DESCRIPTION
Details for Major Projects Completed. Transmission Line Works. Details for Major Projects Completed. Power Substation Works. Details for Major Projects Completed. Power Substation Works. Details for Major Projects Completed. Power Substation Works. Details for Major Projects Completed. - PowerPoint PPT PresentationTRANSCRIPT
DAE YOUNGGeneral Industrial Equipments Co., Ltd 1 / 18
Underground Power Supply Lines
2001KORAIL Subway Construction Office
Installation of Power Transfer Equipments for Honam Doogye S/S and 6 places
* Underground power transfer line (154KV Φ200 6hole) 3.13 ㎞
2001.12~
2003.123,274,814
Iron Tower Maintenance Works
2005 Hansol PapersCleaning of Live Wire Insulator
* Cleaning of live wire insulator and repair 17 insulators
2005.03~
2006.013,264
2006 Hansol EME154kv Iron Tower Cleaning of Live Wire Insulator
* Cleaning of live wire insulator and repair 17 insulators
2006.01~
2006.1211,871
2006 SeAH Besteel Co.154KV T/L Cleaning and change of suspension insulator
* 19 live wire insulators of154KV line iron tower
2006.02~
2006.085,540
2006 Asia Paper MFG154KV Power line repair work
* Inspection, tighten volts, painting and change of insulator for 22 iron towers
2006.01~
2006.059,712
2006 KEPCO - Suwon154KV Nam Suwon S/S #5
M.TR Extention Work* Installation of TR 154KV/22KV
1Φ 15/20MVA *3 1BANK
2006.05~
2006.07 31,573
Transmission Line Works
Typesof work
YearCustomer
NameName of Project Descriptions of Project Period
Amount USD(1$:1390Won)
Details for Major Projects Completed
DAE YOUNGGeneral Industrial Equipments Co., Ltd 2 / 18
Installation Works for Transformer
2006 Iljin HeavyHwanyoung Steel 154KV Transformer Installation Work
* Installation of TR 154KV 3Φ 30/40MVA 1BANK
2006.09~
2006.09 21,763
2006 Daehan SteelRemove and installation work for 40t of transformer for electric furnace
* Installation of 22.9KV 42MVA transformer for furnace
2006.08~
2006.10 18,201
2006 Dongbu SteelIncheon Factory - Purchase and Installation of 154KV transformer
* Installation of 154KV/22.9KV 30/40MVA 1BANK
2006.07~
2006.12 201,799
2006 Iljin Heavy POSCO Pohang - Installation of 154KV M.TR
* TR 154KV 3Φ 10MVA 1BANK Installation
2006.07~
2006.09 9,496
2007Hyundai Steel - Pohang
Daehyung Steel - Urgent recovery works for transformer of 100t electric furnace
* Detailed inspection of transformer 22.9KV 95MVA for furnace
* Remove of 22.9KV 95MVA transformer and installation of 66MVA transformer for furnace
* Remove of 22.9KV 66MVA transformer and installation of 95MVA transformer for furnace
2007.03~
2007.10 166,741
Details for Major Projects CompletedPower Substation Works
Typesof work
YearCustomer
NameName of Project Descriptions of Project Period
Amount USD(1$:1390Won)
DAE YOUNGGeneral Industrial Equipments Co., Ltd 3 / 18
Installation Works for Transformer
2007 SeAh Besteel
Assembling work for warehousing of electric furnace TR 62MVA for contingency
* Installation of 22.9KV 62MVA transformer for furnace
2007. 07~
2007. 1116,000
2007 Iljin HeavyPOSCO Pohang - Installation of 154KV M.TR
* Installation of TR 154KV 3Φ 100/120MVA 3BANK
2006. 02~
2006. 03 25,165
2007 KEPCO - Seongnam
Urgent recovery works for Ansung S/S #2M.TR
* Installation of TR 154KV/22KV 1Φ 15/20MVA *3 1BANK
2007.08
12,000
2008 KEPCO - Nam SeoulInstallation work for 154kv at Ganam S/S M.TR
* Installation of TR 154KV/22KV 1Φ 15/20MVA *6 2BANK
