topic 3 - concrete and masonry
TRANSCRIPT
-
8/12/2019 Topic 3 - Concrete and Masonry
1/60
Building Measurement
Topic 3Masonry & Concrete Works
The Copyright of this document belongs to BCA. No part of this document may be used, disclosed, transferred, reproduced,
stored in a retrieval system or transmitted in any form or by any means electronic, mechanical, photocopying recording orotherwise to any person not authorized to use it without the express written permission of BCA
Lecturer: Hong Pham
1
-
8/12/2019 Topic 3 - Concrete and Masonry
2/60
Course overview
Topic 1: Introduction & measurement techniques
Topic 2: Excavation works Topic 3: Concrete and masonry works
Topic 4: Internal finishes: floor, wall and ceiling
2
Topic 5: Doors, windows and ironmongeries Topic 6: Roofing structure and covering
Topic 7: Structural steel works
Topic 8: External works
Topic 9: Piling
-
8/12/2019 Topic 3 - Concrete and Masonry
3/60
Recap of Topic 2
CP97 Section 4 Excavation works
Deduct existing void / objects or area not to be excavated V excavated = V backfill + V disposal
Measure net V ; no expansion/bulk allowance V backfill = V size of hole/void
Excavation to be measured in successive stages of 3m
Cutting down trees measured in No. and be sorted by tree girth Excavation oversite measured in m3 and stated average depth Excavation works item should include backfill or disposal
8
Measurementrules
3
accor ng y
Site clearance Excavation / Filling works
Support works
Site dewatering Disposal of excavated material Surface treatment
Hardcore and blinding
Underpinning
8
MeasurementItems
-
8/12/2019 Topic 3 - Concrete and Masonry
4/60
Building elements & Lesson plan
A. SUB-STRUCTURE
1. Piling Topic 9 Piling
2. Foundation Topic 2 Excavation
Topic 3 Concrete & masonry3. Basement
B. SUPER-STRUCTURE
1. Frame structure Topic 3 Concrete & masonry
Topic 7 Structural steelwork2. Envelope & Partitions
3. Doors & Windows
Topic 5 Doors, windows
Topic 6 Roof
4. Finishes5. Furniture & Fittings
6. Roofing
C. MEP
WORKS
D. EXTERNALWORKS
1. Drainage
2. Gate & Fencing
3. Road & Landscaping
Topic 8 External works
4
-
8/12/2019 Topic 3 - Concrete and Masonry
5/60
Topic 3 Concrete and masonry works
1. Building elements require concrete &
masonry works2. Section 5 Concrete work
Measurement rules
Measurement items
3. Section 6 Brickwork and Blockwork
Measurement rules
Measurement items
5
-
8/12/2019 Topic 3 - Concrete and Masonry
6/60
Building elements require concrete &
masonry works
Sub-structure
Foundation Column stumps
Ground beam/slab
- Columns
Beams
Slabs
Walls Staircases
Lintols
6
-
8/12/2019 Topic 3 - Concrete and Masonry
7/60
CP97Section 5 - Concrete WorkMeasurement rules
7
-
8/12/2019 Topic 3 - Concrete and Masonry
8/60
Concrete Work
In-situ concrete: Casting on-site
Pre-cast concrete: Casting off-site
In-situ concrete + Formwork + Reinforcement
8
-
8/12/2019 Topic 3 - Concrete and Masonry
9/60
Section 5 Concrete workMea. rules Measurement items
In-situconcrete
In-situ Concrete MR1 13 1. In-situ concrete2. Sundries
Waterproofing MR14 17 3. Waterproofing4. Surface treatment
In-situ Formwork MR18 28 5. In-situ formwork
Permanent metal MR29 30 6. Permanent formwork system
Waffle formwork MR31 33 7. Waffle form
Slip formedconstruction
MR34 36 8. Slip formed construction
Reinforcement MR37 41 9. Mild steel rebars
10. High tensile rebars11. Fabric reinforcement12. Prestress tendons
Pre-castconcrete
Pre-cast concrete MR1 4 1. Form major part2. No form major part
3. Prestressed concrete 9
-
8/12/2019 Topic 3 - Concrete and Masonry
10/60
SECTION 5 - CONCRETE WORK
In-situ Concrete
10
In-situconcrete
Waterproofing
In-situFormwork
Reinforcement
-
8/12/2019 Topic 3 - Concrete and Masonry
11/60
Section 5 - Concrete work
In-situ concrete
Measurement rules (13)
MR1: State concrete strength MR2: Separate plain & RC
MR3: State method of placing
MR4: Labour to existing works measured separately
