total station

29
PRESENTATION ON TOTAL STATION BY Ashish pandey(civil) BBS college of engineering& technology

Upload: 000123456789

Post on 28-Sep-2015

31 views

Category:

Documents


0 download

DESCRIPTION

Get full knowledge on total station

TRANSCRIPT

  • PRESENTATION ON TOTAL STATION

    BYAshish pandey(civil)

    BBS college of engineering& technology

  • AIM

    Collecting of Digitally survey data by total station for designing by advance software for achieving higher accuracy in short time.

  • 1. Total Station includes Theodolite, Electronicdistance measurement (EDM) & data recorders.

    2. We collect vertical & horizontal data in a singleoperation. Data recorder can record information inthe field to take back to the office forprocessing.

    3. Data recorders can also be used to downloadpreviously determined data at the office for use inthe field to stake out or to locate constructioncontrol points & boundaries.

    4. We can also designed traditionally(manually),data collected by the Total station in data recorders.

    INTRODUCTION

  • Role of Total Station in Preparation of Highway DPR

    In Highway Detail Project Report (DPR)preparation. Total Station is used forcollection of all Survey data digitally.

    Digitally collected survey Data furthertransferred to a computer to create Digitaldesign model by any designing software.

    Designed Data up loaded in Total Stationfor further staking out on ground.

  • Electronic Total Station DTM-552/652 Series (Face 2/Right)

  • Face Left & Face Right

  • DISPLAY BOARD

  • How Total Station works

    Total Station collects all ground data in Three Dimensional

    Format (Co-ordinate system).

    Prior to collection of data, it requires at least two known points

    (co-ordinates known), to set up the station.

    After setting up the station it gives / collects the details of

    points w.r.t. the two known points from the Station.

    Total Station measures horizontal angles in WCB system

    automatically from the assumed Meridian as worked in Station

    set up and the Vertical angles from the Horizontal axis of the

    instrument [above (+), below (-)].

    . As this instrument gives all the engineering details of a station

    / point , the instruments has been named as Total Station.

  • Setting up the TripodOpen the tripod legs enough to for the instrument

    to stable.

    Locate the tripod directly over the station point. To the check tripod position look through the center hole in the tripod head.

    Firmly press the tripod ferrules into the ground.

    Level the top surface of the tripod head.

    Securely faster the thumb screws on the tripod legs.

    Place the Base plate on the tripod head

    Tighten the tripod mounting screw.

  • LEVELING

    Firstly level the base plate level by tripod legs slide

    Place the instrument on the base plate and fixed by leveling base plate clamp

    Loose the upper horizontal movement plate clamp

    Level by THREE LEGS METHOD

  • CREATING JOB

    BMS Screen Press Menu

    Select Job & ENT

    Press MSR1 Key & ENT

  • CREATING JOB..(CONT)

    Press ENT for Setting

    Creating Job

    BMS Screen

    Feed Job Name & ENT

  • Station Setup by one station & one bearing

    BMS Screen press STN Key Select Known & ENT Feed ST. No.

    After ST Press ENT Feed NEZ Feed Code & ENT

    Feed HI After HI press ENT Select Angle & ENT

  • .Turn to Face 2 Sight same point on F2 Press ENT

    Press ENT for record Recording Station Come back to BMS

    Station Setup by one station & one bearingCONT

    Asking Bearing Feed Bearing & ENT Sight BS & MSR 1 or ANG

  • Station Setup by Resection

    BMS Screen press STN Key Select Resection & ENT Feed 1st PT No.

    After No. Press ENT Feed HT After HT Press ENT

    Sight 1st PT & MSR 1 Press ENT Feed 2nd PT No.

  • Station Setup by Resection Method CONT.

    Feed HT for 2nd PT Sight PT2 & MSR 1 Press ENT

    Press ANG or ENT Calculating the coordinate

    Of Station PT.

    Come back to the BMS

  • Measurement of Side Shots

    Sight Prism & Press

    MSR1 & ENTAfter ENT asking code

    Press ANG Key for Stack

    Select the code &ENT

    Code appear Press ENT Recording the Point After recording go to the next NO.

  • DOWN LOAD DATA FROM DTM -500/502/552

    1. PWR on DTM

    2. Open menu

    3. Open job manager

    4. Select open job & click

    5. Your job is opened & System return back to BMS

    6. Menu key than No 5 key for Communication click

    7. (1) No key Down Load

    8. Type of Data : Raw Data

    9. Enter

    10. Ready to send Data it will appear how much data lines

    are going to transfer to you computer.

  • GO TO COMPUTER

    1. Start computer & go to All Program

    2. Transit

    3. Transit (Transit window open )

    4. Transfer

    5. Data Recorder to PC (window open data recorder to PC)

    6. Data Recorder: DTM -500/502/552

    7. Data format: Nikon Raw

    (Directories selected) Example : C / program / Nikon/

    Transit/ Down load

  • 8. Job n(name : abcd

    9. OK (message window appears)

    10. OK (You will get data Receiving Box & its waiting for data)

    11. Return back to DTM(Total Station)-500/502/552

    12. (Press)Enter in DTM-500/502/552

    13. Start Data Transfer Show on window

    Transfer Complete (message appears)

    14. OK (click on)

    GO TO COMPUTER .Cont

  • 15. Select or(click on) Keep All Old Coordinates ,Discard all

    new coordinates

    16. OK

    Note : Data Export in ASCII Coordinate or Raw Data format

    GO TO COMPUTER .Cont

  • STAKE OUT1. First setup the tripod on station and complete the leveling as per procedure.

    2. Open the Job (Menu Job Highlight the job and Enter.)

    3. Station Setup(7 No. Key (STN) Known (1 No. Key) ST input number input NEZ HI input Back Sight Select Coordinate BS input number NEZ HT input

    sight the

    Back sight and press MSR1 key

    4. (for accuracy work press ANG for face 2 measurement and sight the same point on

    face 2 and press MSR 1)

    5. Press enter to record

    6. Press S-O key (8 No. Key)

    7 Select XYZ

    8. Feed the Number if available in the job instrument will take auto otherwise feed theNEZ

    9. Now instrument will guide you. Rotate the angle and sight the prism and measure.

    Now instrument will guide Left/right in/out cut/fill.

  • Conclusion Every engineering project, surveying isthe first step of the execution of the success ofany engineering project. And it is based uponthe accurate and complete survey work prior tocommencement of project as well as duringexecution and after completion.

    Hence the survey by TOTAL STATION ismost important for accurate estimate in lesstime and execution of work.