Page 1: TPED 125 130 4 S Chiller

Company name: -Created by: -Phone: -Fax: -Date: -

Printed from Grundfos CAPS [2013.03.059]

96276078 TPED 125-130/4-S 50 Hz

H[m]

0

1

2

3

4

5

6

7

8

9

10

11

12

13

Q [m³/h]0 20 40 60 80 100 120 140 160

eta[%]

0

10

20

30

40

50

60

70

80

90

100

TPED 125-130/4-S, 50Hz

100 %

Q = 152 m³/hH = 7.96 mn = 96 %Pumped liquid = Cold water / cooling waterLiquid temperature = 20 °CDensity = 998.2 kg/m³

Eta pump = 74.2 %

P2[kW]

0

1

2

3

4

5

NPSH[m]

0

1

2

3

4

5

P2 = 4.42 kWNPSH = 2.07 m

1/3

Page 2: TPED 125 130 4 S Chiller

Company name: -Created by: -Phone: -Fax: -Date: -

Printed from Grundfos CAPS [2013.03.059]

H[m]

0

1

2

3

4

5

6

7

8

9

10

11

12

13

Q [m³/h]0 20 40 60 80 100 120 140

eta[%]

0

10

20

30

40

50

60

70

80

90

100

TPED 125-130/4-S, 50Hz

100 %

Q = 152 m³/hH = 7.96 mn = 96 %Pumped liquid = Cold water / cooling waterLiquid temperature = 20 °CDensity = 998.2 kg/m³

Eta pump = 74.2 %

P2[kW]

0

2

4

NPSH[m]

0

2

4

P2 = 4.42 kWNPSH = 2.07 m

680

8430

0

145

145

145

145

125

537

518

620

215283

877

213

600

260

537

537

M16 M16

Description ValueProduct name: TPED 125-130/4-S A-F-A-BAQEProduct No: 96276078EAN number: 5700830065112

Technical:Speed for pump data: 1455 rpmActual calculated flow: 152 m³/hResulting head of the pump: 7.96 mHead max: 130 dmShaft seal: BAQECurve tolerance: ISO 9906:1999 Annex APump version: AModel: A

Materials:Pump housing: Cast iron

EN-JL1040ASTM A48-40 B

Impeller: Cast ironEN-JL1030ASTM A48-30 B

Material code: A

Installation:Maximum ambient temperature: 40 °CMaximum operating pressure: 16 barMax pressure at stated temp: 16 bar / 120 °CFlange standard: DINConnect code: FPipe connection: DN 125Pressure stage: PN 16Port-to-port length: 620 mmFlange size for motor: FF265

Liquid:Pumped liquid: Cold water / cooling waterLiquid temperature range: 0 .. 120 °CLiquid temp: 20 °CDensity: 998.2 kg/m³Kinematic viscosity: 0 mm2/s

Electrical data:Motor type: 132SBNumber of poles: 4Rated power - P2: 2 x 5.5 kWMains frequency: 50 HzRated voltage: 3 x 380-480 VRated current: 11,0-9,00 ACos phi - power factor: 0,95-0,94Rated speed: 240-1750 rpmEfficiency: IE3 89,6%Enclosure class (IEC 34-5): IP55Insulation class (IEC 85): FMotor protec: NONEMotor No: 86906157

Others:Minimum efficiency index, MEI ≥: 0.46

Net weight: 438 kgGross weight: 521 kgShipping volume: 1.52 m3Config. file no: 97845594

2/3

Page 3: TPED 125 130 4 S Chiller

Company name: -Created by: -Phone: -Fax: -Date: -

Printed from Grundfos CAPS [2013.03.059]

96276078 TPED 125-130/4-S 50 Hz

InputSelect ApplicationOverview mode Yes

Air-conditioning

Input overview:Installation Type CirculationFlow (Q) 152 m³/hHead (H) 7.96 mMore YesPumped liquid Cold water /

cooling waterMin. liquid temperature 5 °CMax. liquid temperature 40 °CMax. operation pressure 10 barAllowed flow undersize 2 %Min. inlet pressure 1.5 barAmbient temperature 20 °CControl mode Constant Diff.

pressureEnclosure Class IP20Maximum frequency 105 %Select type of hydraulic Twin pumpYearly operation time 100 daysEnergy price 0.15 €/kWhIncrease of energy price 6 %Calculation period 15 yearsEvaluation criterion Duty point

deviationMax. hits per product group 2Max. hits total 8Frequency 50 HzPhase 1 or 3Min. power limit for SD start 5.5 kWVoltage 1 x 230 or 3 x 400

VTwin-head Inline Canned Rotor YesTwin-head Inline Yes

Load Profile1 2 3 4

Flow 100 75 50 25 %Head 100 100 100 100 %P1 5.27 3.83 2.82 2.35Eta total 62.1 64.2 58.0 34.9 %Time 144 360 840 1056Energy consumption 759 1378 2372 2479 /YearQuantity 1 1 1 1

Sizing resultType TPED 125-130/4-SQuantity 2Motor 5.5 kWFlow 152 m³/hHead 7.96 mPower P1 5.27 kWPower P2 4.42 kWEta pump 74.2 %Eta motor 86.0 %Eta pump+motor 63.8 % =Eta pump * Eta

motorEta total 62.1 % =Eta relative to the

duty pointEnergy consumption 6988 kWh/YearCO2 emission 3980 kg/YearPrice On requestPrice + energy costs On request /15Years

H[m]

0

1

2

3

4

5

6

7

8

9

10

11

12

13

Q [m³/h]0 20 40 60 80 100 120 140

eta[%]

0

10

20

30

40

50

60

70

80

90

100

TPED 125-130/4-S, 50Hz

100 %

Q = 152 m³/hH = 7.96 mn = 96 %Pumped liquid = Cold water / cooling waterLiquid temperature = 20 °CDensity = 998.2 kg/m³

Eta pump = 74.2 %

P2[kW]

0

2

4

NPSH[m]

0

2

4

P2 = 4.42 kWNPSH = 2.07 m

3/3