TRANSMISI DAYA ELEKTRIK
Nanang HariyantoSekolah Teknik Elektro dan Informatika
Institut Teknologi Bandung
![Page 2: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/2.jpg)
![Page 3: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/3.jpg)
![Page 4: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/4.jpg)
![Page 5: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/5.jpg)
![Page 6: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/6.jpg)
![Page 7: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/7.jpg)
![Page 8: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/8.jpg)
![Page 9: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/9.jpg)
![Page 10: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/10.jpg)
![Page 11: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/11.jpg)
![Page 12: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/12.jpg)
![Page 13: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/13.jpg)
![Page 14: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/14.jpg)
TRANSMISI DAN GARDU INDUKURAIAN SINGKAT
“TRANSMISI” ATAU LEBIH LENGKAPNYA SALURAN TRANSMISI ADALAH SUATU INSTALASI LISTRIK PASANGAN LUAR YANG MERUPAKAN BAGIAN DARI SISTEM TENAGA LISTRIK, YANG MENGHUBUNGKAN SIMPUL-SIMPUL DIDALAM SISTEM TENAGA LISTRIK, TERDIRI DARI SUSUNAN SEJUMLAH MATERIAL, PERALATAN DAN KELENGKAPANNYA YANG DIPASANG MENEMPATI SUATU JALUR LINTASAN TERTENTU, BERFUNGSI SEBAGAI SARANA UNTUK MENYALURKAN TENAGA LISTRIK DALAM JUMLAH BESAR DARI SATU TEMPAT KETEMPAT LAIN (DARI PEMBANGKIT KE GARDU INDUK, DARI GARDU INDUK KE GARDU INDUK LAIN) DENGAN MENGGUNAKAN TEGANGAN TINGGI DAN EKSTRA TINGGI SEBAGAI TEGANGAN KERJANYA, MENUNJANG KEANDALAN SISTEM TENAGA LISTRIK TERKAIT SERTA DIRANCANG DAN DIPASANG DENGAN SEKSAMA BERDASARKAN STANDAR-STANDAR YANG BERLAKU.
![Page 15: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/15.jpg)
TRANSMISI DAN GARDU INDUKURAIAN SINGKAT
GARDU INDUK ADALAH SUATU INSTALASI LISTRIK PASANGAN LUAR
ATAU PASANGAN DALAM YANG MERUPAKAN BAGIAN DARI SISTEM
TENAGA LISTRIK, MERUPAKAN SIMPUL DIDALAM SISTEM TENAGA
LISTRIK,
TERDIRI DARI SUSUNAN DAN RANGKAIAN SEJUMLAH PERALATAN DAN
KELENGKAPANNYA YANG DIPASANG MENEMPATI SUATU LOKASI
TERTENTU, BERFUNGSI MENERIMA DAN MENYALURKAN TENAGA
LISTRIK, MENAIKKAN DAN MENURUNKAN TEGANGAN SESUAI DENGAN
TINGKAT TEGANGAN-TEGANGAN KERJANYA, TEMPAT MELAKUKAN
KERJA SWITCHING RANGKAIAN SUATU SISTEM TENAGA LISTRIK,
MENUNJANG KEANDALAN SISTEM TENAGA LISTRIK TERKAIT SERTA
DIRANCANG DAN DIPASANG DENGAN SEKSAMA BERDASARKAN
STANDAR-STANDAR YANG BERLAKU.
![Page 16: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/16.jpg)
TRANSMISI DAN GARDU INDUKURAIAN SINGKAT
SALURAN TRANSMISI
ARUS (DAYA) BOLAK BALIK SEARAH
FISIK INSTALASI SALURAN UDARA (OHL) SALURAN KABEL TANAH (UNDERGROUND CABLE) SALURAN KABEL LAUT (SUBMARINE CABLE)
TEGANGAN 70 KV 150 KV 275 KV 500 KV
![Page 17: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/17.jpg)
TRANSMISI DAN GARDU INDUKURAIAN SINGKAT
KONSTRUKSI SALURAN UDARA
TERDIRI ATAS BAGIAN-BAGIAN :
1. PONDASI PENOPANG
2. STRUKTUR PENOPANG (MENARA KERANGKA, TIANG)
3. INSULATOR
4. KONDUKTOR
5. PERALATAN PENTANAHAN
6. KELENGKAPAN LAIN
![Page 18: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/18.jpg)
TRANSMISI DAN GARDU INDUKURAIAN SINGKAT
PONDASI PENOPANG
PONDASI MERUPAKAN DASAR TEMPAT BERPIJAKNYA STRUKTUR PENOPANG, DIBUAT DENGAN DISAIN DAN PERHITUNGAN YANG CERMAT DENGAN MEMPERHATIKAN BERAT DAN TINGGI STRUKTUR PENOPANG, BERAT KONDUKTOR DAN INSULATOR, BEBAN TARIKAN KONDUKTOR, BEBAN ANGIN, KEADAAN TANAH SETEMPAT, DLL.
ENJINIR TEKNIK SIPIL DAN ENJINIR GEOLOGI AKAN MEMPERTIMBANGKAN DENGAN CERMAT DALAM MEMBUAT DESAIN DAN PERHITUNGAN PONDASI BERDASARKAN DATA BEBAN DAN DATA HASIL PENYELIDIKAN TANAH.
![Page 19: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/19.jpg)
TRANSMISI DAN GARDU INDUKURAIAN SINGKAT
STRUKTUR PENOPANG
STRUKTUR INI DIPERLUKAN UNTUK MENOPANG BENTANGAN KONDUKTOR, MEMASANG SET INSULATOR DAN PERLENGKAPAN LAIN YANG DIPERLUKAN. UNTUK STRUKTUR PENOPANG SALURAN UDARA DAPAT DIGUNAKAN : MENARA KERANGKA BAJA (STEEL LATTICE TOWER) TIANG BAJA BULAT (TUBULAR STEEL POLE) TIANG BETON (CONCRETE POLE) TIANG KAYU (WOOD POLE)
![Page 20: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/20.jpg)
TRANSMISI DAN GARDU INDUKURAIAN SINGKAT
MENARA KERANGKA BAJA (STEEL LATTICE TOWER):
TYPE AA : MENARA PENOPANG DENGAN SUDUT 0°-3° (SUSPENSION TOWER)
TYPE BB : MENARA TARIK DENGAN SUDUT 3°–20° (SMALL ANGLE TENSION TOWER)
TYPE CC : MENARA TARIK DENGAN SUDUT 20°–40° (MEDIUM ANGLE TENSION TOWER)
TYPE DD/DDR: MENARA TARIK DAN TERMINAL DENGAN SUDUT 40°-60° (LARGE ANGLE
TENSION/ DEAD END TOWER)
TYPE EE : MENARA TARIK DENGAN SUDUT 60°-90° (LARGE ANGLE TENSION TOWER)
![Page 21: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/21.jpg)
TRANSMISI DAN GARDU INDUKURAIAN SINGKAT
TIANG BAJA (TUBULAR STEEL POLE):
TYPE SSP1 : TIANG BAJA PENOPANG DENGAN SUDUT 0°-1°
TYPE SSP5 : TIANG BAJA TARIK DENGAN SUDUT 1°-5°
TYPE TSP15 : TIANG BAJA TARIK DENGAN SUDUT 5°-15°
TYPE TSP30 : TIANG BAJA TARIK DENGAN SUDUT 15°-30°
TYPE TSP60 : TIANG BAJA TARIK DENGAN SUDUT 30°-60°.
