training material-2nd officer, add chief officer & new c.o
TRANSCRIPT
-
8/22/2019 Training Material-2nd Officer, Add Chief Officer & New C.O
1/10
Unix Line Issued on 2002 (revised on 10th Jun.2008))
RE: Training materials for 2/O,Add C/O or New C/O
(Remark: This is only for advance training but not a guarantee letter for promotion. Itdoesnt mean immediate promotion to higher rank after training. They will be remained
as candidate until it is required to do so and to meet our expectation)
Please study following items and report company by surface mail(Dont send it by e-
mail or CD) by 30th Nov.2011.
Report should be provided by Hand writing.Any drawings in this report should be drawn by hand writing, but dont attach any
drawing as it is. Also not allow to make copy from other candidates report.
After completion, it should be signed by Master with comment for the report.The report which received from vessel will be reviewed by Company and questioned the
contents to concerned candidate for verification through visitation of our superintendent.
1. Ships P&A manual1) Stripping procedure including trim(?) & list(?)
2) Meaning of solidifying cargo3) Meaning of high viscosity cargo
4) Pre wash procedure(CDI-11.2.4/11.2.5)
Cycle of machine
Temperature of water
Minimum hours for pre wash
Minimum water quantity requiring
Pressure
2. Ships tank cleaning machine
2-1. Fixed machine(If it was fitted)
1) Maker & Type
2) Number of flexible hoses(ROB)3) Size of nozzle/ pressure/cycle time/ water quantity per hour
4) Height of machine from deck head(ceiling of cargo tank)
5) Spare part list
2-2. Portable machine
1) Make & Type2) Number of flexible hoses(ROB)
3) Size of nozzle/ pressure/cycle time/ water quantity per hour4) Draw the machine drawing with description
5) Spare part list
3. Cargo pump & Cargo line
1) Maker & Type2) Capacity
3) Max hydraulic pressure
1/10
-
8/22/2019 Training Material-2nd Officer, Add Chief Officer & New C.O
2/10
Unix Line Issued on 2002 (revised on 10th Jun.2008))
4) How to check Cofferdam of cargo pump(Leak check)
5) Draw the cargo pump drawing including cargo, hydraulic line, purging line, drain
line( identified by color).6) Manifold sizes of cargo lines
7) Sizes of cargo lines
4. Power pack
1) Maker & Type
2) Number of power packs3) Max. Hyd pressure
4) Max. flow rate of each power pack & total flow rate
5) Flow rate of cargo pump/hose handling crane/windlass
6) Role of Jockey pump(If fitted)7) Proper temperature of hydraulic oil and how to control the temperature.
8) Operating procedure of power pack
5. Tank cleaning pump1) Maker and Type
2) Capacity3) Max pressure
4) Size of tank cleaning line
5) Material of tank cleaning line
6. Ballast pump
1) Maker and Type
2) Capacity3) Size of pipe line
4) Kind of coating in ballast tank
5) * State How to exchange ballast water and why it is required ?
7. Cargo tank
1) Kinds of cargo tank coating2) Designed specific gravity of the vessel? How to load a cargo of higher
density(CDI-5.5.6)
3) Where is the temperature sensor & the height(high and low) from bottom or top
4) State max. loading rate for each cargo tank(CDI-5.5.13)5) * What is Pickling of SUS cargo tank ?
6) * What is passivation of SUS cargo tank ?
7) * State procedures for pickling & passivation8) * For making 30% Nitric Acid solution with 1200 Ltrs of Nitric Acid(68%), how
many fresh water is required ? State formula how to calculate
8. Vapor control system(refer to ships finish plan)
1) Designed negative pressure & positive pressure(CDI-5.5.26)
2) Vapor capacity
2/10
-
8/22/2019 Training Material-2nd Officer, Add Chief Officer & New C.O
3/10
Unix Line Issued on 2002 (revised on 10th Jun.2008))
3) What is the vapor drop (definition) and how to calculate.(Unix training material
2003Y)
9. Level master in CCR(CDI-5.5.22)
1) Designed Setting position of High Level alarm & Oerfill alarm ( by percentage)
2) * Calculate topping ullage with following information:Cargo & cargo tank to be loaded: MEG / 2P
Cargo quantity : 273MT
Draft: F/4.52M, Aft/6.78MList : 1.7 degree to STBD
SG & Factor : find from data sheet or previous data which ever loaded
Temperature of cargo: 13C
Table : use Ullage table for level gauge* Attach calculation sheet which shows the calculation process
3) * Calculate topping ullage with following information:
Cargo & cargo tank to be loaded : PPT/ 3P(If single hull tank, use 3C for 3P)Cargo quantity : 350MT
Draft: F/4.32M, Aft/7.15MList : 1.3 degree to Port
SG & Factor: find from data sheet or previous data which ever loaded.