MR5: All concrete measured in m3
MR6: State thickness when measure slabs/walls MR7: Beams/walls/columns measured to under of slab if same mix
MR8: No deduction opening 0.10 m2; void 0.05 m3
MR9: Any special treatment shall be stated
MR10: Any projection to walls considered columns
MR11: Details produced by formwork to be measured with formworks MR12: Prestressed shall be group in separate heading
MR13: General description for prestressed concrete work
11
-
8/12/2019 Topic 3 - Concrete and Masonry
12/60
MR1: Strength or mix of the concrete
E.g. Grade 30 ; Grade 45; Grade 50
MR2: Plain and reinforced concrete to be given
Section 5 : Concrete work
In-situ Concrete Measurement Rules
separa e y
MR5: Measured m3 unless otherwise stated
MR6: Slabs, walls and the like measured in m3stating the thickness
12
-
8/12/2019 Topic 3 - Concrete and Masonry
13/60
MR7: Beams, walls or columns:
Measured to the underside of slabs if sameconcrete mix or strength
Measured through the slabs if differenceconcrete mix or stren th
Section 5 : Concrete work
In-situ Concrete Measurement Rules
13
Slab
Column
Beam
Slab
Column
Beam
Same Grade Different Grade
-
8/12/2019 Topic 3 - Concrete and Masonry
14/60
Section 5 : Concrete work
In-situ Concrete Measurement Rules
MR8: No deduction for:
Voids of 0.05 m3
Volume of the reinforcement and steelwork
Cast in assessories
. , , ,
roadways
14
-
8/12/2019 Topic 3 - Concrete and Masonry
15/60
Section 5 : Concrete work
In-situ Concrete Measurement Rules MR10: All projections shall be dealt with as columns;
shall be measured through wall
Projection to
wall
Measured
through as
Plan view Plan view15
-
8/12/2019 Topic 3 - Concrete and Masonry
16/60
Section 5 : Concrete work
In-situ Concrete Measurement Items1.1 Blinding (lean concrete) m3/ thickness stated
1.2 Plinths and machine bases No/ dim & fwk stated
16
-
8/12/2019 Topic 3 - Concrete and Masonry
17/60
Section 5 : Concrete work
In-situ Concrete Measurement Items1.3 1.6 Pilecaps / Strip fdn / Retainting wall / Underpinning m3
1.7 1.8 Isolated pier / post fdn / ground beam m3
17
-
8/12/2019 Topic 3 - Concrete and Masonry
18/60
Section 5 : Concrete work
In-situ Concrete Measurement Items1.9 Columns / isolated piers / struts m3
1.10 Beams / braces / cantilevers m3
1.11 & 1.13 Ground slab m3 thickness stated1.12 Thickening to slab m width and thickness stated
1.13 Suspended slab m3 thickness stated/ sort in slope of 20o
18
Brace
-
8/12/2019 Topic 3 - Concrete and Masonry
19/60
Section 5 : Concrete work
In-situ Concrete Measurement Items1.14 1.15 Coffered slab / topping layers m3 / thickness
1.16 1.23 Walls / Retaining, lift shaft, parapet wall / Slab partitions
/ Steps & staircases / Balustrades / Landings m3/thickness
19
-
8/12/2019 Topic 3 - Concrete and Masonry
20/60
Section 5 : Concrete work
In-situ Concrete Measurement Items1.24 1.25 Casing to steel beams/ lintols/columns m3 / thickness
1.26 1.28 Kerbs / copings / strings / sills / water channel / scupper
drain - m / incl formwork
20
Sill
Surface waterchannel
Scupper
drain
-
8/12/2019 Topic 3 - Concrete and Masonry
21/60
Section 5 : Concrete work
In-situ Concrete Measurement Items1.29 Cascade steps to channel No / height
2.1 2.2 Expansion joints / Water stops m/ incl formwork, labor
2.3 Special junction pieces No / incl fwk, labor2.4 Formation or grouting m / size stated
21
-
8/12/2019 Topic 3 - Concrete and Masonry
22/60
SECTION 5 - CONCRETE WORK
Waterproofing
22
In-situconcrete
Waterproofing
In-situFormwork
Reinforcement
-
8/12/2019 Topic 3 - Concrete and Masonry
23/60
Section 5 : Concrete work
Water-proofing Measurement rules
MR15: Waterproofing particulars to be given:
Kind and quality of waterproofing Thickness and number of coats
Nature of base on which waterproofing is applied
Examples:
Applying 3 coats of water-based polyurethane liquidapplied water proofing, comply with B.S.123,
minimum thickness of 1.5mm to concrete slab.