2008. 01~
2008. 05 70,419
2008Seoul Power Management Office
Installation work for 345KV at Mikeum S/S #3MTR
* Installation of TR 345KV/161KV/23KV 166.7MVA*3
2008. 03~
2008. 07 134,964
2008 Daehan SteelNoksan Steel Mill Factory - Installation work for transformer
* Installation of TR 154KV/22KV 3Φ 30MVA 1BANK
2008. 05~
2008. 09 94,964
Power Substation Works
Typesof work
YearCustomer
NameName of Project Descriptions of Project Period
Amount USD(1$:1390Won)
Details for Major Projects Completed
DAE YOUNGGeneral Industrial Equipments Co., Ltd 4 / 18
InstallationWorks forTransformer
2008 KEPCO - Nam SeoulInstallation work for Dong Pangyo S/S M.TR
* Installation of TR 154KV/22KV 1Φ 15/20MVA *6 2BANK
2008. 02~
2008. 11 81,243
2008 KEPCO - IncheonExpansion of 154KV at Yeokgok S/S#4 M.TR
* Installation of TR 154KV/22KV 1Φ 15/20MVA *3 1BANK
2008. 06 ~
2008. 12 42,017
InstallationWorks forBreaker(GIS)
2005
KEPCO - Joongbu
Installation of GIS for 154KV at Jido S/S #4M.Tr
* Installation of GIS 170KV 50KV 1200A * 1CCT* Installation of GIS 25.8KV 25KA 600A 2BAY
2005. 05~
2005. 06
38,973
2005 KEPCO - IncheonExpanded work for 345kv at New Bupyong S/S #64 D.Tr (25.8kv GIS)
* Installation of GIS 25.8KV 25KA 600A 7BAY
2005. 05~
2005. 06 22,025
2005 KEPCO - CheongwonExpanded work of breaker at Bugang and Manseung S/S 23KV
* Installation of GIS 25.8KV 25KA 600A 2BAY
2005. 03~
2005. 03 20,446
Power Substation Works
Typesof work
YearCustomer
NameName of Project Descriptions of Project Period
Amount USD(1$:1390Won)
Details for Major Projects Completed
DAE YOUNGGeneral Industrial Equipments Co., Ltd 5 / 18
InstallationWorks for Breaker(GIS)
2005KEPCO - New Seongnam
Installation of 345KV at New Suwon S/S 170KV GIS
* Installation of GIS 170KV 50KV 1200A * 2CCT
2005. 05~
2005. 09 7,668
2006 KEPCO - SuwonInstalation of 345KV at New Seongnam S/S 362KV GIS
* Installation of GIS 362KV 3CB 2006.04
~2006.08
53,013
2006 KEPCO - IncheonInstallation at Gokang S/S 25.8KV GIS
* Installation of GIS 25.8KV 25KA 600A 13BAY
2006.08~
2006.12 88,772
2006 KEPCO - JecheonInstallation at Moonmak S/S 170KV GIS
* Installation of GIS 170KV 50KV 1200A * 1CCT
2006.01~
2006.12 10,191
2006 KEPCO - SeongdongExtended works for new SW at Jongam S/S 23KV
* Installation of GIS 25.8KV 25KA 600A 1BAY
2006. 03~
2006. 05 18,024
2006 KEPCO - Seo SeoulInstallation for 154KV at Shihwa S/S 23KV GIS
* Installation of GIS 25.8KV 25KA 600A 41CCT
2006.08~
2006.12 274,139
Power Substation Works
Typesof work
YearCustomer
NameName of Project Descriptions of Project Period
Amount USD(1$:1390Won)
Details for Major Projects Completed
DAE YOUNGGeneral Industrial Equipments Co., Ltd 6 / 18
InstallationWorks for Breaker(GIS)
2006
Yoosuk Ind. & Dongyang Sement
Instalation at Dongyang Sement for 154KV S/S GCB
* Installation of 1 unit of GCB 170KV 1 대 and remove I unit of OCB 169KV and control cable * Changes of MOF, CT and main line
2006. 02~
2006. 06
10,288
2007 KEPCO - SuwonInstallation at 07 Byongjeom S/S 23KV for New GIS
* Installation of GIS 25.8KV 25KA 600A 11CCT
2007. 03~
2007. 05 58,465
2007 KEPCO - GoonpoInstallation of S.W at Nam Ansan and other S/S
* Installation of GIS 25.8KV 25KA 600A 1CCT*2 units
2007. 01
2007. 04 11,214
2007KEPCO - New Seongnam
Extension at Seo Anyang S/S 23KV New SW
* Installation of GIS 25.8KV 25KA 600A 2CCT
2007. 08~
2007. 12 11,262
