Topic: PID Control Module
Contents
Instructions for PID Control Module.......................................................................................................3
Configure a PID Control Module............................................................................................................5
2 Copyright © 2013 Honeywell International Inc. 9/18/2013
HPS Automation College written permission required to distribute
Honeywell Confidential and Proprietary
This page was intentionally left blank.
PID Control Module
Instructions for PID Control Module
9/18/2013 Copyright © 2013 Honeywell International Inc. 3
HPS Automation College written permission required to distribute
Honeywell Confidential and Proprietary
Instructions for PID Control Module
Introduction
This portion of the document contains important information required to perform to ‘PID Control Module’ lab.
Procedure
Step Action
1
Read the following IMPORTANT information carefully.
Decide if you will be performing labs for C200E (and Series A I/O modules) OR C300 (and Series C I/O Modules). You can opt for either one but not both.
_______ C200E (and Series A I/O modules)
_______ C300 (and Series C I/O Modules)
2
ATTENTION
You must perform the remaining steps of this lab if you skipped any of the prior lessons of this course, else skip the remaining instructions and proceed to the next lab.
Locate the “GUI_DB_Load” Shortcut on desktop.
1. Double click “GUI_DB_Load” Shortcut to launch the import utility.
2. In Controller drop down select either C200 or C300 Controller (as per the option selected in step#1).
3. In Lesson number drop down select Lesson14.
4. Click the LOAD button.
PID Control Module
Instructions for PID Control Module
4 Copyright © 2013 Honeywell International Inc. 9/18/2013
HPS Automation College written permission required to distribute
Honeywell Confidential and Proprietary
Step Action
3
ATTENTION
If you are facing any of the following situation while loading the data base:
1. Import wrong Lesson Database
2. Error prompt appears while loading data base.
Then students should wait for at least one minute before reloading the database.
4 Open Control Builder. Select ONLY the Controller and load it. Activate the CEE using
Warmstart option.
5 Now select and load all IO and Control Modules with the “Automatically change All Control ….. …. ” option selected.
6 Ensure that the Controller, IO, and Control Modules are indicated in green color.
7 Open the Excel spreadsheet if not already open. Open either from:
C:\Users\Student\Documents\Tie_back_NEW.xls
OR by double clicking the shortcut on your desktop.
Proceed to next Lab.
PID Control Module
Configure a PID Control Module
9/18/2013 Copyright © 2013 Honeywell International Inc. 5
HPS Automation College written permission required to distribute
Honeywell Confidential and Proprietary
Configure a PID Control Module
Practice
Objective
• Configure a Control Module
• Use the naming conventions for the Control Module and function blocks within the control module
• Configure a Control Module with a single PID loop
Prerequisites
• Experion PKS Server or Client machine loaded with Experion PKS Engineering Tools
• Debutanizer_123 graphic loaded on the Server (This will be required at a later time to check the control strategy.)
• Control Builder running with the Project and Monitoring tree windows open
• SIM-C200E/C200E, or SIM-C300/C300 Controller and IOMs configured
• Excel Data Exchange open and loaded with the simulation spread sheet
PID Control Module
Configure a PID Control Module
6 Copyright © 2013 Honeywell International Inc. 9/18/2013
HPS Automation College written permission required to distribute
Honeywell Confidential and Proprietary
Introduction
The Heavy Feed Flow FC01 is built in this lab. This PID loop requires bumpless Auto – Manual transfer with alarms, groups, and historization enabled.
The PID loop will be built, loaded and activated. The remaining control modules, of a similar type, are imported into the project.
To create a control strategy, a Control Module 11_FC01 must be built and function blocks inserted and connected. Once the control modules are built or imported, you can test them with the simulation.
In this lab, you will build a control module for a simple PID loop 11_FC01 for the heavy feed to the debutanizer tower T-100.
PID Control Module
Configure a PID Control Module
9/18/2013 Copyright © 2013 Honeywell International Inc. 7
HPS Automation College written permission required to distribute
Honeywell Confidential and Proprietary
Create a Control Module (CM)
Step Action
1 Open Control Builder through Configuration Studio.
Open one or two Project/Monitor tree windows as desired.
