tp48200a-h15a1 quick installation guide & tp48200a-h15a1 +8-+¦¦+¦++-- (v300r001_03)

2
Site monitoring unit (SMU) 监控单元 1.The Weight of theTP48200A: 110 kg (242.55 lb) (excluding the weight of the power supply unit (PSU) and storage batteries) . TP48200A重量:110kg(不包含整流模块与蓄电池)。  2. Cabinet dimensions (excluding the base) : 1500 mm x 600 mm x 650 mm (59.06 in. x 23.62 in. x 25.59 in.) (height x width x depth) 机柜尺寸(不包含底座):1500mm×600mm×650mm (高××深)。 3. Dimensions of the base : 100 mm x 600 mm x 650 mm (3.94 in. x 23.62 in. x 25.59 i n.) (height x width x depth) 底座尺寸: 100mm×600mm×650mm (高××深)  Socket wrench 套筒扳手 Drill holes and install expansion sleeves. 打孔并安装膨胀管。 1. The outputs of the TP48200A-H15A1 (TP48200A for short) can be customized. The picture is for reference only. TP48200A-H15A1(简称TP48200A)的输出配电路数可以根据客户需求进行定制化设计,图片仅供参考。  2. The local cable colors prevail. The cable colors in the figure are for reference only. 图中线缆颜色仅供参考,请以当地电源线缆标准为准。  Battery temperature sensor 电池温度传感器 Installing the Cabinet. /安装机柜 Cable outlet 出线孔 Power distribution unit (PDU) 配电单元 Site ground bar 站点接地排 Installing a PGND Cable / 装保护地线  PGND Cable 25 mm2 ( 0.04 in. 2 ) (recommended) 保护地线建议线径:25 mm2 (非标准发货配置) Installing Batteries / 安装蓄电池  + - + - + - + - Installing batteries, pay attention to the positive and negative pole of the battery. Then connecting copper bars or cables . 安装蓄电池,注意正负极朝向。连接蓄电池之间的铜排或线缆。  The battery temperature sensor is installed on the side panel interior by default. If the storage batteries match the battery temperature sensor, installing the battery temperature sensor on the battery t erminal. 电池温度传感器默认安装在机柜侧面,如果实际安装的蓄电池和电池温度传感器匹配,则把电池温度传感器直接安装在蓄电 池端子上。 Installing the Battery Temperature Sensor / 安装电池温度传感器  To battery terminal 接蓄电池端子 To the BTEMP port on the UIM 已接用户接口板上TEM BAT 接口 Installing PSUs / 安装整流模块  The rated output current of each PSU is 50 A. The number of PSUs depends on actual capacity requirements for the TP48200A. 每个PSU额定输出为50A。请根据电源实际所需配置的容量进行整流模块的安装。  1 2 3 4 5 Cable / 接线标号 Cable Diameter and Color / 线径、颜色 (s1) Signal cables to dry contacts, Boolean values, and sensor ports 干接点/开关量/传感器信号线 Not provided / 非标准发货配置 (s2) RS485, RS232 or Fast Ethernet (FE) cable RS485/RS232/ FE信号线 Not provided / 非标准发货配置 (d1) DC Power cable to the primary load 主要负载电源线 Not provided / 非标准发货配置 (d2) DC Power cable to the secondary load 次要负载电源线 Not provided / 非标准发货配置 (d3) DC Power cable to storage batteries 蓄电池电源线 Cross-sectional area: 25 mm2 (0.04 in.2) Color: black cable and red cable 25 