    Building Measurement

    Topic 3Masonry & Concrete Works

    The Copyright of this document belongs to BCA. No part of this document may be used, disclosed, transferred, reproduced,

    stored in a retrieval system or transmitted in any form or by any means electronic, mechanical, photocopying recording orotherwise to any person not authorized to use it without the express written permission of BCA

    Lecturer: Hong Pham

    1

  • 8/12/2019 Topic 3 - Concrete and Masonry

    2/60

    Course overview

    Topic 1: Introduction & measurement techniques

    Topic 2: Excavation works Topic 3: Concrete and masonry works

    Topic 4: Internal finishes: floor, wall and ceiling

    2

    Topic 5: Doors, windows and ironmongeries Topic 6: Roofing structure and covering

    Topic 7: Structural steel works

    Topic 8: External works

    Topic 9: Piling

  • 8/12/2019 Topic 3 - Concrete and Masonry

    3/60

    Recap of Topic 2

    CP97 Section 4 Excavation works

    Deduct existing void / objects or area not to be excavated V excavated = V backfill + V disposal

    Measure net V ; no expansion/bulk allowance V backfill = V size of hole/void

    Excavation to be measured in successive stages of 3m

    Cutting down trees measured in No. and be sorted by tree girth Excavation oversite measured in m3 and stated average depth Excavation works item should include backfill or disposal

    8

    Measurementrules

    3

    accor ng y

    Site clearance Excavation / Filling works

    Support works

    Site dewatering Disposal of excavated material Surface treatment

    Hardcore and blinding

    Underpinning

    8

    MeasurementItems

  • 8/12/2019 Topic 3 - Concrete and Masonry

    4/60

    Building elements & Lesson plan

    A. SUB-STRUCTURE

    1. Piling Topic 9 Piling

    2. Foundation Topic 2 Excavation

    Topic 3 Concrete & masonry3. Basement

    B. SUPER-STRUCTURE

    1. Frame structure Topic 3 Concrete & masonry

    Topic 7 Structural steelwork2. Envelope & Partitions

    3. Doors & Windows

    Topic 5 Doors, windows

    Topic 6 Roof

    4. Finishes5. Furniture & Fittings

    6. Roofing

    C. MEP

    WORKS

    D. EXTERNALWORKS

    1. Drainage

    2. Gate & Fencing

    3. Road & Landscaping

    Topic 8 External works

    4

  • 8/12/2019 Topic 3 - Concrete and Masonry

    5/60

    Topic 3 Concrete and masonry works

    1. Building elements require concrete &

    masonry works2. Section 5 Concrete work

    Measurement rules

    Measurement items

    3. Section 6 Brickwork and Blockwork

    Measurement rules

    Measurement items

    5

  • 8/12/2019 Topic 3 - Concrete and Masonry

    6/60

    Building elements require concrete &

    masonry works

    Sub-structure

    Foundation Column stumps

    Ground beam/slab

    - Columns

    Beams

    Slabs

    Walls Staircases

    Lintols

    6

  • 8/12/2019 Topic 3 - Concrete and Masonry

    7/60

    CP97Section 5 - Concrete WorkMeasurement rules

    7

  • 8/12/2019 Topic 3 - Concrete and Masonry

    8/60

    Concrete Work

    In-situ concrete: Casting on-site

    Pre-cast concrete: Casting off-site

    In-situ concrete + Formwork + Reinforcement

    8

  • 8/12/2019 Topic 3 - Concrete and Masonry

    9/60

    Section 5 Concrete workMea. rules Measurement items

    In-situconcrete

    In-situ Concrete MR1 13 1. In-situ concrete2. Sundries

    Waterproofing MR14 17 3. Waterproofing4. Surface treatment

    In-situ Formwork MR18 28 5. In-situ formwork

    Permanent metal MR29 30 6. Permanent formwork system

    Waffle formwork MR31 33 7. Waffle form

    Slip formedconstruction

    MR34 36 8. Slip formed construction

    Reinforcement MR37 41 9. Mild steel rebars

    10. High tensile rebars11. Fabric reinforcement12. Prestress tendons

    Pre-castconcrete

    Pre-cast concrete MR1 4 1. Form major part2. No form major part

    3. Prestressed concrete 9

  • 8/12/2019 Topic 3 - Concrete and Masonry

    10/60

    SECTION 5 - CONCRETE WORK

    In-situ Concrete

    10

    In-situconcrete

    Waterproofing

    In-situFormwork

    Reinforcement

  • 8/12/2019 Topic 3 - Concrete and Masonry

    11/60

    Section 5 - Concrete work

    In-situ concrete

    Measurement rules (13)

