total solution of energy - sookook.co.kr

46
SooKook Corporation Total solution of energy

Upload: others

Post on 05-Jan-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Total solution of energy - sookook.co.kr

SooKook Corporation

Total solution of energy

Page 2: Total solution of energy - sookook.co.kr

CONTENTS

I. Company Profile

VI. Experience

II. Business Field

III. Major Fabrication Facilities

Page 3: Total solution of energy - sookook.co.kr

3

Address 441, Taejeon-Dong, Gwangju-Si, Gyeonggi-Do, Korea

Establishment (Year) 21st January 1982

Type of Business Engineering, Manufacturing, Supervision, Construction and

Commissioning of Energy Plant

Number of Officers and Staff 140 Persons (as of Jan. 2012)

Total Equity Capital

(2011) KRW 26,217,000,000.-(USD 23.8 Million)

Annual Turnover (2011) KRW 45,000,000,000.-(USD 41 Million)

Technical Collaboration

Partners Standardkessel (Germany), NFK (Japan), PFP (Iran)

I. Company Profile

Page 4: Total solution of energy - sookook.co.kr

4

I. Company Profile

1. LAND AREA : 9,300 ㎡

2. BUIDING AREA : 5,100 ㎡

3. MAJOR WORKS : BOILER, PRESSURE PART, VESSEL, STEEL FABRICATION

4. ADDRESS : 242-2, SHINNUNG-RI, SEOUN-MYEON, ANSEONG-SI, GYEONGGI-DO, KOREA

TEL : 031-671-7911 FAX : 031-671-7915

ANSEONG FACTORY

Page 5: Total solution of energy - sookook.co.kr

5

I. Company Profile

GWANGJU FACTORY

1. LAND AREA : 3,650 ㎡

2. BUIDING AREA : 3,500 ㎡

3. MAJOR WORKS :

Combustion System and

Burner with Instrumentation

4. ADDRESS :

441, Taejeon-dong, Gwangju-si,

Gyeonggi-do, Korea

Tel. : 031-798-7711

Fax. : 031-798-7705

Page 6: Total solution of energy - sookook.co.kr

6

I. Company Profile

ICHEON FACTOR

1. LAND AREA : 8,100 ㎡

2. BUIDING AREA : 3,200 ㎡

3. MAJOR WORKS :

Package Burner & Combustion Equipment

4. ADDRESS :

345-4, Suhari, Shindun-myeon, Icheon-si,

Gyeonggi-do, Korea

Tel : 031-631-3400

Fax : 031-631-2730

Page 7: Total solution of energy - sookook.co.kr

7

I. Company Profile – Financial Statements

YEAR 2009년도 2010년도 2011년도

Total Assets / 총자산 328 442 356

Debts / 부채 145 231 94

Equity Capital / 자본총액

183 211 262

Annual Turnover / 매출액

357 363 450

Net Profit

/ 당기순이익 23.8 27.9 55.8

(단 위 : 억원 / unit : 100 Million KRW)

Page 8: Total solution of energy - sookook.co.kr

8

I. Company Profile – Overseas Cooperation Partners

Company Nationality Items

Standardkessel

GmbH Germany Heat Recovery Steam Generator (HRSG)

NFK Japan Burners for packaged boilers

Burners for incinerator

UNIGAS Italy Low Nox Burners

Burners for packaged boiler

HOTWORK U.K. Burners for industrial boilers

Burners for various furnaces

Page 9: Total solution of energy - sookook.co.kr

9

I. Company Profile – Quality Certification-ASME

Manufacture and assembly

of power boiler Manufacture of pressure

vessels Fabrication and assembly

of power piping

Page 10: Total solution of energy - sookook.co.kr

CEO Jong Tae Lee

COMBUSTION EQUIP. DIVISION

President Jae Yun Park

ENERGY PLANT DIVISION

President Tae Ho Ha

GWANGJU FACTORY ANSEONG FACTORY

ADMINISTRATION

DIVISION

R&D

Engineering

Manufacturing

QA / QC

Sales

A/S

Manufacturing

Detail Engineering

Engineering

Procurement

Sales

Commissioning

Manufacturing

A/S

ACCOUNTS

Human Resources

General Affairs

ICHEON FACTORY

QA / QC

I. Company Profile – Organization

10

Page 11: Total solution of energy - sookook.co.kr

I. Company Profile – Man Power

No. Section Energy Plant

Division

Combustion

Equip. Div. Total

1.