mm2-黑色电缆与红色电缆 (a1) AC input power cable 交流输入电源线 Cross-sectional area: 25 mm2 ( 0.04 in.2) (recommended) Not provided 建议线径:25 mm2(非标准发货配置) Installing Cables / 系统接线  100mm (3.94 in.) 540mm(21.26 in.) 423.5mm (16.67 in.) Ground busbar 接地排 TP48200A-H15A1 V300R001 快速安装指南  TP48200A-H15A1 V300R001 Quick Installation Guide Issue: 02 Date: 2012-12-05 文档版本:02 发布日期:2012-12-05 NOTE / 说明  Cabinet Appearance / 机柜外观  NOTE / 说明  Battery rack 蓄电池架 Installing the TP48200A / 安装机柜  Fix the installation hole 确定安装孔位。 Spring washer / 弹垫 Flat washer / 平垫 Socket wrench 套筒扳手 Ф16mm (0.63 in.) 52mm~60mm (2.05 in. ~2.36 in.) Bolt / 螺栓 Expansion sleeve 膨胀管 M12 x 60 (4pcs) Before installation, switch all circuit breakers to the OFF position. 安装前将所有空开都置于OFF CAUTION / 注意  1. Before installing power cables for storage batteries , remove one copper bar or cable from each battery string. 安装蓄电池电源线前,将每组电池组其中一个串联铜排或线缆拆除。  2. Do not bind the AC power cables, DC power cables, signal cables, and communications cable together. 交流线、直流线、信号线、通信线均需分开绑扎,不能互相绑扎在一起。  Connect cables in the following sequence: s1 s2 d1 d2 d3 a1 按照顺序连接线缆: s1s2 d1 d2 d3 a1 CAUTION / 注意  (Optional) Installing signal cables to dry contacts, Boolean values, and sensor ports. /干接点、开关量、传感器信号线接 线方法(选接): 1. Press the white contact plates slightly using a flat-head screwdriver. Then, insert the two wires on the other end of the signal cable into the corresponding ports, and pull out the screwdriver to fasten the dry contact signal cable. 先用一字螺丝刀顶住干接点对应的白色触片,使干接点的金属弹片弹起,再将信号线的两条线分别插入到对应的干接点中, 然后将螺丝刀收回,固定紧干接点信号线。  2. Connect the sensor cable to the corresponding ports on the monitoring user i nterface module. ( See the sensor pin definitions in theTP48200A-H15A1 User Manual .) 将需要连接的传感器信号线接头接在监控用户接口模块面板对应的端口上。(传感器接口 Pin脚定义请参考《TP48200A- H15A1 用户手册》)  All ports in this manual are protected by a security mechanism/文中出现的端口都支持安全保护机制。 (Optional) Installing the RS232, RS485, or FE Cable / RS232 RS485FE信号线接线方法(选接) 1. When in-band monitoring is required , connect the COM_ 485/232 port on the SMU to the commun ications equipment over a cable with an RJ45 connector. 当确认需要使用带内监控时,则使用 RJ45头的线缆连接监控模块的COM_ 485/232接口与上位机接口。 2. When out-of-band monitoring is required, connect the FE port on the SMU to the communications equipment over a cable with an RJ45 connector. 当确认需要使用带外监控时,则使用 RJ45头的线缆连接监控模块的FE接口与上位机接口。 Dry contact 干接点 White Contact plate 白色触片 NOTE / 说明  Installation hole 安装孔位 Front / 正面 Wall or platform edge 墙体或平台边缘 Ground 地面 + - + - + - + - Space for PSU 整流模块安装空间 

