LAMPIRAN D DEWAN BANDARAYA KUALA LUMPUR  JABA T AN PERANCANGAN INFRASTRUK TUR  TERMS OF REFERE NCE For PROFESSIONAL SERVICES, DETAILED ENGINEERING DESIGN AND OTHER ASSOCIATED WORKS In Connection With CADANGAN PERLAKSANAAN SISTEM SALIRAN DAN PENGURUSAN AIR HUJAN UNTUK PROGRAM TEBATAN BANJIR DI WILAYAH PERSEKUTUAN KUALA LUMPUR PENGARAH  J A B A T A N P E R A N C A N G A N I N F R A S T R U K T U R  TINGK A T 15-16 , B A NGUNA N D BKL  J A L A NRA J A L A U T 5 03 5 0 K U A LAL U MP U R

Upload: sara-ikhwan-nor-salim

Post on 07-Jul-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

8/18/2019 Tor Civil Main Drain

http://slidepdf.com/reader/full/tor-civil-main-drain 1/23

LAMPIRAN D 

DEWAN BANDARAYA KUALA LUMPUR JABATAN PERANCANGAN INFRASTRUKTUR

 TERMS OF REFERENCE

For 

PROFESSIONAL SERVICES, DETAILED ENGINEERINGDESIGN AND OTHER ASSOCIATED WORKS

In Connection With

CADANGAN PERLAKSANAAN SISTEM

SALIRAN DAN PENGURUSAN AIR HUJANUNTUK PROGRAM TEBATAN BANJIR DIWILAYAH PERSEKUTUAN KUALA LUMPUR

PENGARAH

 JABATAN PERANCANGAN INFRASTRUKTUR

 TINGKAT 15-16, BANGUNAN DBKL

 JALAN RAJA LAUT 50350 KUALA LUMPUR

8/18/2019 Tor Civil Main Drain

http://slidepdf.com/reader/full/tor-civil-main-drain 2/23

TABLE OF CONTENTS

1.0 Backgro!"#

#.0 Pro$%c& '

'.0 O($%c&)*% '

+.0 Sco,% o- Co!/&a!c S%r*)c%+

.0 E2%c&)o! o- Co!/&)!g S%r*)c%1#

3.0 Co!&%r,ar& S&a4 15

5.0 S%r*)c% a!" Fac)/)&)%16

6.0 O&7%r T%r8 a!" R%9)r%8%!&#0

1

8/18/2019 Tor Civil Main Drain

http://slidepdf.com/reader/full/tor-civil-main-drain 3/23

TERMS OF REFERENCE

For 

PROFESSIONAL SERVICES, DETAILED ENGINEERING DESIGN ANDOTHER ASSOCIATED WORKS

In Connection With

CADANGAN PERLAKSANAAN SISTEM SALIRANDAN PENGURUSAN AIR HUJAN UNTUK 

PROGRAM TEBATAN BANJIR DI WILAYAHPERSEKUTUAN KUALA LUMPUR

The DATUK BANDAR of KUALA LUPUR  wishes to appoint a

CONSULTING ENGINEER !CE"  to provide professional services in the

discipline of civil and structural engineering including other associated

engineering works, to enable the Datuk Bandar of Kuala Lumpur to implement

project successfully !elevant services re"uired from the #$ include civil and

structural engineering analysis, design and drafting, preparation of work and

material specifications, acting as submitting person on behalf of the DatukBandar of Kuala Lumpur in obtaining %lanning %ermission if necessary from

relevant Local &uthority, preparation of tender drawings ' supervision on site

#$%$ BACKGROUND

Due to massive development mainly within the boundary of (ilayah

%ersekutuan Kuala Lumpur, the city had adversely e)periencing serious flash

flooding problems !eports from resident staying at the affected areas

indicated that flash flood had occurred at almost every heavy thunderstorm

%reliminaries study shows that sole main drain alignment that discharge the

stormwater from the affected flooding area has insufficient capacity of the

open channel main drain and road culvert crossing to serve the current

demand of the stormwater flow had causes serious backflow and over flow of 

drain at various point of the main drain alignment *t is also observed that the

e)isting road side drain is unable to cater the tremendous amount of 

stormwater and causes stormwater overflowing onto the public road

#ity +all of Kuala Lumpur had several discussion and site visit with theresident affected by the flood and to understand the nature and actual

description if the incident &ll information had been listed down and

8/18/2019 Tor Civil Main Drain

http://slidepdf.com/reader/full/tor-civil-main-drain 4/23

summari-ed to formulate this Term of !eference and suggestion on the best

proposal to mitigate and overcome the flooding problems

 

&$% PRO'ECT

The proposed project shall comprise works as follows.