2 Select File > New > Control Module.
3 Double-click the blank chart background.
PID Control Module
Configure a PID Control Module
8 Copyright © 2013 Honeywell International Inc. 9/18/2013
HPS Automation College written permission required to distribute
Honeywell Confidential and Proprietary
Step Action
4 On the Main properties tab, enter the following:
• Name: 11_FC01
• Item Name: 11_FC01_item
• Parent Asset: Analyser_C11
• Description: Heavy Feed To Debutanizer (Maximum 120 characters)
• Click the OK Button.
• Save and close 11_FC01.
ATTENTION
Control Builder numbers all new CMs sequentially. You can use any 16-character unique name for the CM in Project.
PID Control Module
Configure a PID Control Module
9/18/2013 Copyright © 2013 Honeywell International Inc. 9
HPS Automation College written permission required to distribute
Honeywell Confidential and Proprietary
Step Action
5 For this lab, use the specified CM names, because this allows you to test the CMs with the pre-configured Excel spreadsheet, used for simulation.
• CM 11_FC01 is added to the Unassigned node in Project window.
ATTENTION
Your Project window may differ. Verify that 11_FC01 is in the Unassigned node.
PID Control Module
Configure a PID Control Module
10 Copyright © 2013 Honeywell International Inc. 9/18/2013
HPS Automation College written permission required to distribute
Honeywell Confidential and Proprietary
Step Action
6 Configure the Parameters for 11_FC01.
• If the Main property page is not open, right click 11_FC01.
• Select Module Properties.
PID Control Module
Configure a PID Control Module
9/18/2013 Copyright © 2013 Honeywell International Inc. 11
HPS Automation College written permission required to distribute
Honeywell Confidential and Proprietary
Step Action
7 Enter the following parameter details in the Main tab.
• Engr Units: m3/hr (Maximum 16 characters allowed)
• Accept the defaults for any remaining parameters on the Main tab
ATTENTION
The name of every CM must be unique server wide.
8 Click the Server Displays tab.
Enter the following Display details:
Point Detail Display: sysDtlPIDA
Click the OK button.
ATTENTION
The Group detail display for 11_FC01 in Station will be directly picked from the type of Point detail display specified.
You can directly add a CM, to a Trend and Group by entering trend/group numbers and the pen/position in Trends and Groups windows, here or after building the control strategy in the CM.
PID Control Module
Configure a PID Control Module
12 Copyright © 2013 Honeywell International Inc. 9/18/2013
HPS Automation College written permission required to distribute
Honeywell Confidential and Proprietary
Step Action
9 Assign the CM to the controller CEESCEFB61 (for SIM C200E) or SIM_CEEC300 (for SIM C300).
• With the CM 11_FC01 selected, click the (Assign) button on the toolbar to open the Execution Environment Assignment dialog.
• Select 11_FC01 in the CMs/SCMs tab in Available Modules list box.
• Select CEESCEFB61 or SIM_CEEC300 in the Assign To list box.
• Click the Assign button.
• 11_FC01 is added to Assigned Modules list box.
• Click the Close button.
• 11_FC01 is now assigned to CEESCEFB61 or SIM_CEEC300 as indicated below.
For SIM-C200E For SIM C300
PID Control Module
Configure a PID Control Module
9/18/2013 Copyright © 2013 Honeywell International Inc. 13
HPS Automation College written permission required to distribute
Honeywell Confidential and Proprietary
Add Function Blocks to a CM
After creating a CM, you must design the control strategy by adding relevant Input/Output blocks and control blocks such as PIDs, device control or logic blocks.
The IOMs configured in the Configure C200E Hardware and Series A IOM/Configure C300 Hardware and Series C IOM lab are used here.
Step Action
1 Double-click 11_FC01 in the Project window to open the chart view, and then maximize the view.
2 Add Function Blocks to the CM
• From the Library tab, expand the IOCHANNEL (For Series A I/O) or Series_C_IO AI-HL (For Series C I/O).
• Select AICHANNEL.
