DAE YOUNG General Industrial Equipments Co., Ltd 1 / 18 Undergro und Power Supply Lines 2001 KORAIL Subway Construction Office Installation of Power Transfer Equipments for Honam Doogye S/S and 6 places * Underground power transfer line (154KV Φ200 6hole) 3.13 ㎞ 2001.12 ~ 2003.12 3,274,814 Iron Tower Maintena nce Works 2005 Hansol Papers Cleaning of Live Wire Insulator * Cleaning of live wire insulator and repair 17 insulators 2005.03 ~ 2006.01 3,264 2006 Hansol EME 154kv Iron Tower Cleaning of Live Wire Insulator * Cleaning of live wire insulator and repair 17 insulators 2006.01 ~ 2006.12 11,871 2006 SeAH Besteel Co. 154KV T/L Cleaning and change of suspension insulator * 19 live wire insulators of154KV line iron tower 2006.02 ~ 2006.08 5,540 2006 Asia Paper MFG 154KV Power line repair work * Inspection, tighten volts, painting and change of insulator for 22 iron towers 2006.01 ~ 2006.05 9,712 2006 KEPCO - Suwon 154KV Nam Suwon S/S #5 M.TR Extention Work * Installation of TR 154KV/22KV 1Φ 15/20MVA *3 1BANK 2006.05 ~ 2006.07 31,573 Transmission Line Works Types of work Year Customer Name Name of Project Descriptions of Project Period Amount USD (1$:1390Won) Details for Major Projects Completed

Upload: shiela

Post on 03-Feb-2016

71 views

Category:

Documents


0 download

DESCRIPTION

Details for Major Projects Completed. Transmission Line Works. Details for Major Projects Completed. Power Substation Works. Details for Major Projects Completed. Power Substation Works. Details for Major Projects Completed. Power Substation Works. Details for Major Projects Completed. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Transmission Line Works

DAE YOUNGGeneral Industrial Equipments Co., Ltd 1 / 18

Underground Power Supply Lines

2001KORAIL Subway Construction Office

Installation of Power Transfer Equipments for Honam Doogye S/S and 6 places

* Underground power transfer line (154KV Φ200 6hole) 3.13 ㎞

2001.12~

2003.123,274,814

Iron Tower Maintenance Works

2005 Hansol PapersCleaning of Live Wire Insulator

* Cleaning of live wire insulator and repair 17 insulators

2005.03~

2006.013,264

2006 Hansol EME154kv Iron Tower Cleaning of Live Wire Insulator

* Cleaning of live wire insulator and repair 17 insulators

2006.01~

2006.1211,871

2006 SeAH Besteel Co.154KV T/L Cleaning and change of suspension insulator

* 19 live wire insulators of154KV line iron tower

2006.02~

2006.085,540

2006 Asia Paper MFG154KV Power line repair work

* Inspection, tighten volts, painting and change of insulator for 22 iron towers

2006.01~

2006.059,712

2006 KEPCO - Suwon154KV Nam Suwon S/S #5

M.TR Extention Work* Installation of TR 154KV/22KV

1Φ 15/20MVA *3 1BANK

2006.05~

2006.07 31,573

Transmission Line Works

Typesof work

YearCustomer

NameName of Project Descriptions of Project Period

Amount USD(1$:1390Won)