Design &

Engineering Team

Basic design 4 3 7

Mechanical 10 6 16

Electrical & Ins. 5 5

Piping 2 2 4

2. Sales Team 6 12 18

3. Quality Management 3 3 6

4. Project Management 6 2 8

5. Supervision & After-Sales Service 12 12

6. Producing Management 10 5 15

7. Procurement 6 6

Total 97

11

Page 12: Total solution of energy - sookook.co.kr

12

II. Business Field

Heat Recovery

Steam

or

Hot Water generator

Solid Fuel Fired

Boiler (Bagasse, Rice

Husk, Waste Wood,

Palm Waste, RPF,

RDF, Coal)

1

2

3 4

6 5 7

8 9

11 10

12

Page 13: Total solution of energy - sookook.co.kr

13

II. Business Field

- Gas/Oil Fired Boiler

- Waste Heat Boiler

- Deaerator

- Steam Accumulator

- Superheater

Page 14: Total solution of energy - sookook.co.kr

14

II. Business Field

Combustion Equipment

- Low Nox Gas/Oil Burner for Boiler

- Burner for Ind. Furnace

- Waste Liquid & Gas Burner

- LFG Burner

- Steel Mill Facilities

Page 15: Total solution of energy - sookook.co.kr

15

II. Business Field

Instrument and Control System

- Field Instrument

- BMS & ACC Control System

- Instrument and MCC Panel

- DCS, M(H)MI System

Page 16: Total solution of energy - sookook.co.kr

16

III. Major Fabrication Facilities

PRESSURE PART FABRICATION SHOP

Page 17: Total solution of energy - sookook.co.kr

17

III. Major Fabrication Facilities

RADIAL

DRILLING M/C

Page 18: Total solution of energy - sookook.co.kr

18

III. Major Fabrication Facilities

BENDING ROLLER

Page 19: Total solution of energy - sookook.co.kr

19

III. Major Fabrication Facilities

SHOT & PAINTING ROOM

Page 20: Total solution of energy - sookook.co.kr

20

III. Major Fabrication Facilities

PIPE & TUBE

BENDING M/C

TUBE

SWAGING M/C

Page 21: Total solution of energy - sookook.co.kr

21

III. Major Fabrication Facilities

MEMBRANE PANEL

WELDING M/C

Page 22: Total solution of energy - sookook.co.kr

22

III. Major Fabrication Facilities

BURNER ASSEMBLY SHOP

Page 23: Total solution of energy - sookook.co.kr

23

III. Major Fabrication Facilities

COMBUSTION TEST FURNACE & BOILER

POTENTIAL BALANCING TEST OF FAN WHEEL

Page 24: Total solution of energy - sookook.co.kr

24

POIC Biomass Power Plant

Project Site Palm Oil Industrial Complex in Malaysia

Project Name POIC Biomass Co-generation Power Plant

Steam Condition 52 Ton/hr x 63 kg/cm2g x 433 ℃

Power Output 25 MW

Fuel EFB 80% + PKS 20% (Empty Fruit Bunches + Palm Kernel Shell)

Scope Boiler Island

VI. Experience

Page 25: Total solution of energy - sookook.co.kr

25

Biomass (RPF) Fired Power Boiler

Project Site Hansol Biomass Co-generation Power Plant

Location Hansol Paper Mill in Korea

Steam Condition 52 Ton/hr x 45 kg/cm2g x 400 ℃

Fuel RPF 100% (Refuse Plastic Fuel)

Scope Boiler Proper

VI. Experience

Page 26: Total solution of energy - sookook.co.kr

26

7.3MW KTH Biomass Power Plant

Project Site South Central Kalimantan in Indonesia

Project Name 7.3MW KTH Biomass Fired Power Plant

Steam Condition 32.8 Ton/hr x 45 kg/cm2a x 440 ℃

Power Output 7.3 MW

Fuel Bark 100%

Scope Boiler Island

VI. Experience

1

2

3

4

6 5

7

8 9

11 10

12

Page 27: Total solution of energy - sookook.co.kr

27

HRSG FOR STEEL MILL SINTERING PLANT

Client Hyundai Steel Mill in Korea • Heat Source Sinter Cooler Exhaust Gas Gas Flow Rate: 720,000 N㎥/hr Inlet Gas Temp.: Max. 350 ℃

