toxicology update - implementation of revised impacts review procedures mike coldiron, p.e. air...

28
Toxicology Update - Implementation of Revised Impacts Review Procedures Mike Coldiron, P.E. Air Permits Division Texas Commission on Environmental Quality Advanced Air Permitting Seminar 2015

Upload: bruce-walton

Post on 18-Jan-2016

229 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Toxicology Update - Implementation of Revised Impacts Review Procedures Mike Coldiron, P.E. Air Permits Division Texas Commission on Environmental Quality

Toxicology Update -Implementation of

Revised Impacts Review Procedures

Mike Coldiron, P.E.Air Permits Division

Texas Commission on Environmental QualityAdvanced Air Permitting Seminar 2015

Page 2: Toxicology Update - Implementation of Revised Impacts Review Procedures Mike Coldiron, P.E. Air Permits Division Texas Commission on Environmental Quality

Revisions to Review

Procedures

Revisions toReview

Procedures

o Procedural changes to impacts review were designed to reduce processing times

o Fewer projects will need review by the Toxicology Division (TD)

o Fewer ESLs will need to be derived

Page 3: Toxicology Update - Implementation of Revised Impacts Review Procedures Mike Coldiron, P.E. Air Permits Division Texas Commission on Environmental Quality

Revisions to Review

Procedures

Revisions toReview

Procedures

o Case-by-case de minimis review will no longer require TD review

o For projects that meet the Tier II TD requirements, no TD review is needed

o Fewer particulate species will need a TD review

Page 4: Toxicology Update - Implementation of Revised Impacts Review Procedures Mike Coldiron, P.E. Air Permits Division Texas Commission on Environmental Quality

Revisions to Review

Procedures

Revisions toReview

Procedures

De Minimi

s

Toxicological

Tiered Review

s

Particulate

Matter

Page 5: Toxicology Update - Implementation of Revised Impacts Review Procedures Mike Coldiron, P.E. Air Permits Division Texas Commission on Environmental Quality

De Minimis Review

Procedures

Revisions to Review

Procedures

De Minimis

Page 6: Toxicology Update - Implementation of Revised Impacts Review Procedures Mike Coldiron, P.E. Air Permits Division Texas Commission on Environmental Quality

Revisions to Review

Procedures

De Minimi

s

De Minimis Review

ProceduresCase-by-case reviews no longer require TD approval and may be completed by the permit reviewer if:o Modeled emissions

rates are the rates without the use of emission controls;

o Impacts are evaluated using SCREEN3 only;

Page 7: Toxicology Update - Implementation of Revised Impacts Review Procedures Mike Coldiron, P.E. Air Permits Division Texas Commission on Environmental Quality

Revisions to Review

Procedures

De Minimi

s

De Minimis Review

Procedures

o The maximum off-property impacts are less than 10% of ESL for individual species; and

o The impacts for criteria pollutants are less than the SIL for all averaging periods

Page 8: Toxicology Update - Implementation of Revised Impacts Review Procedures Mike Coldiron, P.E. Air Permits Division Texas Commission on Environmental Quality

Current Toxicological Tiered Permit

Reviews

Revisions to Review

Procedures

Toxicological Tiered

Reviews

Page 9: Toxicology Update - Implementation of Revised Impacts Review Procedures Mike Coldiron, P.E. Air Permits Division Texas Commission on Environmental Quality

Current Toxicological Tiered Permit Reviews

Toxicology Review Tier

Review Criteria Responsibility for Review

Tier I All impacts are below ESLs APD

Tier IIImpacts on non-industrial receptors < ESL,Impacts on industrial receptors < 2X ESL

Toxicology

Tier III Case-by-case review Toxicology

Page 10: Toxicology Update - Implementation of Revised Impacts Review Procedures Mike Coldiron, P.E. Air Permits Division Texas Commission on Environmental Quality

Revised Toxicological Reviews Tier II

Toxicology Review Tier

Review Criteria Responsibility for Review

Tier I All impacts are below ESLs APD

Tier IIImpacts on non-industrial receptors < ESL,Impacts on industrial receptors < 2X ESL

APD

Tier III Case-by-case review Toxicology

Page 11: Toxicology Update - Implementation of Revised Impacts Review Procedures Mike Coldiron, P.E. Air Permits Division Texas Commission on Environmental Quality

Current Particulate Matter Review Procedures

Revisions to Review

Procedures

Particulate Matter

Page 12: Toxicology Update - Implementation of Revised Impacts Review Procedures Mike Coldiron, P.E. Air Permits Division Texas Commission on Environmental Quality

Revisions to Review

Procedures

Particulate

Matter

Current Particulate Matter Review Procedures

o Over 4,000 species on the ESL List, but many more species in the world

o TD receives frequent requests for ESLs for PM species

o An ESL must be developed for each species not on the current ESL List

Page 13: Toxicology Update - Implementation of Revised Impacts Review Procedures Mike Coldiron, P.E. Air Permits Division Texas Commission on Environmental Quality

Revisions to Review

Procedures

Particulate

Matter

Current Particulate Matter Review Procedures

o ESL development is time consuming, and applicants can wait two weeks or more for a response

o Many species are of limited concern

o Species of concern include metals and certain silica compounds

Page 14: Toxicology Update - Implementation of Revised Impacts Review Procedures Mike Coldiron, P.E. Air Permits Division Texas Commission on Environmental Quality