Details for Major Projects Completed

Page 2: Transmission Line Works

DAE YOUNGGeneral Industrial Equipments Co., Ltd 2 / 18

Installation Works for Transformer

2006 Iljin HeavyHwanyoung Steel 154KV Transformer Installation Work

* Installation of TR 154KV 3Φ 30/40MVA 1BANK

2006.09~

2006.09 21,763

2006 Daehan SteelRemove and installation work for 40t of transformer for electric furnace

* Installation of 22.9KV 42MVA transformer for furnace

2006.08~

2006.10 18,201

2006 Dongbu SteelIncheon Factory - Purchase and Installation of 154KV transformer

* Installation of 154KV/22.9KV 30/40MVA 1BANK

2006.07~

2006.12 201,799

2006 Iljin Heavy POSCO Pohang - Installation of 154KV M.TR

* TR 154KV 3Φ 10MVA 1BANK Installation

2006.07~

2006.09 9,496

2007Hyundai Steel - Pohang

Daehyung Steel - Urgent recovery works for transformer of 100t electric furnace

* Detailed inspection of transformer 22.9KV 95MVA for furnace

* Remove of 22.9KV 95MVA transformer and installation of 66MVA transformer for furnace

* Remove of 22.9KV 66MVA transformer and installation of 95MVA transformer for furnace

2007.03~

2007.10 166,741

Details for Major Projects CompletedPower Substation Works

Typesof work

YearCustomer

NameName of Project Descriptions of Project Period

Amount USD(1$:1390Won)

Page 3: Transmission Line Works

DAE YOUNGGeneral Industrial Equipments Co., Ltd 3 / 18

Installation Works for Transformer

2007 SeAh Besteel

Assembling work for warehousing of electric furnace TR 62MVA for contingency

* Installation of 22.9KV 62MVA transformer for furnace

2007. 07~

2007. 1116,000  

2007 Iljin HeavyPOSCO Pohang - Installation of 154KV M.TR

* Installation of TR 154KV 3Φ 100/120MVA 3BANK

2006. 02~

2006. 03 25,165

2007  KEPCO - Seongnam

Urgent recovery works for Ansung S/S #2M.TR

* Installation of TR 154KV/22KV 1Φ 15/20MVA *3 1BANK

 2007.08  

 12,000  

2008 KEPCO - Nam SeoulInstallation work for 154kv at Ganam S/S M.TR

* Installation of TR 154KV/22KV 1Φ 15/20MVA *6 2BANK

2008. 01~

2008. 05 70,419

2008Seoul Power Management Office

Installation work for 345KV at Mikeum S/S #3MTR

* Installation of TR 345KV/161KV/23KV 166.7MVA*3

2008. 03~

2008. 07 134,964

2008 Daehan SteelNoksan Steel Mill Factory - Installation work for transformer

* Installation of TR 154KV/22KV 3Φ 30MVA 1BANK

2008. 05~

2008. 09 94,964

Power Substation Works

Typesof work

YearCustomer

NameName of Project Descriptions of Project Period

Amount USD(1$:1390Won)

Details for Major Projects Completed

Page 4: Transmission Line Works

DAE YOUNGGeneral Industrial Equipments Co., Ltd 4 / 18

InstallationWorks forTransformer

2008 KEPCO - Nam SeoulInstallation work for Dong Pangyo S/S M.TR

* Installation of TR 154KV/22KV 1Φ 15/20MVA *6 2BANK

2008. 02~

2008. 11 81,243

2008 KEPCO - IncheonExpansion of 154KV at Yeokgok S/S#4 M.TR

* Installation of TR 154KV/22KV 1Φ 15/20MVA *3 1BANK

2008. 06  ~

2008. 12 42,017

InstallationWorks forBreaker(GIS)

2005 

KEPCO - Joongbu 

Installation of GIS for 154KV at Jido S/S #4M.Tr 

* Installation of GIS 170KV 50KV 1200A * 1CCT* Installation of GIS 25.8KV 25KA 600A 2BAY

2005. 05~

2005. 06   

38,973

2005 KEPCO - IncheonExpanded work for 345kv at New Bupyong S/S #64 D.Tr (25.8kv GIS)

* Installation of GIS 25.8KV 25KA 600A 7BAY

2005. 05~

2005. 06 22,025

2005 KEPCO - CheongwonExpanded work of breaker at Bugang and Manseung S/S 23KV

* Installation of GIS 25.8KV 25KA 600A 2BAY

2005. 03~

2005. 03 20,446

Power Substation Works

Typesof work

YearCustomer

NameName of Project Descriptions of Project Period

Amount USD(1$:1390Won)