Steam Condition 35 tons/hr x 20 kg/cm2g x 230 ℃

Completion in 2009

Scope Turn Key Base, 2 units

VI. Experience

Page 28: Total solution of energy - sookook.co.kr

28

STEEL MILL BY-PRODUCT GAS FIRED BOILER

Client Hyundai Steel Mill in Korea

Steam Condition 60 Ton /hr x 20 kg/cm2 g x 230 ℃

Fuel COG (Coke Oven Gas) LDG (L. D. Converter Gas) LNG (Liquefied Natural Gas)

Scope Turn Key Plant

Completion in 2009

VI. Experience

Page 29: Total solution of energy - sookook.co.kr

29

STEEL MILL BY-PRODUCT GAS FIRED BOILER

Client

Hyundai Steel Mill in Korea

Steam Parameter

50 Ton /hr x 10 kg/cm2g x 183 ℃

Fuel

BFG (Blast Furnace Gas)

Scope

Turn Key Plant

Completion in 2011

VI. Experience

Page 30: Total solution of energy - sookook.co.kr

30

Heat Recovery Steam Generator for Co-Gen. Power Plant

VI. Experience

Type

Finned Water Tube, Natural

Circulation, 2-drum, Bottom Support

Steam Parameter

15 tons/hr x 20 kg/cm2g x 230 ℃

Gas Turbine : 5MW, KHI GPB 70 GT

Client

Century Paper Mill in Pakistan

Page 31: Total solution of energy - sookook.co.kr

31

HEAT RECOVERY HOT WATER GENERATOR

VI. Experience

Location of Heat Exchanger

Between Existing HRSG and Stack

Total No. Built : 20 units

Total Heat Duty : 145 Gcal/hr

1st

Heat Recovery

Location of Heat Exchanger

Stack Inside

Total No. Built : 8 units

Total Heat Duty : 40 Gcal/hr

2nd Heat Recovery

Page 32: Total solution of energy - sookook.co.kr

32

HEAT RECOVERY HOT WATER GENERATOR

VI. Experience

Location of Heat Exchanger

Between Existing HRSG

and Stack

Total No. Built : 9 units

Total Heat Duty : 60 Gcal/hr

Page 33: Total solution of energy - sookook.co.kr

33

Heat Recovery Hot Oil Heater for Organic Rankine Cycle

VI. Experience

Heat Source

- Cement Kiln Exhaust Gas

Gas Flow Rate: 370,000 N㎥/hr

Inlet Gas Temp.: Max. 300 ℃

Type

Finned Tube Multy Loop Type

Heat Duty : 16.6 Gcal/hr

Client : ASIA Cement, 2005

Page 34: Total solution of energy - sookook.co.kr

34

HEAT RECOVERY STEAM SUPERHEATER for SULFUR PLANT

VI. Experience

Client LS-NIKKO in Korea

Steam Parameter 70 Ton /hr x 52.5 kg/cm2g x 428 ℃

Heat Source Process Gas of Sulfur Plant

Type Shop Assembled, Horizontal, Multi Loops

Completion in 2009

Page 35: Total solution of energy - sookook.co.kr

35

OTHERS – PRESSURE and NON-PRESSURE

VI. Experience

FLARE STACK FOR

FINEX PROCESS GAS

ID 1.6 m x H 85 m

STEAM ACCUMULATOR

200 m3, 3 UNITS

TUNDISH PREHEATER

FOR STEEL WORKS

Page 36: Total solution of energy - sookook.co.kr

SooKook Corporation

■ ICHEON FACTORY

345-4, Suha-ri, shindun-myeon, Icheon-si, Gyeonggi-do, KOREA

Tel : +82-31-631-3400 Fax : +82-31-631-2730

■ GWANGJU FACTORY

441, Taejeon-Dong, Gwangju-si, Gyeonggi-do, KOREA

Tel : +82-31-798-7711 Fax : +82-31-798-7705

■ ANSEONG FACTORY

224-2, Shinnung-ri, Seoun-myeon, Anseong-si, Gyeonggi-do, KOREA

Tel : +82-31-671-7911 Fax : +82-31-671-7915

■ Web Site : http://www.sookook.co.kr

Page 37: Total solution of energy - sookook.co.kr

SOOKOOK CORPORATION (株) 水 國

July, 2012

LIST of REFERENCE (ENERGY PLANT DIVISION)

