  • 7/30/2019 Tower Manufacturing Process

    1/47

    Toolfab Engineering Industries (P) Ltd

    (Heavy Engineering Fabrication)

  • 7/30/2019 Tower Manufacturing Process

    2/47

    Heavy Engineering Fabrication

  • 7/30/2019 Tower Manufacturing Process

    3/47

    Heavy Engineering Fabrication

  • 7/30/2019 Tower Manufacturing Process

    4/47

    Heavy Engineering Fabrication

  • 7/30/2019 Tower Manufacturing Process

    5/47

    Heavy Engineering Fabrication

    Material Unloading Material Stacking Handling to CNC Cutting Station Plate Cutting

    Edge Preparation Dimensional Inspection After E.P. Shell Rolling L-Seam Welding L-Seam Welding Inspection L-Seam BG L-Seam BG Welding L-Seam BG Welding Inspection Shell Rerolling Handling of Shells Shell to Shell Cir-Seam Fitup Cir-Seam Fitup Inspection Cir-Seam Welding Cir-Seam BG

    Cir-Seam BG Inspection Cir Seam BG Welding

    Flange to Section Fitup

    Flange to Section Fitup Inspection

    FCS Welding

    FCS BG

    FCS BG Inspection FCS BG Welding

    FCS BG Welding Inspection

    NDT

    Easy Laser Inspection Internal Fittings

    Dimensional Inspection

    Blasting

    Blasting Inspection

    Painting

    Painting Inspection

    Internals / Electricals Assembly

    Packing

    Handling of finished product

    Dispatch of Finished Goods

  • 7/30/2019 Tower Manufacturing Process

    6/47

    Heavy Engineering Fabrication

    Material Unloading with thehelp of Mobile Cranes

    Raw material inspection /reception control Visual,

    Verification of material with MillTC

  • 7/30/2019 Tower Manufacturing Process

    7/47

    Heavy Engineering Fabrication

    Plate Material Stocking

  • 7/30/2019 Tower Manufacturing Process

    8/47

    Heavy Engineering Fabrication

    Material Stocking of Internal Items & Paint Materials

  • 7/30/2019 Tower Manufacturing Process

    9/47

    Heavy Engineering Fabrication

    Loading to CNC Profile Cutting Machine

  • 7/30/2019 Tower Manufacturing Process

    10/47

    Heavy Engineering Fabrication

    Plate Cutting at Profile Cutting Machine.

    MESSER 4Mtr/30Mtr Bay one 20Mtr x 80Mtr

  • 7/30/2019 Tower Manufacturing Process

    11/47

    Heavy Engineering Fabrication

    Beveling & Smoothening by Grinding

  • 7/30/2019 Tower Manufacturing Process

    12/47

    Heavy Engineering Fabrication

    Plate Rolling in Three Roll Plate Bending Machine 2.5 Mtr Width & 25mm /

    40mm Thickness - Himalaya

  • 7/30/2019 Tower Manufacturing Process

    13/47

    Heavy Engineering Fabrication

    Shell Profile Checking using Template

  • 7/30/2019 Tower Manufacturing Process

    14/47

    Heavy Engineering Fabrication

    Maintaining required Circumference & Shell Height

  • 7/30/2019 Tower Manufacturing Process

    15/47

    Heavy Engineering Fabrication

    Maintaining required Circumference & Shell Height by Checking the LS Fit up

    Shells

  • 7/30/2019 Tower Manufacturing Process

    16/47

    Heavy Engineering Fabrication

    Back Gouging By Grinding

  • 7/30/2019 Tower Manufacturing Process

    17/47

    Heavy Engineering Fabrication

    Back Gouging Area DP Test Check

  • 7/30/2019 Tower Manufacturing Process

    18/47

    Heavy Engineering Fabrication

    Back Gouging Welding- SAW COLOUMN BOOM

  • 7/30/2019 Tower Manufacturing Process

    19/47

    Heavy Engineering Fabrication

    Rerolling

  • 7/30/2019 Tower Manufacturing Process

    20/47

    Heavy Engineering Fabrication

    CS Fit up

    Fit up on Roller Bed using Hydraulic Jack

  • 7/30/2019 Tower Manufacturing Process

    21/47

    Heavy Engineering Fabrication

    End Ovality arresting, Straightness, Mismatch & Length Checking

  • 7/30/2019 Tower Manufacturing Process

    22/47

    Heavy Engineering Fabrication

    CS Welding

    SAW Process with Rotator Bed Using Column Boom (5Mtr X 5Mtr)

  • 7/30/2019 Tower Manufacturing Process

    23/47

    Heavy Engineering Fabrication

    During CS BG Welding Proper Current Parameters are Maintained using Traly

    SAW Machine

  • 7/30/2019 Tower Manufacturing Process

    24/47

    Heavy Engineering Fabrication

    During Flange with Shell Fit up, Maintaining Face out & Plumb out, Verticality

    as well as Total Length of the Section.