Details for Major Projects Completed

Page 5: Transmission Line Works

DAE YOUNGGeneral Industrial Equipments Co., Ltd 5 / 18

InstallationWorks for Breaker(GIS)

2005KEPCO - New Seongnam

Installation of 345KV at New Suwon S/S 170KV GIS

* Installation of GIS 170KV 50KV 1200A * 2CCT

2005. 05~

2005. 09 7,668

2006 KEPCO - SuwonInstalation of 345KV at New Seongnam S/S 362KV GIS

* Installation of GIS 362KV 3CB 2006.04

~2006.08

53,013

2006 KEPCO - IncheonInstallation at Gokang S/S 25.8KV GIS

* Installation of GIS 25.8KV 25KA 600A 13BAY

2006.08~

2006.12 88,772

2006 KEPCO - JecheonInstallation at Moonmak S/S 170KV GIS

* Installation of GIS 170KV 50KV 1200A * 1CCT

2006.01~

2006.12 10,191

2006 KEPCO - SeongdongExtended works for new SW at Jongam S/S 23KV

* Installation of GIS 25.8KV 25KA 600A 1BAY

2006. 03~

2006. 05 18,024

2006 KEPCO - Seo SeoulInstallation for 154KV at Shihwa S/S 23KV GIS

* Installation of GIS 25.8KV 25KA 600A 41CCT

2006.08~

2006.12 274,139

Power Substation Works

Typesof work

YearCustomer

NameName of Project Descriptions of Project Period

Amount USD(1$:1390Won)

Details for Major Projects Completed

Page 6: Transmission Line Works

DAE YOUNGGeneral Industrial Equipments Co., Ltd 6 / 18

InstallationWorks for Breaker(GIS)

2006 

Yoosuk Ind. & Dongyang Sement

Instalation at Dongyang Sement for 154KV S/S GCB

* Installation of 1 unit of GCB 170KV 1 대 and remove I unit of OCB 169KV and control cable * Changes of MOF, CT and main line

2006. 02~

2006. 06

10,288  

2007 KEPCO - SuwonInstallation at 07 Byongjeom S/S 23KV for New GIS

* Installation of GIS 25.8KV 25KA 600A 11CCT

2007. 03~

2007. 05 58,465

2007 KEPCO - GoonpoInstallation of S.W at Nam Ansan and other S/S

* Installation of GIS 25.8KV 25KA 600A 1CCT*2 units

2007. 01 

2007. 04 11,214

2007KEPCO - New Seongnam

Extension at Seo Anyang S/S 23KV New SW

* Installation of GIS 25.8KV 25KA 600A 2CCT

2007. 08~

2007. 12 11,262

2008 KEPCO -GoonpoExtension at Jangdeok S/S 23KV New SW

* Installation of GIS 25.8KV 25KA 600A 1CCT

2008. 01~

2008. 02 16,596

Power Substation Works

Typesof work

YearCustomer

NameName of Project Descriptions of Project Period

Amount USD(1$:1390Won)

Details for Major Projects Completed

Page 7: Transmission Line Works

DAE YOUNGGeneral Industrial Equipments Co., Ltd 7 / 18

InstallationWorks for Breaker(GIS)

2008 KEPCO - SuwonInstallation at 08 Cheongbuk S/S 154KV new GIS

* Installation of GIS 170KV 50KV 1200A * 2CCT

2008. 02~

2008. 06 31,068

2008 Iljin ElectricInstallation at KAIST for transformer breaker

* Installation of GIS 170KV 50KA 2CCT, M.TR 154KV 30/45MVA 1 unit

2008. 01~

2008. 11 214,388

2008 KEPCO - JejuExtension of 154KV at Sanji S/S 25.8KV GIS 2 Lines

* Installation of GIS 25.8KV 25KA 600A 2BAY

2008. 03~

2008. 05 19,571

Additional Construction, Inspection and Maintenance for substation

2005 KEPCO - SeoSeoulAnnula suppliers' work for '05

* 14 substations* Power transforming facilities (345KV, 154KV, 22KV TR, GIS, GCB, DS, MOF* P.T, C.T, LA, CABLE) inspection, maintenance and repair