TYPE TSP90 : TIANG BAJA TARIK DENGAN SUDUT 60°– 90°
TYPE DSP : TIANG BAJA TARIK/TERMINAL
![Page 22: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/22.jpg)
TRANSMISI DAN GARDU INDUKURAIAN SINGKAT
SEBAGIAN BESAR SALURAN UDARA TEGANGAN TINGGI DAN EKSTRA TINGGI MENGGUNAKAN STRUKTUR PENOPANG MENARA KERANGKA BAJA DENGAN PERTIMBANGAN BAHWA HARGA STRUKTUR PENOPANG INI LEBIH MURAH DIBANDINGKAN DENGAN TIANG BAJA YANG SETARA. MENARA BERDIRI DIATAS KEEMPAT KAKINYA (BEBAN DIBAGI PADA MASING-MASING KAKI MENARA, PONDASI MENARA/TOWER LEBIH SEDERHANA DIBANDINGKAN PONDASI UNTUK TIANG TUNGGAL YANG BERDIRI HANYA DIATAS SATU KAKI). PENGANGKUTAN BAGIAN-BAGIAN MENARA KE LOKASI PEMASANGAN MUDAH DILAKUKAN KARENA MENARA BAJA TERDIRI DARI POTONGAN-POTONGAN BESI BAJA (TOWER MEMBER) YANG DAPAT DIANGKUT OLEH MANUSIA. PEKERJAAN PEMASANGAN MENARA BAJA SEDERHANA DENGAN PERALATAN KERJA TERBATAS (TIDAK MEMERLUKAN PERALATAN CRANE ATAU ALAT BERAT LAINNYA).
![Page 23: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/23.jpg)
TRANSMISI DAN GARDU INDUKURAIAN SINGKAT
STRUKTUR PENOPANG JENIS TIANG BAJA, TIANG BETON MAUPUN TIANG KAYU LEBIH KOMPAK BILA DIBANDINGKAN DENGAN MENARA KERANGKA, AKAN TETAPI CARA PENGANGKUTAN DAN PEMASANGANNYA TIDAK SESEDERHANA MENARA KERANGKA BAJA. STRUKTUR PENOPANG JENIS TIANG AKAN DIPILIH BILA ADA KENDALA ATAU BATASAN DALAM MELAKUKAN DESAIN SUATU SALURAN UDARA TEGANGAN TINGGI ATAU EKSTRA TINGGI, MISALNYA KESULITAN MEMPEROLEH LAHAN TANAH YANG CUKUP LUAS UNTUK TAPAK TOWER, JALUR SALURAN UDARA MELALUI WILAYAH KOTA ATAU DAERAH YANG PADAT BANGUNAN DENGAN JALUR BEBAS YANG SANGAT TERBATAS, ADANYA PERATURAN/KETENTUAN YANG MENSYARATKAN MEMELIHARA KEINDAHAN DAN KESERASIAN LINGKUNGAN, ADANYA KETENTUAN BATAS KETINGGIAN MAKSIMUM MENARA DAN KONDUKTOR MAUPUN JARAK CLEARANCE MINIMUM TERHADAP TANAH.
![Page 24: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/24.jpg)
TRANSMISI DAN GARDU INDUKURAIAN SINGKAT
INSULATOR (1)
BERFUNGSI UNTUK MEMEGANG SECARA FISIK DAN MEMISAHKAN
SECARA LISTRIK BAGIAN BERTEGANGAN (KONDUKTOR FASA) DENGAN
BAGIAN TIDAK BERTEGANGAN (STRUKTUR PENOPANG/MENARA/TIANG).
UMUMNYA INSULATOR UNTUK SALURAN UDARA TEGANGAN TINGGI DAN
EKSTRA TINGGI TERDIRI DARI RENTENGAN INSULATOR PIRING (DISC
INSULATOR UNIT) BAIK YANG TERBUAT DARI PORSELIN/KERAMIK,
GELAS ATAU KOMPOSIT .
SELAIN ITU ADA JENIS INSULATOR YANG KAKU (LONG-ROD INSULATOR)
YANG TERBUAT DARI PORCELAIN/KERAMIK ATAUPUN KOMPOSIT .
![Page 25: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/25.jpg)
TRANSMISI DAN GARDU INDUKURAIAN SINGKAT
INSULATOR (2)
JUMLAH INSULATOR PIRING DALAM SATU RENTENGAN (STRING
INSULATOR SET) DITENTUKAN OLEH TEGANGAN KERJA TRANSMISI,
BIL, CREEPAGE DISTANCE YANG DISYARATKAN DAN RATING DARI UNIT
DISC INSULATORNYA. KEKUATAN MEKANIS STRING INSULATOR SET
YANG DIPILIH DITENTUKAN OLEH UKURAN DAN JUMLAH KONDUKTOR
PER FASA PADA SALURAN TRANSMISI.
KARENA FUNGSINYA SEBAGAI PEMEGANG DAN PEMISAH BAGIAN
BERTEGANGAN DENGAN BAGIAN TIDAK BERTEGANGAN, JENIS
RENTENGAN INSULATOR DIKENAL DENGAN SET INSULATOR
PENGGANTUNG (SUSPENSION INSULATOR SET), SET INSULATOR
PENEGANG (TENSION INSULATOR SET) DAN SET INSULATOR
PENYANGGA (SUPPORT INSULATOR SET).