  • 7/30/2019 Tower Manufacturing Process

    25/47

    Heavy Engineering Fabrication

    Using SAW COLOUMN BOOM

  • 7/30/2019 Tower Manufacturing Process

    26/47

    Heavy Engineering Fabrication

    Flange with Shell Welded area Back Gouge Grinding

    H E i i F b i ti

  • 7/30/2019 Tower Manufacturing Process

    27/47

    Heavy Engineering Fabrication

    Flange Back Gouging Area DP Test Checking

    H E i i F b i ti

  • 7/30/2019 Tower Manufacturing Process

    28/47

    Heavy Engineering Fabrication

    After DP Test Back Gouging Area Welding

    Heavy Engineering Fabrication

  • 7/30/2019 Tower Manufacturing Process

    29/47

    Heavy Engineering Fabrication

    Checking weld Defect by Ultrasonic Testing

    Heavy Engineering Fabrication

  • 7/30/2019 Tower Manufacturing Process

    30/47

    Heavy Engineering Fabrication

    Checking weld Defect by Radio Graphic Testing(Random)

    Heavy Engineering Fabrication

  • 7/30/2019 Tower Manufacturing Process

    31/47

    Heavy Engineering Fabrication

    Fixing Bushes and welding with Shells and Platforms

    Heavy Engineering Fabrication

  • 7/30/2019 Tower Manufacturing Process

    32/47

    Heavy Engineering Fabrication

    To Measure flatness and Tilting of Flanges using Easy Laser

    Heavy Engineering Fabrication

  • 7/30/2019 Tower Manufacturing Process

    33/47

    y g g

    Checking Face out & Plumb out, Verticality, Ovality, Total length, Internals

    locations, Mismatches & Scratches, Surface defects.

    Heavy Engineering Fabrication

  • 7/30/2019 Tower Manufacturing Process

    34/47

    y g g

    Fixing Bushes welding with Shells and Platforms

    Heavy Engineering Fabrication

  • 7/30/2019 Tower Manufacturing Process

    35/47

    Shifting cleared section for blasting site

    Heavy Engineering Fabrication

  • 7/30/2019 Tower Manufacturing Process

    36/47

    Blasting with Steel Shots in Blasting Chamber. Adherence to Pollution Control

    Norms.

    Heavy Engineering Fabrication

  • 7/30/2019 Tower Manufacturing Process

    37/47

    After Blasting checking the surface roughness

    Heavy Engineering Fabrication

  • 7/30/2019 Tower Manufacturing Process

    38/47

    Painting using with Airless Guns- Inside Painting Chamber.

    Heavy Engineering Fabrication

  • 7/30/2019 Tower Manufacturing Process

    39/47

    Coating Thickness checked with coat meter

    Heavy Engineering Fabrication

  • 7/30/2019 Tower Manufacturing Process

    40/47

    Assembling of all Internals Like Ladder, Door Fittings, using recommendedFasteners & Electrical Fittings

    Heavy Engineering Fabrication

  • 7/30/2019 Tower Manufacturing Process

    41/47

    Assembling of all Internals Like Ladder, Door Fittings, using recommendedFasteners & Electrical Fittings

    Heavy Engineering Fabrication

  • 7/30/2019 Tower Manufacturing Process

    42/47

    Ends Covered with Plywood and Spider

    Heavy Engineering Fabrication

  • 7/30/2019 Tower Manufacturing Process

    43/47

    Finished Goods are Ready for Getting Dispatch Clearance

    Heavy Engineering Fabrication

  • 7/30/2019 Tower Manufacturing Process

    44/47

    Finished Goods Loaded on Trailer

    Heavy Engineering Fabrication

  • 7/30/2019 Tower Manufacturing Process

    45/47

    After Completion of all Inspections Finished Goods are Dispatched

    Heavy Engineering Fabrication

  • 7/30/2019 Tower Manufacturing Process

    46/47

    Work Shed 3 Bays 20Mtr x 80Mtr Each. 2 Nos EOT Cranes capacity30MT.

    Heavy Engineering Fabrication

  • 7/30/2019 Tower Manufacturing Process

    47/47