Revisions to Review

Procedures

Particulate

Matter

Revised Particulate Matter Review Procedures

o For species of limited concern, no additional review is required, as long as compliance with the PM2.5 NAAQS is demonstrated

o For species of concern, use the current review procedures

Page 15: Toxicology Update - Implementation of Revised Impacts Review Procedures Mike Coldiron, P.E. Air Permits Division Texas Commission on Environmental Quality

Revisions to Review

Procedures

Particulate

Matter

Particulate Matter Species of

Limited Concern

o Changes to PM species procedures represent a new impacts analysis approach

Page 16: Toxicology Update - Implementation of Revised Impacts Review Procedures Mike Coldiron, P.E. Air Permits Division Texas Commission on Environmental Quality

Revisions to Review

Procedures

Particulate

Matter

Justification for Revised Procedures

o New approach still protective of public health

o Comparison of 24-hour NAAQS standard to equivalent 1-hour concentration

Page 17: Toxicology Update - Implementation of Revised Impacts Review Procedures Mike Coldiron, P.E. Air Permits Division Texas Commission on Environmental Quality

Justification for Revised Procedures

Air Contaminant

Averaging Period

NAAQS (µg/m3)

1-hr to 24-hr Conversion

Factor

Equivalent 1-hr Concentration

(µg/m3)

PM2.5 24-hr 35 0.40 87.5

Page 18: Toxicology Update - Implementation of Revised Impacts Review Procedures Mike Coldiron, P.E. Air Permits Division Texas Commission on Environmental Quality

Justification for Revised Procedures

Air Contaminant

Averaging Period

Surrounding Land Use

Example Background

Concentration (µg/m3)

1-hr to 24-hr Conversion

Factor

Equivalent 1-hr

Concentration (µg/m3)

PM2.5 24-hr Industrial 25 0.40 62.5

PM2.5 24-hr Rural 18 0.40 45.0

Page 19: Toxicology Update - Implementation of Revised Impacts Review Procedures Mike Coldiron, P.E. Air Permits Division Texas Commission on Environmental Quality

Justification for Revised Procedures

Air Contaminant

Averaging Period

Equivalent 1-hr Concentration

(µg/m3)

Surrounding Land Use

Example Background

Concentration (µg/m3)

Equivalent 1-hr Allowable Total

Site Concentration

(µg/m3)

PM2.5 1-hr 87.5 Industrial 62.5 25.0

PM2.5 1-hr 87.5 Rural 45.0 42.5

Page 20: Toxicology Update - Implementation of Revised Impacts Review Procedures Mike Coldiron, P.E. Air Permits Division Texas Commission on Environmental Quality

Revisions to Review

Procedures

Particulate

Matter

Implementation of Revised PM

Review Procedures

o Identification of all species and species emission rate calculations are still required

o For species of limited concern, no further species-specific analysis is required

o An appropriate PM2.5 NAAQS analysis is required

Page 21: Toxicology Update - Implementation of Revised Impacts Review Procedures Mike Coldiron, P.E. Air Permits Division Texas Commission on Environmental Quality

Revisions to Review

Procedures

Particulate

Matter

Implementation of Revised PM

Review Procedures

o For all other species, the impacts analysis remains unchanged

o Even if the analysis is completed using the MERA flowchart, modeling may still be required to support the chemical flexibility condition

Page 22: Toxicology Update - Implementation of Revised Impacts Review Procedures Mike Coldiron, P.E. Air Permits Division Texas Commission on Environmental Quality

Permit Condition Revisions

Permit Condition Revisions

o Current chemical flexibility special condition requires an ESL for each species

o The special condition has been revised to accommodate the revised impacts analysis

o No exceedance of the PM2.5 NAAQS is allowed

Page 23: Toxicology Update - Implementation of Revised Impacts Review Procedures Mike Coldiron, P.E. Air Permits Division Texas Commission on Environmental Quality

Revised Procedure Exclusions

Revised Procedure Exclusions

o Contested case hearingso Public comments on

exposure to air contaminants

o Unsatisfactory compliance history rating

o Emissions of an APWL species in an APWL area

Page 24: Toxicology Update - Implementation of Revised Impacts Review Procedures Mike Coldiron, P.E. Air Permits Division Texas Commission on Environmental Quality

In Review

Summary

o Case-by-case de minimis review will no longer require TD review

o For projects that meet the Tier II TD requirements, no TD review is needed

Page 25: Toxicology Update - Implementation of Revised Impacts Review Procedures Mike Coldiron, P.E. Air Permits Division Texas Commission on Environmental Quality

In Review

Summary

o Fewer particulate species will need a TD review, and a PM2.5 NAAQS analysis will serve as a surrogate for these species

o The revised procedures are not allowed in certain cases

Page 27: Toxicology Update - Implementation of Revised Impacts Review Procedures Mike Coldiron, P.E. Air Permits Division Texas Commission on Environmental Quality

Contact Information

Phone Numbers

APIRT: (512) 239-3075

APD: (512) 239-1240 or

(512) 239-1250

Page 28: Toxicology Update - Implementation of Revised Impacts Review Procedures Mike Coldiron, P.E. Air Permits Division Texas Commission on Environmental Quality

Contact Information

Mike Coldiron Contact Information

Mike Coldiron, P.E.

(512) 239-5027

[email protected]