Temperature of cargo: 47.5 FTable: use MMC table
a) State formula which convert from M3 to Gross Bbls / Net Bbls / MT
b) State formula which convert temperature from C to F
c) Topping ullaged) Attach calculation sheet which shows the calculation process
4) * Calculate cargo quantity by draft surveyCargo : Molasses
Draft: F(P)/ 3. 33M, F(S)/ 3.35, M(P)/ 5.32, M(S)/5. 57, A(P)/ 7.41, A(S)/7.52
Attach calculation sheet which shows the calculation process
5) * Before unloading MEG at China, vessel was informed by terminal who
mentioned cargo(MEG/ 3P/ 500MT) contaminated with sea water and chloride
was 2ppm. It was found sea water leaked into cargo tank(3P) through pump stackflange . Please calculate the quantity of sea water in MEG 500MT/3P which
equivalent to Chloride 2 ppm.
10. O2 meter/Toxic/Flammable gas detectors(to be confirmed by Master)
1) Maker & Type
2) Expiry date of sensor3) Toxic gas list(Up dated)
4) * State Check of Hydrocarbon gas under inerted and non-inerted atmosphere
5) * What is the minimum quantity of Oxygen by volume which needs in order to
using Flammable gas monitor incorporating a pellistor sensor ?
3/10
-
8/22/2019 Training Material-2nd Officer, Add Chief Officer & New C.O
4/10
Unix Line Issued on 2002 (revised on 10th Jun.2008))
6) * Convert 95% of LFL of Hydrocarbon gas into Volume of Hydrocarbon
7) * Convert 1.8% by volume of Acetone into LFL of Acetone
11. MMC
1) Maker & Type
2) Number of MMC & Sampler(ROB)3) ROB of spare battery
12. Cargo Hose/Steam hose/Air hose1) Specification and ROB of cargo hoses/Steam hose/Air hose(with size and length)
13. Wilden pump
1) Type2) ROB
3) Spare part list
14. Oil spill gear list and location
15. WWT equipment and reagent list
16. WWT(To be confirmed by Master)
1) How to check HC/CL/ KMnO42) How to make standard solution for HC/CL/KMnO4
17. Reducers & Valves
1) ROB of reducers2) * What is ANSI & JIS and how do you know whether it is ANSI or JIS ?
3) * What is non-return valve & how do you know whether it is non- return valve ?
18. MARPOL
18-1. Annex-1
1) Definition of oil2) Special area
3) The conditions of discharging tank cleaning water
18-2. Annex-21) Definition of noxious liquid substance
2) State Category-X,Y,Z & OS (CDI-5.5.15 /11.2.2 /11.2.3)
3) Calculation of maximum discharge rate(T/C water) & Role of Bafflecover(P&A manual )
4) * For using formula QD = D x 5L, find D, L, & QD of your vessel
5) * What is the Clingage residues and how to calculate it (please calculate Qusing No.4P cargo tank)
6) What cargo can do tank cleaning by ventilation method
7) Vessel unloaded cargo-Trimethylacetic acid from 2P(or 2C). please calculate
minimum quantity of water for pre-wash and formula ?
4/10
-
8/22/2019 Training Material-2nd Officer, Add Chief Officer & New C.O
5/10
Unix Line Issued on 2002 (revised on 10th Jun.2008))
8) Vessel unloaded cargo-Dodecene from 4P(or 4C) , please calculate minimum
quantity of water for pre-wash and formula ?