![Page 26: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/26.jpg)
TRANSMISI DAN GARDU INDUKURAIAN SINGKAT
KONDUKTOR
KAWAT PENGHANTAR (KONDUKTOR) UNTUK SALURAN UDARA
ADALAH KONDUKTOR PILIN TANPA INSULASI (STRANDED BARE
CONDUCTOR) SEPERTI ALUMINIUM CONDUCTOR STEEL
REINFORCED (ACSR) ATAU THERMAL ALUMINIUM CONDUCTOR
STEEL REINFORCED (TACSR) UNTUK KONDUKTOR FASA,
GALVANIZED STEEL WIRE (GSW) UNTUK KAWAT PERISAI (SHIELD
WIRE).
UKURAN, JENIS DAN JUMLAH KONDUKTOR YANG DIPAKAI PADA
TIAP FASA SALURAN UDARA DITENTUKAN DARI BESAR DAYA YANG
HARUS DISALURKAN / DITRANSMISIKAN MELALUI SALURAN UDARA
BERSANGKUTAN, TEGANGAN KERJA SERTA FAKTOR-FAKTOR LAIN.
![Page 27: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/27.jpg)
TRANSMISI DAN GARDU INDUKURAIAN SINGKAT
PERALATAN PENTANAHAN
MERUPAKAN SARANA UNTUK MENGHUBUNGKAN MENARA /
TIANG DENGAN TANAH AGAR DIDAPATKAN TAHANAN
PENTANAHAN MENARA / TIANG YANG CUKUP RENDAH.
PADA UMUMNYA PERALATAN INI TERDIRI DARI BATANG
PENTANAHAN (BESI BAJA GALVANIZED) DAN KAWAT
PENTANAHAN (KAWAT BAJA GALVANIZED) YANG DIPASANG
DENGAN CARA TERTENTU.
![Page 28: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/28.jpg)
TRANSMISI DAN GARDU INDUKURAIAN SINGKAT
KELENGKAPAN LAIN
KELENGKAPAN LAIN YANG HARUS DIPASANG MELIPUTI
LENGKAPAN PADA MENARA / TIANG BERUPA PENGHALANG
PANJAT, PELAT INDIKASI DAN PELAT PERINGATAN.
KELENGKAPAN PADA KONDUKTOR BERUPA VIBRATION DAMPER
DAN SPACER ; PADA KONDUKTOR PELINDUNG (SHIELD WIRE)
BERUPA VIBRATION DAMPER DAN AIRCRAFT WARNING SPHERE
YANG DIPASANG PADA BEBERAPA TEMPAT YANG DISYARATKAN ;
PADA SET INSULATOR STRING BERUPA COUNTER-WEIGHT YANG
DIPASANG PADA BEBERAPA TEMPAT YANG MEMERLUKAN.
![Page 29: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/29.jpg)
TRANSMISI DAN GARDU INDUKURAIAN SINGKAT
SALURAN KABEL BAWAH TANAH (1)
KARENA KENDALA TERTENTU, SALURAN KABEL TEGANGAN TINGGI BAWAH TANAH (HV UNDERGROUND CABLE) DAPAT MERUPAKAN SALAH SATU PILIHAN SEBAGAI SALURAN TRANSMISI .
KABEL TEGANGAN TINGGI DITANAM DALAM TANAH PADA KEDALAMAN DAN DENGAN CARA PEMASANGAN TERTENTU. KABEL DAPAT DIPASANG DENGAN CARA TERTENTU PADA JEMBATAN KABEL DI LOKASI YANG MEMERLUKANNYA. INSTALASI KABEL TANAH HARUS DIBERI TANDA PERINGATAN LOKASI KABEL PADA TITIK-TITIK TERTENTU SEPANJANG JALURNYA.
DIKENAL DUA MACAM JENIS KABEL BAWAH TANAH YANG BANYAK DIGUNAKAN, YAITU KABEL DENGAN INSULASI XLPE DAN KABEL DENGAN INSULASI MINYAK (OIL FILLED).
PADA PEMASANGAN KABEL TEGANGAN TINGGI JENIS OIL FILLED CABLE DIPERLUKAN DATA ELEVASI TITIK-TITIK PADA JALUR KABEL DENGAN AKURAT GUNA MENENTUKAN LOKASI PEMASANGAN STOP JOINT DENGAN TEPAT.
![Page 30: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/30.jpg)
TRANSMISI DAN GARDU INDUKURAIAN SINGKAT
SALURAN KABEL BAWAH TANAH (2)
SALURAN KABEL JENIS INI MEMERLUKAN KELENGKAPAN ALAT BANTU BERUPA TANKI MINYAK (OIL TANK) DAN PERALATAN MONITORING UNTUK MENGETAHUI KONDISI, JUMLAH DAN TEKANAN MINYAK PADA KABEL TERSEBUT .
KEBOCORAN YANG TERJADI PADA KABEL INI MENGAKIBATKAN KELUARNYA MINYAK DARI KABEL KE LINGKUNGAN SEKITARNYA SEHINGGA DAPAT MENCEMARI LINGKUNGAN .
KECENDERUNGAN SEKARANG ADALAH MENGGUNAKAN KABEL DENGAN INSULASI XLPE SEBAGAI ALTERNATIF PENGGANTI KABEL DENGAN INSULASI MINYAK .
UKURAN DAN JUMLAH KABEL YANG DIPAKAI PADA SUATU INSTALASI DITENTUKAN DARI BESARNYA DAYA YANG HARUS DISALURKAN / DITRANSMISIKAN MELALUI SALURAN KABEL BERSANGKUTAN, TEGANGAN KERJA DAN FAKTOR-FAKTOR LAIN.
![Page 31: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/31.jpg)
TRANSMISI DAN GARDU INDUKURAIAN SINGKAT
SALURAN KABEL LAUT
KABEL LAUT (SUBMARINE CABLE) DIGUNAKAN UNTUK MENYALURKAN TENAGA LISTRIK ANTAR PULAU, MISALNYA DARI PULAU JAWA KE PULAU BALI, DAN PULAU JAWA KE PULAU MADURA DENGAN TEGANGAN 150 KV.
KONSTRUKSI KABEL DIBUAT KHUSUS SUPAYA TAHAN TERHADAP KONDISI ALAM DI LOKASI KABEL LAUT INI DILETAKKAN / DIGELAR. KABEL LAUT DIBUAT BERDASARKAN DESAIN KHUSUS DAN UNIK YANG DIDASARKAN PADA KEBUTUHAN PENGAMANAN KABEL TERHADAP KEGANASAN ALAM SETEMPAT. KEBOCORAN YANG TERJADI PADA KABEL INI MENGAKIBATKAN KELUARNYA MINYAK DARI KABEL KE LINGKUNGAN SEKITARNYA (LAUT) SEHINGGA DAPAT MENCEMARI LINGKUNGAN .