2008 KEPCO -GoonpoExtension at Jangdeok S/S 23KV New SW
* Installation of GIS 25.8KV 25KA 600A 1CCT
2008. 01~
2008. 02 16,596
Power Substation Works
Typesof work
YearCustomer
NameName of Project Descriptions of Project Period
Amount USD(1$:1390Won)
Details for Major Projects Completed
DAE YOUNGGeneral Industrial Equipments Co., Ltd 7 / 18
InstallationWorks for Breaker(GIS)
2008 KEPCO - SuwonInstallation at 08 Cheongbuk S/S 154KV new GIS
* Installation of GIS 170KV 50KV 1200A * 2CCT
2008. 02~
2008. 06 31,068
2008 Iljin ElectricInstallation at KAIST for transformer breaker
* Installation of GIS 170KV 50KA 2CCT, M.TR 154KV 30/45MVA 1 unit
2008. 01~
2008. 11 214,388
2008 KEPCO - JejuExtension of 154KV at Sanji S/S 25.8KV GIS 2 Lines
* Installation of GIS 25.8KV 25KA 600A 2BAY
2008. 03~
2008. 05 19,571
Additional Construction, Inspection and Maintenance for substation
2005 KEPCO - SeoSeoulAnnula suppliers' work for '05
* 14 substations* Power transforming facilities (345KV, 154KV, 22KV TR, GIS, GCB, DS, MOF* P.T, C.T, LA, CABLE) inspection, maintenance and repair
2005.03~
2006.02
817,599
Power Substation Works
Typesof work
YearCustomer
NameName of Project Descriptions of Project Period
Amount USD(1$:1390Won)
Details for Major Projects Completed
DAE YOUNGGeneral Industrial Equipments Co., Ltd 8 / 18
Additional Construction, Inspection and Maintenance for substation
2005 KNCElectric work for K.N.C new factory
TR 22KV/380,220V 4000KVA, CABLE 6200m, Power Line, Installation of 6 distributing Boards
2004.09~
2005.05 237,410
2005 KEPCO - IncheonCommon ispection at Inner S/S Main Transformer and OLTC precision inspection
Detailed inspection of OLTC for TR 154KV 62 units 대 OLTC and LA 80 units
2005. 03~
2005. 05 75,588
2005 Lotte Daesan Check all TRANSFORMERS in the Factories
Inspection and repair for TR 22KV/6.6KV 25/28MVA and 91 units
2005. 07~
2005. 11 49,856
2006KEPCO - New Seongnam
Inspection of New Ansung Station - Main Transformer (765KV)
* General inspection of 11 TANK for TR 765KV * Initial inspection of 6 TANK for TR 765KV * General inspection of 6 TANK for TR 765KV 3rd ReactorK
2006.04~
2006.06 63,553
Power Substation Works
Typesof work
YearCustomer
NameName of Project Descriptions of Project Period
Amount USD(1$:1390Won)
Details for Major Projects Completed
DAE YOUNGGeneral Industrial Equipments Co., Ltd 9 / 18
Additional Construction, Inspection and Maintenance for substation
2006 Daekwang CableIksan Factory - Power Transformer
* 16 distributing boards, Cables installation for 6500m, input cables
2005.05~
2005.06 144,029
2006 KEPCO - Dong SeoulCommon inspection at Dong Seoul P/O Transformer and OLTC predision inspection
* Inspection for OLTC of TR 345KV 2 units, 154KV 37 units and Inspection for NGR 3 units and LA 50 units
2006 .06~
2006. 10 74,679
2006Hyundai Steel - Pohang
75t Furnace TR TAP CHANGER INSPECTION and Filtering insulating oil
* Inspection and filtering of 22.9KV 45/54MVA transformer for furnace
2006. 06~
2006. 07 9,496
2006Hyundai Steel - Pohang
80t Steel Manufacturing Furnace TR TAP CHANGER INSPECTION and Filtering insulating oil
* Inspection and filtering of 22.9KV 65MVA transformer for furnace
2006 .06~
2006. 08 9,496
2006Hyundai Steel - Dangjin
Repair work for 345kv main transformer
* Change bushing of TR 345KV/154KV 166.7/200MVA and filtering check
2006. 07~
2006. 10 8,753
2007 Hwanyoung SteelRepair works for electric furnace transformer and breaker