i" To c(rr) o*t +et(i Stor-.(ter (n(/e-ent (n+ Ur0(n Dr(in(/e St*+) 0(1e on

the ne.e1t 2 (te1t technoo/) (n+ -(n*( to 3ro+*ce (ction 3(n1 for the

reh(0iit(tion (n+ *3/r(+in/ of the +r(in(/e 1)1te- in the (re( in or+er to

o4erco-e the foo+in/ i11*e1 (n+ other re(te+ +r(in(/e -(tter1 5

ii" To +e1i/n the UPGRADING or NEW (in Dr(in 2 retic*(tion +r(in(/e 1)1te- to

-iti/(te (n+ o4erco-e the foo+in/ (re( 5

iii"To 3ro3o1e+ (n+ +e1i/n .here4er 3o11i0e W(ter Retention Are( (n+ 1)1te-

*1in/ Be1t (n(/e-ent Pr(ctice1 !BP" i$e A0o4e or Beo. Gro*n+

Detention Are( to re+*ce the Pe(6 Fo. (t +o.n1tre(- of the c(tch-ent 5

i4"To chec6, 7*1tif) (n+ 3ro3o1e+ !if re8*ire+" ( 0i//er c(3(cit) for (n) C*4ert

Cro11in/ *1in/ O3en C*t or Pi3e '(c6in/ -etho+1 to enh(nce+ the

Stor-.(ter Fo. 5

4" To i-3ro4e (n+ incre(1e the c(3(cit) of the Ro(+ Si+e Dr(in (n+ enh(ncin/ it1

+r(in(/e 1er4ice(0iit) to (e1thetic, 1cenic (n+ h)/ienic en4iron-ent (n+

3e+e1tri(n frien+ine11 f(ciitie1 5

4i"To (++re11 (n+ tr(3 the 1e+i-ent1 (n+ other 3o*t(nt -(teri(1 1*ch (1 itter1

(n+ +e0ri1 (n+ 1*01e8*ent) re-o4( 0) -e(n1 of Gro11 Po*t(nt Tr(31,

Tr(1h R(c6 or other effecti4e (n+ 3r(ctic( -etho+ of r*00i1h coection 9

4ii" To or/(ni:e (n+ con+*ct 3*0ic en/(/e-ent (n+ +i1c*11ion .ith the

Re1i+ent A11oci(tion, Non;Go4ern-ent Bo+ie1 !NGO" (n+ other re(te+

3(rtie1 to /(ther infor-(tion (n+ 3*0ic fee+;0(c6 .hich c(n (11i1t in

o3ti-i:in/ the +e1i/n to 1*it the 3*0ic nee+1 5

<$% OB'ECTIVE

The general main objective of procuring professional services is to make

available comprehensive +ydraulic $ngineering Design, Technical Drawings

and "uality /pecifications on the stated target date to enable practicalimplementation of the Datuk Bandar of Kuala Lumpur0s project to be as

scheduled *n addition, the professional services rendered should also allow

the S(fe, F*nction( (n+ St(0e  design, B*i+(0e (n+ Econo-ic(  to

construct and lastly D*r(0e and Econo-ic( to maintain

The specific objectives of the #$0s work are as follows.

i2 To carry out detail hydraulic analysis and study base on the catchment

study to determine to the stormwater generated from the catchment This

will able the designer proposed the best drainage channel design for the

whole drainage system

3

8/18/2019 Tor Civil Main Drain

http://slidepdf.com/reader/full/tor-civil-main-drain 5/23

ii2 To propose additional drainage system and upgrading the e)isting drains

if proven insufficient base on the study above

iii2 To produce complete tender documents for the Datuk Bandar of Kuala

Lumpur that include the 4inal %roposed $ngineering %lans, Technical/pecifications, Bills of 5uantities, 6eneral and /pecial #onditions of 

#ontract, *nstruction to Tenderers, %reambles, 4orm 7f Tender and

#ontract Documents for the scheme to enable a construction contract to

be tendered and for the construction to be completed

iv2 To prepare detailed cost estimates based on final "uantities and

construction schedules

v2 To work and liase with the Datuk Bandar of Kuala Lumpur or its agents in

advising and assisting on the procedures which should be adopted inorder to e)pedite the completion of the construction works

vi2 The scope shall also include the overseeing of the contractors works toensure the design intent and details are properly translated into the buildproduct

=$% SCOPE OF CONSULTANC> SERVICES

81 The duties to be performed by the #$ are inter alia at 9 :five2 stages as

follows.

811 Prei-in(r) St(/e

i) Preparing such drawings, estimates and other engineering 

documents as are necessary to enable the proposals for the

construction of the main drain, road side drain, walway ! side table

and other ci"il engineering facilities to be submitted for 

consideration and appro"al by Datu #andar of $uala Lumpur,

including%& 

a2 #hecking through the available survey plans and

advoce the department surveyors the additional survey work to

be carried out top enable an effective engineering design

b2 Discussions with, and obtaining data and

information from the various 6overnment Departments and

others who are affected by the construction of the works

c2 *nvestigating data and other information already

available

d2 #arrying out hydraulic analysis studies to

determine the most suitable geometric design

8

8/18/2019 Tor Civil Main Drain

http://slidepdf.com/reader/full/tor-civil-main-drain 6/23

e2 *nvestigating on the e)isting services in the vicinity

of the job site and liaising with various 6overnment Departments

and &gencies concerned

ii) Preparing a Preliminary Report, gi"ing%& 

a2 !ecommendation for the type of drain;hydraulic structure to be

built with ade"uate technical and financial justifications, including

maintenance costs

b2 %roposed design and methods of construction including

materials to be used for the type of main drain, road side

drainage system, walkways ; side table and other facilities

c2 %reliminary cost estimates for the recommended design

d2 $valuation of possible time schedule on a Bar #hart for the

detailed design, tendering and construction stage

e2 !ecommendation on the proposed relocation of services affected

ensuring minimum disruption and disturbance to users

f2 &ny other relevant information

iii) Maing such modifications in the preliminary drawings and designsand other documents as are necessary after re"iew by Datu #andar 

of $uala Lumpur and re"ision of cost estimate as may be re'uired(

i") Professional ser"ices to be pro"ided by the * at this stage may also

comprise all or any of the following as may be necessary in a

 particular case%

a2 *nvestigating data and information relevant to the works and

considered any reports relating to the works<

b2 &dvising the client on making any further topographical survey of 

the proposed site of the works which may be necessary to

supplement available topographical information<

c2 &dvising the client on the need to carry out any geotechnical

investigation which may be necessary to supplement the

available geotechnical information, arranging for the

investigation, certifying the amount of any payments to be made

by the client to the persons, firms or companies carrying out the

investigation under the #$0s direction, and advising the client onthe results of the investigation<

9

8/18/2019 Tor Civil Main Drain

http://slidepdf.com/reader/full/tor-civil-main-drain 7/23

d2 &dvising the client on the need for arrangements to be made, for 

the carrying out of special survey, special investigations or model

tests and advising the client of the results of any such surveys,

investigation or tests carried out<

e2 #onsulting any local or other approving authorities on matters of 

principle in connection with the works<

f2 #onsulting any architect appointed by the client in connection

with the architectural treatment of the works< and

g2 %reparing such reports and documents as are reasonably

necessary to enable the client to consider the #$0s proposals,

including alternative proposals, for the construction of the works

in the light of the investigations carried out by him at this stage,

and to enable the client to apply for approval in principle from the

appropriate authorities for the e)ecution of the works in

accordance with the proposals

=$#$& De1i/n St(/e

=$#$&$#$ The #$ in general responsibilities shall be as follows.

i2 %reparing the necessary Terms of !eference :if necessary2 for.

