transit oriented development joint development · owings mills metro – construction reisterstown...

16
Transit Oriented Development Joint Development FTA Workshop November 2012 Andrew J. Scott Director, Office of Real Estate Maryland Department of Transportation

Upload: others

Post on 07-Aug-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Transit Oriented Development Joint Development · Owings Mills Metro – construction Reisterstown Metro – construction State Center Metro/LRT – development Odenton MARC – development

Transit Oriented Development Joint Development

FTA Workshop November 2012

Andrew J. Scott Director, Office of Real Estate

Maryland Department of Transportation

Page 2: Transit Oriented Development Joint Development · Owings Mills Metro – construction Reisterstown Metro – construction State Center Metro/LRT – development Odenton MARC – development

Maryland Department of Transportation

•Multi-modal department

• Integrated Transportation Trust Fund

Page 3: Transit Oriented Development Joint Development · Owings Mills Metro – construction Reisterstown Metro – construction State Center Metro/LRT – development Odenton MARC – development

Statewide transit system

• State operated transit – Metro/heavy rail line – LRT line – 3 Commuter Rail lines – Core bus – Commuter Bus

• WMATA system • Locally Operated Transit systems

Page 4: Transit Oriented Development Joint Development · Owings Mills Metro – construction Reisterstown Metro – construction State Center Metro/LRT – development Odenton MARC – development

TOD – transportation and Smart

• Growth in traffic outpaces road expansions

Growth strategy • Sprawl 560,000 acres of open space by 2030 1.1 million people

0

5

10

15

20

25

30

35

40

45

Total road miles Population Vehicle Miles Traveled

Traffic!

Page 5: Transit Oriented Development Joint Development · Owings Mills Metro – construction Reisterstown Metro – construction State Center Metro/LRT – development Odenton MARC – development

Governor O’Malley’s2008 legislation

defined TOD as a “transportation

purpose”

= part of MDOT’stransportation

mission!

Page 6: Transit Oriented Development Joint Development · Owings Mills Metro – construction Reisterstown Metro – construction State Center Metro/LRT – development Odenton MARC – development

Maryland TOD efforts • Joint Development program

• TOD Designation Tools – Property – “transportation purpose” – Funding

• Predevelopment/grants • Prioritized for infrastructure support

– Financing – Priority for the location of State offices – Gov.

O’Malley’s TOD Executive Order – Tax credits – building rehabilitation costs

Page 7: Transit Oriented Development Joint Development · Owings Mills Metro – construction Reisterstown Metro – construction State Center Metro/LRT – development Odenton MARC – development

0 4 8

Designated TOD Locations

Station Rail Line

Q Baltimore Light Rail

Q Baltimore Metro

• DC Metro

• MARC

DC Metro Lines --- Blue

--- Green

--- Orange

--- Red

Yellow

--- Maryland Rail Lines

--- Main Road

Municipalities

- WaterBody

State Designated TOD Stations Areas – July 2012

Page 8: Transit Oriented Development Joint Development · Owings Mills Metro – construction Reisterstown Metro – construction State Center Metro/LRT – development Odenton MARC – development

Joint Development pipeline Symphony Center LRT – completed

Bank of Baltimore – completed

Owings Mills Metro – construction

Reisterstown Metro – construction

State Center Metro/LRT – development

Odenton MARC – development

Savage MARC – development

Laurel MARC – development

New Carrollton Metro/MARC – development

Page 9: Transit Oriented Development Joint Development · Owings Mills Metro – construction Reisterstown Metro – construction State Center Metro/LRT – development Odenton MARC – development

Owings Mills Metro Station

Baltimore County, Maryland

Legend

Owings Mills Metro TOD Site

1:1] Station Location

~~-4'!!.-- '.;,,,==,;:;"';;._ o.i.." .:' ' __.

Page 10: Transit Oriented Development Joint Development · Owings Mills Metro – construction Reisterstown Metro – construction State Center Metro/LRT – development Odenton MARC – development
Page 11: Transit Oriented Development Joint Development · Owings Mills Metro – construction Reisterstown Metro – construction State Center Metro/LRT – development Odenton MARC – development

Reisterstown Metro: GSA site •Compete lease, not location

•Ensure transit site

Social Security Admin. -MDOT/GSA – assignable purchase agreement -GSA – build-to-suit lease -JBG Awarded

Page 12: Transit Oriented Development Joint Development · Owings Mills Metro – construction Reisterstown Metro – construction State Center Metro/LRT – development Odenton MARC – development
Page 13: Transit Oriented Development Joint Development · Owings Mills Metro – construction Reisterstown Metro – construction State Center Metro/LRT – development Odenton MARC – development

Predevelopment planning: reduce risk

Urban Land Institute Real Estate Development

Process II

Page 14: Transit Oriented Development Joint Development · Owings Mills Metro – construction Reisterstown Metro – construction State Center Metro/LRT – development Odenton MARC – development
Page 15: Transit Oriented Development Joint Development · Owings Mills Metro – construction Reisterstown Metro – construction State Center Metro/LRT – development Odenton MARC – development

New Carrollton

• Request for Qualifications

• Incentives to attract interest – $650,000 credit against future ground lease

revenues by WMATA – $350,000 in consultant support from MDOT

• Selected Forest City/Urban Atlantic

Page 16: Transit Oriented Development Joint Development · Owings Mills Metro – construction Reisterstown Metro – construction State Center Metro/LRT – development Odenton MARC – development

Discussion

• Predevelopment planning – Goals – Feasibility – Transit facility/access planning – Manage risk

• Partnerships