Page 38: Total solution of energy - sookook.co.kr

: : MAJOR DELIVERY LIST

I. INDUSTRIAL BOILER

II. HRSG (Heat Recovery Steam Generator)

III. HRW/OG (Heat Recovery Water/Oil Generator)

IV. BIOMASS FIRED BOILER

VI. DEAERATOR

VII. STEAM ACCUMULATOR

V. ECONOMIZER

VIII. OTHERS

Page 39: Total solution of energy - sookook.co.kr

No. CUSTOMER

( SITE )

CAPACITY

FUEL Q'TY SPECIFICATION YEAR OF DELIVERY

EVA.

ton/h

r

PRESS.

kg/㎠

.G

1 HYUNDAI MOTOR

(NAMYANGMAN / KOREA) 8 10 LNG 1

TYPE : WATER TUBE TYPE BOILER AUX.EQUIPMENT : ECONOMIZER

2002

2

KOREA UNIVERSITY HOSPITAL

(GURO, SEOUL) 2 7 LNG 2 TYPE : FIRE TUBE TYPE BOILER 2003

3 KIA MOTOR

(GWANG JU / KOREA) 20 10 LNG 1

TYPE : WATER TUBE TYPE BOILER AUX.EQUIPMENT : ECONOMIZER

2003

4 KIA MOTOR

(GWANG JU / KOREA) 10 10 LNG 2

TYPE : WATER TUBE TYPE BOILER AUX.EQUIPMENT : ECONOMIZER

2003

5 ILJINPHARM COMPANY (HWASUNG / KOREA)

2 10 LNG 1 TYPE : FIRE TUBE TYPE BOILER 2004

6

DAEHAN PRINTING & PUBLISHING

(SUNGNAM / KOREA) 5 10 LNG 1 TYPE : FIRE TUBE TYPE BOILER 2004

7 HYUNDAI MOTOR

(NAMYANGMAN / KOREA) 15 10 LNG 1 TYPE : WATER TUBE TYPE BOILER 2006

8 HYUNDAI STEEL

(DANGJIN/ KOREA) 60 17

LNG, COG, LDG

1

TYPE : WATER TUBE TYPE BOILER AUX.EQUIPMENT : S/H,

ECONOMIZER, DEAERATOR, STACK, etc.

2008

9 HYUNDAI STEEL

(DANGJIN/ KOREA) 50 17 LNG 2

TYPE : WATER TUBE TYPE BOILER AUX.EQUIPMENT : S/H,

ECONOMIZER, DEAERATOR, STACK, etc.

2008

10 HYUNDAI STEEL

(DANGJIN/ KOREA) 50 10 BFG, COG 1 TYPE : WATER TUBE TYPE BOILER 2011

I. INDUSTRIAL BOILER

Page 40: Total solution of energy - sookook.co.kr

No. CUSTOMER

( SITE )

CAPACITY

Q'TY SPECIFICATION YEAR OF DELIVERY

EVA.

ton/h

r

PRESS.

kg/

㎠.G

1

CENTURY PAPER & MILL COMPANY

/ HYUNDAI ENGINEERING (PAKISTAN)

14.65 16 4

GAS TURBINE : KHI GPB 70GT GAS TURBINE OUTPUT : 5MW TYPE : SINGLE PRESSURE, 2-DRUM, NATURAL CIRCULATION, BOTTOM SUPPORT, SOLID FINNED TUBE, HORIZONTAL TYPE STEAM TEMPERATURE : 230℃ AT S/H OUTLET

