I / 7.- / 17 INITIAL ENVIRONMENT AL EXAMINATION Satpara Development Project (SDP) D C/V : (PJ\-m -/ '-6 -o · a:. - - a>o td3 Amendment-3 Project/Activity Data: Activity/Project Title: Satpara Dam Construction Completion I Solicitation #:N. A. Contract/Award Number (if known): AID-391-A-12-00002 Geographic Location: Pakistan; 391 Originating Bureau/Office: USAID Pakistan, Office of Economic Growth and Agriculture <EGA). DCN and date of Original document: Asia 11-11, approved on Oct. 27, 201 O; Supplemental IEE: DY es DNo DCN and ECD link(s) of Amendment(s): Amendment: 181Yes DNo Amendment-I; OAPA-l 1-Jun-PAK-0033, approved Programmatic IEE: DY es DNo on July 15, 2011 and Amendment-2; OAPA-14- NOV-PAK-0005, approved on Nov 05, 2013 Amendment No.: 3 Funding Amount: $47,200,000 Life of Project Amount: $47,2000,000 Implementation Start/End: FY: 2010 to March 31, 2019 Prepared By: Ayaz Muhammad Date Prepared: November 29, 2017 Expiration Date (if any): March 31, 2019 Reporting due dates (if any): N.A. Environmental Media and/or Human Health Potentially Impacted (check all that apply): Non e D Air D Water 181 Land 181 Biodiversity D Human Healthl8l OtherD Recommended Threshold Determination: l8l Negative Determination 181 with conditions D Deferral l8l Categorical Exclusion D Exemption D Positive Determination D USG Domestic NEPA action Climate Change: l8l GCC/ Adaption 0 GCC/Mitigation l8l Climate Change Vulnerability Analysis Adaptation/Mitigation Measures: Influence of extreme weather conditions and adaptation will be considered in re-designing of damaged infrastructure components. Page 1of4 IEE amendment no.3: Satpara Development Project (SDP)

Upload: lamnhi

Post on 27-Jul-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ~T~~~p~ I PAKIST~~~ - Environmental Compliance … · Originating Bureau/Office: USAID Pakistan, Office of Economic Growth and Agriculture

~T~~~p~ I PAKIST~~~ / 7.-/ ~/2-o 17

INITIAL ENVIRONMENT AL EXAMINATION Satpara Development Project (SDP) D C/V : (PJ\-m -/ '-6 -o·a:.- (?11~ - a>o td3

Amendment-3

Project/Activity Data:

Activity/Project Title: Satpara Dam Construction Completion I Solicitation #:N.A.

Contract/Award Number (if known): AID-391-A-12-00002

Geographic Location: Pakistan; 391 Originating Bureau/Office: USAID Pakistan, Office of Economic Growth and Agriculture <EGA).

DCN and date of Original document: Asia 11-11, approved on Oct. 27, 201 O;

Supplemental IEE: DY es DNo DCN and ECD link(s) of Amendment(s): Amendment: 181Yes DNo Amendment-I; OAPA-l 1-Jun-PAK-0033, approved Programmatic IEE: DY es DNo on July 15, 2011 and Amendment-2; OAPA-14-

NOV-PAK-0005, approved on Nov 05, 2013 Amendment No.: 3

Funding Amount: $4 7 ,200,000 Life of Project Amount: $47,2000,000

Implementation Start/End: FY: 2010 to March 31, 2019

Prepared By: Ayaz Muhammad Date Prepared: November 29, 2017

Expiration Date (if any): March 31, 2019 Reporting due dates (if any): N.A. Environmental Media and/or Human Health Potentially Impacted (check all that apply): None D Air D Water 181 Land 181 Biodiversity D Human Healthl8l OtherD Recommended Threshold Determination: l8l Negative Determination 181 with conditions D Deferral l8l Categorical Exclusion D Exemption D Positive Determination D USG Domestic NEPA action

Climate Change: l8l GCC/ Adaption 0 GCC/Mitigation l8l Climate Change Vulnerability Analysis

Adaptation/Mitigation Measures: Influence of extreme weather conditions and adaptation will be considered in re-designing of damaged infrastructure components.