2005.03~

2006.02

817,599   

Power Substation Works

Typesof work

YearCustomer

NameName of Project Descriptions of Project Period

Amount USD(1$:1390Won)

Details for Major Projects Completed

Page 8: Transmission Line Works

DAE YOUNGGeneral Industrial Equipments Co., Ltd 8 / 18

Additional Construction, Inspection and Maintenance for substation

2005 KNCElectric work for K.N.C new factory

TR 22KV/380,220V 4000KVA, CABLE 6200m, Power Line, Installation of 6 distributing Boards

2004.09~

2005.05 237,410

2005 KEPCO - IncheonCommon ispection at Inner S/S Main Transformer and OLTC precision inspection

Detailed inspection of OLTC for TR 154KV 62 units 대 OLTC and LA 80 units

2005. 03~

2005. 05 75,588

2005 Lotte Daesan Check all TRANSFORMERS in the Factories

Inspection and repair for TR 22KV/6.6KV 25/28MVA and 91 units

2005. 07~

2005. 11 49,856

2006KEPCO - New Seongnam

Inspection of New Ansung Station - Main Transformer (765KV)

* General inspection of 11 TANK for TR 765KV * Initial inspection of 6 TANK for TR 765KV * General inspection of 6 TANK for TR 765KV 3rd ReactorK

2006.04~

2006.06 63,553

Power Substation Works

Typesof work

YearCustomer

NameName of Project Descriptions of Project Period

Amount USD(1$:1390Won)

Details for Major Projects Completed

Page 9: Transmission Line Works

DAE YOUNGGeneral Industrial Equipments Co., Ltd 9 / 18

Additional Construction, Inspection and Maintenance for substation

2006 Daekwang CableIksan Factory - Power Transformer

* 16 distributing boards, Cables installation for 6500m, input cables

2005.05~

2005.06 144,029

2006 KEPCO - Dong SeoulCommon inspection at Dong Seoul P/O Transformer and OLTC predision inspection

* Inspection for OLTC of TR 345KV 2 units, 154KV 37 units and Inspection for NGR 3 units and LA 50 units

2006 .06~

2006. 10 74,679

2006Hyundai Steel - Pohang

75t Furnace TR TAP CHANGER INSPECTION and Filtering insulating oil

* Inspection and filtering of 22.9KV 45/54MVA transformer for furnace

2006. 06~

2006. 07 9,496

2006Hyundai Steel - Pohang

80t Steel Manufacturing Furnace TR TAP CHANGER INSPECTION and Filtering insulating oil

* Inspection and filtering of 22.9KV 65MVA transformer for furnace

2006 .06~

2006. 08 9,496

2006Hyundai Steel - Dangjin

Repair work for 345kv main transformer

* Change bushing of TR 345KV/154KV 166.7/200MVA and filtering check

2006. 07~

2006. 10 8,753

2007 Hwanyoung SteelRepair works for electric furnace transformer and breaker

* 22.9KV 109MVA 1BANK transformer for furnace* Detailed inspection for 154KV 15MVA 2BANK power transformer

2007. 09~

2007. 09 52,784

Power Substation Works

Typesof work

YearCustomer

NameName of Project Descriptions of Project Period

Amount USD(1$:1390Won)