2007

2 HYUN DAI STEEL (DANGJIN/KOREA)

35 17 2

HEAT SOURCE : SINTER COOLER EXH. HOT AIR AIR FLOW : 720,000 Nm3/HR HOT AIR TEMP : 300 ℃ STEAM TEMPERATURE : 230℃ AT S/H OUTLET

2008

3

POSCO POWER / KOPEC

(INCHEON / KOREA) 2.7 14 6

HEAT SOURCE : TURBINE COOLING AIR AIR FLOW : 62,380 kg/hr TYPE : KETTLE TYPE BOILER

2008

4 HYUN DAI STEEL (DANGJIN/KOREA)

40 18 2

HEAT SOURCE : SINTER COOLER EXH. HOT AIR AIR FLOW : 720,000 Nm3/HR HOT AIR TEMP : MAX. 350 ℃ STEAM TEMPERATURE : 230℃ AT S/H OUTLET

2013

II. HRSG (Heat Recovery Steam Generator)

Page 41: Total solution of energy - sookook.co.kr

No. CUSTOMER

( SITE ) Q‘TY SPECIFICATION

YEAR OF DELIVERY

1 ASIA CEMENT

(JECHEON / KOREA) 1

HEAT RECOVERY HOT OIL HEATER HEAT SOURCE : KILN EXHAUST GAS GAS FLOW : 370,000 Nm3/HR GAS TEMP. : 300℃ TYPE : FINNED TUBE MULTI LOOP, VERTICAL GAS PASS HEAT DUTY : 16.6 GCAL/HR HOT OIL OUTLET TEMP. : 229.5℃

2005

2

KOREA SOUTH-EAST POWER

(SUNGNAM / KOREA) 8

HEAT RECOVERY HOT WATER GENERATOR HEAT SOURCE : GAS TURBINE EXHAUST GAS GAS TURBINE OUTPUT : 75MW TYPE : SERRATED FIN TUBE MULTI LOOP, HORIZONTAL GAS PASS HEAT DUTY : 9.5 GCAL/HR HOT WATER OUTLET TEMP. : 100℃

2006

3

GS-Power CO., LTD. / KOPEC

(ANYANG /KOREA) 4

HEAT RECOVERY HOT WATER GENERATOR HEAT SOURCE : GAS TURBINE EXHAUST GAS GAS TURBINE OUTPUT : 75MW TYPE : SERRATED FIN TUBE MULTI LOOP, HORIZONTAL GAS PASS HEAT DUTY : 4.25 GCAL/HR HOT WATER OUTLET TEMP. : 90.4℃

2007

4

GS-Power CO., LTD. / KOPEC

(BUCHEON/KOREA) 3

HEAT RECOVERY HOT WATER GENERATOR HEAT SOURCE : GAS TURBINE EXHAUST GAS GAS TURBINE OUTPUT : 105MW TYPE : ERRATED FIN TUBE MULTI LOOP, HORIZONTAL GAS PASS HEAT DUTY : 6.3 GCAL/HR HOT WATER OUTLET TEMP. : 95℃

2007

5 KOREA WEST POWER (INCHEON/KOREA)

8

HEAT RECOVERY HOT WATER GENERATOR HEAT SOURCE : GAS TURBINE EXHAUST GAS GAS TURBINE OUTPUT : 170MW TYPE : SERRATED FIN TUBE MULTI LOOP, HORIZONTAL GAS PASS HEAT DUTY : 9.6 GCAL/HR HOT WATER OUTLET TEMP. : 98℃

2008

6

KOREA SOUTH-EAST POWER

(SUNGNAM/KOREA) 5

HEAT RECOVERY HOT WATER GENERATOR HEAT SOURCE : GAS TURBINE EXHAUST GAS GAS TURBINE OUTPUT : 75MW TYPE : SERRATED FIN TUBE MULTI LOOP, HORIZONTAL GAS PASS HEAT DUTY : 4.2 GCAL/HR HOT WATER OUTLET TEMP. : 88℃

2009

7

KOREA EAST-WEST POWER

(ILSAN / KOREA) 6

HEAT RECOVERY HOT WATER GENERATOR HEAT SOURCE : GAS TURBINE EXHAUST GAS GAS TURBINE OUTPUT : 105MW TYPE : SERRATED FIN TUBE MULTI LOOP, HORIZONTAL GAS PASS HEAT DUTY : 7.7 GCAL/HR HOT WATER OUTLET TEMP. : 90.7℃

2009

III. HRW/OG (Heat Recovery Hot Water/Oil Generator)

Page 42: Total solution of energy - sookook.co.kr

No. CUSTOMER/C

LIENT PROJECT NAME

Q'TY

SPECIFICATION YEAR OF DELIVERY

1

STX HEAVY INDUSTRY Co., Ltd./ KOREA

MIDLAND POWER Co.,

Ltd.