(" S*r4e) .or61 (n+ for.(r+ to DBKL for the (33oint-ent of L(n+

S*r4e)or fir- to c(rr) o*t +et(ie+ /ro*n+ 1*r4e)1 (1 (re

nece11(r) for the 3ro3er +e1i/n of the 0ri+/e?*n+er3(11

1tr*ct*re (n+ other .or61$

0" Soi In4e1ti/(tion .or61 (n+ for.(r+ to DBKL for the

(33oint-ent of Soi In4e1ti/(tion fir- to c(rr) o*t Soi

In4e1ti/(tion (1 i1 nece11(r) for the 3ro3er +e1i/n of the 0ri+/e

1tr*ct*re?*n+er3(11 (n+ other .or61$

ii2 %reparing detailed designs of the =inor !iver and

=ain Drain, hydraulic structures and road including the road

pavement and its infrastructures, drawings, specifications and bills

of "uantities after the preliminary proposals have been approved

iii2 %reparing appropriate #onditions of #ontract, 4rom

of Tender and other documents as are necessary to enable

tenders to be called for the construction of the hydraulic structure

and road works

iv2 %reparing final cost estimates based on complete

designs and final "uantities

>

8/18/2019 Tor Civil Main Drain

http://slidepdf.com/reader/full/tor-civil-main-drain 8/23

v2 %reparing revised time schedule on Bar #hart

based on the approved design

vi2 %reparing detailed drawings on the relocation of  services including all permanent and temporary structures

re"uired

vii2 The professional services to be provided by the #$

at this stage may also comprise all or any of the following as may

be necessary in a particular case.

(" 3re3(rin/ +e1i/n1, inc*+in/ -inor ri4er (n+ -(in +r(in

1tr*ct*re, ro(+ 3(4e-ent (n+ it1 infr(1tr*ct*re, reinforce+

concrete (n+ 1tr*ct*r( 1tee .or6 +e1i/n1, (n+ ten+er +r(.in/1 in connection .ith the .or65 (n+

0" Pre3(rin/ 1*ch con+ition1 of contr(ct, 13ecific(tion1,

1che+*e1 (n+ 0i1 of 8*(ntitie1 (1 -() 0e nece11(r) to

en(0e the cient to o0t(in ten+er1 or other.i1e (.(r+ (

contr(ct for c(rr)in/ o*t the .or61$

viii2 The #$ shall furnish to the Datuk Bandar of Kuala

Lumpur such number of copies of the Tender Document which

includes specifications and all plans as approved by the DatukBandar of Kuala Lumpur and three priced copies of the Bill of 

5uantities under sealed confidential cover using the final unit

priced as established by the #$ and one set of reproducible

drawing on a stable based material

i)2 The #$ shall furnish to the Datuk Bandar of Kuala

Lumpur one copy each of computer diskettes;compact disk

readable by the following software programs.

(" Dr(.in/1

Dr(.in/ fie1 3re3(re+ (n+ re(+(0e *1in/ A*to C(+ &%%@ !or 

other 4er1ion re8*e1te+" for Win+o.1 in PC or co-3(ti0e PC$

0" S3ecific(tion

S3ecific(tion fie1 3re3(re+ (n+ re(+(0e *1in/ icro1oft Wor+

for Win+o.1 in PC or co-3(ti0e PC$

c" Bi of *(ntitie1

Bi of 8*(ntitie1 fie1 3re3(re+ (n+ re(+(0e *1in/ icro1oft

Ece for Win+o.1 in PC or co-3(ti0e PC$

+" Other Doc*-ent1 ? Gr(3hic

?

8/18/2019 Tor Civil Main Drain

http://slidepdf.com/reader/full/tor-civil-main-drain 9/23

Other +oc*-ent ? /r(3hic fie1 -() 0e in the for-(t con1i1tent

.ith the co-3*ter 1oft.(re *1e+ for their 3re3(r(tion, 3ro4i+e+

the co-3*ter *1e+ i1 PC or co-3(ti0e PC$

=$#$&$&$ Certific(tion 0) Profe11ion( En/ineer1

 &ll drawings and documents submitted must be duly signed and

certified by professional engineers duly registered with the Board of 

$ngineers =alaysia

=$#$&$<$ De1i/n Co+e

The services of the #$ should comply with relevant current

=alaysian /tandards or British /tandards unless such codes are not

available

=$#$&$=$ C(c*(tion1 for IBS Content

#alculations to determine the *B/ content is based on the =anual

*B/ #ontent /coring /ystem :*B/ /core2 by #*DB The #$ must

submit :if instructed by Datuk Bandar of Kuala Lumpur2 calculationsfor *B/ /core points obtained when submitting structural drawing for 

verification The #onsultant shall also follow all the guideline

published by #*DB

=$#$< Ten+er St(/e

i2 To prepare all necessary %re5ualification @otice,

%re5ualification 5uestionnaire and $valuation #riteria :if 

re"uires2 to enable the pre"ualification of contractors to be carried

out and assisting in the %re5ualification of #ontractors

ii2 /ubmission to the Datuk Bandar of Kuala Lumpur  

the tender documents upon completion :the number of copies

depend on the demand during tender stage2 so that the Datuk

Bandar of Kuala Lumpur or its agent may call tender for the works

iii2 +elping and advising the Datuk Bandar of Kuala

Lumpur as to tenders, tenderers0 pricing, evaluating tenders

received according to DBKL procedure and making

recommendations on the acceptance of tender

A

8/18/2019 Tor Civil Main Drain

http://slidepdf.com/reader/full/tor-civil-main-drain 10/23

The professional services to be provided by the #$ at this stage

may also comprise advising the client as to the suitability for 

carrying out the works of the persons, firms or companies

tendering and as the relative merits of the tenders, but e)cluding

the relative merits of alternative tenders, prices and estimatesreceived for carrying out the works