* 22.9KV 109MVA 1BANK transformer for furnace* Detailed inspection for 154KV 15MVA 2BANK power transformer
2007. 09~
2007. 09 52,784
Power Substation Works
Typesof work
YearCustomer
NameName of Project Descriptions of Project Period
Amount USD(1$:1390Won)
Details for Major Projects Completed
DAE YOUNGGeneral Industrial Equipments Co., Ltd 10 / 18
Additional Construction, Inspection and Maintenance for substation
2007 KEPCO - New Incheon
Works for inner S/S GIS precision inspection and UHF sensor installation
* Detailed inspection for 345KV GIS - 4CCT* Detailed inspection for 170KV GIS - 24CCT * 66KV GCB -1CCT
2007. 05~
2008. 01 347,151
2007KEPCO - New Seongnam
Annual suppliers' works for '06-'07
* 16 substations* Power transforming facilities (345KV, 154KV, 22KV TR, GIS, GCB, DS, MOF P.T, C.T, LA, CABLE) inspection, maintenance and repair
2006.02~
2008. 02 1,890,101
2007Daehan Steel - Noksan
Noksan Steel Manufacturing Factory - Installation of transformer for EAF and LF
* Detailed inspection for 22.9KV 52MVA transformer for furnace and I unit of installation* Detailed inspection for 22.9KV 22.5MVA transformer for furnace and 1 unit of installation* 2nd BUS and installation of water cooling cable
2007. 05~
2007. 12 217,230
Power Substation Works
Typesof work
YearCustomer
NameName of Project Descriptions of Project Period
Amount USD(1$:1390Won)
Details for Major Projects Completed
DAE YOUNGGeneral Industrial Equipments Co., Ltd 11 / 18
Power Generation
Inspection of Breaker for Power Generation and Transformer
2004Korea East-West Power
Inspection for inner of main transformer of 2nd GT #5, 6 & ST #2, 3
* Detailed inspection for internal TR 18KV/345KV 400MVA
2004.04~
2004.05 38,740
2004 Korea Midland PowerFiltering of insulating oil and detailed inspection for main transformer of GT 1,2
* Inspection for internal TR 154KV 60MVA and filtering
2004.03~
2004.04 22,237
2006Korea South-East Power
Detailed inspection for Mooju Water - Pumping 1, 2
* Detailed inspection for 2 units of 24KV 13000A 100KA(HEK4)
2006. 09~
2007. 05 323,022
2006 “ “
* Detailed inspection for 1 unit of phase transfer disconnect
2006 .08~
2006. 11
Included above
2006Korea East-West Power - Ulsan
Repair work for #1,2 GT Main TR Bushing Oil Leak
* Change of TR 154KV bushing and filtering
2006. 09~
2006. 11 7,360
2006Korea Midland Power - Boryong
Detailed breakdown inspection for GT1, 2 generator and breaker of 3rd station
* Detailed inspection for internal GCB HEC-3 18KV 8000A 100KA
2006. 05~
2006. 06 12,274
Typesof work
YearCustomer
NameName of Project Descriptions of Project Period
Amount USD(1$:1390Won)
Details for Major Projects Completed
DAE YOUNGGeneral Industrial Equipments Co., Ltd 12 / 18
Inspection of Breaker for Power Generation and Transformer
2006Korea South Power - New Incheon
Detailed breakdown inspection for 3rd GT generator and breaker
* Detailed inspection for GCB HEK-3 124V 10KA
2006. 06~
2006. 10 28,094
2007Korea Western Power -Seo Incheon
Detailed breakdown inspection and repair works for 2nd generator and breaker
* Detailed breakdown inspection for 2 units of synchronous circuit breaker HEK-3 24KV 10000A 100KA
2007.01~
2007.02 89,568
2007Korea South Power - New Incheon
4MT 201 #2 COOLER change and filtering insulating oil
* Cooler changing and filtering for TR 154KV 60MVA
2007. 02~
2007. 03 9,353