POIC BIOMASS

CHP POWER PROJECT

IN MALAYSIA

2

Type : 2-Drum, Natural Circulation, Bottom Support, Water Tube Type Fuel : EFB(Empty Fruit Bunches) 80% PKS(Palm Kernel Shell) 20% Combustion Type : Reciprocating Step-Grate Stoker Steam Capacity : 51,450 kg/hr Steam Pressure : 63 kg/cm2 g Steam Temperature : 438℃

2011

2

HANSOL EME Co., Ltd./ HYUNDAI HEAVY

INDUSTRY / SUNGWON ECONERGY

Co., Ltd KOREA

HANSOL PAPER

JANGHANG RPF BOILER PROJECT

2

Type : 2-Drum, Natural Circulation, Bottom Support, Water Tube Type Fuel : RPF Combustion Type : Rotary Kiln and Grate Combination Steam Capacity : 53,000 kg/hr Steam Pressure : 47.5 kg/cm2 g Steam Temperature : 400℃

2011

3 DOHWA

ENGINEERING

Co., Ltd.

KTH BIOMASS

FIRED POWER

PLANT IN INDONESIA

1

Type : 1-Drum, Natural Calculation, Water tube type Fuel : Bark Steam Capacity : 32.79 t/h Steam Pressure : 45kg/cm2a Steam Temperature : 440℃

2012

IV. BIOMASS FIRED BOILER

Page 43: Total solution of energy - sookook.co.kr

No. CUSTOMER

( SITE )

BOILER SPEC.

Q'TY SPECIFICATION YEAR OF DELIVERY E

VA.

ton/h

r

PRESS.

kg/

㎠.G

1 KIA MOTOR

(ASAN / KOREA ) 20~50 10 10 TYPE : FINNED TUBE MULTI LOOP TYPE 1999

2 RHODIA KOREA

(ULSAN / KOREA) 20 10 2 TYPE : FINNED TUBE MULTI LOOP TYPE 2000

3 KIA MOTOR

(GWANG JU / KOREA) 10~40 10 8 TYPE : FINNED TUBE MULTI LOOP TYPE 2002~2003

4

HYUNDAI MOTOR (NAMYANGMAN /

KOREA) 8 10 3 TYPE : FINNED TUBE MULTI LOOP TYPE 2002

5 KIA MOTOR

(GWANG JU / KOREA) 20 10 2 TYPE : FINNED TUBE MULTI LOOP TYPE 2003~2005

6

KEPCO E&C (YOUNGDONG /

KOREA) 590 175 2 TYPE : FINNED TUBE MULTI LOOP TYPE 2011

7 KEPCO E&C

(DONGHAE / KOREA) 693 179 2 TYPE : FINNED TUBE MULTI LOOP TYPE 2011

V. ECONOMIZER

Page 44: Total solution of energy - sookook.co.kr

VI. DEAERATOR

No. CUSTOMER

( SITE )

CAPACITY

Q'TY TYPE SPECIFICATION

YEAR O

F

DELIV

ERY

FLO

W

ton/h

r

PRESS.

kg/㎠

.g

TEM

P.