=$#$= Con1tr*ction St(/e

i2 The administration and monitoring of the construction contract and

supervision of construction that include auditing designs

submitted by the #ontractors

ii2 $stablishment or provision of reference points and the checking of the site survey including the grid lines and levels undertaken by

the #ontractor

iii2 Liaison with the respective 6overnment Bodies and other relevant

authorities for necessary information and re"uirements with

respect to the relocation of e)isting services and laying of new

services with regard to the construction staging of the (orks *n

connection with this, the Datuk Bandar of Kuala Lumpur will

assist the #onsultant to have access to all information re"uired

for the completion of their servicesiv2 Keeping full records relating to all aspects of the construction work

which shall be available for inspection by the Datuk Bandar of 

Kuala Lumpur at all times *n particular, the !esident $ngineer 

shall keep detailed diaries concerning the work and working

conditions

v2 %reparing a comprehensive report at monthly intervals on the

progress of the construction works

vi2 *nspection, including check testing, where re"uired, of all materials

and workmanship to ensure that they comply with the

specification and plans, and immediate notice to the #ontractor 

of any defects or deficiencies

vii2 !ecommendations to the Datuk Bandar of Kuala Lumpur on any

changes in the plans and specifications which may prove

necessary with the production of the necessary revised plans

and specifications for any changes which may be approved by

the Datuk Bandar of Kuala Lumpur

8/18/2019 Tor Civil Main Drain

http://slidepdf.com/reader/full/tor-civil-main-drain 11/23

viii2 !ecommendations to the Datuk Bandar of Kuala Lumpur on

possible reduction of e)penditure during the progress of 

constructions

i)2 =easurement of "uantities of approved and accepted work andmaterials and the checking and certifying of the #ontractorCs

payment certificates

)2 %eriodic checking of remaining "uantities and a constant check on

the cost estimate including a "uarterly updating of monthly cash

flow projections to the end of the project

)i2 $)amination of and recommendations to the Datuk Bandar of Kuala

Lumpur on claims from the #ontractor for e)tensions of time,

payment for e)tra works and any other similar matters

)ii2 @egotiation with #ontractor on the rates for any unscheduled items

of work, which may arise, and recommendations on this to the

Datuk Bandar of Kuala Lumpur

)iii2 #ertificate to the Datuk Bandar of Kuala Lumpur of the acceptance

of each part of the works as completed

)iv2 Delivery to the Datuk Bandar of Kuala Lumpur on completion of the

(orks C&sbuiltC plans of the (orks as constructed in the format

of copies of hard copy :%olyster /heet and "uality paper print2

and one copy computer diskette readable by &uto #ad :latest

re"uested version2 and 3 copies of project report The report

intended to provide a detailed account of the overall construction

of the project and its main components individually in a format as

approved by the Datuk Bandar of Kuala Lumpur

)v2 During the maintenance periods, the #onsultants shall as re"uired

by the Datuk Bandar of Kuala Lumpur check and ensure that the

#ontractors concerned are carrying out their contractual

obligations in respect of maintenance, repair and reconstruction

of the (orks

)vi2 /hortly before the end of the maintenance periods, the #onsultants

shall carry out the necessary inspection with the agent of the

Datuk Bandar of Kuala Lumpur and other relevant agencies to

designate the rectification work to be done, to supervise this and

when it is completed to the Datuk Bandar of Kuala LumpurCs

satisfaction, issues a #ertificate of 4inal &cceptance to the DatukBandar of Kuala Lumpur

1

8/18/2019 Tor Civil Main Drain

http://slidepdf.com/reader/full/tor-civil-main-drain 12/23

)vii2&ssistance in settling disputes or differences which may arise

between the Datuk Bandar of Kuala Lumpur and the contractors

)viii2 The #onsultantCs responsibilities shall continue until the

#ertificate of 4inal &cceptance has been received and accepted

by the Datuk Bandar of Kuala Lumpur *n the event of arbitration,litigation or other proceedings after the completion of 

construction, the #onsultant shall be available to assist the Datuk

Bandar of Kuala Lumpur, under the same conditions of 

engagement

)i)2 The professional services to be provided by the #$ at this stage

should also comprise all or any of the following as may be

necessary in a particular case.