    MR1: State concrete strength MR2: Separate plain & RC

    MR3: State method of placing

    MR4: Labour to existing works measured separately

    MR5: All concrete measured in m3

    MR6: State thickness when measure slabs/walls MR7: Beams/walls/columns measured to under of slab if same mix

    MR8: No deduction opening 0.10 m2; void 0.05 m3

    MR9: Any special treatment shall be stated

    MR10: Any projection to walls considered columns

    MR11: Details produced by formwork to be measured with formworks MR12: Prestressed shall be group in separate heading

    MR13: General description for prestressed concrete work

    11

  • 8/12/2019 Topic 3 - Concrete and Masonry

    12/60

    MR1: Strength or mix of the concrete

    E.g. Grade 30 ; Grade 45; Grade 50

    MR2: Plain and reinforced concrete to be given

    Section 5 : Concrete work

    In-situ Concrete Measurement Rules

    separa e y

    MR5: Measured m3 unless otherwise stated

    MR6: Slabs, walls and the like measured in m3stating the thickness

    12

  • 8/12/2019 Topic 3 - Concrete and Masonry

    13/60

    MR7: Beams, walls or columns:

    Measured to the underside of slabs if sameconcrete mix or strength

    Measured through the slabs if differenceconcrete mix or stren th

    Section 5 : Concrete work

    In-situ Concrete Measurement Rules

    13

    Slab

    Column

    Beam

    Slab

    Column

    Beam

    Same Grade Different Grade

  • 8/12/2019 Topic 3 - Concrete and Masonry

    14/60

    Section 5 : Concrete work

    In-situ Concrete Measurement Rules

    MR8: No deduction for:

    Voids of 0.05 m3

    Volume of the reinforcement and steelwork

    Cast in assessories

    . , , ,

    roadways

    14

  • 8/12/2019 Topic 3 - Concrete and Masonry

    15/60

    Section 5 : Concrete work

    In-situ Concrete Measurement Rules MR10: All projections shall be dealt with as columns;

    shall be measured through wall

    Projection to

    wall

    Measured

    through as

    Plan view Plan view15

  • 8/12/2019 Topic 3 - Concrete and Masonry

    16/60

    Section 5 : Concrete work

    In-situ Concrete Measurement Items1.1 Blinding (lean concrete) m3/ thickness stated

    1.2 Plinths and machine bases No/ dim & fwk stated

    16

  • 8/12/2019 Topic 3 - Concrete and Masonry

    17/60

    Section 5 : Concrete work

    In-situ Concrete Measurement Items1.3 1.6 Pilecaps / Strip fdn / Retainting wall / Underpinning m3

    1.7 1.8 Isolated pier / post fdn / ground beam m3

    17

  • 8/12/2019 Topic 3 - Concrete and Masonry

    18/60

    Section 5 : Concrete work

    In-situ Concrete Measurement Items1.9 Columns / isolated piers / struts m3

    1.10 Beams / braces / cantilevers m3

    1.11 & 1.13 Ground slab m3 thickness stated1.12 Thickening to slab m width and thickness stated

    1.13 Suspended slab m3 thickness stated/ sort in slope of 20o

    18

    Brace

  • 8/12/2019 Topic 3 - Concrete and Masonry

    19/60

    Section 5 : Concrete work

    In-situ Concrete Measurement Items1.14 1.15 Coffered slab / topping layers m3 / thickness

    1.16 1.23 Walls / Retaining, lift shaft, parapet wall / Slab partitions

    / Steps & staircases / Balustrades / Landings m3/thickness

    19

  • 8/12/2019 Topic 3 - Concrete and Masonry

    20/60

    Section 5 : Concrete work

    In-situ Concrete Measurement Items1.24 1.25 Casing to steel beams/ lintols/columns m3 / thickness