23
-
8/12/2019 Topic 3 - Concrete and Masonry
24/60
Section 5 : Concrete work
Water-proofing Measurement rules
MR14: Waterproofing shall be given in the following
heading where applicable: Damp-proofing and tanking
Paving and sub-floors
oo ng
MR 16: State in description if work to be done byspecially ordered, not follow the main work.
MR17: No deduction for opening of water-proofingarea 0.50 m2
24
-
8/12/2019 Topic 3 - Concrete and Masonry
25/60
Section 5 : Concrete work
Waterproofing Measurement items
3
Waterproofing
3.1
Liquid applied
4 Surfacetreatment
4.1
Hardener
3.2Membrane
3.3 Sundries
3.4 Additives
4.2
Anti-slip
4.3
Colorant
4.4
Coatings
-
8/12/2019 Topic 3 - Concrete and Masonry
26/60
Section 5 : Concrete work
Waterproofing Measurement items
3 Waterproofing
3.1 Liquid applied
m2
3.2 Membrane
m2; in 250mm widthcategory
1. Horizontal
2. Slope >10 deg3. Vertical4. Circular5. Tanking6. Damp-proofing7. Overhand work
8. Work subsequently covered9. Carried out in workspace
600 mm wide
-
8/12/2019 Topic 3 - Concrete and Masonry
27/60
Section 5 : Concrete work
Waterproofing Measurement items3.3 Sundries forWaterproofing
Angle fillets / Skirtings / Coves / Turn-ups
m; Size and height stated
3.4 Waterproofing
Additive
m3
Extra over in in-situ concretecomponents;
May be included in thedescription of the in-situ
concrete
+ Area 1m2 : No+ Area > 1 m2: m2
Gutter; kerbs; channels
M; Size/dim stated
Outlets
(a) Collars around pipes
(b) Dressing into outlets
No; Size/dim stated
-
8/12/2019 Topic 3 - Concrete and Masonry
28/60
Section 5 : Concrete work
Waterproofing Measurement items4 Surface treatment
To concrete surface of slabs
m2
4.1 Hardener
28
4.2 Anti-slipGrooves / Rings
4.3 Colorant
4.4 Coatings
-
8/12/2019 Topic 3 - Concrete and Masonry
29/60
SECTION 5 - CONCRETE WORK
In-situ Formwork
29
In-situconcrete
Waterproofing
In-situFormwork
Reinforcement
-
8/12/2019 Topic 3 - Concrete and Masonry
30/60
Section 5 : Concrete work
In-situ Formwork Measurement rules
MR19:
Describe separately the
special surface finish ofthe concrete face
State the linin material
to be left in position as afinish to concrete ; statethe method of securing tothe concrete
30
-
8/12/2019 Topic 3 - Concrete and Masonry
31/60
Section 5 : Concrete work
In-situ Formwork Measurement rules
MR20: Separate permanent or left-in formworkformwork from reusable fwk
31
-
8/12/2019 Topic 3 - Concrete and Masonry
32/60
Section 5 : Concrete work
In-situ Formwork Measurement rules
MR21: height of strutting exceeds 5.00m, formworkgiven separately in stages of 1.50m
Formwork to soffit ofslab struttin hei ht
7.00m
6.00m
exceeding 6.50m butn.e. 8.00m
Formwork to soffit ofslab, strutting heightexceeding 5.00m butn.e. 6.50m
32
-
8/12/2019 Topic 3 - Concrete and Masonry
33/60
Section 5 : Concrete work
In-situ Formwork Measurement rules
33
-
8/12/2019 Topic 3 - Concrete and Masonry
34/60
Section 5 : Concrete work
In-situ Formwork Measurement rules MR22: No deduction for opening 1.00 m2
MR25: Formwork is given in m2, measure the actual surface in
contact with the concrete
34
-
8/12/2019 Topic 3 - Concrete and Masonry
35/60
Section 5 : Concrete work
In-situ Formwork Measurement rules
MR26: Formwork to edges and breaks in floors and walls andthe like where under 500mm wide shall be given in m2 and
grouped in stages of 250mm.E.G. width n.e. 250mm
width e. 250mm but n.e. 500mm
35
Edge of
slabSlab Section
Break
in wall
Wall elevation
S i C k
-
8/12/2019 Topic 3 - Concrete and Masonry
36/60
Section 5 : Concrete workIn-situ Formwork Measurement rules
MR 27: No deduction for formwork at intersectionsbetween
Main and secondary beams Beams and columns
MainBeam
MainBeam
SecondaryBeams
Plan view36
Column Column
Beams
Elevation
S ti 5 C t k
-
8/12/2019 Topic 3 - Concrete and Masonry
37/60
Section 5 : Concrete workIn-situ Formwork Measurement rules
MR 28: Formwork shall be measured to the surfaceof work sloping more than 20 degrees from thehorizontal
37
S ti 5 C t k
-
8/12/2019 Topic 3 - Concrete and Masonry
38/60
Section 5 : Concrete workIn-situ Formwork Measurement items
Horizontal surfaces
Strutting hi 5m
Strutting hi > 5m, stage
1.5m
For:
Slabs, staircases,
Ramps, etc.