Upload: bbpncb

Post on 13-Oct-2015

155 views

Category:

Documents


8 download

DESCRIPTION

This contains installation instructions for Huawei TP48200A-H15A1 outdoor BTS.

TRANSCRIPT

  • Site monitoring unit (SMU)

    1.The Weight of theTP48200A: 110 kg (242.55 lb) (excluding the weight of the power supply unit (PSU) and storage batteries) .

    TP48200A 110kg 2. Cabinet dimensions (excluding the base) : 1500 mm x 600 mm x 650 mm (59.06 in. x 23.62 in. x 25.59 in.) (height

    x width x depth)

    1500mm600mm650mm 3. Dimensions of the base : 100 mm x 600 mm x 650 mm (3.94 in. x 23.62 in. x 25.59 in.) (height x width x depth)

    100mm600mm650mm

    Socket wrench

    Drill holes and install expansion sleeves.

    1. The outputs of the TP48200A-H15A1 (TP48200A for short) can be customized. The picture is for reference only.

    TP48200A-H15A1TP48200A 2. The local cable colors prevail. The cable colors in the figure are for reference only.

    Battery temperature sensor

    Installing the Cabinet. /

    Cable outlet

    Power distribution unit (PDU)

    Site ground bar

    Installing a PGND Cable /

    PGND Cable

    25 mm 2 ( 0.04 in. 2 ) (recommended)

    25 mm 2

    Installing Batteries /

    + - + - + - + -

    Installing batteries, pay attention to the positive and negative pole of the battery. Then connecting copper bars or cables .

    The battery temperature sensor is installed on the side panel interior by default. If the storage batteries match the battery

    temperature sensor, installing the battery temperature sensor on the battery terminal.

    Installing the Battery Temperature Sensor /

    To battery terminal

    To the BTEMP port on the UIM TEM BAT

    Installing PSUs /

    The rated output current of each PSU is 50 A. The number of PSUs depends on actual capacity requirements for the TP48200A.

    PSU50A

    1 2 3 4 5

    Cable / Cable Diameter and Color /

    (s1) Signal cables to dry contacts, Boolean

    values, and sensor ports

    //

    Not provided /

    (s2) RS485, RS232 or Fast Ethernet (FE) cable

    RS485/RS232/ FE Not provided /

    (d1) DC Power cable to the primary load

    Not provided /

    (d2) DC Power cable to the secondary load

    Not provided /

    (d3) DC Power cable to storage batteries

    Cross-sectional area: 25 mm2 (0.04 in.2) Color: black cable and red cable

    25 mm2-

    (a1) AC input power cable

    Cross-sectional area: 25 mm2 ( 0.04 in.2 ) (recommended)

    Not provided

    25 mm2

    Installing Cables /

    100mm (3.94 in.)

    540mm(21.26 in.)

    423.5mm

    (16.67 in.)

    Ground busbar

    TP48200A-H15A1 V300R001

    TP48200A-H15A1 V300R001

    Quick Installation Guide

    Issue: 02

    Date: 2012-12-05

    02 2012-12-05

    NOTE /

    Cabinet Appearance /

    NOTE /

    Battery rack

    Installing the TP48200A /

    Fix the installation hole

    Spring washer / Flat washer /

    Socket wrench

    16mm (0.63 in.)

    52mm~60mm

    (2.05 in. ~2.36 in.)

    Bolt /

    Expansion sleeve

    M12 x 60 (4pcs)

    Before installation, switch all circuit breakers to the OFF position.

    OFF

    CAUTION /

    1. Before installing power cables for storage batteries , remove one copper bar or cable from each battery string.

    2. Do not bind the AC power cables, DC power cables, signal cables, and communications cable together.

    Connect cables in the following sequence: s1 s2 d1 d2 d3 a1 s1 s2 d1 d2 d3 a1

    CAUTION /

    (Optional) Installing signal cables to dry contacts, Boolean values, and sensor ports. / 1. Press the white contact plates slightly using a flat-head screwdriver. Then, insert the two wires on the other end of the

    signal cable into the corresponding ports, and pull out the screwdriver to fasten the dry contact signal cable.

    2. Connect the sensor cable to the corresponding ports on the monitoring user interface module. ( See the sensor pin

    definitions in the TP48200A-H15A1 User Manual.)

    PinTP48200A-H15A1

    All ports in this manual are protected by a security mechanism/ (Optional) Installing the RS232, RS485, or FE Cable / RS232RS485FE 1. When in-band monitoring is required , connect the COM_ 485/232 port on the SMU to the communications equipment

    over a cable with an RJ45 connector.