Details for Major Projects Completed

Page 10: Transmission Line Works

DAE YOUNGGeneral Industrial Equipments Co., Ltd 10 / 18

Additional Construction, Inspection and Maintenance for substation

2007  KEPCO - New Incheon

Works for inner S/S GIS precision inspection and UHF sensor installation

* Detailed inspection for 345KV GIS - 4CCT* Detailed inspection for 170KV GIS - 24CCT * 66KV GCB -1CCT

2007. 05~

2008. 01 347,151

2007KEPCO - New Seongnam

Annual suppliers' works for '06-'07

* 16 substations* Power transforming facilities (345KV, 154KV, 22KV TR, GIS, GCB, DS, MOF P.T, C.T, LA, CABLE) inspection, maintenance and repair

2006.02~

2008. 02 1,890,101

2007Daehan Steel - Noksan

Noksan Steel Manufacturing Factory - Installation of transformer for EAF and LF

* Detailed inspection for 22.9KV 52MVA transformer for furnace and I unit of installation* Detailed inspection for 22.9KV 22.5MVA transformer for furnace and 1 unit of installation* 2nd BUS and installation of water cooling cable

2007. 05~

2007. 12 217,230

Power Substation Works

Typesof work

YearCustomer

NameName of Project Descriptions of Project Period

Amount USD(1$:1390Won)

Details for Major Projects Completed

Page 11: Transmission Line Works

DAE YOUNGGeneral Industrial Equipments Co., Ltd 11 / 18

Power Generation

Inspection of Breaker for Power Generation and Transformer

2004Korea East-West Power

Inspection for inner of main transformer of 2nd GT #5, 6 & ST #2, 3

* Detailed inspection for internal TR 18KV/345KV 400MVA

2004.04~

2004.05 38,740

2004 Korea Midland PowerFiltering of insulating oil and detailed inspection for main transformer of GT 1,2

* Inspection for internal TR 154KV 60MVA and filtering

2004.03~

2004.04 22,237

2006Korea South-East Power

Detailed inspection for Mooju Water - Pumping 1, 2

* Detailed inspection for 2 units of 24KV 13000A 100KA(HEK4)

2006. 09~

2007. 05 323,022

2006    “ “

* Detailed inspection for 1 unit of phase transfer disconnect

2006 .08~

2006. 11

Included above

2006Korea East-West Power - Ulsan

Repair work for #1,2 GT Main TR Bushing Oil Leak

* Change of TR 154KV bushing and filtering

2006. 09~

2006. 11 7,360

2006Korea Midland Power - Boryong

Detailed breakdown inspection for GT1, 2 generator and breaker of 3rd station

* Detailed inspection for internal GCB HEC-3 18KV 8000A 100KA

2006. 05~

2006. 06 12,274

Typesof work

YearCustomer

NameName of Project Descriptions of Project Period

Amount USD(1$:1390Won)

Details for Major Projects Completed

Page 12: Transmission Line Works

DAE YOUNGGeneral Industrial Equipments Co., Ltd 12 / 18

Inspection of Breaker for Power Generation and Transformer

2006Korea South Power - New Incheon

Detailed breakdown inspection for 3rd GT generator and breaker

* Detailed inspection for GCB HEK-3 124V 10KA

2006. 06~

2006. 10 28,094

2007Korea Western Power -Seo Incheon

Detailed breakdown inspection and repair works for 2nd generator and breaker

* Detailed breakdown inspection for 2 units of synchronous circuit breaker HEK-3 24KV 10000A 100KA

2007.01~

2007.02 89,568

2007Korea South Power - New Incheon

4MT 201 #2 COOLER change and filtering insulating oil

* Cooler changing and filtering for TR 154KV 60MVA

2007. 02~

2007. 03 9,353

2007Cheongpyong Water

Pumping#1 S.Tr Detailed inspection and repair work

* Detailed breakdown inspection for TR 154KV 25MVA 1BANK

2007. 05~

2007. 07 10,604

2007Korea South Power - Cheongpyong Water Pumping

#2 S.Tr OLTC detailed inspection

* Detailed breakdown inspection for TR 154KV 25MVA 1BANK OLTC

2007. 06~

2007. 07 40,360

2007Korea Western Power - Seo Incheon

Detailed breakdown inspection for breaker of 1st and 2nd generators

* Detailed breakdown inspection for 2 units of synchronous circuit breaker HEK-3 24KV 10000A 100KA * Detailed breakdown inspection for 2 units of synchronous circuit breaker HEK-1 24KV 6300A 63KA