JENIS KABEL YANG DIPAKAI ADALAH OIL FILLED CABLE, DILETAKKAN / DIPASANG PADA JALUR YANG DITETAPKAN DENGAN CARA TERTENTU, MENGGUNAKAN KAPAL KHUSUS DAN PERALATAN KHUSUS.PEMBANGUNAN SISTEM KABEL LAUT DIMULAI DENGAN TAHAP PERENCANAAN, SURVEY JALUR, STUDI / PENGAMATAN KONDISI SETEMPAT, DESAIN AWAL, METODA / CARA PEMASANGAN KABEL, METODA PENANAMAN KABEL DIDASAR LAUT DAN FAKTOR LAIN.
![Page 32: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/32.jpg)
TRANSMISI DAN GARDU INDUKURAIAN SINGKAT
GARDU INDUK
UMUM (1)
GARDU INDUK SEBAGAI SUATU TITIK (NODE) DARI SISTEM TENAGA LISTRIK ADALAH INSTALASI LISTRIK YANG MEMPUNYAI BAGIAN SERANDANG DAN GEDUNG KONTROL, MENEMPATI SUATU LOKASI TERTENTU, BERFUNGSI MENERIMA DAN MENYALURKAN TENAGA LISTRIK, MENAIKKAN DAN MENURUNKAN TEGANGAN SESUAI DENGAN TINGKAT TEGANGAN KERJANYA, MELAKUKAN KERJA SWITCHING RANGKAIAN SUATU SISTEM TENAGA LISTRIK SERTA MENUNJANG KEANDALAN SISTEM TENAGA LISTRIK TERKAIT.
![Page 33: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/33.jpg)
TRANSMISI DAN GARDU INDUKURAIAN SINGKAT
GARDU INDUK
UMUM (2)
SERANDANG (SWITCHYARD) ADALAH BIDANG TANAH YANG
MERUPAKAN BAGIAN DARI GARDU INDUK TEMPAT
DIPASANGNYA PERALATAN UTAMA GARDU INDUK YANG
TERDIRI DARI STRUKTUR PENOPANG, REL-DAYA, PEMUTUS-
TENAGA, SAKLAR-PEMISAH, SAKLAR-PENTANAHAN, TRAFO-
ARUS, TRAFO-TEGANGAN, TRAFO-TENAGA, PENANGKAL
SURJA, LINE TRAP, PONDASI PERALATAN DAN STRUKTUR-
STRUKTUR PENOPANG SERTA JARINGAN PENTANAHAN.
![Page 34: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/34.jpg)
TRANSMISI DAN GARDU INDUKURAIAN SINGKAT
GARDU INDUK
UMUM (3)
GEDUNG KONTROL ADALAH TEMPAT DILETAKKAN DAN
DIPASANGNYA PERALATAN KONTROL, PERALATAN
PROTEKSI, PERALATAN BANTU (LVAC & DC AUXILLIARY
SUPPLY), PERALATAN KOMUNIKASI/SCADA, MERUPAKAN
TEMPAT OPERATOR GARDU INDUK MELAKUKAN KERJA
KONTROL DAN MONITORING OPERASI GARDU INDUK, SERTA
DAPAT PULA DILENGKAPI DENGAN FASILITAS LAIN YANG
DIPERLUKAN SEPERTI UNTUK KANTOR, GUDANG, DLS.
![Page 35: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/35.jpg)
TRANSMISI DAN GARDU INDUKURAIAN SINGKAT
KONSTRUKSI GARDU INDUK
TEGANGAN, LETAK PASANGAN, MEDIA-INSULASI REL DAYA
A. PASANGAN DALAM DENGAN INSULASI UDARA (INDOOR AIR INSULATED/CONVENTIONAL SUBSTATION)
B. PASANGAN DALAM DENGAN INSULASI GAS SF6
(INDOOR GAS INSULATED SUBSTATION) C. PASANGAN LUAR DENGAN INSULASI UDARA
(OUTDOOR AIR INSULATED/CONVENTIONAL SUBSTATION) D. PASANGAN LUAR DENGAN INSULASI GAS SF6
(OUTDOOR GAS INSULATED SUBSTATION)
![Page 36: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/36.jpg)
SISTEM REL-DAYA TUNGGAL(TANPA/DENGAN SECTIONALIZER)
I
SISTEM REL-DAYA GANDA DENGAN SATU PEMUTUS-TENAGA
II
I
TRANSMISI DAN GARDU INDUKURAIAN SINGKAT
KONFIGURASI SISTEM REL DAYA DAN
PEMUTUS TENAGA
![Page 37: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/37.jpg)
II
I
SISTEM REL-DAYA GANDA DENGAN DUA PEMUTUS-TENAGA
TRANSMISI DAN GARDU INDUKURAIAN SINGKAT
SISTEM REL-DAYA GANDA DENGAN SATU-SETENGAH PEMUTUS-TENAGA
I II
KONFIGURASI SISTEM REL DAYA DAN
PEMUTUS TENAGA
![Page 38: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/38.jpg)
SISTEM REL-DAYA BANYAK DGN SATU PEMUTUS-TENAGA
II
I
III
SISTEM REL-DAYA CINCIN
TRANSMISI DAN GARDU INDUKURAIAN SINGKAT
KONFIGURASI SISTEM REL DAYA DAN
PEMUTUS TENAGA
![Page 39: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/39.jpg)
TRANSMISI DAN GARDU INDUKURAIAN SINGKAT
KONFIGURASI SISTEM REL DAYAPADA GARDU-GARDU INDUK PT. PLN (PERSERO)
PEMILIHAN SUATU SISTEM REL-DAYA GARDU INDUK DITENTUKAN DENGAN MEMPERTIM-BANGKAN KEPERLUAN OPERASI DAN PEMELIHARAAN, TINGKAT KETERSEDIAAN DAN KEANDALAN YANG DISYARATKAN, KEBUTUHAN BESAR BEBAN DAN PERKEMBANGANNYA SERTA FAKTOR EKONOMI. KONFIGURASI SISTEM REL-DAYA YANG TERDAPAT PADA GARDU-GARDU INDUK PT. PLN (PERSERO) ADALAH: A. SELURUH G.I 500 KV DAN BEBERAPA G.I 150 KV MENGGUNAKAN SISTEM REL-DAYA GANDA DENGAN SATU-SETENGAH PEMUTUS-TENAGA. B. SEBAGIAN BESAR G.I 150 KV DAN G.I 70 KV MENGGUNAKAN SISTEM REL-DAYA GANDA DENGAN SATU PEMUTUS-TENAGA. C. SEBAGIAN KECIL G.I 150 KV DAN G.I 70 KV MENGGUNAKAN SISTEM REL-DAYA TUNGGAL DENGAN SATU PEMUTUS-TENAGA.
