Transit Priorities for Toronto
Transport Action OntarioOct 12, 2010
Metro Hall - TorontoPresenter: Bruce Budd
![Page 2: Transit Priorities for Toronto Transport Action Ontario Oct 12, 2010 Metro Hall - Toronto Presenter: Bruce Budd](https://reader036.vdocuments.site/reader036/viewer/2022062516/56649e4b5503460f94b40516/html5/thumbnails/2.jpg)
Modern Transit Vehicles
![Page 3: Transit Priorities for Toronto Transport Action Ontario Oct 12, 2010 Metro Hall - Toronto Presenter: Bruce Budd](https://reader036.vdocuments.site/reader036/viewer/2022062516/56649e4b5503460f94b40516/html5/thumbnails/3.jpg)
A: Background - Metrolinx
![Page 4: Transit Priorities for Toronto Transport Action Ontario Oct 12, 2010 Metro Hall - Toronto Presenter: Bruce Budd](https://reader036.vdocuments.site/reader036/viewer/2022062516/56649e4b5503460f94b40516/html5/thumbnails/4.jpg)
The GTHA – 10 Transit Systems
![Page 5: Transit Priorities for Toronto Transport Action Ontario Oct 12, 2010 Metro Hall - Toronto Presenter: Bruce Budd](https://reader036.vdocuments.site/reader036/viewer/2022062516/56649e4b5503460f94b40516/html5/thumbnails/5.jpg)
The 15 year Plan
![Page 6: Transit Priorities for Toronto Transport Action Ontario Oct 12, 2010 Metro Hall - Toronto Presenter: Bruce Budd](https://reader036.vdocuments.site/reader036/viewer/2022062516/56649e4b5503460f94b40516/html5/thumbnails/6.jpg)
![Page 7: Transit Priorities for Toronto Transport Action Ontario Oct 12, 2010 Metro Hall - Toronto Presenter: Bruce Budd](https://reader036.vdocuments.site/reader036/viewer/2022062516/56649e4b5503460f94b40516/html5/thumbnails/7.jpg)
The Big 5 plus 4 in 10
![Page 8: Transit Priorities for Toronto Transport Action Ontario Oct 12, 2010 Metro Hall - Toronto Presenter: Bruce Budd](https://reader036.vdocuments.site/reader036/viewer/2022062516/56649e4b5503460f94b40516/html5/thumbnails/8.jpg)
Immediate Impact in Toronto
![Page 9: Transit Priorities for Toronto Transport Action Ontario Oct 12, 2010 Metro Hall - Toronto Presenter: Bruce Budd](https://reader036.vdocuments.site/reader036/viewer/2022062516/56649e4b5503460f94b40516/html5/thumbnails/9.jpg)
B. Proposed Improvements
By: Transport Action Ontario
![Page 10: Transit Priorities for Toronto Transport Action Ontario Oct 12, 2010 Metro Hall - Toronto Presenter: Bruce Budd](https://reader036.vdocuments.site/reader036/viewer/2022062516/56649e4b5503460f94b40516/html5/thumbnails/10.jpg)
Modify the Eglinton Lineto allow for a future subway
1. the grades are too steep (5% instead of the 3.5% maximum for a subway)
2. the station lengths (and the pocket tracks) are too short to handle 6-car subway trains
3. the angle of turnouts are too sharp and the vertical curvature too steep for subway cars
4. Use TTC gauge track (like existing subways/streetcars)
![Page 11: Transit Priorities for Toronto Transport Action Ontario Oct 12, 2010 Metro Hall - Toronto Presenter: Bruce Budd](https://reader036.vdocuments.site/reader036/viewer/2022062516/56649e4b5503460f94b40516/html5/thumbnails/11.jpg)
1) Pocket Track 2) Turnout Angle
![Page 12: Transit Priorities for Toronto Transport Action Ontario Oct 12, 2010 Metro Hall - Toronto Presenter: Bruce Budd](https://reader036.vdocuments.site/reader036/viewer/2022062516/56649e4b5503460f94b40516/html5/thumbnails/12.jpg)
Prince Edward Viaduct
![Page 13: Transit Priorities for Toronto Transport Action Ontario Oct 12, 2010 Metro Hall - Toronto Presenter: Bruce Budd](https://reader036.vdocuments.site/reader036/viewer/2022062516/56649e4b5503460f94b40516/html5/thumbnails/13.jpg)