2007. 01~

2007. 09 186,108

Power Generation

Typesof work

YearCustomer

NameName of Project Descriptions of Project Period

Amount USD(1$:1390Won)

Details for Major Projects Completed

Page 13: Transmission Line Works

DAE YOUNGGeneral Industrial Equipments Co., Ltd 13 / 18

Inspection of Breaker for Power Generation and Transformer 

2007 

Korea South-East Power - Youngdong

Detailed inspection for 1st transformer

* Detailed inspection and filtering for internal M.TR 154KV 150MVA* Detailed inspection and filtering for internal S.TR 14KV 10MVA

2007. 10~

2007. 11 15,771

Power Generation

Typesof work

YearCustomer

NameName of Project Descriptions of Project Period

Amount USD(1$:1390Won)

Details for Major Projects Completed

Page 14: Transmission Line Works

DAE YOUNGGeneral Industrial Equipments Co., Ltd 14 / 18

Electric Rail Road

Installation of Substation and Line for Electric Rail Road     

2000 Suwon Stationrelocation work of power transformer facilities at Suwon sub-point

* Re-installation for 24 units of disconnecting switch (2P 72.5KV 800A)* Re-installation for 2 units of autotransformer (55KV/25KV 5MVA)* Re-installation for 3 units of breaker (36KV 1200A)

2000.04~

2000.06 241,367

2001 

KORAIL - Subway Construction HQ

Installation of power transformer facilities at Doogye S/S and 6 others of Honam line

* Substation facilities 154KV 1 unit, 72.5KV 7 units (power equipments, lighting, power, electric power source facilities)

2001.12~

2003.12 3,274,814

2001KORAIL - Subway Construction HQ

Installation of lines between Shindo - Gangkyung of Honam line

* Installation of Electric Railway lines 112.423 ㎞ , Supplement lines 112.423 ㎞

2001.11~

2005.06 13,370,180

Typesof work

YearCustomer

NameName of Project Descriptions of Project Period

Amount USD(1$:1390Won)

Details for Major Projects Completed

Page 15: Transmission Line Works

DAE YOUNGGeneral Industrial Equipments Co., Ltd 15 / 18

Installation,Repair, Inspection of Substation & Line for Electric Rail Road

2005Daegu Subway Construction HQ

Power transformer work for Daesil substation at subway Line No. 2

* Installation for 22.9KV power cable for 16,364m* Installation of underground lines for 1,856m * installation of truf 2,711m* Transforming facilities (Distributing boards of 17, TR, GIS and others)

2003.02~

2005.08

808,494   

2005 KORAIL - SeoulRepair work for power transformer equipments at Jooan substation

* Detailed inspection for GIS AIR COM, P

2005. 02~

2005. 06 43,165

2005 KORAI - Youngju HQRepair works of power transformer at Anjeong and 3 others

* Repair TR 66KV/55KV 10MVA and GIS

2005. 06~

2005. 09 43,320

2005 Aju EngineeringGIS inspection at Wonduk sub-point of Joongan Line and other

* Detailed inspection for GIS 36KV 1P

2005. 07~

2005. 12 22,927

Electric Rail Road

Typesof work

YearCustomer

NameName of Project Descriptions of Project Period

Amount USD(1$:1390Won)