![Page 40: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/40.jpg)
TRANSMISI DAN GARDU INDUKURAIAN SINGKAT
KONFIGURASI SISTEM REL DAYAPADA GARDU-GARDU INDUK PT. PLN (PERSERO)
SERANDANG GARDU INDUK KONVENSIONAL TEGANGAN TINGGI DAN TEGANGAN EKSTRA-TINGGI PASANGAN LUAR EKSISTING MILIK PT. PLN (PERSERO) DAPAT DIKLASIFIKASIKAN ATAS :
SERANDANG G.I 500 KV (GITET) DAN G.I 150 KV PEMBANGKIT MENGGUNAKAN SISTEM REL-DAYA GANDA DENGAN SATU-SETENGAH PEMUTUS-TENAGA.
SERANDANG G.I 150 KV NON-PEMBANGKIT MENGGUNAKAN SISTEM REL-DAYA GANDA DENGAN SATU PEMUTUS-TENAGA, TERDIRI DARI BEBERAPA TYPE : TYPE I TYPE II TYPE III TYPE IV
SERANDANG G.I 70 KV MENGGUNAKAN SISTEM REL-DAYA TUNGGAL DAN REL-DAYA GANDA DENGAN SATU PEMUTUS-TENAGA : TYPE I
![Page 41: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/41.jpg)
TRANSMISI DAN GARDU INDUKURAIAN SINGKAT
DESAIN GARDU INDUK (1) GARDU INDUK DIDESAIN DAN DIBANGUN MENURUT KEBUTUHANNYA DAN MENGACU KEPADA STANDAR-STANDAR YANG BERLAKU. PEMBANGUNAN GARDU INDUK DIDAHULUI DENGAN PEKERJAAN TAHAP DESAIN GARDU INDUK YANG MEMPERHATIKAN FAKTOR-FAKTOR :
A. LINGKUNGAN : LOKASI, KONDISI ALAM DAN IKLIM SETEMPAT, PENGARUH INSTALASI TERHADAP LINGKUNGAN.
B. TERHADAP SISTEM TENAGA LISTRIK : BERFUNGSI SEBAGAI GARDU UTAMA PADA SISTEM, GARDU ANTARA ATAU GARDU UJUNG,
TEGANGAN KERJA, TINGKAT ARUS GANGGUAN HUBUNG-SINGKAT.
C. KAPASITAS YANG DIPERLUKAN.
D. SISTEM OPERASI DAN PEMELIHARAAN YANG AKAN DITERAPKAN.
E. TINGKAT KETERSEDIAAN DAN KEANDALAN YANG DISYARATKAN.
![Page 42: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/42.jpg)
TRANSMISI DAN GARDU INDUKURAIAN SINGKAT
DESAIN GARDU INDUK (2)
F. PERSYARATAN KEAMANAN DAN KESELAMATAN INSTALASI, MANUSIA, BINATANG DAN LINGKUNGAN.
G. KONDISI-KONDISI OPERASI KHUSUS.
H. BIAYA INVESTASI.
PERANGKAT ENJNIRING DESAIN GARDU INDUK UMUMNYA ADALAH STANDAR-STANDAR INTERNASIONAL SEPERTI IEC, VDE, JIS, ANSI, DLL.
![Page 43: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/43.jpg)
TRANSMISI DAN GARDU INDUKURAIAN SINGKAT
GARDU INDUK BERPENYEKAT GAS SF6
(GAS INSULATED SWITCHGEAR / GIS SUBSTATION) (1)
TATA-LETAK REL-DAYA DAN PERALATAN PEMUTUS-PENGHUBUNG UNTUK BAY GARDU INDUK (SAKLAR-PEMISAH, SAKLAR-PENTANAHAN, PEMUTUS-TENAGA, TRANSFORMATOR-ARUS, TRANSFORMATOR-TEGANGAN) PADA GARDU INDUK BERPENYEKAT GAS SF6 (SF6 GAS INSULATED SWITCHGEAR/GIS) SUDAH DIRANCANG DI PABRIK PEMBUATNYA, DIPASANG DAN DITEMPATKAN DALAM SATU MODUL TERTUTUP SELUBUNG YANG KOMPAK.
PERANCANGAN / DESAIN GARDU INDUK YANG MENGGUNAKAN GAS INSULATED SWITCHGEAR ADALAH MENCAKUP PEKERJAAN BAGAIMANA “SEJUMLAH BAY” DISUSUN MEMBENTUK SATU KESATUAN YANG SESUAI DENGAN KEBUTUHANNYA, DILETAKKAN PADA SUATU TEMPAT YANG DIRANCANG UNTUK MENEMPATKAN PERALATAN TERSEBUT, APA SAJA DAN BAGAIMANA SUSUNAN PERALATAN BANTUNYA, KESESUAIAN ANTARA PEKERJAAN LISTRIK DENGAN PEKERJAAN SIPIL DAN LAIN SEBAGAINYA, TANPA MENCAKUP RANCANGAN TATA LETAK PERALATAN PEMUTUS-PENGHUBUNG DIDALAM MODULNYA.