19. IBC Code
1) Which vessel applies this code
2) What is the meaning of Separate?3) How to test cargo hose(IBC-5.7.3)
4) State Types of tank venting system(IBC 8.3.1/8.3.2)
5) Definitions of Inerting/ Padding/Drying(CDI-5.5.2)6) State Gauging device: Open/Restricted/closed (IBC 13.1.1)
7) State Inspection of safety equipment(IBC-14.2.6)
8) Cargoes protected by additives and the contents(IBC-15.13)
9) Overflow control and loading rate(IBC-15.19.8)10) Maximum allowable quantity of Cargo per tank(Type-1 and type-2).
11) Cargo information(IBC-16.2)
12) Opening of and entry into cargo tanks(IBC-16.4)
13) Stowage of cargo samples and the condition(IBC-16.5.2)
20. Fitness certificate1) Contents
2) What is nos
3) What cargoes(MARPOL pollution categories) are required to put in fitnesscertificate ?
4) State product names as per IBC code & COF for following cargoes ?
a) Caustic Soda
b) Caradolc) Isopar G
d) Fatty Alcohol C 12-14
e) Fatty Alcohol C 14
21. Compatibility(CDI-5.5.3)
1) Compatibility chart- How to use2) Coating compatibility (what cargoes are? Provide all tank coating types and their
limitations)
3) Heat compatibility (what cargoes are?)
22. * Freezing points of special cargoes & why it is important to know the freezing point?
1) Benzene
2) Phenol3) Para Xylene
4) Acetic acid
5) 1.4 Butanediol6) Cyclohexane
7) Diethanolamine
23. * Polymer cargoes(SM,MMA)- ( CDI-5.5.4, & IBC code)
5/10
-
8/22/2019 Training Material-2nd Officer, Add Chief Officer & New C.O
6/10
Unix Line Issued on 2002 (revised on 10th Jun.2008))
1) What is the polymerization
2) How is it dangerous and what is the precaution
3) Contents of Inhibitor certificate4) Precautions before tank cleaning and during tank cleaning
24. State the hazards from corrosive cargoes(CDI-5.5.7)25. State the hazard of toxic cargoes(CDI-5.5.9)
26. State necessary action in the event of cargo spill(CDI-5.5.12)
27. Close loading(CDI-5.5.14)
1) What is the close loading
2) Purpose of close loading
3) Precaution for close loading4) Closed sampling
28. State Precaution during winter season
1) Relating to safe Navigation & ships safety2) Relating to cargo operation
29. ISGOTT
1) State flame arrester and flame screen ?
2) State effective valve close time relating to Pressure surges3) State Volatile and Non-Volatile ?
4) State Flammable limits(Ch.1.2.2)
5) State Toxicity(Ch. 2.3.1)
6) State Oxygen deficiency(Ch. 2.3.10)7) State Hot work within the cargo tank deck area (Ch.9.4.4.3)
8) State Hot work in cargo tanks (Ch.9.4.4.2)
9) State Entry into cargo tanks (Ch.7.1.7.3)10) State Definition of Enclosed space(Ch. Definition)
11) State Electrical Storms(Lightning) (Ch.26.1.3)
12) State Scupper plugs (Ch.24.7.3)13) State hazards from electrostatic generation(CDI-5.5.17) & use of re-circulated
wash water(CDI-5.5.30)
14) State Testing of Tank Cleaning Hoses (Ch. 11.3.6.3)
15) State Inerted/Too lean/Over rich/Undefined16) State Meaning of A/P/ R which mentioned at ship/shore safety check
List (Ch 26.3.2.2)
17) State T/C methods in a Non-inert atmosphere(ISGOTT)18) * State the hazard & precaution of handling nitrogen (CDI-VIQ, CDI-5.5.27/5.5.28)
19) State precaution from steaming into non-inert tank(CDI-5.5.32)
20) State associated dangers with steaming cargo tanks(CDI-5.5.33)
30. Tanker Safety Guide(Chemical)
1) Explain for Receiving Nitrogen from shore(Ch.5.7.2).