    RJ45COM_ 485/232 2. When out-of-band monitoring is required, connect the FE port on the SMU to the communications equipment over a

    cable with an RJ45 connector.

    RJ45FE

    Dry contact

    White

    Contact

    plate

    NOTE /

    Installation hole

    Front /

    Wall or platform edge

    Ground

    + - + - + - + -

    Space for PSU

  • s2

    ACDB

    a1

    s1,s2

    d1

    d2

    Sensor

    Element management

    system (EMS)

    Secondary load

    Primary load

    d1 d2

    Maintenance socket

    L

    d3

    N

    d3

    s1

    Battery circuit breakers

    Circuit breaker of the Socket

    a1

    RTN+

    -48V

    Port Type / Silkscreen / Description /

    Sensor ports /

    TEM_HUM Temperature and humidity sensor /

    WATER Water sensor /

    TEMP1 Connected to environment temperature sensor

    and used for fan speed adjustment

    TEMP2 Reserved /

    GATE Door status sensor /

    SMOKE Smoke sensor /

    BTEMP Battery temperature sensor /

    Boolean value input ports / DIN1 Boolean value input 1 / 1

    DIN2 Boolean value input 2 / 2

    DIN3 Boolean value input 3 / 3

    DIN4 Boolean value input 4 / 4

    DIN5 Boolean value input 5 / 5

    DIN6 Boolean value input 6 / 6

    Dry contact output ports /

    Default mode (Close: alarm; Open: normal) can

    be modified as required.

    ALM1 AC power failure alarm /

    ALM2 DC undervoltage alarm or DC overvoltage alarm

    ALM3 Rectifier faults alarm /

    ALM4 SPD failure alarm /

    ALM5 Fuse burn-out alarm /

    ALM6 Battery temperature alarms /

    ALM7 Door alarms /

    ALM8 TCU alarms /

    Communication Port / COM RS485/RS232

    Verifying the Installation /

    SN / Check Item /

    1

    The TP48200A is installed properly and the cables are connected properly. (Cables fastened by screws

    are not easily removable.)

    2 Cables are arranged neatly and bound properly by using cable ties.

    3 The storage battery is connected properly.

    4

    Check for short circuits between the live wire and the ground cable, between the live wire and the neutral

    wire, between the RTN+ and the 48 V busbar. Rectify short circuits before powering on the TP48200A. RTN+-48V

    Powering On and Commissioning the TP48200A /

    Troubleshooting /

    Trouble Symptoms

    Cause and Solution

    Communication fail

    1. Make sure the communication cable is connected successfully. 2. Make sure the communication parameters is set right, for example IP or host address. IP 3. Make sure the communication loop between the host and the SMU is normal. 4. After above 3 steps , the trouble still exist, plug the SMU out then plug in to restart the SMU. 3SMU 5. After above 4 steps , the trouble still exist, change a new one. 4SMU

    The SMU generator an alarm SMU

    Query the real time alarm information or refer to the User Manual.

    The PSU is not power on, the running indicator is off

    1. Make sure the AC input circuit breaker is in the ON position. on 2. Make sure the AC input voltage is in the range of the PSU working space. PSU 3. After above 2 steps, the trouble still exist, plug the PSU out then plug in to restart the PSU. 2PSU 4. After above 3 steps , the trouble still exist, change a new one. 3PSU

    518129 www.huawei.com

    HUAWEI TECHNOLOGIES CO., LTD. Huawei Industrial Base Bantian Longgang

    Shenzhen 518129

    Peoples Republic of China www.huawei.com

    Switch the AC input circuit breaker to the ON position, measure the voltage between L wiring and N wiring terminal .

    The voltage must range from 200 V to 240 V. The rated voltage is 220 V.

    ONLN200V~240V220V

    Switch the LLVD and BLVD branches to the ON positions , Measure whether the voltage between RTN+ and the 48 V check points. The voltage must range from 42 V to 58 V. The rated voltage is 53.5 V. Check whether the loads work

    normally. If the loads work abnormally, rectify the fault according to the relevant user Manual.

