training p&id
TRANSCRIPT
-
8/9/2019 Training P&ID
1/45
PIPING &
INSTRUMENTATIONDIAGRAMINTRODUCTION & HOW TO CREATE
TRAINING PT. WIJAYA KARYA(PERSERO)
PT. TRACONINDUSTRI
Trainer: Tanti Soa Ra!"i#$Pro%e!!
-
8/9/2019 Training P&ID
2/45
Piping & InstrumentationDiagram (PID)
What is PID?The Usage ofPID
PIDs ElementsHow to CreatePID
-
8/9/2019 Training P&ID
3/45
Whats PID?
Diagram shows
! E"uipments s#stem
! Piping s#stem
!Instrumentation$%ontrol
s#stem
-
8/9/2019 Training P&ID
4/45
E'i*ent S"!te*!:
- The path/flow of equipments (equipments
arrangements)
- Equipments types (tanks, rotating
equipments, pumps, blowers,mixers, heat
exchanger,etc)- Equipments !etails (specification, !imension,
stan!ar!s, connections, utility !ata, etc)
-
8/9/2019 Training P&ID
5/45
-
8/9/2019 Training P&ID
6/45
In!tr*entation+%ontro,!"!te*
- instrumentation system (local/remote
instrumentation)
- control system (", *%, control
+al+es,etc)
- safety system ("%)
-
8/9/2019 Training P&ID
7/45
The Usage of PID
"&* is implementation of process system conceptual
"&* is a more complete-"* with control system .specification/!etails !ata
"&* is input (upstream !ocument) for otherengineering/procurement/construction !isciplines(material take off equipment, piping,instruments,scope of supply checking,construction
stages,commissioning/start up sequences)
"&* is the !ata source for analysis of ha0ar!ousoperation (1#23"), risk mitigation of operation
-
8/9/2019 Training P&ID
8/45
Pro%e!! Con%etI*,e*entation
4esearch/!e+elopmentprocess flow
!iagram,material/heat balance,utility
consumption,chemical reactionspiping .instrumentation !iagram
-
8/9/2019 Training P&ID
9/45
PID i! *ore %o*,ete P-D
"* 5 equipment si0ing5instrumentation/control
system5!etails information 6 "&*
-
8/9/2019 Training P&ID
10/45
PID i! int (!trea* #o%*ent) or ot/erenineerin+ro%re*ent+%on!tr%tion #i!%i,ine!
"&*isometric piping (an!/or "*%) for
material take off piping (manual
+al+es,pipes,fittings,re!ucers,gaskets,etc)
hook up !rawing,wiring schematic,instrument
layout, control system for material take off for
instrument (bulk material an!/or in!i+i!ual
instruments)
-
8/9/2019 Training P&ID
11/45
"&*equipment list/specification, utility
consumption, connection rating
equipment supply"3 (purchase
or!er)
test package construction/pre-start up,performance/start up proce!ure
-
8/9/2019 Training P&ID
12/45
PID i! #ata !or%e or ana,"!i! o0a1ar#o! Oeration & Ri!2
Mitiation o Oeration 1a0ar!ous 3peration with/without
integration with existing
4isk mitigation of operation processsafety with/without integration with
existing
-
8/9/2019 Training P&ID
13/45
PID3! E,e*ent!
"&* consists of:
Equipments symbol (complete with internal
an! ma7or parts
&nstrumentation symbol
"iping symbols (line,re!ucer,etc)
egen!s to explain the symbols
8attery imit location (Tie-ins with existing an!/or
+en!or9s scope of supply,other party9s scope)
$otice of re+isions
-
8/9/2019 Training P&ID
14/45
Title block to show title, pro7ect name,
person incharge, re+ision number, an!
priority/important things
-
8/9/2019 Training P&ID
15/45
How to Create P&ID
%oftware use!: #T3 #*,%mart "lant, ;icro
station, "*%,etc
hoose "* that woul! like to be !e+elope! as
"&*
*i+i!e "* becoming some ma7or equipments
3ne or < ma7or equipments becomes = sheet of
"&*
-
8/9/2019 Training P&ID
16/45
Ma4or e'i*ent!: Tower, urnace, *rum,
4eactor, olumns, Tankage
Non$*a4or e'i*ent!: "umps,
exchanger, reboilers, con!enser
-
8/9/2019 Training P&ID
17/45
;a7or equipments shoul! be !rawn in "&* refer
to:
oa! sheets
essel sketch
exchanger setting plans
-
8/9/2019 Training P&ID
18/45
;a7or/non-ma7or equipments shoul! be name!
as per name in >Equipment ist?