Vertical surfaces
For:
Foundation
Columns
38
5 In-situformwork
Beams
Curved surfaces
For:
Curved walls,
Tank, etc.
Edges / breaks
Width in 250mmcategory
For:
Floors; walls; openstrings of stairs
m2
S ti 5 C t k
-
8/12/2019 Topic 3 - Concrete and Masonry
39/60
Section 5 : Concrete workIn-situ Formwork Measurement items
Cornices and mouldings /Formation produced by
formworkm/ size stated
39
5 In-situformwork
Small surfaces /
Cantilever ends / capsNo/ size stated
Formwork / temporary
support for pre/posttension units
m2/ size stated
Height above ground
-
8/12/2019 Topic 3 - Concrete and Masonry
40/60
SECTION 5 - CONCRETE WORK
Reinforcement
40
In-situconcrete
Waterproofing
In-situFormwork
Reinforcement
-
8/12/2019 Topic 3 - Concrete and Masonry
41/60
Section 5 : Concrete work
-
8/12/2019 Topic 3 - Concrete and Masonry
42/60
Section 5 : Concrete workReinforcement Measurement rules
Reinforcement bars:
MR39: Weights per metre for steel bars:
Diameter
6mm
Kg/m
0.222
Diameter
25mm
Kg/m
3.854
10mm
12mm
16mm
20mm
.
0.616
0.888
1.579
2.466
32mm
36mm
40mm
44mm
56mm
.
6.313
7.991
9.864
11.926
19.318
42
Section 5 : Concrete work
-
8/12/2019 Topic 3 - Concrete and Masonry
43/60
Section 5 : Concrete workReinforcement Measurement rules
MR40: Measured follow the location of in-situ concretethat they belong to:
Descriptions:
In situ Concrete Grade 45 in:
Quantities
Beams B1
Mild steel reinforcement bars in:
Beams B1
12mm dia.25mm dia.
7.50m3
700 kg800 kg
43
Section 5 : Concrete work
-
8/12/2019 Topic 3 - Concrete and Masonry
44/60
Section 5 : Concrete workReinforcement Coverage Information
C14: Reinforcement shall deem toinclude Allowances for rolling margins
All cleaning, cutting, bending,fabricating, placing & tying
All necessary distance blocks
Tying wire
Spacers or chairs
Temporary fixings & supports
Special joints
Additional reinforcement around
openings
-
8/12/2019 Topic 3 - Concrete and Masonry
45/60
Section 5 : Concrete workReinforcement Measurement items
Reinforcement
Mild steel / Hightensile bars
Kg
State Diameter
Fabricreinforcement
Wire mesh
m2
State Mesh ref. &
Weight per m2
Categorize Width
Examples
Fabric reinforcement F1,50kg/m2, in suspended Slab:
> 500 mm wide
Qty
300m245
> 500 mm
500 mm
Pre-stressedtendon
Kg
State Diameter; Number &Ultimate strength
-
8/12/2019 Topic 3 - Concrete and Masonry
46/60
Section 6 Brickwork
and Blockwork (Masonry)
1. Brickwork2. Blockwork
3. Glass blockwork
46
Section 6: Brickwork & Blockwork
-
8/12/2019 Topic 3 - Concrete and Masonry
47/60
MR1: The following shall be given:
Kind, quality and size of bricks
Type of bond
Mix of mortar for bedding, jointing and pointing
Section 6: Brickwork & BlockworkBrickwork - Measurement Rules
47
Section 6: Brickwork & Blockwork
-
8/12/2019 Topic 3 - Concrete and Masonry
48/60
Section 6: Brickwork & BlockworkBrickwork - Measurement Rules
MR2: Brickwork is measured on the centre line of thematerials
Area of Brickwork (m2) = Mean Girth x Height
48
Ht
Section 6: Brickwork & Blockwork
-
8/12/2019 Topic 3 - Concrete and Masonry
49/60
MR3: Brickwork shall be given in m2 and measuredseparately according to thickness
Section 6: Brickwork & BlockworkBrickwork - Measurement Rules
49
Section 6: Brickwork & Blockwork
-
8/12/2019 Topic 3 - Concrete and Masonry
50/60
MR5: No deduction for openings 0.50 m2
MR6: Deductions shall be made for string courses,lintels, sills, plates and the like only when exceeding
Sect o 6 c o & oc oBrickwork - Measurement Rules
50
Sill
String course
Section 6: Brickwork & Blockwork
-
8/12/2019 Topic 3 - Concrete and Masonry
51/60
MR7: Brickwork curved or circular on plan shall bemeasured separately on the mean length of thewall, and the radius will not be stated.
