8/2/2019 TQM Assignments 03 Ex2 3 4 5
1/3
Total
QualityManagement
Assignment No.03Submitted to: Mr.Ali Zulqarnain
DATED: March 11, 2012
-
8/2/2019 TQM Assignments 03 Ex2 3 4 5
2/3
Exercise No. 05: Motorolas Secretto Total Quality Control (Case
Study)Question No.01: What major effects led to Motorola being awarded
the Malcolm Baldrige National Quality Award?
Answer No.01: when Motorola was awarded the Malcolm Baldrige National
Quality Award in 1988, a summary of its quality achievements was distributed
as part of an informational packet. That summary contained the following
description of six sigma quality.
To accomplish its quality and total customer satisfaction goals, Motorolaconcentrates on several key operational initiatives. At the top of the list are six
sigma qualities, a statistical measure of variation from a desired result.
Motorola employees record the defects found in every function of the business
and statistical technologies are increasingly made part of each and every
employees job. Due to this practice Motorola was able to achieve the award.
Question No.02: Prepare a form to rate vendors based on
characteristics that you consider to be important. Suggest a schemeto select vendors?
Answer No.02:
Question No.03: Describe the role of auditing in maintaining an SPC
system?
Answer No.03: Motorola uses two types of audits for process control:
engineering and monitoring. The former is conducted by a QA engineer andentails an intense review of all process steps including equipment parameters,
handling techniques and SPC.
The monitor audit is conducted by a certified auditor it reviews a broad range
of issues such as whether specifications and revisions are correct whether logs
are filled and maintained properly etc .the system is set up so that any
-
8/2/2019 TQM Assignments 03 Ex2 3 4 5
3/3
discrepancy critical major or minor is documented and corrective action is
required in writing .
Question No.04: Discuss specific auditing tasks in operator and
process control that could be beneficial to companies?
Answer No.04: Critical defects must be corrected immediately Major and
minor problems must be remedied within five working days. The proof of
success is that results from customer audits for the past two years have been
excellent. Inspecting out defects until permanent corrective actions can be
implemented. Statistical sampling plans are used to inspect each lot as it
finishes each operation.
Question No.05: Describe how the philosophy of never-ending
improvement is incorporated in the company?
Answer No.05