    1.26 1.28 Kerbs / copings / strings / sills / water channel / scupper

    drain - m / incl formwork

    20

    Sill

    Surface waterchannel

    Scupper

    drain

  • 8/12/2019 Topic 3 - Concrete and Masonry

    21/60

    Section 5 : Concrete work

    In-situ Concrete Measurement Items1.29 Cascade steps to channel No / height

    2.1 2.2 Expansion joints / Water stops m/ incl formwork, labor

    2.3 Special junction pieces No / incl fwk, labor2.4 Formation or grouting m / size stated

    21

  • 8/12/2019 Topic 3 - Concrete and Masonry

    22/60

    SECTION 5 - CONCRETE WORK

    Waterproofing

    22

    In-situconcrete

    Waterproofing

    In-situFormwork

    Reinforcement

  • 8/12/2019 Topic 3 - Concrete and Masonry

    23/60

    Section 5 : Concrete work

    Water-proofing Measurement rules

    MR15: Waterproofing particulars to be given:

    Kind and quality of waterproofing Thickness and number of coats

    Nature of base on which waterproofing is applied

    Examples:

    Applying 3 coats of water-based polyurethane liquidapplied water proofing, comply with B.S.123,

    minimum thickness of 1.5mm to concrete slab.

    23

  • 8/12/2019 Topic 3 - Concrete and Masonry

    24/60

    Section 5 : Concrete work

    Water-proofing Measurement rules

    MR14: Waterproofing shall be given in the following

    heading where applicable: Damp-proofing and tanking

    Paving and sub-floors

    oo ng

    MR 16: State in description if work to be done byspecially ordered, not follow the main work.

    MR17: No deduction for opening of water-proofingarea 0.50 m2

    24

  • 8/12/2019 Topic 3 - Concrete and Masonry

    25/60

    Section 5 : Concrete work

    Waterproofing Measurement items

    3

    Waterproofing

    3.1

    Liquid applied

    4 Surfacetreatment

    4.1

    Hardener

    3.2Membrane

    3.3 Sundries

    3.4 Additives

    4.2

    Anti-slip

    4.3

    Colorant

    4.4

    Coatings

  • 8/12/2019 Topic 3 - Concrete and Masonry

    26/60

    Section 5 : Concrete work

    Waterproofing Measurement items

    3 Waterproofing

    3.1 Liquid applied

    m2

    3.2 Membrane

    m2; in 250mm widthcategory

    1. Horizontal

    2. Slope >10 deg3. Vertical4. Circular5. Tanking6. Damp-proofing7. Overhand work

    8. Work subsequently covered9. Carried out in workspace

    600 mm wide

  • 8/12/2019 Topic 3 - Concrete and Masonry

    27/60

    Section 5 : Concrete work

    Waterproofing Measurement items3.3 Sundries forWaterproofing

    Angle fillets / Skirtings / Coves / Turn-ups

    m; Size and height stated

    3.4 Waterproofing

    Additive

    m3

    Extra over in in-situ concretecomponents;

    May be included in thedescription of the in-situ

    concrete

    + Area 1m2 : No+ Area > 1 m2: m2

    Gutter; kerbs; channels

    M; Size/dim stated

    Outlets

    (a) Collars around pipes

    (b) Dressing into outlets

    No; Size/dim stated

  • 8/12/2019 Topic 3 - Concrete and Masonry

    28/60

    Section 5 : Concrete work

    Waterproofing Measurement items4 Surface treatment

    To concrete surface of slabs

    m2

    4.1 Hardener

    28

    4.2 Anti-slipGrooves / Rings

    4.3 Colorant

    4.4 Coatings

  • 8/12/2019 Topic 3 - Concrete and Masonry

    29/60

    SECTION 5 - CONCRETE WORK

    In-situ Formwork

    29

    In-situconcrete

    Waterproofing

    In-situFormwork

    Reinforcement

  • 8/12/2019 Topic 3 - Concrete and Masonry

    30/60

    Section 5 : Concrete work

    In-situ Formwork Measurement rules

    MR19:

    Describe separately the

    special surface finish ofthe concrete face

    State the linin material

    to be left in position as afinish to concrete ; statethe method of securing tothe concrete

    30

  • 8/12/2019 Topic 3 - Concrete and Masonry

    31/60

    Section 5 : Concrete work

    In-situ Formwork Measurement rules

    MR20: Separate permanent or left-in formworkformwork from reusable fwk

    31

  • 8/12/2019 Topic 3 - Concrete and Masonry

    32/60

    Section 5 : Concrete work

    In-situ Formwork Measurement rules

    MR21: height of strutting exceeds 5.00m, formworkgiven separately in stages of 1.50m

    Formwork to soffit ofslab struttin hei ht

    7.00m

    6.00m

    exceeding 6.50m butn.e. 8.00m

    Formwork to soffit ofslab, strutting heightexceeding 5.00m butn.e. 6.50m

    32

  • 8/12/2019 Topic 3 - Concrete and Masonry

    33/60

    Section 5 : Concrete work

    In-situ Formwork Measurement rules

    33

  • 8/12/2019 Topic 3 - Concrete and Masonry

    34/60

    Section 5 : Concrete work

    In-situ Formwork Measurement rules MR22: No deduction for opening 1.00 m2

    MR25: Formwork is given in m2, measure the actual surface in

    contact with the concrete

    34

  • 8/12/2019 Topic 3 - Concrete and Masonry

    35/60

    Section 5 : Concrete work

    In-situ Formwork Measurement rules

    MR26: Formwork to edges and breaks in floors and walls andthe like where under 500mm wide shall be given in m2 and

    grouped in stages of 250mm.E.G. width n.e. 250mm

    width e. 250mm but n.e. 500mm

    35

    Edge of

    slabSlab Section

    Break

    in wall

    Wall elevation

    S i C k

  • 8/12/2019 Topic 3 - Concrete and Masonry

    36/60

    Section 5 : Concrete workIn-situ Formwork Measurement rules

    MR 27: No deduction for formwork at intersectionsbetween

    Main and secondary beams Beams and columns

    MainBeam

    MainBeam

    SecondaryBeams

    Plan view36

    Column Column

    Beams

    Elevation

    S ti 5 C t k

  • 8/12/2019 Topic 3 - Concrete and Masonry

    37/60

    Section 5 : Concrete workIn-situ Formwork Measurement rules

    MR 28: Formwork shall be measured to the surfaceof work sloping more than 20 degrees from thehorizontal

    37

    S ti 5 C t k

  • 8/12/2019 Topic 3 - Concrete and Masonry

    38/60

    Section 5 : Concrete workIn-situ Formwork Measurement items

    Horizontal surfaces

    Strutting hi 5m

    Strutting hi > 5m, stage

    1.5m

    For:

    Slabs, staircases,

    Ramps, etc.

    Vertical surfaces

    For:

    Foundation

    Columns

    38

    5 In-situformwork

    Beams

    Curved surfaces

    For:

    Curved walls,

    Tank, etc.

    Edges / breaks

    Width in 250mmcategory

    For:

    Floors; walls; openstrings of stairs

    m2

    S ti 5 C t k

  • 8/12/2019 Topic 3 - Concrete and Masonry

    39/60

    Section 5 : Concrete workIn-situ Formwork Measurement items

    Cornices and mouldings /Formation produced by

    formworkm/ size stated

    39

    5 In-situformwork

    Small surfaces /

    Cantilever ends / capsNo/ size stated

    Formwork / temporary

    support for pre/posttension units

    m2/ size stated

    Height above ground

  • 8/12/2019 Topic 3 - Concrete and Masonry

    40/60

    SECTION 5 - CONCRETE WORK

    Reinforcement

    40

    In-situconcrete

    Waterproofing

    In-situFormwork

    Reinforcement

  • 8/12/2019 Topic 3 - Concrete and Masonry

    41/60

    Section 5 : Concrete work

  • 8/12/2019 Topic 3 - Concrete and Masonry

    42/60

    Section 5 : Concrete workReinforcement Measurement rules

    Reinforcement bars:

    MR39: Weights per metre for steel bars:

    Diameter

    6mm

    Kg/m

    0.222

    Diameter

    25mm

    Kg/m

    3.854

    10mm

    12mm

    16mm

    20mm

    .

