependencies among different signals,including "other signals"Amend FT part of manual safety injectionusing DAS
SCredit automatic actuation of motor drivenEFW using DAS
SRevise FT structure in a way that thesignal flow can be traced in the tree
42
![Page 49: Transmittal of the Meeting Materials for the NRC's Meeting ...ENCLOSURE 1 Docket No. 52-021 MHI Ref: UAP-HF-09206 MITSUBISHI HEAVY INDUSTRIES, LTD. AFFIDAVIT I, Yoshiki Ogata, state](https://reader034.vdocuments.site/reader034/viewer/2022042803/5f4bb90b78a0e2619845e9bb/html5/thumbnails/49.jpg)
Planned changes to the PRA model
DAS
Adequately model dependency betweenDAS and other systems/ Sensors and distributer module are common with
ESF and Reactor trip system
Apply unreliability value estimated fromfault tree analysis
43
![Page 50: Transmittal of the Meeting Materials for the NRC's Meeting ...ENCLOSURE 1 Docket No. 52-021 MHI Ref: UAP-HF-09206 MITSUBISHI HEAVY INDUSTRIES, LTD. AFFIDAVIT I, Yoshiki Ogata, state](https://reader034.vdocuments.site/reader034/viewer/2022042803/5f4bb90b78a0e2619845e9bb/html5/thumbnails/50.jpg)
Planned changes to the PRA model
Changes of Digital I&C model have beenincorporated in the DCD rev.0 PRA to seethe impact of update
CDF of internal events at power
DCD rev.0
1.17E-6 /RY
Digital I&C updated
1.25E-6 /RY (+9%)
44