Subject: (Passing out Batch 2016) Report No: …………………….. Mail Report To: [email protected] (To be submitted on 2 nd of each month) DEPARTMENT OF ARCHITECTURE (MADHAV INSTITUTE OF TECHNOLOGY AND SCIENCE, GWALIOR) Name of the Student : Organization & Place of Training : Period of Report : From: ……………………………………. To: ………………………………………. Details of Practical Training for the above period: S.No. Project Working On Brief about the Contribution to the Project Time Schedule of Contribution: Day : 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Total Hours Worked AVERAGE CONTRIBUTION PER DAY= TOTAL NO OF DAYS DIVIDED BY 30 Remarks/ Recommendation of Architect: Note: Mark A - for Not Attending , S - for Sick , L - for Leave , H - for Holidays Signature of Architect

Upload: harshitkotiya

Post on 14-Feb-2016

213 views

Category:

Documents


0 download

DESCRIPTION

hghhg

TRANSCRIPT

Page 1: Training Report _16

Subject: (Passing out Batch 2016) Report No: …………………….. Mail Report To: [email protected]

(To be submitted on 2nd

of each month)

DEPARTMENT OF ARCHITECTURE (MADHAV INSTITUTE OF TECHNOLOGY AND SCIENCE, GWALIOR)

Name of the Student :

Organization & Place of Training :

Period of Report : From: ……………………………………. To: ……………………………………….

Details of Practical Training for the above period: S.No. Project Working On Brief about the Contribution to the Project

Time Schedule of Contribution:

Day : 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Total

Hours

Worked

AVERAGE CONTRIBUTION PER DAY= TOTAL NO OF DAYS DIVIDED BY 30

Remarks/ Recommendation of Architect:

Note: Mark – A - for Not Attending , S - for Sick , L - for Leave , H - for Holidays

Signature of Architect