training sessions january 22 / 31, 2003
DESCRIPTION
Northeast Regional Data Center Business Resumption Planning Allan Pither Program Development Manager. Training Sessions January 22 / 31, 2003. Overview. What is a Plan? What is a Disaster? Disaster Models! What is a Business Resumption Plan? Review: - PowerPoint PPT PresentationTRANSCRIPT
1
Northeast Regional Data Center
Business Resumption PlanningAllan Pither
Program Development Manager
Training Sessions
January 22 / 31, 2003
2
Overview
What is a Plan?
What is a Disaster?
Disaster Models!
What is a Business Resumption Plan?
Review:
Center for Galactic and Terrestrial Networking &
Information Technology Business Resumption Plan
3
What is a Plan?A detailed scheme, program, or method worked out beforehand for the
accomplishment of an object
Webster’s II New College Dictionary, 1995, page 842
A delineation; a design; a draft, form or representation. Also, a method of design or action, procedure, or arrangement for accomplishment of a particular act or object.
Black’s Law Dictionary, 1979, page 1036
Nouns 1. A method for making, doing, or accomplishing something; blueprint, design, game plan, idea, layout, project, schema, scheme, strategy …
Bartlett’s Roget’s Thesaurus, 1st Edition, Boston, Little, Brown, 1996
4
What is a Disaster?Disaster:
- A sudden, calamitous event causing great damage, destruction, or loss
Emergency:
- When something is needed that is not or will not be available in the requested, expected, or scheduled time frame
- An unforeseen combination of circumstances or the resulting state that calls for immediate action
EDP Disaster Recovery Models, Allan W. Pither, Northeast Regional Data Center, Florida Association of Educational Data Systems Presentation, October 24, 1989
5
What is a Disaster / Recovery Plan?Disaster:
- Anything which creates an inability to provide vital business information for some pre-determined period of time.
Disaster Recovery:
- Restoration of vial business functions after a disaster.
Disaster Recovery Planning:
- The purpose of disaster recovery planning is to take steps in advance to ensure the continuity of critical business information in the event of a disaster. Disaster recovery planning should be done for all operating and support functions of an organization.Disaster Recovery Planning, Course Reference Materials, IBM, 1993, Glossary, pages ix & x
6
In a Nutshell – Disaster Recovery Planning!
The Product: provable recovery capability, documented
The Process: commitment to continuing actions
The Project: short term, high-impact first efforts
The Program: umbrella for all of the above
Disaster Recovery Planning, Course Reference Materials, IBM, 1993, Glossary, pages ix & x
7
BRP Model - 1
Binary Model
On / Off … Up / Down
Throughput
Gate / Switch
8
BRP Model - 2Spaghetti Model
9
BRP Model – 2aSpaghetti Model - Continued
10
BRP Model - 3
Sinkhole Model
Unit IT
Ground Level
Water Table
11
BRP Model – 4Disaster Recovery Life Cycle
IBM – Used by Permission
Disaster
Normal Processing
Time Emergency Interim Processing
Proccssing
Load
Temporary Data Processing
Restoration
12
BRP Model - 5
Inputs Outputs/Services
Feedback
IT Unit
DisasterResponse Recovery
Processing Environment
Pither’s Interactive Analog Process Model of Provided Function, Disaster, and Recovery, February 27, 1982, 8:45pm
13
Review Business Resumption Plan
Center for Galactic and Terrestrial Networking & Information Technology Business Resumption Plan
Source Document:Office of Information Technology, Information technology Security Policy:
Unit IT Business Resumption Plan Templatehttp://www.it.ufl.edu/policies/security/outlines/unit-brp-outline.html
14
Network Diagram
15
From: http://www.clas.ufl.edu/clasnet/buildings/and/and0.gif
Building / Floor Layout – Wiring Schematic
16
IT Antenna Farm
17