Page 1of4 IEE amendment no.3: Satpara Development Project (SDP)

Page 2: ~T~~~p~ I PAKIST~~~ - Environmental Compliance … · Originating Bureau/Office: USAID Pakistan, Office of Economic Growth and Agriculture

·. 1.0 Background and Activity/Program Description

1.1 Purpose and Scope of IEE

The purpose of this Initial Environmental Examination (IEE) Amendment No .. 3 of"Satpara Development Project" (SDP) is to:

1. Extend the time of IEE from December 31, 2017 to March 31, 2019 2. Add $1,200,000 to the Life of Project (LOP) and increase the LOP from $46,0001000 to

$47,200,000

The scope of work and the nature of all activities established under the .original IEE and Amendments No .. 1. and 2, as well as, all conditions, limitations and stipulation for revisions approved by the BEO/OAP A in the original IEE and the referenced IEE amendments remain tl:te same and in force.

1.2 Background:

The Satpara Development Project (SDP) recently completed its activities stipulated under the scope of work. However, in August 2017 heavy floods, the worst in 60 years, damaged the inigation system. The flood assessment report is·attached. This natural disaster is not covered by the Contractor's .defect lia,bility. USAID amendment of SDP from i2/31/2017 until 3/31/2019 includes fixing the irrigation system, as the damage undermitles our investment, and it could cause reputational hann to the USG/USA1D. The SDP exten~ion will also construct greenhouses and develop agriculttu·e and livestock policies with Gilgit-Baltistan Province. In line with the project extension, the IEE also needs to be. extended from 12/31/2017 until 3/31/2019.

1.3 Lesson Learned:

In accordance with the approved IEE, the SDP enyironmental determi.nation isa Negative Determination with Conditions. Accordingly, the project prepared the Envirorunental Documentation Form and.an Environmental Mitigation and Monitoring Plan. (EMMP), to ensure that USAID and Gilgit-Baltistan Environmental Protection Agency (GB-EPA) followed the required environmental compliance. To ensure compliance, SDP has a dedicated Team to undei1alrn on-site monitoring and report quarterly to USAID. SDP trains the contractors in environmental compliance, monitoring, and reporting. SDP also trained community members in environmental compliance

The lesson learned from this flood is that tl1e design ofthjs irrigation system did not adequately plan for extreme weather variability and conditions. However, without.fwther assessment, it is unclear if an irrigation system could have been built to withstand this type of infrequent natural disaster within the project budget.

Page2of4 IEE amendment no.3: Satpara Development Project (SDP)

Page 3: ~T~~~p~ I PAKIST~~~ - Environmental Compliance … · Originating Bureau/Office: USAID Pakistan, Office of Economic Growth and Agriculture

2.0 Additional Conditions

Prior to the rehabilitation of the damaged irrigation system, the implementing partner (IP) will:

1) Prepare the scope of work, ·including an¥ warranted re-design, which shall take into account projected extreme weather conditions in the project's area of influence;

2) Adapt the existing EMMP to the scope and nature of proposed activities, 3) Submit these documents to USAID for COR and MEO/CIL review and approval prior to the

start of actual physical works. 4) Subn1it timely IP reports anq documentation, including photographic, providing evidence of

enyironmentally and socially compliant execution of the scope of work during implementation.

USAID will review and approve the above-referred documents and .ensure timely and diligent monitoring of the proposed activities. After the completiop of the works, the irrigation system shall be transferred to the ownership of the identified public entity in the province and ensure that this entity is fully capable of operating and maintaining the said irrigation system in accordance wi"th its specifications and environmental mitigation and monitoring measures.

3.0 Revisions

In accordance with 22 CFR 2.16.3( <!)(9) if a project is revised or new information becomes available, including during preparation of an EDF, which indicates that a proposed action might be "major" and its effects "significant." The Determination will be reviewed and revised by the originator(s) of the program and projects and submitted through the MEO to the Bureau Environmental Officers, OAPA, for approval. Tfw.ari:anted, an environmental assessment (EA) will be launched to prepare scoping statement and EA report. The scoping and EA proces·s, if determined necessary during scoping, will follow and comply·with 22 CFR 216.3(a)(4). It is the responsibility of the CORJ AOR to inform the· MEO and BEO-OAP A, in a timely manner, of any changes in the scope and nature of approved activities. These changes may warrant the revision of the approved tlu·eshold decisions.