![Page 44: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/44.jpg)
TRANSMISI DAN GARDU INDUKURAIAN SINGKAT
GARDU INDUK BERPENYEKAT GAS SF6
(GAS INSULATED SWITCHGEAR / GIS SUBSTATION) (2)
DALAM MEMBUAT DESAIN DAN KONFIGURASI BAY SUATU GARDU INDUK BERPENYEKAT GAS UNTUK TEGANGAN TINGGI DAN TEGANGAN EKSTRA-TINGGI MAKA HAL-HAL SEPERTI :
LETAK LOKASI/LAHAN KEADAAN LOKASI DAN LUAS LAHAN YANG TERSEDIA POSISI LOKASI G.I TERHADAP SALURAN TRANSMISI EKSISTING DAN/ATAU
RENCANA SALURAN TRANSMISI BARU, MENGGUNAKAN SUTT ATAU SKTT KAPASITAS GARDU INDUK YANG DIBUTUHKAN TEGANGAN KERJA, BIL DAN MASALAH KOORDINASI ISOLASI BATAS KEMAMPUAN PERALATAN (ARUS KONTINYU, ARUS SESAAT HUBUNG-SINGKAT) JENIS INDOOR ATAU OUTDOOR DIMENSI MODUL GIS KEMUDAHAN / FLEKSIBILITAS DALAM OPERASI DAN PEMELIHARAAN
![Page 45: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/45.jpg)
TRANSMISI DAN GARDU INDUKURAIAN SINGKAT
GARDU INDUK BERPENYEKAT GAS SF6
(GAS INSULATED SWITCHGEAR / GIS SUBSTATION) (3)
PERSYARATAN JARAK-AMAN MINIMUM TERHADAP TEGANGAN LISTRIK, PENGARUH MEDAN MAGNIT DAN MEDAN LISTRIK TERHADAP MANUSIA DAN MAHLUK HIDUP LAIN SERTA LINGKUNGAN DISEKITARNYA JUMLAH DAN JENIS MODUL BAY GIS YANG DIPERLUKAN (JUMLAH SALURAN KELUAR DAN MASUK, TRAFO, BUS-COUPLER) PADA SAAT PERTAMA DIBUTUHKAN DAN KEBUTUHAN PADA WAKTU YANG AKAN DATANG PERLINDUNGAN GEDUNG DAN GIS TERHADAP PETIR PERSYARATAN KEAMANAN DAN KESELAMATAN BAGI OPERATOR G.I DAN MAKHLUK HIDUP LAIN SERTA LINGKUNGAN DISEKITARNYA. KEMUDAHAN UNTUK PERLUASAN GARDU INDUK PADA WAKTU MENDATANG RENCANA GEDUNG KONTROL FAKTOR-FAKTOR LAINNYA,
MENENTUKAN RANCANGAN TATA LETAK (LAY OUT) GIS, UKURAN GEDUNG, KONEKSI GIS TERHADAP SALURAN TRANSMISI TERKAIT DARI SUATU GARDU INDUK GIS PASANGAN LUAR DAN PASANGAN DALAM.
![Page 46: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/46.jpg)
TRANSMISI DAN GARDU INDUKURAIAN SINGKAT
GARDU INDUK BERPENYEKAT UDARA
(AIR INSULATED SWITCHGEAR/AIS – CONVENTIONAL SUBSTATION)(1) DALAM MEMBUAT DESAIN, KONFIGURASI DAN TATA-LETAK REL-DAYA SERTA PERALATAN PEMUTUS-PENGHUBUNG PADA SUATU GARDU INDUK KONVENSIONAL TEGANGAN TINGGI DAN TEGANGAN EKSTRA-TINGGI MAKA HAL-HAL SEPERTI:
LETAK LOKASI/LAHAN KEADAAN LOKASI DAN LUAS LAHAN YANG TERSEDIA POSISI LOKASI G.I TERHADAP SALURAN TRANSMISI EKSISTING DAN/ATAU RENCANA SALURAN TRANSMISI BARU KAPASITAS GARDU INDUK YANG DIBUTUHKAN TEGANGAN KERJA, BIL DAN MASALAH KOORDINASI ISOLASI BATAS KEMAMPUAN PERALATAN (ARUS KONTINYU, ARUS SESAAT HUBUNG-
SINGKAT) DIMENSI PERALATAN KEMUDAHAN / FLEKSIBILITAS DALAM OPERASI DAN PEMELIHARAAN
![Page 47: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/47.jpg)
TRANSMISI DAN GARDU INDUKURAIAN SINGKAT
GARDU INDUK BERPENYEKAT UDARA
(AIR INSULATED SWITCHGEAR/AIS – CONVENTIONAL SUBSTATION)(2) PERSYARATAN JARAK-AMAN MINIMUM TERHADAP TEGANGAN LISTRIK, PENGARUH MEDAN MAGNIT DAN MEDAN LISTRIK TERHADAP MANUSIA DAN MAHLUK HIDUP LAIN SERTA LINGKUNGAN DISEKITARNYA. JUMLAH BAY YANG DIPERLUKAN (JUMLAH SALURAN KELUAR DAN MASUK,
TRAFO, BUS-COUPLER) PADA SAAT PERTAMA DIBUTUHKAN DAN KEBUTUHAN PADA WAKTU YANG AKAN DATANG PERLINDUNGAN SERANDANG TERHADAP PETIR PERSYARATAN KEAMANAN DAN KESELAMATAN BAGI OPERATOR G.I DAN
MAKHLUK HIDUP LAIN SERTA LINGKUNGAN DISEKITARNYA. KEMUDAHAN UNTUK PERLUASAN GARDU INDUK PADA WAKTU MENDATANG RENCANA LETAK GEDUNG KONTROL FAKTOR-FAKTOR LAINNYA,
MENENTUKAN RANCANGAN TATA LETAK (LAY OUT), UKURAN, KONSTRUKSI DAN CARA PEMASANGAN PERALATAN SERANDANG SUATU GARDU INDUK KONVENSIONAL PASANGAN LUAR DAN PASANGAN DALAM.
![Page 48: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/48.jpg)
TRANSMISI DAN GARDU INDUKURAIAN SINGKAT
PERALATAN GARDU INDUK (1) GARDU INDUK JENIS GIS MAUPUN KONVENSIONAL TERDIRI DARI DUA BAGIAN UTAMA YAITU BANGUNAN GEDUNG DAN PERALATAN SERANDANG. BANGUNAN GEDUNG BERFUNGSI UNTUK MENEMPATKAN PERALATAN-PERALATAN JENIS PASANGAN DALAM (PERALATAN GIS, PERALATAN KONTROL DAN PENGAMAN, FAULT RECORDING, KUBIKEL SWITCHGEAR 20 KV, PANEL LVAC, PANEL DC, BATTERY SET, BATTERY CHARGER, PERALATAN TELEKOMUNIKASI DAN SCADA). GEDUNG GARDU INDUK SEBAGAI BANGUNAN MULTI-FUNGSI DILENGKAPI SARANA LISTRIK UNTUK PENERANGAN DAN TENAGA, AIR BERSIH, ALAT PENGKONDISI UDARA (AC), EXHAUST FAN, PEMADAM KEBAKARAN, MEJA DAN KURSI, SISTEM CCTV DAN LAIN SEBAGAINYA.