Equipments shoul! be complete! with
necessary an! (also) important information from
+en!or/fabricator
-
8/9/2019 Training P&ID
19/45
1ow to !raw the process lines
process stream flow is !rawn from left to
right
ine output from @before "&*9 shoul! be in
the same location with line input from @after"&*9
;ain process line shoul! be in @bol! line9
-
8/9/2019 Training P&ID
20/45
ent line going up an! !rain line going !own
ine to tube si!e of exchanger shoul! befrom abo+e si!e of shell
%team/con!ensate shoul! lea+e theexchanger from bottom si!e
ine shoul! represent the actual con!ition of
no00les of equipments
ontrol +al+e shoul! be !rawn in hori0ontal line
&f hori0ontal an! +ertical line is meet in the one
point, +ertical line shoul! be cut
-
8/9/2019 Training P&ID
21/45
*estiny or source point of lines shoul!
be !rawn in "&*
-
8/9/2019 Training P&ID
22/45
Mana, 5a,5e!6
Aate +al+e, plug +al+e, ball +al+e:
usually use! for blocking the line, fully
open/fully close
Alobe +al+e: usually use! for throttling,
because of high range of pressure !rop
8utterfly +al+e: usually use! for cooling water,
because of low pressure !rop an! rating
heck +al+e (swing . lift): usually use! to
anticipate the back flow
-
8/9/2019 Training P&ID
23/45
Mana, 5a,5e !e,e%tion:
"ro7ect specification from client
Ao+ernment regulation
"rocess requirement
"iping specification
-
8/9/2019 Training P&ID
24/45
7,o%2 5a,5e: not use! for inlet/outlet of
process si!e of exchanger, except there isexchanger9s spare/maintenance/process
requirement, an! not use! for o+erhea!
con!ensing ser+ice, except for systemcontrolling
-
8/9/2019 Training P&ID
25/45
Drain+5ent ,ine:
3n the pipeline or equipment that
flammable, use !ouble block +al+e Theupstream +al+e is gate +al+e an! !ownstream
+al+e is globe +al+e
-
8/9/2019 Training P&ID
26/45
C/e%2 5a,5e: using !ouble +al+e with the
arrangement:
Aate +al+e (upstream)Bcheck +al+e globe +al+e(!ownstream)
Contro, 5a,5e: using !ouble +al+e with type gate
+al+e an! globe +al+e for the by pass line
Re,ie 5a,5e (PS8):to relief o+er pressure in the
pressuri0e! system, on the +essel/tower-"% is installe!
on the o+erhea! circuit system
-
8/9/2019 Training P&ID
27/45
0o9 to i5e ine N*;er+ine In#e
-
8/9/2019 Training P&ID
28/45
In!tr*entation on PID
meaning controlling system, pressure in!icator,
temperature in!icator, le+el in!icator an! flow
in!icatorcontrolling . alarm&nstrumentation symbols on "&* as per &nstrument %ocietyof #merica (%tan!ar! an! "ractices for &nstrumentation)
;ore !etail information about instrumentation will be
informe! by &nstrumentation *epartment to "rocess*epartment to be shown on "&*
-
8/9/2019 Training P&ID
29/45
inimum information on E"uipmentsin PID
Heater: heater type, ra!iation coil,con+ection coil,pipingsystem an! the !imension,manifol! of inlet . outlet for thecase of multi pass heaters,l buil! in-instrumentationsystem,steam connection, sample gas connection,openingaccess,information summary for equipments (such as type,!imension, !esign temperature an! pressure, an!material)
-
8/9/2019 Training P&ID
30/45
Tower$'essel$Tan$ilter$*ea%torEquipment shape, tray, packing, catalyst, an! fillingmaterial,mesh blanket (if any), +ortex breaker (if any),!emister (if any), piping system an! !imension,built-ininstrumentation system,opening access,skirt height (if anyprocess requirement), +ent an! !rain +al+es (if any),steam tracing (if any), information summary for
equipments (such as type, !imension, !esign temperaturean! pressure, an! material),access for loa!ing an!unloa!ing packing,catalyst an! filling material
-
8/9/2019 Training P&ID
31/45
Heat E+%hangerExchanger shape, no00leposition,slope (if process require!),back flushing (if process
require!),tracing an! insulation (if any), piping system an!
!imension,built-in instrumentation system,opening access, +ent
an! !rain +al+es (if any), information summary for equipments
(such as type, !imension, !esign temperature an! pressure,
insulation type an! material),spool in inlet an! outlet of
exchanger (espfor plate 1E) for maintenance purposes, strainerfor inlet flui! flow that !irty or corrosi+e (espfor plate 1E)
-
8/9/2019 Training P&ID
32/45
Pump$%ompressor$,lower"ump/compressor/blower9s type, !ri+er9s type,connection
si0e/rating for suction/!ischarge line (if require!),all connection
si0e/rating for process line (usually shown in +en!or9s
!ocuments), all connection si0e/rating for utility line (not shown in
+en!or9s !oc), all controlling an! monitoring system to the main
process line,summary information (such as hea!,type,capacity,
insulation type an! material), recycle lines,tracing an!insulation,inter stage coolers (if any),C/3 !rum,+ent . !rain
+al+es,accumulator,strainer, filter an! silencer
-
8/9/2019 Training P&ID
33/45
-team Tur,ine Turbine Type, Turbine *ri+er,ump/compressor/blower9s type, !ri+er9s type,connection
si0e/rating for suction/!ischarge line (if require!),allconnection si0e/rating for process line (usually shown in
+en!or9s !ocuments), all connection si0e/rating for utility
line (not shown in +en!or9s !oc), all controlling an!
monitoring system to the main process line,summaryinformation (such as hea!,type,capacity, insulation type
an! material),+ent . !rain +al+es
-
8/9/2019 Training P&ID
34/45
inimum Information of Instrumentation inPID..