2) Explain for Precaution when tank washing in an undefined atmosphere(Ch.7.3.4)
6/10
-
8/22/2019 Training Material-2nd Officer, Add Chief Officer & New C.O
7/10
Unix Line Issued on 2002 (revised on 10th Jun.2008))
3) Explain for TLV-TWA/ TLV-STEL/TLV-C(Appendix, A.1.3)
31. Finished drawing list(Hull Part)Please fill up the concerned list & drawing numbers
List No. Drawing No. Title
Finished drawing listTank cleaning Machine
List of spare & tools for equipment(INCL,DK inventory list)
Shell Expansion
Hull Particulars
MMC
Test record
Docking plan
General arrangement
Midship Section
Mooring arrangement
Deck MachineryCapacity Plan & Deadweight scale
ODME control system
USCG pumping plan
Loading & stability information booklet
Painting scheme
Combustible gas alarm
Result of sea trial
Cargo tank level gauge
Fire control plan
USCG VSC operational manual
Loading operation manual
Damage stability calculation
Life saving apparatus
Cargo vapor control manual(required by USCG)
Chemical operation manual(1/2, 2/2)
Cargo oil transfer procedure
P&A Manual
Cargo control room plan
List of personnel protection
Stockless anchor
Tank cleaning heater32. Others
1) * State What is dew point ? & find dew point when dry bulb is 26C and wet bulb
is 23C ?
2) * In order to request Toxic gas tube, you have to check whether the cargo is Toxic ornot. How do you know it is Toxic or not ?
3) * State Designed Break holding capacity and Rendering test
a) What is the designed break holding capacity ?
7/10
-
8/22/2019 Training Material-2nd Officer, Add Chief Officer & New C.O
8/10
Unix Line Issued on 2002 (revised on 10th Jun.2008))
b) What is the rendering test & what is the purpose of rendering test ?
4) * Find followings(?) for Rendering test using formula below and attach the
Calculation sheet which shows process of calculation.
q = Rendering point x (D+d)/ A x I x 2
Rendering point: 23 Tons for deep sea vessel & 16 Tons for short see vessel
D(cm) : ?
d(cm) : ?q( kg/cm2) : ?
I(cm) : ?
A(cm2): ?
5) * Calculate constant of vessel with current voyage & attach thecalculation sheet which shows process of calculation.
33. On Scene Training by C/O
It is required to conduct demonstration by himself(candidate) and supervised by C/O.As the minimum requirement:
a) WWT for HC/CL/KmNo4b) ODME
c) O2 meter
d) Combustible gas detector
e) Toxic gas detectorf) Adjustment of Level, Temperature, Pressure on CCR level gauge
g) Simulation of Level, Temperature, Pressure on CCR Level gauge
h) Calibration of Level, Temperature, Pressure on CCR Level gaugei) Cofferdam leak check of Cargo pump
j) Check of heating coil in cargo tank
k) Test & Calculation of rendering of mooring winchl) Providing of Stowage plan & stability for current voyage
m) Recording of Cargo record book(from loading to tank cleaning via unloading)
n) Overhaul of tank cleaning machine & took a photo as overhauled it without
assemblingo) Calculation of cargo ullage at loading/unloading port
p) Tank cleaning plan & conduct T/C under his control
q) Operation of emergency generator(CDI-7.2.1)r) Operation of emergency fire pump(CDI-7.2.2)
* Record of actual practice (Take a photo for each demonstration and attach at report asevidence)
Code Date(ddmmyy) Time(from/to) Location or Port Signature by
C/O or
Master
Candidate
8/10
-
8/22/2019 Training Material-2nd Officer, Add Chief Officer & New C.O
9/10
Unix Line Issued on 2002 (revised on 10th Jun.2008))
a
b
c
d
e
fg
h
i
j
k
l
m
n
o
p
34. Review & suggestion ?
1) What are your findings through training report ?
2) What is your suggestion for crew training ?
end
.
Evaluation report by Master
After completion of training, evaluation report should be sent to companyScore: Excellent(10-9), Good(8-7), Normal(6-5), Poor(4-3), Bad(2-1)
Duty: Name of candidate:
Item Personality Knowledge Possibility
To improve
Aver
T/17
a b c d e f g h i j k l m n o p q
Score
Comment by Master:
Name of Master & Signature: Date:
Remarks: a: leadership, b: loyalty, c: health, d: confidence, e: attitude, f: diligence, g:responsibility, h:navigation, i:
management, j:ISPS, k: cargo operation, l: tank cleaning, m: port information, n: inspection, o: regulation, p: safety,
q: possibility to improve
End
9/10
-
8/22/2019 Training Material-2nd Officer, Add Chief Officer & New C.O
10/10
Unix Line Issued on 2002 (revised on 10th Jun.2008))
10/10