![Page 49: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/49.jpg)
TRANSMISI DAN GARDU INDUKURAIAN SINGKAT
PERALATAN GARDU INDUK (2)
SERANDANG (SWITCHYARD) UNTUK MEMASANG / MENEMPATKAN PERALATAN-PERALATAN UTAMA JENIS PASANGAN LUAR YANG PADA UMUMNYA ADALAH PERALATAN SWITCHGEAR TEGANGAN TINGGI DAN EKSTRA TINGGI. GEDUNG GARDU INDUK DAN SERANDANG DILINDUNGI DARI KEMUNGKINAN SAMBARAN PETIR MENGGUNAKAN PENANGKAL PETIR DAN KAWAT PERISAI (SHIELD-WIRE) SERTA ELEKTRODA-PENTANAHAN YANG MEMADAI. SECARA UMUM PERALATAN GARDU INDUK TERDIRI ATAS PERALATAN UTAMA, STRUKTUR SERANDANG, PERALATAN BANTU, PERALATAN KONTROL DAN PENGAMAN, TELEKOMUNIKASI DAN SCADA.
![Page 50: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/50.jpg)
TRANSMISI DAN GARDU INDUKURAIAN SINGKAT
PERALATAN UTAMA : PEMUTUS TENAGA (CIRCUIT BREAKER) PEMISAH DENGAN SAKELAR PENTANAHAN (DISCONNECTING +
EARTHING SWITCH) PEMISAH (DISCONNECTING SWITCHES) TRANSFORMATOR ARUS (CURRENT TRANSFORMER) TRANSFORMATOR TEGANGAN (VOLTAGE TRANSFORMER) SURGE ARRESTER TRANSFORMATOR INTERBUS (500/150 KV; 275/150 KV; 150/70 KV) TRANSFORMATOR TENAGA (150/20 KV ; 70/20 KV) REAKTOR (DIBUTUHKAN PADA GI TERTENTU) KAPASITOR TENAGA (DIBUTUHKAN PADA GI TERTENTU) MV SWITCHGEAR PANEL (STANDAR UNTUK JARINGAN DISTRIBUSI ADALAH 20 KV).
![Page 51: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/51.jpg)
TRANSMISI DAN GARDU INDUKURAIAN SINGKAT
STRUKTUR SERANDANG, REL DAYA DAN JARING PENTANAHAN:
STRUKTUR PENOPANG DAN PENYANGGA REL DAYA SERTA PERALATAN. REL DAYA (MAIN BUSBAR). JARING PENTANAHAN (EARTHING GRID, GROUNDING MESH).
PERALATAN BANTU: PERALATAN SUPPLY AC (TRAFO PEMAKAIAN SENDIRI DAN PANEL
LV AC) PERALATAN SUPPLY DC (BATTERY SET, CHARGER DAN PANEL DC) DIESEL GENERATOR SET (HANYA DIPERLUKAN PADA LOKASI TERTENTU)
![Page 52: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/52.jpg)
TRANSMISI DAN GARDU INDUKURAIAN SINGKAT
PERALATAN KONTROL DAN PENGAMAN :
PANEL KONTROL
PANEL RELAY PENGAMAN
FAULT RECORDING EQUIPMENT DAN GPS PERALATAN TELEKOMUNIKASI DAN SCADA :
LINE TRAP, COUPLING CAPACITOR, LINE MATCHING UNIT
PLC, TELEPROTECTION, TELEPHONE EQUIPMENT
TRANSDUCER
RTU
![Page 53: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/53.jpg)
KONFIGURASI SISTEM REL DAYA DAN PEMUTUS TENAGA
Sistem rel-daya tunggal (tanpa/dengan sectionalizer).
I
Sistem rel-daya ganda dengan satu pemutus-tenaga.
II
I
II
I
Sistem rel-daya ganda dengan dua pemutus-tenaga.
![Page 54: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/54.jpg)
KONFIGURASI SISTEM REL DAYA DAN PEMUTUS TENAGA
Sistem rel-daya ganda dengan satu-setengah pemutus-tenaga.
I II
Sistem rel-daya banyak dengan satu pemutus-tenaga.
II
I
III
Sistem rel-daya Cincin.
![Page 55: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/55.jpg)
ItemRel Daya Tunggal
1 PMT
Rel Daya Ganda
1 PMT
Rel Daya Ganda
2 PMT
Rel Daya Banyak
1 PMT
Rel Daya Cincin
Rel Daya Ganda
1½ PMT
Tampilan Sangat
Sederhana
Sederhana Sederhana Kompleks Sederhana Kompleks
Kapasitas Kecil Besar Besar Besar Besar Besar
Jumlah Bay Sedikit Banyak Banyak Banyak Banyak Banyak
Fleksibilitas Rendah Cukup Tinggi Tinggi Tinggi Cukup Tinggi Sangat Tinggi
Reliabilitas Kurang Baik
Baik Lebih Baik Lebih Baik Baik Baik Sekali
Biaya Termurah Murah Mahal Mahal Murah Termahal
PERBANDINGAN SINGKAT KONFIGURASI SISTEM REL DAYA
![Page 56: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/56.jpg)
Item Type I Type II Type III Type IV
Jumlah Bay (contoh untuk bahasan)
8 8 8 8
Luas lahan efektif (m²) 112 x 59,5
(tanpa jalan inspeksi)
112 x 61,5
(tanpa jalan inspeksi)
112 x 68
(tanpa jalan inspeksi)
104 x 66
(dengan jalan inspeksi)
Lebar bay (m) 14 14 14 14; 12
Jumlah kolom (bh) 23 28 31 26
Tinggi kolom:-Tertinggi (m)
-Terendah (m)
15,5
8,75
18
13
18
13
13
10
Jumlah Balok (bh) 26 25 31 22
Panjang balok :-Terpanjang (m)
-Terpendek (m)
14
14
14
14
14
14
14
12
PERBANDINGAN SINGKAT SERANDANG GI 150KV KONVENSIONAL PASANGAN LUAR (1)
![Page 57: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/57.jpg)
Item Type I Type II Type III Type IV
Take-off Gantry Tidak ada Ada Ada Ada
Sudut Masuk/Keluar Feeder
Kecil Besar (≤ 15°) Besar (≤ 15°) Besar (≤ 15°)
Perlindungan Serandang dengan Kawat Tanah
Baik Cukup Cukup Cukup
Posisi PMS sisi rel-daya
per set
Paralel Paralel Paralel Seri
Dimensi PMS Bus dan Jarak Sumbu
Normal Normal Normal Kompak/Lebih Kecil
PERBANDINGAN SINGKAT SERANDANG GI 150KV KONVENSIONAL PASANGAN LUAR (2)
![Page 58: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/58.jpg)
Item Type I Type II Type III Type IV
Letak Branch-Conductor Diatas rel;
antar peralatan
Diatas rel;
antar peralatan
Diatas rel;
antar peralatan
Antar peralatan;
diatas peralatan
Jumlah Branch-Insulator set
Sedikit Agak banyak Terbanyak Sedikit
Fleksibilitas Tinggi Tinggi Tinggi Tinggi
Pemeliharaan PMS sisi rel-daya
Mudah;
Pemadaman sebentar
Mudah;
Pemadaman sebentar
Mudah;
Pemadaman sebentar
Mudah;
Pemadaman lebih lama
Penggantian Trafo Tenaga
Perlu membongkar
20kV cable head
Perlu membongkar
20kV cable head
Perlu membongkar
20kV cable head
Tanpa membongkar
20kV cable head
PERBANDINGAN SINGKAT SERANDANG GI 150KV KONVENSIONAL PASANGAN LUAR (3)
![Page 59: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/59.jpg)
Bandung, Mei 2004
Konfigurasi Jaringan Distribusi
![Page 60: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/60.jpg)
Sistem Tenaga Listrik Terdiri dari :
- Pusat Pembangkit
- Saluran Transmisi - Sistem distribusi (Tegangan operasi 20
kV dan 0,2/0,38 kV) Definisi sebagai bagian dari sistem yang terletak
diantara Gardu Induk Distribusi sampai ke konsumen pemakai
![Page 61: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/61.jpg)
Struktur Jaringan Sistem Distribusi(Jaringan Tegangan Menengah)
1. Struktur Jaringan Radial
Energi listrik disalurkan ke konsumen
melalui satu penyulang / feeder dan hanya
satu arah
- Struktur sederhana (biaya relatif murah),
sehingga banyak digunakan.