1eat tracing/7acket steam for instruments (if require!),failure positionof control +al+e,limit switches,han! wheel for c/+ (if any),instrumentation
no00le (exc,for orifice tapping),tight shut off requirement (if
require!),control +al+e si0ing,set pressure of relief +al+e/rupture
!isc,interlock number,scope of work/supply i!entification
(contractor,+en!or or client),safe location !escription (+enting line-ha0ar!ous flui!s)
/ote Drain valve for instruments system not necessary to be shown,except if dispose to sewer.
-
8/9/2019 Training P&ID
35/45
1ow to !raw instrumentation
The figure of piping instrumentation ("A,"&
("),A,&(),analy0ers,etc) will be simplifie!after @the first block +al+e9
The !etails of piping instrumentation will be
shown in @hook up !rawing9
-
8/9/2019 Training P&ID
36/45
The 0riefs of
Instrumentations&nstrumentation *e+ices
*iaphragm type is use! to measure le+el
an! pressure of flui! with high soli!ity
or the purposes of checking plant eficiency
an! checking fee! supply from other party,flow meter shoul! be pro+i!e! with totali0er
-
8/9/2019 Training P&ID
37/45
-,o9 *eter !e,e%tion:press!rop,+elocity,!isplacement
"ressure !rop:orifice plate (cheapest . simplest)
+enturi tubes (low press!rop,a+ailable for !irty . slurryflui!s),target meter (expensi+e,soli! an! +iscousflui!),rotameter (low flow rate . local)
elocity:magnetic flow meter (not a+ailable for 1),+ortexmeter (liqui! +ortex meter-4eD=,,+ortex precision meter-gas,more accurate but expensi+e,+ortex she!!ing-cheaper,1)
*isplacement:Turbine meter (clean flui!,not corrosi+e)
-
8/9/2019 Training P&ID
38/45
Inter,o%2 Sina,!+S/t Do9nS"!te*
low instrument:T to interlock shoul! be !ifferent with T forcontrolling . in!ication, e+en using the same E
e+el instrument:&n the %/* &nterlock %ystem,E for signal trip shoul! be
!ifferent with E for control . in!ication E for interlock common using
e+el switch
"ressure instrument:&n the %/* &nterlock %ystem, "E (*uplex Type) foracti+ation signal trip (pressure switch or transmitter) shoul! be !ifferent
with "E for control . in!ication"%:+acuum-
-
8/9/2019 Training P&ID
39/45
Temperature instrument:&n the %/* &nterlock %ystem,TE
(*uplex Type) shoul! be !ifferent with TE for control .
in!icationTE for in!ication " shoul! be place! inseparate! well from this TE
uel gas to burner:shoul! be complete! with !ouble
block an! blee! +al+e to %/* system if there is fuel
failure
-
8/9/2019 Training P&ID
40/45
"re-#larm: Farning before Trip/%*
ontrol +al+e: #ll shoul! be controlle! in 4
urnace: &nstrumentation shoul! be pro+i!e! to
furnace system to guarantee the ignition can
perform well
&nstrument connection:see the table for
examples
-
8/9/2019 Training P&ID
41/45
The 0riefs of Piping
-#stem;anual +al+es: by type,by function
8y Type: Aate +al+e,globe +al+e,nee!le +al+e,
check +al+e,butterfly +al+e,ball +al+e, angle+al+e
8y function:8lock +al+e . 8y pass +al+e
-
8/9/2019 Training P&ID
42/45
7,o%2 5a,5e & 7" Pa!! 8a,5e
8lock +al+e at the battery limit of plant
8lock +al+e . by pass +al+e for control +al+e 8lock +al+e for safety +al+e/rupture !iscno
nee! to install block +al+e for safety +al+e
8lock +al+e for water coole! exchangers 8lock +al+e for pump, turbine an! compressor
8lock +al+e for branch of utility hea!er
-
8/9/2019 Training P&ID
43/45
8lock +al+e for piping auxiliary
8y pass +al+e for turbine meter
8y pass +al+e for gate +al+es
-
8/9/2019 Training P&ID
44/45
Strainer!: permanent, temporary"ermanent:pump suction (exccooling water pump-usetemporary strainer),moti+e steam line for steam 7et e7ectoran! steam turbines,burner-main line of fuel supply,hy!raulicactuate! equipment (hy!raulic oil pump),pneumaticactuate! equipment (air supply),43 for gas/air/ser+iceair/mixe! air
Temporary:pump suction !uring start up$ote:except that there is instrument air filter
-
8/9/2019 Training P&ID
45/45
7,in#!+!a%er!: maintenance,inspection or changing ofoperation mo!e
8ent! & Drain!: to !ispose ha0ar!ous/non ha0ar!ous
agent +ent/!rain for tower/!rum
+ent/!rain for heat exchanger
+ent/!rain for pump
!rain +al+e for steam trap
!rain +al+e for
+ent opening for atmospheric tank