(" A+4i1in/ on (n+ 3re3(rin/ for-( Contr(ct Doc*-ent, inc*+in/

the etter of (cce3t(nce for c(rr)in/ o*t the .or61 or (n) 3(rt of 

the-5

 

0" In13ectin/ (n+ te1tin/ +*rin/ -(n*f(ct*re (n+ in1t((tion ci4i 2

infr(1tr*ct*re -(teri( !i$e Pi3e ? Bo C*4ert ", eec2 Gro11

Po*t(nt Tr(3" eectric( (n+ -ech(nic( -(teri(1 !i$e P*-3",

-(chiner) (n+ 3(nt 1*33ie+ for incor3or(tion in the .or61 (1

(re nece11(r) .here the in13ection (n+ te1t (re .ithin the

technic( co-3etence of the CE, (n+ (rr(n/in/ (n+ .itne11in/

the (cce3t(nce te1t5

c" A+4i1e the D(t*6 B(n+(r of K*(( L*-3*r on the nee+ for (

13eci( in13ection or te1t other th(n th(t referre+ to in =$#$= !i"

!0"5

+" A+4i1e the D(t*6 B(n+(r of K*(( L*-3*r on the (33oint-ent of 

1ite 1t(ff for S*3er4i1ion On Site5

e" Pre3(rin/ (n) f*rther +e1i/n1 (n+ +r(.in/1 re(tin/ to the .or615

f" E(-inin/ (n+ (33ro4in/ the contr(ctor1 3ro3o1( (n+ hi1

.or6in/ +r(.in/ re(tin/ to the .or615

/" (6in/ 1*ch 4i1it1 to the 1ite (1 the CE con1i+er1 nece11(r) to

1(ti1f) hi-1ef (1 to the 3erfor-(nce of (n) 1ite 1t(ff (33ointe+

for S*3er4i1ion On Site (n+ to 1(ti1f) hi-1ef th(t the .or61 (re

eec*te+ /ener() (ccor+in/ to contr(ct or other.i1e in

(ccor+(nce .ith /oo+ en/ineerin/ 3r(ctice5

h" Gi4in/ ( nece11(r) in1tr*ction1 re(tin/ to the .or61 to thecontr(ctor5

11

8/18/2019 Tor Civil Main Drain

http://slidepdf.com/reader/full/tor-civil-main-drain 13/23

i" I11*in/ ( certific(te1 (1 (re re8*ire+ in the contr(ct5

 7" Perfor-in/ (n) +*tie1 .hich the CE -() 0e re8*ire+ to c(rr) o*t

*n+er (n) +oc*-ent .hich he h(1 3re3(re+ for the eec*tion of 

the .or615

6" Dei4erin/ to the D(t*6 B(n+(r of K*(( L*-3*r on theco-3etion of the .or61 1*ch recor+1 (n+ -(n*f(ct*rer1

-(n*(1 (1 (re re(1on(0) nece11(r) to en(0e the cient to

o3er(te (n+ -(int(in the .or615 (n+

" Deci+in/ (n) +i13*te or +ifference (ri1in/ 0et.een the D(t*6

B(n+(r of K*(( L*-3*r (n+ the contr(ctor in connection .ith

the .or61 (n+ 1*0-itte+ to the CE for hi1 +eci1ion, 3ro4i+e+ th(t

thi1 3rofe11ion( 1er4ice 1h( not eten+ to (+4i1in/ the D(t*6

B(n+(r of K*(( L*-3*r foo.in/ the t(6in/ of (n) 1te3 in or 

to.(r+1 (n) (r0itr(tion or iti/(tion in connection .ith the .or61$

HOWEVER THE DATUK BANDAR OF KUALA LUMPURRESERVES THE FULL RIGHT TO DEFER THE CONSTRUCTIONWORKS DUE TO WHATEVER REASON (S) OR TO APPOINT ITSOWN STAFF TO SUPERVISE THE CONSTRUCTION ANDADMINISTRATION OF THE CONSTRUCTION CONTRACT.

=$#$@ Defect1 Li(0iit) Perio+ St(/e

The re"uired services to be provided by the #$ are described in the

overall documents

=$& De1i/n Criteri(

i2 The design for the structures shall follow the latest version of 

=alaysian or British /tandards and #odes of %ractice The

principal standards are the following.

(" The Ur0(n Stor- (n(/e-ent (n*( of (()1i( !ASA"

  &n+  E+ition 0) De3(rt-ent of Irri/(tion 2 Dr(in(/e !DID"

(()1i( !>e(r &%#&"$

0" Reinforce+ Concrete -e-0er1 (n+?or Pre;1tre11e+ Concrete

-e-0er1 of 1tr*ct*r( 1ection1 1h( co-3) .ith BS ##%$

@$% EECUTION OF CONSULTING SERVICE

@$# H)+r(*ic An()1i1

911 The #$ shall carry out the necessary hydraulic analysis for the

drainage system using the latest available computer software

and computer hardware to be purchased by the #$ solely for this

purpose The cost had already being included in the sum "uoted

for the consulting works &ll software purchased or developed in

house shall be subjected to the approval of the Datuk Bandar of 

Kuala Lumpur and shall become the property of Datuk Bandar of 

1

8/18/2019 Tor Civil Main Drain

http://slidepdf.com/reader/full/tor-civil-main-drain 14/23

Kuala Lumpur upon completion of the analysis studies and

monitoring of the project

91 The computer hardware shall be installed at the office of 

E&B&T&@ K$EF!FT$!&&@ &(&= ' %$@6&@6KFT&@B&@D&! :EK%B2, D$(&@ B&@D&!&G& KF&L& LF=%F!$ The

#$ personnel involved in the studies and analysis shall conduct

his workusing computer at E&B&T&@ K$EF!FT$!&&@ &(&=

' %$@6&@6KFT&@ B&@D&! :EK%B2, D$(&@ B&@D&!&G&

KF&L& LF=%F!$

@$& Fin( En/ineerin/ Wor6

The #$ shall carry out final engineering work for the project subject to

much modification as may be determined by the Datuk Bandar of KualaLumpur The final design shall incorporate such refinements in

alignment and gradient consistent with final engineering surveys and

design criteria @o major changes from the selected layout shall be

made without the prior approval of the Datuk Bandar of Kuala Lumpur

@$< Fin( En/ineerin/ S*r4e)1

The #$ shall be responsible to liaise with the Land /urveyor :either 

appointed or being the staff of the Datuk Bandar of Kuala Lumpur2 toconduct all topographical surveys, the results of which will be forwarded