- Keandalan kurang
![Page 62: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/62.jpg)
Gambar Diagram Segaris Jaringan Radial
20 kV
150 kV
Trafo GIbeban
![Page 63: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/63.jpg)
2. Struktur Jaringan Open Loop
Merupakan perluasan jaringan radialdengan cadangan pasokan dari penyulang lain.
- Struktur sederhana (memerlukan
kecermatan dalam manuver beban)
- Sumber pasokan dapat dari GI yg sama
atau dari GI yang lain
- Keandalan lebih tinggi dari radial
![Page 64: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/64.jpg)
Diagram Segaris Open Loop
20 kV
150 kV
Trafo GI
beban
Open loop dari 2 GI
Open loop dari 1 GI
![Page 65: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/65.jpg)
3. Struktur Jaringan Loop
Merupakan struktur jaringan tertutup yang dimulai dari suatu gardu induk mengelilingi daerah beban dan kembali ke gardu induk tersebut.
- Memerlukan proteksi dan pemeliharaan yang rumit.
Sehingga memerlukan biaya pembangunan dan
pemeliharaan lebih mahal
- Keandalan Relatif Tinggi
![Page 66: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/66.jpg)
Diagram Segaris Jaringan Loop
20 kV
150 kV
Trafo GI
beban
PMT
![Page 67: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/67.jpg)
4. Struktur Jaringan Spindle
Merupakan perluasan dari jaringan radial dengan penambahan penyulang / feeder lebih banyak lagi, yang kesemuanya bertemu pada suatu titik yang merupakan gardu switching (gardu refleksi).
- Struktur lebih kompleks (biaya relatif mahal),
digunakan 1 penyulang / feeder tanpa beban
(feeder express) dalam kondisi normal.
- Keandalan Tinggi
![Page 68: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/68.jpg)
Diagram Segaris Jaringan Spindle
20 kV
150 kV
Trafo GI
beban
PMT
Gardurefleksi
![Page 69: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/69.jpg)
5. Struktur Jaringan Cluster
Merupakan pengembangan dari jaringan spindle, dengan ditandai terdapatnya 2 gardu refleksi atau lebih.
- Biaya pembangunan dan perawatan
lebih tinggi
- Keandalan Tinggi
![Page 70: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/70.jpg)
Diagram Segaris Jaringan Cluster
20 kV
150 kV
Trafo GI
beban
PMT
Gardurefleksi
Ekspress feeder
Ekspress feederGardurefleksi
![Page 71: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/71.jpg)
6. Struktur Jaringan Margerithe
Merupakan struktur jaringan yang terdiri dari penggabungan antara jaringan spindle dengan jaringan loop.
- Biaya pembangunan dan perawatan
Sangat tinggi
- Keandalan Paling Tinggi
![Page 72: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/72.jpg)
Diagram Segaris Jaringan Margerithe
20 kV
150 kV
Trafo GI
beban
PMT
Trafo GIEkspress feeder
150 kV
20 kV
![Page 73: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/73.jpg)
Resume Perbandingan Struktur Jaringan Distribusi
Faktor Radial Loop Ring Grid Spindle Cluster Margerithe
Jumlah PMT
4 12 18 20 7 6 9
Jumlah
kabel
1 2 2 10 7 6 5
Keandalan rendah Lebih tinggi
Dari radial
Lebih tinggi
Dari loop
Lebih tinggi dari loop & ring
Lebih tinggi dari radial
Lebih tinggi dari spindle
Paling tinggi
harga murah mahal mahal mahal mahal mahal Sangat mahal
Proteksi jaringan
mudah rumit rumit rumit rumit rumit Sangat rumit
Aplikasi Daerah dgn beban rendah/sedang
Daerah pemukiman penduduk
Daerah pemukiman penduduk
Daerah industri sedang
Daerah perkotaan
Daerah luas & Daya terpasang cukup besar
Daerah pedesaan yang jaraknya cukup jauh
![Page 74: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/74.jpg)
![Page 75: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/75.jpg)
Bandung,Mei 2004
Konfigurasi Jaringan Distribusi Listrik
![Page 76: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/76.jpg)
Keandalan
“Adalah kontinuitas Penyaluran Tenaga Listrik “
• Keandalan / kontinuitas penyaluran tenaga listrik merupakan salah satu pelayanan terbaik kepada konsumen
• Keandalan sistem dipengaruhi oleh Lama Gangguan / Interupsi dan Frekuensi (banyaknya) interupsi yang mengakibatkan terhenti / padam penyaluran TL ke konsumen
![Page 77: TRANSMISI-DAYA-ELEKTRIK](https://reader037.vdocuments.site/reader037/viewer/2022102423/552612c14a7959a2488b4e3a/html5/thumbnails/77.jpg)
Menghitung Keandalan
• Indeks Frekuensi interupsi rata-rata, adalah jumlah komponen yang mengalami interupsi dalam satu periode dibagi dengan jumlah konsumen yang dilayani
• Indeks Lama Interupsi rata-rata, adalah lama interupsi
yang dialami konsumen dalam satu periode dibagi dengan jumlah konsumen yang dilayani (dihitung dari laju kegagalan dan waktu pemulihan)