For Series A I/O
For Series C I/O
PID Control Module
Configure a PID Control Module
14 Copyright © 2013 Honeywell International Inc. 9/18/2013
HPS Automation College written permission required to distribute
Honeywell Confidential and Proprietary
Step Action
3 Drag AICHANNEL into the 11_FC01 Project chart view.
4 Drag the following Function Blocks from their respective block libraries and add to the CM.
Block Family Block
DATAACQ DATAACQ
REGCTL PID
IOCHANNEL (For Series A I/O) or
SERIES_C_IO AO (For Series C I/O) AOCHANNEL
ATTENTION
Add the blocks in the order specified above. For more information on adding function blocks to a CM, refer to the Knowledge Builder along the path:
Experion R410 > Configuration > Control Building User’s Guide > Creating a Control Module > Creating and saving a control module > Creating an Instance of a Basic Function Block
PID Control Module
Configure a PID Control Module
9/18/2013 Copyright © 2013 Honeywell International Inc. 15
HPS Automation College written permission required to distribute
Honeywell Confidential and Proprietary
Step Action
5 After adding all the blocks, arrange them as shown below.
For SIM-C200E
For SIM-C300
6 Configure AIChannel parameters:
• Double-click the AICHANNEL block to open the AI parameter configuration form.
• Enter the Channel Name as FI.
For Series A I/O For Series C I/O
TIP (Only for Series C IO Channels)
Channel PV Range parameters can be configured in Series C AI Channel block.
Therefore, PV ranges for Analog Inputs must be configured for both the Series C AI Channel block and the DACA block.
7 For C300s ONLY:
Change the ranges of the FI block as follows:
PV Extended High Range 600.9
PV High Range 600
PV Low Range 0
PV Extended Low Range -6.9
PID Control Module
Configure a PID Control Module
16 Copyright © 2013 Honeywell International Inc. 9/18/2013
HPS Automation College written permission required to distribute
Honeywell Confidential and Proprietary
Step Action
8 Assign the AI Channel to an AI Module.
For C200E:
Step Action
1 Refer to Appendix 1 – C200E I/O list assignments at the end of Appendix (or Document available on Desktop) for the following information on 11_FC01.FI:
Module Name:
Channel Number:
2 In the properties of the AI channel (FI block), use the pull-down list to select the module name.
3 Select the channel number.
4 Click the ‘Assign Channel Block’ button.
5 Click the OK button to close FI properties.
For C300:
Step Action
1 Refer to Appendix 1 – C300 I/O list assignments at the end of Appendix (or Document available on Desktop) for the following information on 11_FC01.FI:
Module Name:
Channel Number:
2 Click the OK button to close FI properties.
3 Right-click the AI channel (FI block) and select Function Block Assign.
4 In the ‘Function Block Assignment Dialog’, select the appropriate channel (use the Module Name (IOM Name), and the Channel Number from above), and click the Assign button.
PID Control Module
Configure a PID Control Module
9/18/2013 Copyright © 2013 Honeywell International Inc. 17
HPS Automation College written permission required to distribute
Honeywell Confidential and Proprietary
Step Action
9 Configure a Data Acquisition Block. Double-click the Data Acquisition Block, to open the configuration form, and enter the following:
Name: DACA
Description: Heavy Feed to Debutanizer
Engr Units: m3/hr
PVEU Range Hi: 600
PVEU Range Lo: 0
PV Extended Hi Limit: 600.9
PV Extended Lo Limit: -6.9
Clamping Option: ENABLE
Accept the defaults for any remaining parameters on this tab.
ATTENTION
You must name this block DACA so that the Honeywell-supplied Analog Point Details display functions properly when called from Station.
PID Control Module
Configure a PID Control Module
18 Copyright © 2013 Honeywell International Inc. 9/18/2013
HPS Automation College written permission required to distribute
Honeywell Confidential and Proprietary
Step Action
10 Select the Show Parameter Names checkbox located at the lower left corner. Note that the parameter names now appear in place of the parameter descriptions.
ATTENTION
This displays the parameter names instead of parameter descriptions.
11 Uncheck the Show Parameter Names checkbox.
PID Control Module
Configure a PID Control Module
9/18/2013 Copyright © 2013 Honeywell International Inc. 19
HPS Automation College written permission required to distribute
Honeywell Confidential and Proprietary
Step Action
12 To Configure Alarms, select the Alarms tab.
Enter the following:
PV High: 500 Priority: HIGH
PV Low: 0 Priority: Low
Accept the defaults for all remaining parameters.
