TPC meeting, NBI, 2-3 September 2002 Børge Svane Nielsen, NBI 1 Status of laser system TPC meeting, Copenhagen, 2-3 September 2002 Børge Svane Nielsen, Jørn Westergaard Niels Bohr Institute Effect of laser on mylar foil Design details frozen since May Micro-mirror status Mirror support rings status Assembly of laser rods Optics and mechanics on end-plates

Upload: lena-warren

Post on 14-Dec-2015

214 views

Category:

Documents


0 download

TRANSCRIPT

TPC meeting, NBI, 2-3 September 2002 Børge Svane Nielsen, NBI 1

Status of laser systemStatus of laser system

TPC meeting, Copenhagen, 2-3 September 2002Børge Svane Nielsen, Jørn Westergaard

Niels Bohr Institute

Effect of laser on mylar foil Design details frozen since May Micro-mirror status Mirror support rings status Assembly of laser rods Optics and mechanics on end-plates

TPC meeting, NBI, 2-3 September 2002 Børge Svane Nielsen, NBI 2

Laser beams hitting mylar strips in TPC

Laser beams hitting mylar strips in TPC

mylar strips

TB: What is the effect on the mylar strips from the laser beams?

TPC meeting, NBI, 2-3 September 2002 Børge Svane Nielsen, NBI 3

Preliminary testsPreliminary tests

We use aluminized mylar strip received from CERN

Shoot on strip with laser beam reflected from a micromirror ( 1 mm)

Preliminary results from last week:

300-370 J/pulse 1 mm through-going hole after 15 minutes! 150-200 J/pulse small damage after 6 hours 100-150 J/pulse no visible damage after 6-7 hours

Design power is 20 J/pulse, well below the tested values.We believe that the damage is due to melting of the Al layer.

Plan more systematic tests over longer time, but hard to do longer than 1 week.

TPC meeting, NBI, 2-3 September 2002 Børge Svane Nielsen, NBI 4

Status of laser systemStatus of laser system

TPC meeting, Copenhagen, 2-3 September 2002Børge Svane Nielsen, Jørn Westergaard

Niels Bohr Institute

Effect of laser on mylar foil Design details frozen since May Micro-mirror status Mirror support rings status Assembly of laser rods Optics and mechanics on end-plates

TPC meeting, NBI, 2-3 September 2002 Børge Svane Nielsen, NBI 5

Rod numberingRod numbering

TPC meeting, NBI, 2-3 September 2002 Børge Svane Nielsen, NBI 6

Micromirror z positionsMicromirror z positions

TPC meeting, NBI, 2-3 September 2002 Børge Svane Nielsen, NBI 7

Muon arm side beam transport

Muon arm side beam transport

limited space between TPC and space frame move beam transport 10º from vertical plane adds 2 mirrors on shaft side + modifies beam transport on muon side

hope to attach 50 mm pipe on outside of TPC permanently

special prism

”knee” in beam transport on shaft side

”standard” prism

Muon side

Shaft side

TPC meeting, NBI, 2-3 September 2002 Børge Svane Nielsen, NBI 8

Micromirror productionMicromirror production

A.Ridiger, Moscow: all 60 bundles produced all angle measurements done report received, delivery imminent

micro-mirror bundle

brass cup

protection cap

TPC meeting, NBI, 2-3 September 2002 Børge Svane Nielsen, NBI 9

Micromirror measurementsMicromirror measurements

and angles of all micromirror faces measured by goniometer in Moscow

0.0014 (5 arc sec)

TPC meeting, NBI, 2-3 September 2002 Børge Svane Nielsen, NBI 10

Ideal laser tracks in TPCIdeal laser tracks in TPC

TPC meeting, NBI, 2-3 September 2002 Børge Svane Nielsen, NBI 11

angle measurements angle measurements

Mean = 0.111Sigma = 0.190

Mean = 0.033Sigma = 0.229

TPC meeting, NBI, 2-3 September 2002 Børge Svane Nielsen, NBI 12

angle measurements angle measurements

Ideal angle = 45º

Mean = -0.048Sigma = 0.073

TPC meeting, NBI, 2-3 September 2002 Børge Svane Nielsen, NBI 13

Linear measurementsLinear measurements

Top mirrors

Mean = 6.24 mmSigma = 0.27 mm

Mean = 4.75 mmSigma = 0.35 mm

Mean = 3.25 mmSigma = 0.35 mm

Middle mirrors

Bottom mirrors

L

TPC meeting, NBI, 2-3 September 2002 Børge Svane Nielsen, NBI 14

Laser rod with mirrorsLaser rod with mirrors

TPC meeting, NBI, 2-3 September 2002 Børge Svane Nielsen, NBI 15

Mirror support ringsMirror support rings

NBI workshop: 50 mirror support rings in production

Prototype produced at NBI

TPC meeting, NBI, 2-3 September 2002 Børge Svane Nielsen, NBI 16

Rod gluingRod gluing

Two stage gluing procedure at CERN:

1. Mirror support rings glued to short rods. Theta alignment guaranteed by jig

2. Full length rod glued from short rods. Phi alignment adjusted during gluing

3. Measurements on final rod possible before installation.

TPC meeting, NBI, 2-3 September 2002 Børge Svane Nielsen, NBI 17

Optics and mechanics on end-plates

Optics and mechanics on end-plates

Design in progress on opto-mechanical supports on end-plates

Prism holder:

Prototype to be constructed in NBI workshop soon

Laserbeam

Market survey on optical components for end-plates imminent