to the #$ as needed to implement the final design of the project

Topographic surveys shall be performed to such accuracy that final

design construction "uantities can be calculated to sufficient accuracy

to permit construction tendering Lines having reference to the final

approved alignment of the carriageway proposed for final construction

shall be ade"uately marked on the ground with suitable permanent

reference monuments and bench marks &ll reference lines and marks

shall be coordinated to the /tate 6rid

@$= Soi1 (n+ (teri(1 In4e1ti/(tion1

The #$ shall be responsible to liaise with the /oil *nvestigation firm

appointed by Datuk Bandar of Kuala Lumpur to conduct detailed soil

investigations with laboratory testing as re"uired for proper e)ecution of 

works *nvestigations and testing shall be completed to permit final

design of drainage system sections, including all the road elements and

road side drainage /ubsurface investigation along the proposed

roadway alignment in areas of cut will be to depths ade"uate to permitreasonable accurate estimates to be made of the "uantities of rock

e)cavation that will be encountered in the construction

13

8/18/2019 Tor Civil Main Drain

http://slidepdf.com/reader/full/tor-civil-main-drain 15/23

The #$ shall also supervise detailed soil investigations together with

laboratory testing for the purpose of establishing the foundation features

of each structure *n cases where e)tra information is needed on the

soil characteristic and structure, the #$ will assist the Datuk Bandar of Kuala Lumpur to prepare a 5uotation Document following the DBKL

standard format for an open tender purposes

@$@ Fin( En/ineerin/ P(n1

991 The #$ shall, on the basis of field surveys and investigation

undertaken, perform final engineering for the project and prepare plans

in sufficient detail that they are suitable for tendering and construction

The plans shall include all items such as hori-ontal, and verticalalignment of the proposed and e)isting roadways, crosssections,

related earthworks and rock e)cavations, earthworks mass diagrams,

pavement details, superstructures, substructures, foundation details of 

bridges;underpass and drainage structures, bar bending schedules,

connection with e)isting road and all miscellaneous items of 

construction

The #$ shall investigate different methods in the design of bridge

structures, including the use of prefabricated prestressed beams andsteel beams and appropriate work se"uence

99 &ll plans shall be prepared on stable reproducible materials and have

title blocks approved by the Datuk Bandar of Kuala Lumpur %lans,

elevations and details shall be prepared in the /* system of 

measurement /cale chosen shall be those normally adopted for urban

roadwork, which shall be not less than 1.9 hori-ontally and 1.9

vertically

@$ Fin( Co1t E1ti-(te1

9>1 The #$ shall determine accurately the calculations of current unit price

for the purpose of cost estimates The unit prices so determined shall

be applied to the final "uantities to arrive at the #$0s final estimated

cost

The unit prices shall be based on actual costs of operating, the

necessary e"uipment and the relevant labour costs The unit prices

arrived at shall be checked against such prices currently paid tocontractors for similar works in Kuala Lumpur

18

8/18/2019 Tor Civil Main Drain

http://slidepdf.com/reader/full/tor-civil-main-drain 16/23

9> The #$ shall prepare a detailed Bill of 5uantities for the contract Three

:32 copies of final estimates of the cost of construction for the contract

shall be submitted to the Datuk Bandar of Kuala Lumpur under 

confidential cover

@$ Ten+er Doc*-ent1

9?1 The #$ shall review the tender documents and specifications currently

used by the Datuk Bandar of Kuala Lumpur for civil works contracts and

in consultation with the Datuk Bandar of Kuala Lumpur makeappropriate changes where necessary to reflect current practice The

#$ shall prepare complete tender documents and specifications for the

works &ll such documents shall be of a standard suitable for 

competitive tendering in accordance with the re"uirement of the Datuk

Bandar of Kuala Lumpur

9? The Tender Documents amongst other things shall include the

following.

1 Gener( Con+ition1&$ Ti-in/ of the Wor61

<$ V(ri(tion of Price C(*1e

=$ Perfor-(nce Bon+ Re8*ire-ent1

@$ P()-ent Con+ition1 !-onth) 1t(te-ent1"

$ Li8*i+(te+ D(-(/e1 C(*1e

$ Force (7e*re C(*1e

$ Ar0itr(tion C(*1e

$ A+4(nce P()-ent1

#%$ Defect1 Li(0iit) Perio+ !-(inten(nce 3erio+" c(*1e

@$ St(n+(r+ S3ecific(tion1

The #$ shall specify =alaysian /pecifications where such

specifications have been issued by the /*!*= *n specifying

re"uirements according to British /tandards, or other standards, the #$

shall take into consideration the availability of locally produced

materials Trade names shall not be specified without prior approval of the Datuk Bandar or Kuala Lumpur

19

8/18/2019 Tor Civil Main Drain

http://slidepdf.com/reader/full/tor-civil-main-drain 17/23

@$ L(n+ Ac8*i1ition P(n1

91 *f it is necessary to ac"uire land, in order to carry out the improvement

works the #$ shall familiari-e himself with the Land &c"uisition &ct The

design shall be such as to minimi-e property ac"uisition consistent with

economy

9 (here re"uired, the #$ shall prepare assist and advice DBKL Land

/urveyor, the final !ightof(ay &c"uisition %lans to a scale acceptable

to the Land 7ffice These final ac"uisition plans shall show all e)isting

structures, fence lines, e)isting !ightsof(ay and all other landmarks

93 The #$ shall set out the limits of any necessary land ac"uisition on the

ground by suitable markers The limits of ac"uisition to be set out shall

include all true e)isting boundaries of properties affected and their 

revised boundaries so as to establish on the ground the e)act limits of 

each and every property to be ac"uired !evised boundaries in this

conte)t shall mean the boundaries that will e)ist after the affected land

is ac"uired

98 &ll lines of limits of ac"uisition shall be coordinated to the /tate 6rid

99 &ll Land &c"uisition %lans shall have title blocks approved by the Datuk

Bandar of Kuala Lumpur

@$#% S*0;ettin/ of CEJ1 Wor6

@$#%$# S*0;ettin/ of .or61 refer1 to .or61 th(t (re not c(rrie+ o*t 0)

the CE1 o.n 1t(ff or e1t(0i1h-ent, 0*t (re c(rrie+ o*t 0)

other fir-1 or in+i4i+*(1$ E(-3e1 of the1e (re .or61 i6e-(teri(1 te1tin/, 3rintin/ of +oc*-ent1, 0in+in/ etc$