Brickwork - Measurement Rules
51
Section 6: Brickwork & Blockwork
-
8/12/2019 Topic 3 - Concrete and Masonry
52/60
Brickwork - Measurement items
Brickwork
1 Common bricks
Facingbricks
Common bricks
- To be covered
with plaster
52
3 Brickwork inconnection with boilers
4 Damp proof courses
5 SundriesBoiler
Section 6: Brickwork & Blockwork
-
8/12/2019 Topic 3 - Concrete and Masonry
53/60
Brickwork - Measurement items
1.1 Footings
m3; width stated
1.2-7 Under innin /
Commonbricks
Walls / Piers /
Casingsm2
Thickness stated
1.8 Brickwork in
raising & off girdersm2
Thickness stated
53
Section 6: Brickwork & Blockwork
-
8/12/2019 Topic 3 - Concrete and Masonry
54/60
Brickwork - Measurement items
1.9 Hollow walls
m2 ; state inner skin;
outer skin; cavity widthType of wall ties
-
Commonbricks
. -existing walls / Filling in
openings / Vaultingm2
Thickness stated
1.13 Fairface ofbrickwork
m2
Measure exposed faces
State method ofpointing
54
Section 6: Brickwork & Blockwork
-
8/12/2019 Topic 3 - Concrete and Masonry
55/60
Brickwork - Measurement items
1.14 Arches
m ; state height, width,shapes, exposed faces,
pointing method, No. ofArches
1.15-16 Limewhiting / Cement
Commonbricks
-
1.17 Projections
Width/Ht > 300mm m2
Widht/Ht 300mm m
1.18 Cutting, toothing andbonding to existing walls
1.19 Bedding corrugated sheeton tops of walls
m thk & width stated55
Section 6: Brickwork & Blockwork
-
8/12/2019 Topic 3 - Concrete and Masonry
56/60
Brickwork - Measurement items
2.1-10 Faces of walls
m2 ; nature of brick,pointing type; measured
to whole of the faces;Extra Over to commonbrickwork
Facingbricks
2.11 Arches
m; types of bricks;pointing methods;
Ht & width state
1.12 Quoins
mAve width stated;
Flush/projecting/Bondingto the facings
56
Section 6: Brickwork & Blockwork
-
8/12/2019 Topic 3 - Concrete and Masonry
57/60
Brickwork - Measurement items
2.13-17 Squints/ Birdsmouths/ Splays
m; Width, radius stated
2.18-19 Stops/ Angles
Squint
Facingbricks
2.20 Sills and coping
m
Dim stated; No. of courses andprojection
2.21 Pier caps / Cramps
2.22 Sundries : Key blocks, Corbels;Panels; Tumbling to buttresses
No.; Dim stated
57
birdsmouth
corbels
Section 6: Brickwork & Blockwork
-
8/12/2019 Topic 3 - Concrete and Masonry
58/60
Brickwork - Measurement items
3.1 Firebrick liningsm2; Thickness stated
Boilers
3.2 Detached chimney shafts
3.3 Boiler seating blocks / Curvedflue covers
m; Ht & Thk stated; Dim stated
3.4 Irregular boiler seating blocks /
Curved flue blocksNo; Dim stated
58
Section 6: Brickwork & Blockwork
-
8/12/2019 Topic 3 - Concrete and Masonry
59/60
Brickwork - Measurement items
4.1 Width 300mm
Width >300mm
Damp
proofcourses
m
Categorize by:Vertical; Raking;
Horizontal; Curved;Stepped; Overhand
59
Section 6: Brickwork & BlockworkB i k k M i
-
8/12/2019 Topic 3 - Concrete and Masonry
60/60
Brickwork - Measurement items
5.1 House flue linings and refuse
chutes in brickworkm; thickness & size stated
Sundries
5.2 Precast concrete block chute
or fluesNo; Dim stated
5.3 Airbricks
5.4 Ventilation gratings
5.5 Soot doors
No; Wall thk & Size of openingstated
60