Page 3 of 4 IEE amendment )10.3: Satpara Development Project (SDP)

Page 4: ~T~~~p~ I PAKIST~~~ - Environmental Compliance … · Originating Bureau/Office: USAID Pakistan, Office of Economic Growth and Agriculture

CLEARANCES AND APPROVAL OF RECOMMENDED ENVIRONMENTAL ACTIONS:

IEE amendment·no. 3 for Satpara Development Project (SDP)

CLEARANCES: Deputy Director Agriculture, I Office of Economic Growth and

I Agriculture (EGA): Kenneth M. Dunn Director, Office of Economic Growth and Agriculture (EGA): Mary M. Hobbs

Date

11 lso let: I aate

, Mission Environmental Officer , and Climate Integration Lead: · AsimAziz Mi \ l _''..__(i_" /_11_

t Date 'i Acting Director, Program Management (OPM): I Kevin McGrath

Regional Environmental Advisor I SCA&OAPA: Andrei Barannik

Deputy Mission Director: Julie Chen

APPROVAL: Mission Director: Jerry Bisson

Bureau Environmental Officer/OAP A: Christopher Payne

Cb1lu.l vro.. ~ ~

~~

~ rs , 5;~

/htf?7.?Le Attachment-I: Initial flood damages assessment report CC: 1). SDP Project files 2). Mission IEE Data base 3).RLO 4). OAA.

IEE amendment 110.3: Satpara Development Project (SDP)

' Date ·-

ll(}, 0 /_t 7 Date

( L} 5 ( l 1-Date

1 i, f r / 2,,,11'?

Date I

I l 2-lf /-zc;r1 I Date

Page4of4

Page 5: ~T~~~p~ I PAKIST~~~ - Environmental Compliance … · Originating Bureau/Office: USAID Pakistan, Office of Economic Growth and Agriculture

11/30/2017 USAID Mall - MOST URGENT- Fwd: SOP IEE Amendment-3

MOST URGENT- Fwd: SDP I.EE Amendment-3

Andrei Bara.nnik <[email protected]> To: Aslm Aziz <[email protected]> Cc: "Payne, Christopher (OAPA/TS)" <[email protected]>

Asim Aziz <aaziz@usaid .. gov>

Thu, Nov 30, 2017 at 4:53 AM

Dear Asim - reviewed and clear - pis have the Amnd duly signed in the Mission and send it to Chris Payne, BEO/OAPA who'll be in Dhaka at 22 CFR 216 traning for Bangladesh Mission. W /r, Andrei ro~1olod le:~t h;dden]

Andrei D. Barannik Regional Envh'onmental Adviser for Central and South Asi.a, and for Office of Afghanistan and Pakistan Affairs 1300 Pennsylvania Ave., NW, 5.06-29 Washington, D .C., 20523 Land line: 1.202.712.4161 Cell phone: 1.571 .216.7243

E-mail: [email protected]

USAID Seari;hable IEE D;itabase & U~AID GEMS Projecl

i!,A Please consider the environment before printing this email

THIS E,,M/\li ... IS UNCLt-\SS!FlED ;\S DEFINED BY E.O . ·l;~H58

titlps://mail.google.com/mall/u/O/?ui=2&ik=915c0Ba037&jsver=CSB7NgUoRi<4.en.&view=pt&msg=1600a33baOBeaa70&search=inbox&siml=1600a33b... 1/1

Page 6: ~T~~~p~ I PAKIST~~~ - Environmental Compliance … · Originating Bureau/Office: USAID Pakistan, Office of Economic Growth and Agriculture

Satpara Development Project {SOP} - Initial Flood Damages Assessment Report

Attachment-1

Satpara Development Project (SOP)

INITIAL FLOOD DAMAGES ASSESSMENT REPORT

Seasonal floods and landslides have become a routine phenomenon in Baltistan region for the last 5-7

years. This could possibly be an effect of global climate change process or a local manifestation of a

climate change process that is triggering floods, landslides and avalanches. Huge flash floods and

landslides possibly cause by Glacial lake outburst (GLOF) or the cloud burst have recently hit villages in

UC hussainabad, UC Shigari Khurd and Shigari Kalan in Skardu district.