@$#%$& The CE *ne11 (/ree+ 0) the D(t*6 B(n+(r of K*(( L*-3*r 

other.i1e, 1h( in4ite co-3etiti4e 0i+1 for 1*0;ettin/ of .or61

(n+ 1*0-it their reco--en+(tion1 to the D(t*6 B(n+(r of 

K*(( L*-3*r for (33ro4( 0efore (cce3tin/ (n) 0i+ or 0i+1$

The (33ro4( of 1*ch 0i+1, .hich .i not 0e *nre(1on(0)

.ithhe+ or +e()e+, re1t1 .ith D(t*6 B(n+(r of K*(( L*-3*r$

@$#%$< The CE 1h( f(-ii(ri:e hi-1ef .ith the ten+erin/ (n+(cce3t(nce 3roce+*re1 (n+ +e4i(tion fro- the1e 3roce+*re1

1>

8/18/2019 Tor Civil Main Drain

http://slidepdf.com/reader/full/tor-civil-main-drain 18/23

1h( not 0e 3er-itte+ .itho*t the 3rior (33ro4( of the D(t*6

B(n+(r of K*(( L*-3*r$

@$## Printin/ of Re3ort, P(n1 (n+ Doc*-ent1

The #$ shall make his own arrangements for all printing and binding

@$#& Li(i1on .ith Other A/encie1

@$#&$# The CE 1h( i(i1e .ith the re13ecti4e Go4ern-ent (/encie1

for ( nece11(r) infor-(tion (n+ re8*ire-ent .ith re13ect to

ei1tin/ (n+ f*t*re *tiitie1 (n+ reoc(tion of ei1tin/ *tiitie1$

The CE 1h( i(i1e .ith the re13ecti4e 3(nnin/ (*thoritie1 .ith

re/(r+ to 3re1ent (n+ f*t*re 3(nnin/ 3ro3o1(1$ The CE 1h(

(1o i(i1e .ith De3(rt-ent of Irri/(tion (n+ Dr(in(/e !DID"

Wi()(h Per1e6*t*(n K*(( L*-3*r in re13ect of .or61 .ithin

the re1er4e of the (in Ri4er .hich co-e1 *n+er the

 7*ri1+iction of the +e3(rt-ent$

@$#&$& In connection .ith .or6 0) the CE .hich re8*ire1 the

coo3er(tion of Go4ern-ent De3(rt-ent (n+ A/encie1, the

D(t*6 B(n+(r of K*(( L*-3*r .i 3ro4i+e i(i1on (n+ .i

(11i1t1 the CE, if 3o11i0e, in o0t(inin/ (cce11 to (

infor-(tion re8*ire+ for the co-3etion of thi1 1er4ice1$

$% SERVICE AND FACILITIES

$# Tee3hone1 (n+ Tee/r(-1

The Datuk Bandar of Kuala Lumpur will not reimburse the #$

charges for telephone, email and internet e"uipments installed in

the #$0s office and for calls originating there from The Datuk

Bandar of Kuala Lumpur will reimburse telegrams and cable

charges incurred by the #$ with respect to this assignment

The #$ shall submit details to the Datuk Bandar of KualaLumpur enclosing copies of telegrams;cables, together with

copies of receipts

$& Office Acco--o+(tion (n+ Secret(ri( Ser4ice1

>1 The #$ shall at his own e)penses make his own

arrangements for office accommodation, office furniture,

e"uipment, stationery, and drawing office furniture for the

duration of the works

1?

8/18/2019 Tor Civil Main Drain

http://slidepdf.com/reader/full/tor-civil-main-drain 19/23

> The #$ shall make his own arrangements for /ecretarial

and #lerical /ervices

>3 The #$ shall provide his own transport and the Datuk

Bandar of Kuala Lumpur will reimburse the costs of essential transport based on approved rates

$% TIE SCHEDULES AND DOCUENTATION

?1 i2 Li8*i+(te+ (n+ A1cert(ine+ D(-(/e1

The #$ shall complete the services up to the Design /tage

within HHHHHHHHHHHHHHHHHHHHHHHHHH months from the effective

date of &greement

FAILURE OF THE CE TO COPLETE THE SERVICES WITHIN THE

TIE PRESCRIBED ABOVE OR ETENDED TIE WITHOUT AN>

VALID REASONS, AND IF THE FAILURE HAS CAUSED DELA> IN

THE PROGRESS OF THE PRO'ECT THEN THE DATUK BANDAR

OF KUALA LUPUR A> IPOSE LIUIDATED AND

ASCERTAINED DAAGES !LAD" OF  

PER DA> FOR SUCH DELA>$

ii2 Perfor-(nce Bon+

4or the due and faithful performance of this #ontract, the #$

shall deposit with the Datuk Bandar of Kuala Lumpur a sum of 

!= HHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHH :!*@66*T

=&L&G/*& HHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHH 2

in cash or an approved BankerCs 6uarantee as deposit

:hereinafter called I/ecurity DepositI2 *t is agreed that the Datuk

Bandar of Kuala Lumpur may utili-e and make payments out of 

or deductions from the said /ecurity Deposit

The /ecurity Deposit :or any balance thereof remaining for the

credit of #$2 shall be released on the e)piry of this #ontract and

shall refunded free of interest thereafter

$& Pro/re11 Re3ort1

The #$ shall submit 4*J$ :92 copies :unless otherwise less;more

copies re"uested2 of the progress reports to Datuk Bandar of Kuala

Lumpur every month reviewing their works performed and also

outlining the works intended in the following period The first progressreport shall be submitted after two months of the effective date of 

contract

R%-%r &o &7% ,%r)o" ,ro,o%"

R%-%r &o &7% Ma)!

