tracking group overview

6
Tracking Group Overview Bruce Schumm Cornell Linear Collider Workshop July 13-16 2003

Upload: whitney-golden

Post on 30-Dec-2015

21 views

Category:

Documents


0 download

DESCRIPTION

Tracking Group Overview. Bruce Schumm Cornell Linear Collider Workshop July 13-16 2003. Development 1: Funding. LCRD/UCLC Proposal Status Proposal reviewed; components ranked Sept 2002 DOE (LCRD) top-ranked proposals funded as supplements to existing grants - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Tracking Group Overview

Tracking Group Overview

Bruce SchummCornell Linear Collider

WorkshopJuly 13-16 2003

Page 2: Tracking Group Overview

Development 1: Funding

LCRD/UCLC Proposal Status

• Proposal reviewed; components ranked Sept 2002

• DOE (LCRD) top-ranked proposals funded as supplements to existing grants

• UCLC re-reviewed as individual proposals; did not fare well

• Funded tracking groups: Sci-Fi Int. Tracker (Indiana/Notre Dame) GEM Forward Tracking (Louisiana Tech)

Page 3: Tracking Group Overview

PRC MeetingDESY, Hamburg, May 7 and 8,

2003

SilC: an International R&D Collaboration to develop Si-

tracking technologies for the LC

Aurore Savoy-Navarro, LPNHE-Universités de Paris 6&7/IN2P3-CNRS, France

on behalf of the SiLC Collaboration

Page 4: Tracking Group Overview

Development 2: International Si Tracking

Consortium

SiLC (Silicon Tracking for the Linear Collider) group formally recognized by DESY PRC

Proposal available at http://lpnhe-lc.in2p3.fr/ (click `SiLC’, but 1st write me for username and password

Approved for 1-year `warm-up’ phase

Readdress PRC in October with more specific plans and goals

Page 5: Tracking Group Overview

The SiLC CollaborationThe SiLC Collaboration

Brookhaven

Ann Arbor Wayne

Santa Cruz

Helsinki

Obninsk Karlsruhe

Paris

Prague Wien Geneve

Torino

Pisa

RomeBarcelonaValencia

Korean Universities

Seoul&Taegu

Tokyo

EuropeUSA

ASIASo far: 18 Institutes gathering over 90 people from Asia, Europe & USAMost of these teams are and/or have been collaborating.

Page 6: Tracking Group Overview

Group-Wide Activity

Between Santa Cruz (6/02) and Arlington (1/03), we had a series of three phone meetings (gaseous tracking, solid-state tracking, and simulation).

Do we want to replicate this in Oct/Nov?

Is there some other model or mode of coordination that we want to consider?