1

CENTURY PAPER & MILL COMPANY

/ HYUNDAI ENGINEERING (PAKISTAN)

60 2.13 135 1 SPRAY &

TRAY WATER STORAGE

VOLUME :10m3 2006

2 DOOSAN MECATEC (GUNSAN / KOREA)

253 4.5 154 2 SPRAY &

TRAY WATER STORAGE

VOLUME : 43m3 2007

3 HYUNDAI STEEL

(DANGJIN/ KOREA)

60 0.2 105 1 SPRA & TRAY

WATER STORAGE VOLUME :12m3

2008

4 HYUNDAI STEEL

(DANGJIN / KOREA) 35 0.2 105 2

SPRAY & TRAY

WATER STORAGE VOLUME : 10m3

2009

5 DOOSAN MECATEC (YEOSOO / KOREA)

958 4.15 152 2 SPRAY &

TRAY WATER STORAGE

VOLUME : 160m3 2009

6

STX HEAVY INDUSTRY

(MALAYSIA) 115 4.08 151.7 1

SPRAY & TRAY

WATER STORAGE VOLUME : 21m3

2010

7

HANSOL EME (JANGHWANG /

KOREA) 52 2.65 140 2

SPRAY & TRAY

WATER STORAGE VOLUME : 14m3

2011

8 HYUNDAI STEEL

(DANJIN / KOREA) 77.5 0.2 105 1

SPRAY & TRAY

WATER STORAGE VOLUME : 15m3

2012

9 HYUNDAI STEEL

(DANJIN / KOREA) 150 0.23 105 1

SPRAY & TRAY

WATER STORAGE VOLUME : 40m3

2012

Page 45: Total solution of energy - sookook.co.kr

NO. CUSTOMER

( SITE )

CAPACITY

Q'TY SPECIFICATION

YEAR O

F

DELIV

ERY

ACCU

. CA

PACIT

Y

Ton

IN P

RESS.

kg/㎠

.g

OU

T

PRESS.

kg/㎠

.g

1 HYUNDAI STEEL

(DANGJIN/ KOREA) 10 35 17 3

VOLUME : 200m3

DESIGN PRESS : 40 kg/㎠.g 2011

2 HYUNDAI STEEL

(DANGJIN/ KOREA) 7 35 17 4

VOLUME : 125m3

DESIGN PRESS : 42 kg/㎠.g 2011

VII. STEAM ACCUMULATOR

VIII. OTHERS

NO. CUSTOMER

( SITE ) ITEM SPECIFICATION

YEAR OF DELIVERY

1 POSCO

(GWANGYANG / KOREA) FLUE GAS RE-HEATING

SYSTEM

PROJECT NAME : DE-NOX SYSTEM FOR SINTER PLANT OF STEEL

SUPPLY ITEM : TREAT GAS RE-HEATING SYSTEM GAS FLOW RATE : 1,686,605 kg/hr IN/OUT GAS TEMP. : 255℃ / 305℃ USED FUEL : LDG

2006

2

KOREA EAST-WEST POWER

(ILSAN / KOREA)

FURNACE WALL TUBE REPLACEMENT

BOILER CAPACITY : 590 T/H BOILER WORKING PRESSURE : 175 ata TUBE OUTDIAMETER : 63.5 mm TUBE THICKNESS : 6.5 mm WALL TYPE : MEMBRANE WALL TYPE

2011

3 LS-NIKKO INC.

(ULSAN/KOREA)

PROCESS GAS HEAT RECOVERY

SUPERHEATER

HEAT SOURCE : PROCESS GAS OF SULFUR PLANT

STEAM CONDITION - FLOW RATE : 70 T/H - PRESSURE : 52.5 ata - IN/OUT TEMPERATURE : 256.7℃ / 428℃

Page 46: Total solution of energy - sookook.co.kr

: : CONTACT

■ Burner / Combustion Equipment

345-4, Suha-ri, shindun-myeon, Icheon-si, Gyeonggi-do, KOREA

Tel : (82) 31-631-3400 Fax : (82) 31-631-2730

■ Combustion System And Burner With Instrumentation

441, Taejeon-Dong, Gwangju-si, Gyeonggi-do, KOREA

Tel : (82) 31-798-7711 Fax : (82) 31-798-7705

■ Boiler, Pressure Part, Vessel, Steel Fabrication

224-2, Shinnung-ri, Seoun-myeon, Anseong-si, Gyeonggi-do, KOREA

Tel : (82) 31-671-7911 Fax : (82) 31-671-7915

■ Web Site : http://www.sookook.co.kr

Head office & Icheon factory

Gwangju Factory

Anseong Factory