13 Click OK.
PID Control Module
Configure a PID Control Module
20 Copyright © 2013 Honeywell International Inc. 9/18/2013
HPS Automation College written permission required to distribute
Honeywell Confidential and Proprietary
Step Action
14 To Configure a PID Block:
Double click PIDA.
Enter the following:
Name: PIDA
Description: Heavy Feed to Debutanizer
Engineering Units: m3/hr
PVEU Range Hi: 600
PVEU Range Low: 0
Select the Enable Secondary Initialization Option checkbox.
Normal Mode: AUTO
Normal Mode Attribute: OPERATOR
Accept the defaults for all remaining parameters on this tab.
ATTENTION
This block must be named PIDA for the Honeywell-supplied standard PID Point Detail Display to function properly.
PID Control Module
Configure a PID Control Module
9/18/2013 Copyright © 2013 Honeywell International Inc. 21
HPS Automation College written permission required to distribute
Honeywell Confidential and Proprietary
Step Action
15 Click the Algorithm tab in the PID configuration form and enter the following:
Control Equation type: EQB
Integral Time (T1): 0.2
Linear Gain Options: LIN
Overall Gain: 0.40
ATTENTION
The Algorithm form allows you to configure PID control equation types, associated PID equation parameters and gain options for the PID block.
16 Click the SetPoint Tab and enter the following:
High Limit: 600
Low Limit: 0
Ensure Enable PV Tracking is selected.
g
PID Control Module
Configure a PID Control Module
22 Copyright © 2013 Honeywell International Inc. 9/18/2013
HPS Automation College written permission required to distribute
Honeywell Confidential and Proprietary
Step Action
17 Click the Alarms tab of PID and enter the following:
Type: OP High
Trip Point: 95
Priority: LOW
PID Control Module
Configure a PID Control Module
9/18/2013 Copyright © 2013 Honeywell International Inc. 23
HPS Automation College written permission required to distribute
Honeywell Confidential and Proprietary
Step Action
18 To add or remove Block Pins in a Functional Block:
Click on the Block Pins tab.
In the ‘Selected Parameters’ portion of the window, for the PV parameter, change the location to ‘Left’ by:
Click on the “TOP” value on the PV parameter Location column.
Select LEFT from the drop down combo box.
PID Control Module
Configure a PID Control Module
24 Copyright © 2013 Honeywell International Inc. 9/18/2013
HPS Automation College written permission required to distribute
Honeywell Confidential and Proprietary
Step Action
19 As a result of the previous change in pin location, the PV pin shifted to the left side of the PID block faceplate, as indicated below.
Click OK.
20 Configure the AO Block.
Double-click the AOChannelA Block and enter the following:
Channel Name: FV
PID Control Module
Configure a PID Control Module
9/18/2013 Copyright © 2013 Honeywell International Inc. 25
HPS Automation College written permission required to distribute
Honeywell Confidential and Proprietary
Step Action
21 Assign the AO block to an AO channel.
For C200E:
Step Action
1 Refer to Appendix 1 – C200E I/O list assignments at the end of Appendix (or Document available on Desktop) for the following information on 11_FC01.FV:
Module Name:
Channel Number:
2 In the properties of the AO channel (FV block), use the pull-down list to select the module name.
3 Select the channel number.
4 Click the ‘Assign Channel Block’ button.
5 Click the OK button to close FV properties.
For C300:
Step Action
1 Refer to Appendix 1 – C300 I/O list assignments at the end of Appendix (or Document available on Desktop) for the following information on 11_FC01.FV:
Module Name:
Channel Number:
2 Click the OK button to close FV properties.
3 Right-click the AO channel (FV block) and select Function Block Assign.
4 In the ‘Function Block Assignment Dialog’, select the appropriate channel (use the Module Name (IOM Name), and the Channel Number from above), and click the Assign button.
PID Control Module
Configure a PID Control Module
26 Copyright © 2013 Honeywell International Inc. 9/18/2013
HPS Automation College written permission required to distribute
Honeywell Confidential and Proprietary
Connect Function Blocks
After adding the Function Blocks, wire them together to form a Control Strategy. You can wire Blocks together anytime you choose, before or after configuring block parameters.
Step Action
1 From the Main Menu, Select Chart > Insert > Wire, OR Click the button in the toolbar.
• The cursor changes to a PLUS (+) sign inside the Project chart window.