    ON42V~58V53.5V Switch the circuit breakers for the Maintenance socket, AC input, battery route, primary load, and secondary load as

    required.

    Check whether the EMS can receive the information from the power system. If not, check whether the IP address is set

    correctly .

    IP

    Observe the operation of the power system for 15 minutes. If no alarms are generated, and current/voltage parameters

    of the storage battery and loads are set properly, then re-install the cover of the distribution unit, lock the door to the

    cabinet, give the key of the cabinet door to the customer, and clean the site before leaving.

    15LCD

    d3

    Measure the voltage across the input ports of AC input circuit breakers. The voltage must range from 200 V to 240 V.

    The rated voltage is 220 V. If not, ask professionals to rectify the fault.

    200V~240V220V

    To avoid damaging storage batteries, connect mains to the TP48200A only after correctly setting the storage battery

    parameters on the SMU.

    CAUTION /

    Switch the AC input circuit breakers to the ON positions. Check whether the voltage between the RTN+ busbar and the

    -48 V copper bar are the same as the storage battery voltage and the voltage displayed on the monitoring unit. If not,

    ask professionals to rectify the fault.

    ON

    Setting parameters on the SMU. /

    Button / Description /

    or Allows you to view menu items and set the value of a menu item by pressing or .

    Returns to the previous menu without saving the settings of the current menu item.

    Enters the main menu from the standby screen, enters a submenu from the main menu, or saves the settings of a submenu item. Enter Enter Enter

    1. The preset username is admin and the preset password is 001. /admin001 2. After a menu is displayed, the standby screen is displayed and the LCD screen becomes dark if you do not press

    any button within 5 minutes.

    5LCD 3. You need to log in again if you do not press any button with 8 minutes. / 8

    Main Menu

    Second-Level Menu

    Third-Level Menu

    Default Value

    Settings

    Comm Para

    NetEco Main IP / NetEcoIP -

    NetEco Bak IP / NetEco IP -

    NetEco Port / NetEco 31220

    System Para

    LUI Language / LUI ENGLISH /

    Set Time Zone / GMT +0800

    Quick Setting

    Qty of Battery / - 1

    Rated Capacity / - 150Ah

    Set Date / - 2000-01-28

    Set Time / - -

    IP Address / IP - -

    Subnet Mask / - -

    Gateway / - -

    1. Set the NetEco Main IP, NetEco Bak IP, NetEco Port, LUI Language and Set Time Zone according to actual conditions.

    NetEcoIP NetEco IP NetEco LUI 2. Set the Qty of Battery, Rated Capacity, Set Date and Set Time according to actual conditions. (Always set Qty of Battery

    to 1 and set Rated Capacity to the total capacity of all battery strings.)

    (1) 3. Obtain the IP Address, Subnet Mask and Gateway from the EMS.

    IP

    Reinstall the removed copper bar or cable of the storage battery. /

    Switch the storage battery circuit breakers in the PDU to the ON positions. / ON

    Switch the AC input circuit breakers to the OFF positions. / OFF

    d3

    4. Set battery fuse break alarm "Enable/Disable" status /

    Main Menu

    Second-Level Menu

    Third-Level Menu

    Fourth-Level Menu

    Set Value

    Settings

    Alarm Setting

    Site Summary

    Battery Fuse 1 Break/1 Enable battery

    fuse blown alarms for the branches with batteries, and disable battery fuse blown alarms for the branches without batteries.

    /

    Battery Fuse 2 Break/2

    Battery Fuse 3 Break/3

    Battery Fuse 4 Break/4

    Battery Fuse 5 Break/5

    Battery Fuse 6 Break/6

    Battery Fuse 7 Break/7

    Battery Fuse 8 Break/8

    Battery Fuse 9 Break/9

    Battery Fuse10 Break/10

    Battery Fuse 11 Break/11

    Battery Fuse 12 Break/12