2007Cheongpyong Water
Pumping#1 S.Tr Detailed inspection and repair work
* Detailed breakdown inspection for TR 154KV 25MVA 1BANK
2007. 05~
2007. 07 10,604
2007Korea South Power - Cheongpyong Water Pumping
#2 S.Tr OLTC detailed inspection
* Detailed breakdown inspection for TR 154KV 25MVA 1BANK OLTC
2007. 06~
2007. 07 40,360
2007Korea Western Power - Seo Incheon
Detailed breakdown inspection for breaker of 1st and 2nd generators
* Detailed breakdown inspection for 2 units of synchronous circuit breaker HEK-3 24KV 10000A 100KA * Detailed breakdown inspection for 2 units of synchronous circuit breaker HEK-1 24KV 6300A 63KA
2007. 01~
2007. 09 186,108
Power Generation
Typesof work
YearCustomer
NameName of Project Descriptions of Project Period
Amount USD(1$:1390Won)
Details for Major Projects Completed
DAE YOUNGGeneral Industrial Equipments Co., Ltd 13 / 18
Inspection of Breaker for Power Generation and Transformer
2007
Korea South-East Power - Youngdong
Detailed inspection for 1st transformer
* Detailed inspection and filtering for internal M.TR 154KV 150MVA* Detailed inspection and filtering for internal S.TR 14KV 10MVA
2007. 10~
2007. 11 15,771
Power Generation
Typesof work
YearCustomer
NameName of Project Descriptions of Project Period
Amount USD(1$:1390Won)
Details for Major Projects Completed
DAE YOUNGGeneral Industrial Equipments Co., Ltd 14 / 18
Electric Rail Road
Installation of Substation and Line for Electric Rail Road
2000 Suwon Stationrelocation work of power transformer facilities at Suwon sub-point
* Re-installation for 24 units of disconnecting switch (2P 72.5KV 800A)* Re-installation for 2 units of autotransformer (55KV/25KV 5MVA)* Re-installation for 3 units of breaker (36KV 1200A)
2000.04~
2000.06 241,367
2001
KORAIL - Subway Construction HQ
Installation of power transformer facilities at Doogye S/S and 6 others of Honam line
* Substation facilities 154KV 1 unit, 72.5KV 7 units (power equipments, lighting, power, electric power source facilities)
2001.12~
2003.12 3,274,814
2001KORAIL - Subway Construction HQ
Installation of lines between Shindo - Gangkyung of Honam line
* Installation of Electric Railway lines 112.423 ㎞ , Supplement lines 112.423 ㎞
2001.11~
2005.06 13,370,180
Typesof work
YearCustomer
NameName of Project Descriptions of Project Period
Amount USD(1$:1390Won)
Details for Major Projects Completed
DAE YOUNGGeneral Industrial Equipments Co., Ltd 15 / 18
Installation,Repair, Inspection of Substation & Line for Electric Rail Road
2005Daegu Subway Construction HQ
Power transformer work for Daesil substation at subway Line No. 2
* Installation for 22.9KV power cable for 16,364m* Installation of underground lines for 1,856m * installation of truf 2,711m* Transforming facilities (Distributing boards of 17, TR, GIS and others)
2003.02~
2005.08
808,494
2005 KORAIL - SeoulRepair work for power transformer equipments at Jooan substation
* Detailed inspection for GIS AIR COM, P
2005. 02~
2005. 06 43,165
2005 KORAI - Youngju HQRepair works of power transformer at Anjeong and 3 others
* Repair TR 66KV/55KV 10MVA and GIS
2005. 06~
2005. 09 43,320
2005 Aju EngineeringGIS inspection at Wonduk sub-point of Joongan Line and other
* Detailed inspection for GIS 36KV 1P
2005. 07~
2005. 12 22,927
Electric Rail Road
Typesof work
YearCustomer
NameName of Project Descriptions of Project Period
Amount USD(1$:1390Won)