• Click the PV pin displayed in the AICHANNEL (FI) block and then click the P1 pin in the DATAACQ (DACA) block.
• These function blocks are now connected.
PID Control Module
Configure a PID Control Module
9/18/2013 Copyright © 2013 Honeywell International Inc. 27
HPS Automation College written permission required to distribute
Honeywell Confidential and Proprietary
Step Action
2 Repeat the above steps to connect PV pin of DATAACQ (DACA) to the PV of PIDA.
3 Connect the PIDA OP pin to the OP pin of AO.
• Your CM should be similar to the one shown below.
4 Select File > Save.
PID Control Module
Configure a PID Control Module
28 Copyright © 2013 Honeywell International Inc. 9/18/2013
HPS Automation College written permission required to distribute
Honeywell Confidential and Proprietary
Step Action
5 Configure History Collection, Trends and Groups.
Double-click in the white space of the chart view of 11_FC01 to open its configuration form. Select the Server History tab.
In the History Configuration section, in the Parameter column, row 1, click the (Point Selection) button to open the Point Selection form.
Select the row having Point name 11_FC01 and Block Name PIDA, as shown in the screen capture.
Select OP for the Parameter.
Click OK to close the Point selection form.
6 11_FC01.PIDA.OP appears in the History Configuration table.
• Click to select the FAST (Fast History) and STD (Standard History) options.
• 11_FC01.PIDA.OP will now be historized.
PID Control Module
Configure a PID Control Module
9/18/2013 Copyright © 2013 Honeywell International Inc. 29
HPS Automation College written permission required to distribute
Honeywell Confidential and Proprietary
Step Action
7 Repeat the above steps to configure History Collection for 11_FC01.PIDA.PV in row 2 of the Parameter column.
8 Add Point Parameters to Trends.
Click the Server Displays tab in the configuration form.
In the Trends section, in row 1, specify Trend # 1 as the Trend number.
In row 1, Pen column, click to select 1 from the drop-down menu.
In row 1, Enter 11_FC01.PIDA.PV as the Trend Parameter.
• You can also select the parameter with the help of Point selection list, as shown in an earlier step.
In the Groups section, row 1, specify Group # 11, Position # 1 and Group Parameter 11_FC01.PIDA.PV.
Click OK.
PID Control Module
Configure a PID Control Module
30 Copyright © 2013 Honeywell International Inc. 9/18/2013
HPS Automation College written permission required to distribute
Honeywell Confidential and Proprietary
Step Action
9 Click File > Save.
10 Close the 11_FC01 Project chart window.
• This CM is located under CEESCEFB61 or SIM_CEEC300, which means it is assigned to that execution environment.
• The symbol “ “indicates that the CM has not yet been downloaded to the controller.
• The color gray of the connection icon indicates the CM is in Project mode.
ATTENTION
The screen capture might look different if you are using SIM-C300.
PID Control Module
Configure a PID Control Module
9/18/2013 Copyright © 2013 Honeywell International Inc. 31
HPS Automation College written permission required to distribute
Honeywell Confidential and Proprietary
Step Action
11 Download this CM.
• Select 11_FC01.
• Click the on the toolbar.
• Click Continue on the Load window showing the warning.
• Select the Automatically change checkbox. This ensures that the post load state is automatically set as ACTIVE.
12 Click OK.
• A Load dialog box appears and closes on a successful download.
• In Project, notice that there is no “ “ symbol in front of 11_FC01.
PID Control Module
Configure a PID Control Module
32 Copyright © 2013 Honeywell International Inc. 9/18/2013
HPS Automation College written permission required to distribute
Honeywell Confidential and Proprietary
Step Action
13 Click the Monitoring tab to verify that 11_FC01 is active (green).
• If the CM is active (green), skip the next step
• If the CM is inactive (blue), perform the next step
ATTENTION
The screen capture might look different if you are using SIM-C300.
PID Control Module
Configure a PID Control Module
9/18/2013 Copyright © 2013 Honeywell International Inc. 33
HPS Automation College written permission required to distribute
Honeywell Confidential and Proprietary
Step Action
14 Activate the CM (right-click 11_FC01 and select “Activate”) or select 11_FC01 and click
the (Toggle State) button from the toolbar, to open the following.
Click Yes.
• Notice that the 11_FC01 changes to green indicating it is now active.