    0.616

    0.888

    1.579

    2.466

    32mm

    36mm

    40mm

    44mm

    56mm

    .

    6.313

    7.991

    9.864

    11.926

    19.318

    42

    Section 5 : Concrete work

  • 8/12/2019 Topic 3 - Concrete and Masonry

    43/60

    Section 5 : Concrete workReinforcement Measurement rules

    MR40: Measured follow the location of in-situ concretethat they belong to:

    Descriptions:

    In situ Concrete Grade 45 in:

    Quantities

    Beams B1

    Mild steel reinforcement bars in:

    Beams B1

    12mm dia.25mm dia.

    7.50m3

    700 kg800 kg

    43

    Section 5 : Concrete work

  • 8/12/2019 Topic 3 - Concrete and Masonry

    44/60

    Section 5 : Concrete workReinforcement Coverage Information

    C14: Reinforcement shall deem toinclude Allowances for rolling margins

    All cleaning, cutting, bending,fabricating, placing & tying

    All necessary distance blocks

    Tying wire

    Spacers or chairs

    Temporary fixings & supports

    Special joints

    Additional reinforcement around

    openings

  • 8/12/2019 Topic 3 - Concrete and Masonry

    45/60

    Section 5 : Concrete workReinforcement Measurement items

    Reinforcement

    Mild steel / Hightensile bars

    Kg

    State Diameter

    Fabricreinforcement

    Wire mesh

    m2

    State Mesh ref. &

    Weight per m2

    Categorize Width

    Examples

    Fabric reinforcement F1,50kg/m2, in suspended Slab:

    > 500 mm wide

    Qty

    300m245

    > 500 mm

    500 mm

    Pre-stressedtendon

    Kg

    State Diameter; Number &Ultimate strength

  • 8/12/2019 Topic 3 - Concrete and Masonry

    46/60

    Section 6 Brickwork

    and Blockwork (Masonry)

    1. Brickwork2. Blockwork

    3. Glass blockwork

    46

    Section 6: Brickwork & Blockwork

  • 8/12/2019 Topic 3 - Concrete and Masonry

    47/60

    MR1: The following shall be given:

    Kind, quality and size of bricks

    Type of bond

    Mix of mortar for bedding, jointing and pointing

    Section 6: Brickwork & BlockworkBrickwork - Measurement Rules

    47

    Section 6: Brickwork & Blockwork

  • 8/12/2019 Topic 3 - Concrete and Masonry

    48/60

    Section 6: Brickwork & BlockworkBrickwork - Measurement Rules

    MR2: Brickwork is measured on the centre line of thematerials

    Area of Brickwork (m2) = Mean Girth x Height

    48

    Ht

    Section 6: Brickwork & Blockwork

  • 8/12/2019 Topic 3 - Concrete and Masonry

    49/60

    MR3: Brickwork shall be given in m2 and measuredseparately according to thickness

    Section 6: Brickwork & BlockworkBrickwork - Measurement Rules

    49

    Section 6: Brickwork & Blockwork

  • 8/12/2019 Topic 3 - Concrete and Masonry

    50/60

    MR5: No deduction for openings 0.50 m2

    MR6: Deductions shall be made for string courses,lintels, sills, plates and the like only when exceeding

    Sect o 6 c o & oc oBrickwork - Measurement Rules

    50

    Sill

    String course

    Section 6: Brickwork & Blockwork

  • 8/12/2019 Topic 3 - Concrete and Masonry

    51/60

    MR7: Brickwork curved or circular on plan shall bemeasured separately on the mean length of thewall, and the radius will not be stated.