Details for Major Projects Completed
DAE YOUNGGeneral Industrial Equipments Co., Ltd 16 / 18
Installation,Inspection of Substation & Line for Electric Rail Road
2006 KORAIL - SeeoulRelocation work of rail lines at Ichon station of Kyungwon Line
* Arrangement for Electric Railway lines and supplement lines of 912m, and installation of 14 electric poles* Emergency cable 716m, Protection line and Flashover protection line of 639m
2006.11~
2006.12 79,319
2006 KORAIL - Yangpyong
Detailed breakdown check for gas breaker at Wonju Substation of Joongang Line
* Detailed breakdown inspection for GIS 75KV 1200A 3P
2006. 06~
2006. 08 58,273
Electric Rail Road
Typesof work
YearCustomer
NameName of Project Descriptions of Project Period
Amount USD(1$:1390Won)
Details for Major Projects Completed
DAE YOUNGGeneral Industrial Equipments Co., Ltd 17 / 18
Power Distribution, House
Installation, Repair, Inspection of Power Distribution, House and Dam
2005 KEPCO - Hwaseong
Works to resolve unbalanced external over load at Sunamgan 80 left distributor
* Installation of 21 poles, Installation of cable 2670m
2005. 05~
2006. 03 62,211
2005 KEPCO - DangjinDetailed inspection for ground equipment in 2005
* Ground breaker 107 units (GAS analysis, Thermal injury diagnosis)
2005. 05~
2005. 06 2,849
2005 KEPCO - Bookbu
Detailed inspection for Ground Breaker at Changdong 17-1 and 120 points
* Ground breaker 120 units (GAS analysis, thermal injury diagnosis)
2005. 06~
2005. 07 4,748
2005 KEPCO - KangnamGas analysis and insulation oil for Gannam street TR3 and 68 points
* Ground breaker 69 units (GAS analysis, thermal injury diagnosis)/ PAD TR OT supplement
2005. 04~
2005. 08 7,597
2005 KEPCO - BookbuGas refill and detailed inspection for year 2005 for PAD breaker
* Ground breaker 92 units (GAS analysis, Thermal injury diagnosis)
2005. 08~
2005. 07 7,914
2006 KEPCO - YonginHigh voltage H work for year 2005 Yongin Branch
* Annual contract for line maintenance for Yongin internal 22KV
2004.12~
2005.12 758,685
Typesof work
YearCustomer
NameName of Project Descriptions of Project Period
Amount USD(1$:1390Won)
Details for Major Projects Completed
DAE YOUNGGeneral Industrial Equipments Co., Ltd 18 / 18
Inspection, Installation, Repair of Power Distribution, House, Dam
2006 KEPCO - OsanHigh voltage B work for year 2006 Osan Branch
* Annual contract for line maintenance for Osan internal 22KV
2005.12~
2006.12 503,597
2006 KEPCO - HwaseongReinforcement work for unstable facilities at 06 Youngheungji
* Installation of 17 poles, Underground cable 2,304m
2006. 01~
2006. 08 63,864
2006
Korea Water Resources Corp.
Electric work for Daeam Dam Sub-Water way
* Power equipments (Input 22.9KV 600m TR, MOF, 6 distributing boards)* Installation of cable (600V CV 325 ㎟ -1C 3,135m*3 / Low voltage line 7500m)* Tunnel lighting, lighting for building Park
2005.12~
2008.11
578,114
2007 KEPCO-OsanInstallation of 6 innes at Joam S/S
* Installation of 88 poles, Pipe lines 2,922m, Installation of underground cable 8,511m
2007. 03~
2007. 12 387,067
2007Korea National Housing Corp.
Electric work for Seongnam Pangyo Apt. 6th site
* Electric and fire protection works for APT 584 households
2007.01~
2009.12 1,040,415
Power Distribution, House
Typesof work
YearCustomer
NameName of Project Descriptions of Project Period
Amount USD(1$:1390Won)
Details for Major Projects Completed