Electrify the Air-Rail LinkFaster acceleration/deceleration times Significantly reduced air & noise pollutionProven technology unlike the Tier 4 dieselsShares the initial extra cost with the
Brampton GO lineLong term cost savings compared to dieselWill allow for an integrated network of GO
services with the local systems
![Page 14: Transit Priorities for Toronto Transport Action Ontario Oct 12, 2010 Metro Hall - Toronto Presenter: Bruce Budd](https://reader036.vdocuments.site/reader036/viewer/2022062516/56649e4b5503460f94b40516/html5/thumbnails/14.jpg)
Air-Rail Link to Pearson Airport
![Page 15: Transit Priorities for Toronto Transport Action Ontario Oct 12, 2010 Metro Hall - Toronto Presenter: Bruce Budd](https://reader036.vdocuments.site/reader036/viewer/2022062516/56649e4b5503460f94b40516/html5/thumbnails/15.jpg)
Spadina Subway Extension
![Page 16: Transit Priorities for Toronto Transport Action Ontario Oct 12, 2010 Metro Hall - Toronto Presenter: Bruce Budd](https://reader036.vdocuments.site/reader036/viewer/2022062516/56649e4b5503460f94b40516/html5/thumbnails/16.jpg)
Kill the Hwy 407 Subway Station
CemeteryParking Lot
Railway tracks
Highways
Vaughan Centr e
York U + Steeles Station
![Page 17: Transit Priorities for Toronto Transport Action Ontario Oct 12, 2010 Metro Hall - Toronto Presenter: Bruce Budd](https://reader036.vdocuments.site/reader036/viewer/2022062516/56649e4b5503460f94b40516/html5/thumbnails/17.jpg)
Sheppard East LRT
![Page 18: Transit Priorities for Toronto Transport Action Ontario Oct 12, 2010 Metro Hall - Toronto Presenter: Bruce Budd](https://reader036.vdocuments.site/reader036/viewer/2022062516/56649e4b5503460f94b40516/html5/thumbnails/18.jpg)
LRT Spur to U of T Scarborough
Conlin Yard
U of T Scarborough
Sheppard LRT from subway
![Page 19: Transit Priorities for Toronto Transport Action Ontario Oct 12, 2010 Metro Hall - Toronto Presenter: Bruce Budd](https://reader036.vdocuments.site/reader036/viewer/2022062516/56649e4b5503460f94b40516/html5/thumbnails/19.jpg)
Downtown Relief Line – Sooner
![Page 20: Transit Priorities for Toronto Transport Action Ontario Oct 12, 2010 Metro Hall - Toronto Presenter: Bruce Budd](https://reader036.vdocuments.site/reader036/viewer/2022062516/56649e4b5503460f94b40516/html5/thumbnails/20.jpg)
A 25 year Funding Plan
A combination of some of:
1. Land value enhancement charge along all new lines
2. A TTC Development Company to facilitate development around stations
3. 1% Sales tax increase (GTHA- or province-wide)
4. fuel tax on the gasoline and diesel (5 to 10 cents per litre)
5. Parking surcharge on all non-residential spaces ($1.00/day)
6. Road tolls &/or Congestion charges
7. 2% of property taxes dedicated annually to transit
The Funding Plan should be decided and started in 2012
![Page 21: Transit Priorities for Toronto Transport Action Ontario Oct 12, 2010 Metro Hall - Toronto Presenter: Bruce Budd](https://reader036.vdocuments.site/reader036/viewer/2022062516/56649e4b5503460f94b40516/html5/thumbnails/21.jpg)
Summary
1. Modify the Eglinton to allow for a future subway2. Electrify the Air-Rail Link & Georgetown GO line3. Remove the Hwy 407 station form the Spadina
subway extension4. Extend the Sheppard LRT to U of T Scarborough5. Build a downtown relief line much earlier than
currently planned6. Implement a 25 year funding plan by 2012