    Brickwork - Measurement Rules

    51

    Section 6: Brickwork & Blockwork

  • 8/12/2019 Topic 3 - Concrete and Masonry

    52/60

    Brickwork - Measurement items

    Brickwork

    1 Common bricks

    Facingbricks

    Common bricks

    - To be covered

    with plaster

    52

    3 Brickwork inconnection with boilers

    4 Damp proof courses

    5 SundriesBoiler

    Section 6: Brickwork & Blockwork

  • 8/12/2019 Topic 3 - Concrete and Masonry

    53/60

    Brickwork - Measurement items

    1.1 Footings

    m3; width stated

    1.2-7 Under innin /

    Commonbricks

    Walls / Piers /

    Casingsm2

    Thickness stated

    1.8 Brickwork in

    raising & off girdersm2

    Thickness stated

    53

    Section 6: Brickwork & Blockwork

  • 8/12/2019 Topic 3 - Concrete and Masonry

    54/60

    Brickwork - Measurement items

    1.9 Hollow walls

    m2 ; state inner skin;

    outer skin; cavity widthType of wall ties

    -

    Commonbricks

    . -existing walls / Filling in

    openings / Vaultingm2

    Thickness stated

    1.13 Fairface ofbrickwork

    m2

    Measure exposed faces

    State method ofpointing

    54

    Section 6: Brickwork & Blockwork

  • 8/12/2019 Topic 3 - Concrete and Masonry

    55/60

    Brickwork - Measurement items

    1.14 Arches

    m ; state height, width,shapes, exposed faces,

    pointing method, No. ofArches

    1.15-16 Limewhiting / Cement

    Commonbricks

    -

    1.17 Projections

    Width/Ht > 300mm m2

    Widht/Ht 300mm m

    1.18 Cutting, toothing andbonding to existing walls

    1.19 Bedding corrugated sheeton tops of walls

    m thk & width stated55

    Section 6: Brickwork & Blockwork

  • 8/12/2019 Topic 3 - Concrete and Masonry

    56/60

    Brickwork - Measurement items

    2.1-10 Faces of walls

    m2 ; nature of brick,pointing type; measured

    to whole of the faces;Extra Over to commonbrickwork

    Facingbricks

    2.11 Arches

    m; types of bricks;pointing methods;

    Ht & width state

    1.12 Quoins

    mAve width stated;

    Flush/projecting/Bondingto the facings

    56

    Section 6: Brickwork & Blockwork

  • 8/12/2019 Topic 3 - Concrete and Masonry

    57/60

    Brickwork - Measurement items

    2.13-17 Squints/ Birdsmouths/ Splays

    m; Width, radius stated

    2.18-19 Stops/ Angles

    Squint

    Facingbricks

    2.20 Sills and coping

    m

    Dim stated; No. of courses andprojection

    2.21 Pier caps / Cramps

    2.22 Sundries : Key blocks, Corbels;Panels; Tumbling to buttresses

    No.; Dim stated

    57

    birdsmouth

    corbels

    Section 6: Brickwork & Blockwork

  • 8/12/2019 Topic 3 - Concrete and Masonry

    58/60

    Brickwork - Measurement items

    3.1 Firebrick liningsm2; Thickness stated

    Boilers

    3.2 Detached chimney shafts

    3.3 Boiler seating blocks / Curvedflue covers

    m; Ht & Thk stated; Dim stated

    3.4 Irregular boiler seating blocks /

    Curved flue blocksNo; Dim stated

    58

    Section 6: Brickwork & Blockwork

  • 8/12/2019 Topic 3 - Concrete and Masonry

    59/60

    Brickwork - Measurement items

    4.1 Width 300mm

    Width >300mm

    Damp

    proofcourses

    m

    Categorize by:Vertical; Raking;

    Horizontal; Curved;Stepped; Overhand

    59

    Section 6: Brickwork & BlockworkB i k k M i

  • 8/12/2019 Topic 3 - Concrete and Masonry

    60/60

    Brickwork - Measurement items

    5.1 House flue linings and refuse

    chutes in brickworkm; thickness & size stated

    Sundries

    5.2 Precast concrete block chute

    or fluesNo; Dim stated

    5.3 Airbricks

    5.4 Ventilation gratings

    5.5 Soot doors

    No; Wall thk & Size of openingstated

    60