TransGrid in South West NSW
Appendix "J"
About TransGrid
TransGrid is the operator and manager of the NSW transmission network.
NSW is the largest region in the National Electricity Market, connecting QLD and VIC
32% of Australia’s population
32% of energy in the NEM
Our network comprises:
13,000 km transmission lines and cables
104 substations
4,000 km optical fibre
Sydney
Appendix "J"
TransGrid’s price continues to fall
8
9
10
11
12
13
14
09/10 10/11 11/12 12/13 13/14 14/15 15/16 16/17 17/18 18/19 19/20 20/21 21/22 22/23
Ave
rag
e P
ric
e $
/MW
h (
$ J
un
e 1
8)
Average 2009/10-2013/14 Average 2014/15-2017/18 Average 2018/19-2022/23 Final Decision
Earlier Regulatory Period
Previous Regulatory PeriodCurrent Regulatory Period
5.2%
7.2%
Source: TransGrid data
Appendix "J"
Transmission prices are lower than in 1995Appendix "J"
Price contributions to consumer bills
Source: AEMC and TransGrid data
1.26 1.29 1.24 1.09 1.05 1.05
13 12.6310.77
7.95
11.43 11.19
4.67 4.24
1.42
1.66
1.65 1.71
6.74 8.44
8.24
7.93
11.4614.63
2 0 1 2 / 1 3 2 0 1 3 / 1 4 2 0 1 4 / 1 5 2 0 1 5 / 1 6 2 0 1 6 / 1 7 2 0 1 7 / 1 8
C/K
WH
TransGrid
Distribution
Environmental
Competitive market
eg AGL, EnergyAustralia,
Origin Energy, Red Energy,
Lumo, etc
eg Essential Energy, Ausgrid,
Endeavour Energy
Appendix "J"
Demand is rising
Source: TransGrid
Rolling 12 Month Energy Usage (cumulative)
59
60
61
62
63
64
65
66
67
68
69
Se
p-1
4
No
v-1
4
Jan
-15
Mar-
15
May-1
5
Jul-
15
Se
p-1
5
No
v-1
5
Jan
-16
Mar-
16
May-1
6
Jul-
16
Se
p-1
6
No
v-1
6
Jan
-17
Mar-
17
May-1
7
Jul-
17
Se
p-1
7
No
v-1
7
Jan
-18
Mar-
18
TW
h
12 Mth Rolling Usage
Appendix "J"
Objectives for the energy system
Source: The World Energy Council
RELIABILITY
AFFORDABILITYEMISSIONS
REDUCTION
• Australia’s energy system is undergoing a
period of immense change
• Solving the energy trilemma will remain a
key objective
• The transition to the energy system of the
future will need to be planned
• Transmission will play an essential role as a
platform for the connection and trading of
large scale and geographically dispersed
renewable generation
Appendix "J"
Energy Supply is Changing
Source: Australian Energy Market Operator (AEMO)
0
5
10
15
20
GW
Import Capacity Dispatchable Capacity Retirement Gap
Liddell
Vales PointEraring Bayswater
Mt Piper
NSW dispatchable generation
Appendix "J"
Wind Farm
Wind Farm
Wind FarmWind Farm
Wind Farm
Solar Farm X 2
Wind FarmSolar Farm
Wind Farm
Solar Farm
Wind Farm
Wind Farm
Solar Farm
Solar Farm
In Development
Being Delivered Solar Farm X 2
Solar Farm
Wind Farm
Solar Farm
Solar Farm
Wind FarmSolar Farm
Solar Farm
Solar Farm
Solar Farm
Solar Farm
Solar Farm X 2 Solar Farm
Completed
Solar Farm
Legend:
Solar Farm
Solar Farm
Victoria
Wind Farm
Hydro
Solar Farm
Wind Farm
Bioenergy
Solar Farm
Solar Farm
Solar Farm
TransGrid’s current renewable pipeline
Solar Farm x 3
Solar Farm
SYDNEY
METRO
Appendix "J"
Connection enquiries in Southern NSW
• Currently more than 15,000MW of generation
enquiries across Southern NSW
• Network capacity of approximately 1,000MW
• Significant energy resources in the region
which network require investment
development
• Regulated network expansion will remove
constraints and unlock potential
Appendix "J"
• One of the Finkel Review recommendations
• Provides a co-ordinated approach to
incorporating renewable generation,
supported by storage, into the grid as coal-
fired plant ages and is retired over the next
20 years
• Three groups of investment are
recommended comprising:
• Group 1 - Immediate
• Group 2 - Mid-2020’s
• Group 3 - Mid 2030’s and beyond
• ISP Projects align with TransGrid’s
Contingent Projects submitted to the AER
Integrated System Plan
Source: AEMO Integrated System Plan
Appendix "J"
ISP Stage 1 Projects
Minor NSW to QLD upgrade
Reinforcement of Northern Network
(QNI upgrade) – 2020
Minor VIC to NSW upgrade
Pending commencement of AEMO’s
VIC to NSW upgrade project RIT-T -
2020
Source: AEMO Integrated System Plan
Appendix "J"
Medium NSW to QLD upgrade
Further reinforcement of Northern Network
(QNI upgrade) - 2023
SnowyLink North
Reinforcement of Southern Network in
response to Snowy 2.0 – 2025
RiverLink (SA to NSW upgrade)
New South Wales to South Australia
Interconnector - 2022 to 2025
ISP Stage 2 Projects
Source: AEMO Integrated System Plan
Appendix "J"
SnowyLink South
Connect north-west Victoria
renewable zone to NSW network -
2034
Renewable Energy Zones
Augmentation to support Renewable
Energy Zones – post 2030
ISP Stage 3 Projects
Source: AEMO Integrated System Plan
Appendix "J"
Why the ISP is important
• A more connected NEM will
facilitate increased competition,
deliver lower prices and increase
security as more intermittent
generation enters the system
• Each part of the energy supply
chain will need to play their part to
deliver reliability, affordability and
emissions reduction
Source: AEMO Integrated System Plan (ISP)
Appendix "J"
The NSW Government’s Transmission Infrastructure Strategy outlines three
initiatives:
1. Boost interconnection with Victoria, South Australia and Queensland, and
unlock more power from the Snowy Hydro Scheme.
2. Increase NSW’s energy capacity by prioritising Energy Zones in the Central
West, South West and New England regions of NSW.
3. Work with other states and regulators to streamline regulation and improve
conditions for investment.
NSW Transmission Infrastructure StrategyAppendix "J"
NSW Transmission Infrastructure Strategy
Source: NSW Department of Planning and Environment
Appendix "J"
SA-NSW Interconnector Proposal
Source: ElectraNet
Appendix "J"
SA-NSW Interconnector Proposal
Source: ElectraNet
Appendix "J"