Recent flood in Skardu has damaged several houses, roads, main drinking water supply scheme, three main irrigation channels and 15 tertiary channels. As far as tertiary channels are concerned, major portion of the Pre-cast parabolic Irrigation channels situated within the village (approximately 3300 Feet) is damaged due to the flash flood and the Left Bank Canal is also suffered as 3500 Feet portion of

this important Irrigation Channel is filled with mud, debris and rocks.

Left bank canal filled with mud and rubble Standing crops destroyed by mud and debris

These floods have also damaged the newly built diversion structures at Hussainabad, Burgee and Thayure under Satpara development project and destroyed initial part of the supply channel the rest of

the part of main channel and the tertiary channels emerging from these channels are filled with mud and debris. There is an urgent need to rehabilitate the Irrigation systems so that the standing crops and

trees could be saved.

Hussainabad Nallah: The weir structure and some parts of PCC lined channel at Hussainabad Nallah has

completely swept away from the very starting points, which needs to be reconstructed.

S.No. Description Nature of Damage 1 Weir floor Mostly eroded and damaged

2 Wing walls Completely damaged and washed away 3 Grating oftyroleane Completely damaged

4 Connecting channel Completely damaged and washed away

5 Upstream and downstream apron of weir Completely damaged and washed away

Page 1 of7

Page 7: ~T~~~p~ I PAKIST~~~ - Environmental Compliance … · Originating Bureau/Office: USAID Pakistan, Office of Economic Growth and Agriculture

Satpara Development Project {SOP} - Initial Flood Damages Assessment Report

6 Protective structures of weir Completely damaged and washed away

7 Retaining wall of weir and channel Completely damaged and washed away

8 Main channel Filled with debris & 50 meter washed away

9 Channel bed & plaster Due to rolling of stones damaged at some portions

Estimates of Initial Damages and Rehabilitation Work

S.No. Description 1 Initial Damages Assessment

Before Flood After Flood

Burgaly Nallah: The weir at Burgaiy Nallah has w ithstood as relatively small boulders were flowing with

water which couldn't destroy the structure but there were minor damages which needs to be repaired.

S.No. Description Nature of Damage

1 Protective Structure Scoured along the Nala

Page2 of7

Page 8: ~T~~~p~ I PAKIST~~~ - Environmental Compliance … · Originating Bureau/Office: USAID Pakistan, Office of Economic Growth and Agriculture

Satpara Development Project {SOP} - Initial Flood Damages Assessment Report

2 Nala Cut off wall Damaged

3 Flushing Channel Scoured at D/S bottom 4 Structural Back fill of downstream apron Eroded and washed away

5 Floor of weir Damaged and filled with debris

6 Grating of Tyroleane Damaged and filled with debris

7 Connecting channel Filled with debris

8 Retaining wall along main channel Scoured at bottom at some sections

9 Channel Bed and Plaster Damaged due to rolling stones at some sections

Before Flood After Flood

Estimates of Initial Damages and Rehabilitation Work

S.No. Description 1 Initial Damages Assessment

Thayoure Nallah: The weir at Thayoure Nallah has been partially damaged owing to the extreme

severity of the flooding, which needs to be repaired.

S.No. Description Nature of Damage

1 Weir Floor Completely Damaged 2 Grating ofTyroleane Completely Damaged

3 Downstream apron of Weir Fill & Structural Backfill beneath and surrounding of structure eroded and washed away

4 Structural backfill of wing walls Completed eroded

Page 3of7

Page 9: ~T~~~p~ I PAKIST~~~ - Environmental Compliance … · Originating Bureau/Office: USAID Pakistan, Office of Economic Growth and Agriculture

Satpara Development Project (SOP} - Initial Flood Damages Assessment Report

5 Connecting channel Damaged and filled with debris 6 Floor of upstream apron Damaged 7 Backfill along the channel head portion washed away 8 Baffle blocks, bed and plaster of channel Damaged at head portion

Estimates of Initial Damages and Rehabilitation Work

S.No. Description

1 Initial Damages Assessment

Before Flood After Flood

Page 4 of7

Page 10: ~T~~~p~ I PAKIST~~~ - Environmental Compliance … · Originating Bureau/Office: USAID Pakistan, Office of Economic Growth and Agriculture

Satpara Development Project (SOP) - Initial Flood Damages Assessment Report

List.of damaged minors, tertia1ies channels and Land Leveling & Terracing

S.N Name of Scheme Location and RO Union Council Nature of Damages

o.