Monitoring tree status information is indicated by different symbols and colors, as shown below:
CPM/SCE Symbols
1 Grey - As seen in project tree.
1 Grey – Project tree
2 Grey - Loaded not monitored
3 Red - Communication failure
4 Yellow - Not used
5 Green - Active
6 Red - Failed
7 Yellow - Not Loaded
8 Blue – Loaded
1 2 3 4 5 6 7 8
PID Control Module
Configure a PID Control Module
34 Copyright © 2013 Honeywell International Inc. 9/18/2013
HPS Automation College written permission required to distribute
Honeywell Confidential and Proprietary
Step Action
CEE/ CEESCE Symbols
1 2 3 4 5 6
1 Grey - As seen in project tree
2 Grey - Loaded not monitored
3 Red - Communication failure
4 Blue - Inactive
5 Green - Active
6 Red - Configuration Error
CM Symbols
1 2 3 4 5
1 Grey - As seen in project tree
2 Grey - Loaded not monitored
3 Red - Communication failure
4 Blue - Inactive
5 Green – Active
PID Control Module
Configure a PID Control Module
9/18/2013 Copyright © 2013 Honeywell International Inc. 35
HPS Automation College written permission required to distribute
Honeywell Confidential and Proprietary
Step Action
15 Open Station, access and refresh the Debutanizer_123 graphic.
• Change the 11_FC01 controller to AUTO mode.
• Click the SP value and enter 400 in the 11_FC01 faceplate.
ATTENTION
Open the Tie_Back_New Excel spreadsheet to observe the values for PV and OP.
If the PV value for the point is not updating then restart the Tie_Back_New Excel spreadsheet. This spreadsheet is used for simulation purposes.
PID Control Module
Configure a PID Control Module
36 Copyright © 2013 Honeywell International Inc. 9/18/2013
HPS Automation College written permission required to distribute
Honeywell Confidential and Proprietary
Step Action
16 To watch the trend in Station:
Click the button in Station.
Enter 1 in command line. Change the trend interval, if necessary.
Zoom the line trend to get a closer display.
PID Control Module
Configure a PID Control Module
9/18/2013 Copyright © 2013 Honeywell International Inc. 37
HPS Automation College written permission required to distribute
Honeywell Confidential and Proprietary
Step Action
17 To see the CM in the Group display:
• Click button on Station.
• Type 11 and press the Enter key.
PID Control Module
Configure a PID Control Module
38 Copyright © 2013 Honeywell International Inc. 9/18/2013
HPS Automation College written permission required to distribute
Honeywell Confidential and Proprietary
Step Action
18 From the Group Display, change the MD to MAN.
Change the OP to 30.
• The PV will change because the OP changed. The SP follows the PV because PV tracking is enabled.
• This tests your CM 11_FC01.
PID Control Module
Configure a PID Control Module
9/18/2013 Copyright © 2013 Honeywell International Inc. 39
HPS Automation College written permission required to distribute
Honeywell Confidential and Proprietary
Step Action
19 In Control Builder, import (with CEE assignment) 11_FC02, 11_FC28 and 11_PC15 from the following location:
C:\ Users\Public\Public Documents\Honeywell\Experion PKS\ Ixport\C200E(or C300)\L14_PID Control Module
ATTENTION
If needed, follow the steps in the Import/Export Lab for importing the above CMs.
If you are Using SIMC200E/C200E, the path for Database is:
C:\ Users\Public\Public Documents\ Honeywell\Experion PKS\Ixport\C200E\L14_PID Control Module
If you are Using SIMC300/C300, the path for Database is:
C:\ Users\Public\Public Documents\ Honeywell\Experion PKS\Ixport\C300\L14_PID Control Module
20 From Project, download (with activation) the CMs imported in the previous step.
21 Verify that the three CMs are active (green) in the Monitoring tab.
PID Control Module
Configure a PID Control Module
40 Copyright © 2013 Honeywell International Inc. 9/18/2013
HPS Automation College written permission required to distribute
Honeywell Confidential and Proprietary
Step Action
22 Open Station and access the Debutanizer_123 graphic.
ATTENTION
Verify that the imported CMs have values. (If necessary, place the imported loops in AUTO mode and provide suitable SP values to see a PV response.)