Details for Major Projects Completed

Page 16: Transmission Line Works

DAE YOUNGGeneral Industrial Equipments Co., Ltd 16 / 18

Installation,Inspection of Substation & Line for Electric Rail Road

2006 KORAIL - SeeoulRelocation work of rail lines at Ichon station of Kyungwon Line

* Arrangement for Electric Railway lines and supplement lines of 912m, and installation of 14 electric poles* Emergency cable 716m, Protection line and Flashover protection line of 639m

2006.11~

2006.12 79,319

2006 KORAIL - Yangpyong

Detailed breakdown check for gas breaker at Wonju Substation of Joongang Line

* Detailed breakdown inspection for GIS 75KV 1200A 3P

2006. 06~

2006. 08 58,273

Electric Rail Road

Typesof work

YearCustomer

NameName of Project Descriptions of Project Period

Amount USD(1$:1390Won)

Details for Major Projects Completed

Page 17: Transmission Line Works

DAE YOUNGGeneral Industrial Equipments Co., Ltd 17 / 18

Power Distribution, House

Installation, Repair, Inspection of Power Distribution, House and Dam

2005 KEPCO - Hwaseong

Works to resolve unbalanced external over load at Sunamgan 80 left distributor

* Installation of 21 poles, Installation of cable 2670m

2005. 05~

2006. 03 62,211

2005 KEPCO - DangjinDetailed inspection for ground equipment in 2005

* Ground breaker 107 units (GAS analysis, Thermal injury diagnosis)

2005. 05~

2005. 06 2,849

2005 KEPCO - Bookbu

Detailed inspection for Ground Breaker at Changdong 17-1 and 120 points

* Ground breaker 120 units (GAS analysis, thermal injury diagnosis)

2005. 06~

2005. 07 4,748

2005 KEPCO - KangnamGas analysis and insulation oil for Gannam street TR3 and 68 points

* Ground breaker 69 units (GAS analysis, thermal injury diagnosis)/ PAD TR OT supplement

2005. 04~

2005. 08 7,597

2005 KEPCO - BookbuGas refill and detailed inspection for year 2005 for PAD breaker

* Ground breaker 92 units (GAS analysis, Thermal injury diagnosis)

2005. 08~

2005. 07 7,914

2006 KEPCO - YonginHigh voltage H work for year 2005 Yongin Branch

* Annual contract for line maintenance for Yongin internal 22KV

2004.12~

2005.12 758,685

Typesof work

YearCustomer

NameName of Project Descriptions of Project Period

Amount USD(1$:1390Won)

Details for Major Projects Completed

Page 18: Transmission Line Works

DAE YOUNGGeneral Industrial Equipments Co., Ltd 18 / 18

Inspection, Installation, Repair of Power Distribution, House, Dam

2006 KEPCO - OsanHigh voltage B work for year 2006 Osan Branch

* Annual contract for line maintenance for Osan internal 22KV

2005.12~

2006.12 503,597

2006 KEPCO - HwaseongReinforcement work for unstable facilities at 06 Youngheungji

* Installation of 17 poles, Underground cable 2,304m

2006. 01~

2006. 08 63,864

2006  

Korea Water Resources Corp. 

Electric work for Daeam Dam Sub-Water way

* Power equipments (Input 22.9KV 600m TR, MOF, 6 distributing boards)* Installation of cable (600V CV 325 ㎟ -1C 3,135m*3 / Low voltage line 7500m)* Tunnel lighting, lighting for building Park

2005.12~

2008.11

578,114   

2007 KEPCO-OsanInstallation of 6 innes at Joam S/S

* Installation of 88 poles, Pipe lines 2,922m, Installation of underground cable 8,511m

2007. 03~

2007. 12 387,067

2007Korea National Housing Corp.

Electric work for Seongnam Pangyo Apt. 6th site

* Electric and fire protection works for APT 584 households

2007.01~

2009.12 1,040,415

Power Distribution, House

Typesof work

YearCustomer

NameName of Project Descriptions of Project Period

Amount USD(1$:1390Won)

Details for Major Projects Completed