1 Bowamir (Tertiary (0+340/R),(O+ 18 Shigiri Kalan (Chani Gayul Filled with mud and debris Channel) 3/L),DR-1 area) (SOm)

2 Gamba Sooq Bala

(0+183/L),DR-1 Shigiri Kalan (Chani Gayul

Channel damaged (30111) (Tertiary Channel) area)

3 Brenza Asgaria (Tertiary

12+071/R ,lBC Shiglrf Kalan (Thayor Filled with mud and debris

Channel) Nalla area) (200m)

4 Sarfa Khor Qazi Malakhor i+638/TF M~8 Shigiri Kalan (Thayor Filled with mud and debris {Tertiary Channel) LBC Nalla area) (100m)

5 Arif abad Gamaba

13+670/R,LBC Shigiri Kalan (Thayor & Filled with mud and debris

(Tertiary Channel) Chunda Nalla area) (70m)

6 Braskha Ranga (Tertiary 2+700/L ,Ranga Shigiri Kalan (Thayor& Filled with mud and debris Channel) Disty chunda N~lla area) (300m)

7 Balti Grong {Tertiary· 0+329/L ,Ranga Sh.lgiri Kalan (Thayor & Filled w ith mud and debris Channel) Minor Chunda Nalla area) (400m)

8 Braskha Thang Ranga

2+700/TF ,Ranga Shigiri Kalan (Thayor & Filled with mud and debris

(Tertiary Channel) Chunda Nalla area) (150m)

9 ThakhorpiRanga 3+318/L ,Ranga Shigiri Kalan (Thayor & Filled with mud and debris (Tertiary Channel) Disty Chunda Nalla area) (100m)

10 BairiKhor Gamba Grong 3+ 726/TL, Ranga Shigiri Kalan (Thayor& Filled with mud and debris Ranga (Tertiary Channel) Disty Chunda Neilla area) (120m)

Shlgiri Kalan (Thayor & Filled wi.th mud and debris

11 Ranga Distry NA Chunda Nalla area)

(300m), channel is damag~d in some sections

Shigiri Kalan (Thayor & 'Filled with mud a·nd debris

12 Ranga Minor NA {300m), channel is damaged in Chunda Nalla area)

some sections >------

Shigirl Kalan (Thayor & Filled with mud and debris

13 Minors NA (250m), channel is damaged in Chunda Nalla area)

some sections

14 Qaimabad (I) (Tertiary 8+684R MAIN Hussain abad Head section damaged and Channel) RBC (1-jussainadab Nalla area) washed away

15 Qaimabad (II) (Tertiary 0+471 TL (8+800 Hussain abad

Completely washed out Channel) RBC) (Hussainadab Nalla area)

16 Dehli Muhallah Chani

7+525/R,LBC Shigari Khurd {Chani Most of the channel is covered

Giyual (Tertiary Channel) Gayul nalla area) with mud and debris, most n __ .,. _£..,.

""0- J VI I

Page 11: ~T~~~p~ I PAKIST~~~ - Environmental Compliance … · Originating Bureau/Office: USAID Pakistan, Office of Economic Growth and Agriculture

Satpara Development Project {SOP}- Initial Flood Damages Assessment Report

probably, major portion of channel is washed out.

Most of the channel is covered

17 Braqchan Giayul

6+581/R LBC Shigari Khurd {Chani with mud and debris, most

(Tertiary Channel) Gayul nalla area) probably, major portion of channel is washed out.

18 Skillday Astana Bala 1+450TF, Minor- Shigari Khurd {Burgay Most of the channel filled with (Tertiary Channel) 2, LBC Nalla area) mud and debris.

Muhammad Hassan S/O Land Leveling Shigari Khurd {Chani

19 M Ali (Land levelling and Terracing Gayul nalla area)

Completely washed out scheme) Scheme

Page 6 of7

Page 12: ~T~~~p~ I PAKIST~~~ - Environmental Compliance … · Originating Bureau/Office: USAID Pakistan, Office of Economic Growth and Agriculture

Satpara Development Project (SDP}- Initial Flood Damages Assessment Report

Dehli Muhallah Before flood

Page 7 of7