R%-%r &o &7% COST ,ro,o%" (

1A

8/18/2019 Tor Civil Main Drain

http://slidepdf.com/reader/full/tor-civil-main-drain 20/23

$< Fin( Ri/ht;of;W() Ac8*i1ition P(n1

7ne set of final !ightof(ay %lans :if any2 on reproducible stablemedium and T$@ :12 copies :unless otherwise less;more copies

re"uested2 thereof shall be submitted by the #$ as soon as the

approval is finali-ed

The plans shall be made available to Datuk Bandar of Kuala Lumpur 

as the works progress to facilitate action to be taken for ac"uisition of 

the necessary !ightof(ay

$= Re4ie. of P(n1 (n+ Ten+er Doc*-ent1

The #$ shall submit to the Datuk Bandar of Kuala Lumpur for their 

review two :2 copies of design calculations, draft final plans and

tender documents These shall be submitted progressively, as feasible,

but not later than 47F! :82 weeks in advance of the date on which

final plans and documents will be due The Datuk Bandar of Kuala

Lumpur will review these plans and documents and furnish their 

comments to the #$

$@ Fin( P(n1, Doc*-ent1 (n+ Co-3*ter Di16ette1?Co-3(ct Di161

?91 The #$ shall furnish to the Datuk Bandar of Kuala Lumpur such

number of copies of the Tender Documents which includes

specifications and all plans as approved by Datuk Bandar of 

Kuala Lumpur and three priced copies of the Bill of 5uantities

under sealed confidential cover using the final unit prices as

established by the #$ and one set of reproducible drawings on a

stable based material

?9 The #$ shall furnish to the Datuk Bandar of Kuala Lumpur one

copy each of computer diskettes;compact disks readable by the

following software programs.

i" Dr(.in/19

Drawing files prepared and readable using &uto #ad 9

:or other version re"uested2 for (indows in %# or 

compatible %#

ii" S3ecific(tion9

/pecification files prepared and readable using =icrosoft(ord for (indows in %# or compatible %#

1

8/18/2019 Tor Civil Main Drain

http://slidepdf.com/reader/full/tor-civil-main-drain 21/23

iii" Bi of *(ntitie19

Bill of "uantities files prepared and readable using =icrosoft

$)cel for (indows in %# or compatible %#

i4" Other +oc*-ent1 ? /r(3hic19

7ther documents ; graphic files may be in the formatconsistent with the computer software used for their 

preparation, provided the computer used is %# or compatible

%#

$ Contr(ct Doc*-ent1

?>1 The #$ shall prepare three sets of original #ontract Documents

for signature by the parties concerned *n addition, the #$ shall

prepare #ertified True #opies of the original #ontract Documents

in the number as shall be notified to the #$ by the Datuk Bandar of Kuala Lumpur The certified True #opies need not have plans

attached

?> The #$ shall prepare all the necessary working drawings to be

issued to the contractor The working drawings shall incorporate

all subse"uent amendments made during the tender stage

?>3 The phasing and e)ecution of all construction work shall be such

as to cause minimum interruption and inconvenience to e)isting

property, traffic, and utilities

?? Effecti4e D(te of A/ree-ent

The starting date of $ffective Date of &greement shall be the

date on which the #$ commences work which date however 

shall be not later than T+*!TG :32 days from the issue of the

Later &ppointment by the Datuk Bandar of Kuala Lumpur

$%$ OTHER TERS AND REUIREENTS

$# Con1tr*ction Diffic*tie1

The #$ must ensure that the proposed infrastructure ' facilities

can be constructed without difficulties *n other words the #$ has

to consider this aspect in his design so that the cost is not

unnecessarily increased due to poor consideration for 

construction

*n cases where special techni"ue will be re"uired and it is not

available locally, the #$ must inform and get the approval of 

6overnment before proceeding with the design *n asking for 

8/18/2019 Tor Civil Main Drain

http://slidepdf.com/reader/full/tor-civil-main-drain 22/23

such approval the #$ must come up with the proposals and cost

estimates

$&$ De1i/n (n+ In(+e8*(c) D*rin/ Con1tr*ction

The #$ must ensure the ade"uacy of the design *n cases of 

construction failure the #$ will undertake to give advice and

detailed repair proposal &ny failure due to design inade"uacy

shall be borne by the #$

$<$ F(i*re of the Wor61 After Con1tr*ction

*n the event of failure of the (orks after construction, the #$ will

bear the cost of remedial work if the failure is due to his

negligence in design

$=$ S3ecific(tion1

DBKL ' EK! /tandard /pecification for relevant works shall be

the basis of the specification re"uirement (here necessary the

#$ shall also prepare details and other re"uired specification for 

the construction, testing, erection and construction of special

re"uirements as stated in the /cope of /ervices The #$ shall

also incorporate re"uirements on safety aspect in construction

into the specification.

$@$ Tr(n1fer of Technoo/)

The #$ will also undertake to provide the training and transfer of 

technology to the %ublic (orks Department personnel involved

in the project, when necessary

$$ Go4ern-ent In+e-nit)

The #onsulting $ngineer shall be responsible for any damage to

life and property that may arise out of their works and they shalltake all necessary insurance cover to indemnify the 6overnment

from any claims for compensation that may arise through their 

negligence.

$$ Chec6 Con1*t(nt

*n the event as re"uired, the #onsulting $ngineer shall provide

full cooperation and assistance to any check consultant

appointed by Datuk Bandar of Kuala Lumpur EK! in this project

1