TS-621/TS-6218
top shower series
For Top Shower Box Instructions of Installation and Use
Never climb on the overhead shower box or hang heavy weight on it.
To avoid damage to the overhead shower box, never use hard matterto rub or knock at it.
When you enter the overhead shower box, to avoid falling down, be careful with the height difference between the floor and the bottom tray.
When you enter the overhead shower box, to avoid injury, never put your hand in the door gap.
Soapsuds is usually present on the surface of the overhead shower box, be careful to avoid slip and fall.
Maintain sufficient ventilation from the overhead shower box to prevent accumulation of moisture in it, giving rise to mildew breeding and abnormal odor.
If glass cement falls off, leaking of water is likely. So it is necessary to re-apply.
Maintain the bottom tray clean to avoid blocking of the drain port by hairs, dirt, etc.
Precautions
Never allow a child, a senile people or a people who is difficult in moving about to enter the shower box alone;
Never put a burning cigarette near the bottom tray or bathtub or drop cigarette ash on bottom tray or bathtub lest a fire is caused or they would be damaged.
To clean the bathtub, liquid detergent and a piece of soft fabric should be used. Strong acidic or alkaline detergent, thinner, acetone, ammonia, organic solvent, or strong cleanser should never be used.
If water scale is formed on the bathtub or bottom tray, use a piece of wet soft fabric applied with some tooth paste to rub it off.
1 10
Installation shall be carried out strictly to the instructions for installation, otherwise the shower box would be unreliably installed or would even collapse, leading to injury or damage to property.
The glass panels should be handle vertically by two people.
Never knock at the glass panels forcefully lest they would be broken.
Tools for installation
Important
Level gauge Plumb Glass cement gunPercussion drill
Tape measure
Hexagonal socket screw
Steel hammer
Rubber hammer
Pencil
Cross-head screw driver
φ8 percussion drill bit
Product standard followed: Q/(GZ)ABJK2 《Shower Box》
Unpack the cargo box and check that nothing is missing. Reliably place the glass panels vertically against the wall. If placed horizontally, they would break easily. Special cacumen on not to het the four angles of the glass door.
Before using the product, read these instructions carefully and keep them in a safe place
Vll. Apply sealant
After checking and adjustment, apply
neutral glass cement in the gap between
the bottom tray, the side post and the wall.
Instructions of Installation
To apply sealant onto
9 2
1 7
6
5
4
3
2 8 14
13
12
11
10
9
1
1
2
1
2
1
1
1
1
1
10
10
18
2
7
6
3
5
9 121110 13 14
1
2
4
8
6
Overall dimensions:TS-6218:800×800×2000mm
TS-621: 950×950×2000mm
Construction of TS-6218/TS-621(direct type)
Guide rail
TM-8 sealing strip
#2 door handle
Drain hose
Expansion shield
φ4 big washer
ST4x30 pan head self-tapping screw
ST4x20 pan head self-tapping screw
No. Component Qn'ty No. Component Qn'ty No. Component Qn'ty
RV-23 magnetic sealing strip
Movable door
RV-41 sealing strip
Bottom tray
Side post and inner sheath
Fix door
After installation, check if the shower box body is
vertical and the movable door opens freely. Adjust
the rollers and the side post properly to ensure that
the movable door opens freely.
Checking and adjustment
Vl. Check and adjust
(6) Fix the door handle to the movable door.
Rubber washer
Rubber washer
Door handle grip
Stud
Door handle gripMovable door
Instructions of Installation
3 8
5
7
6
3
51
2
4
8
9 121110 13 14
Construction of TS-6218/TS-621(reverse type)
1 7
6
5
4
3
2 8 14
13
12
11
10
9
1
1
2
1
2
1
1
1
1
1
10
10
18
2
Overall dimensions:TS-6218:800×800×2000mm
TS-621: 950×950×2000mm
Guide rail
TM-8 sealing strip
#2 door handle
Drain hose
Expansion shield
φ4 big washer
ST4x30 pan head self-tapping screw
ST4x20 pan head self-tapping screw
No. Component Qn'ty No. Component Qn'ty No. Component Qn'ty
RV-23 magnetic sealing strip
Movable door
RV-41 sealing strip
Bottom tray
Side post and inner sheath
Fix door
Vl. Install movable door
Installation and adjustment of lower roller
Installation and adjustment
of upper roller
Installation and adjustment of movable door
Eccentric nut
Roller
Down guide rail
Eccentric nut Eccentric nut
Hexagonal nut
Roller
Movable door
Up guide rail
Instructions of Installation
RV-41 sealing strip
RV-23 magnetic sealing strip
RV-41 sealing strip
Side post
Fix door
Movable door
(1)Adjust the eccentric nuts on the upper
and lower rollers so that the distance
between them is equal to that between
the channel of upper guide rail and the
channel of the lower guide rain.
(2)Hang the upper rollers of the moving
door in the channel of the upper guide
rail then insert the lower rollers in the
channel of the lower guide rail.
(3)Adjust the eccentric nuts on the upper
and lower guide rails so that the moving
door slides freely and the door gap is
even. Tighten the locknuts.
(4)Slide the two RV-14 sealing strips over the left edge
of the fix door glass panel and the right edge of the
moving door glass panel respectively.
(5)Slide one RV-23 magnetic sealing strip over the left
edge of the moving door glass panel.
Moving door
7 4
(5 ) Turn the rubber-headed foot bolt to adjust for levelness
of the bottom tray. Tighten the locknut.
Note:
(1) Slide the large end of drain pipe hose over
the drain elbow.(2) Insert the small end of the drain hose in the
drain port in the floor.
Install and adjust the bottom tray
(3) Position the bottom tray in the room corner.
(4)Use level gauge to check for levelness of the
bottom tray.
The inner diameter of drainpipe should be larger than oufer diameferof drain hose. Otherwise water can not go fleetly.
I.Install the bottom tray IV. Install shower box body
Installation and adjustment of shower box body
(1)Use 10 ST4x30 pan head self-tapping screws
and to fix the two inner
sheathes onto the wall on each side.
φ4 big washer
(2)Place the assembled shower box body on
the bottom tray so that the two side posts
catch the two inner sheathes.
Self-tapping screw
Big washer
Inner sheath
Side post
Inner sheath
Instructions of Installation
(3)Use two ST4×20 pan head self-tapping screws to fix the lower guide rail to the bottom tray
Self-tapping screw
Guide rail
Bottom tray
5 6
II. Construction of Fixed doot
Marking and drilling
(1)Place the assembled shower box body on the bottom tray. Perform
plumbing and check that the box body is perpendicular to the
bottom tray.
(2)Use a pencil to mark out a straight line each
along both sides of the inner sheath.
(3)Take out the inner sheath from inside
the side post. (4)Press the inner sheath onto the wall. Use a
pencil to mark out on the wall the positions
of connecting holes of the inner sheath.
(5)Drill five φ8 holes each on either
sides in the wall as marked.
(6)Drive 10 expansion shields in theφ8
holes in the wall on each side.
Ill. Marking and drilling
Side post
Inner sheath
Inner sheath
Instructions of Installation
(4)Squeeze one TM-8 sealing strip in the gap between the fix door glass panel and the #15 post.
TM-8 sealing strip
Guide rail
Door fixer
Self-tappingscrew
Pictures of How the fixed door is Constructed
#15 post
Upper guide rail
Self-tapping screw Fix door
Fix door glass
(1)Use four ST4x30 pan head self-tapping screws to fix the two side posts to the lower guide rail.
Lower guide rail
Self-tapping screw
#15 post
(3) Place the upper guide rail on the top of the fix door glass panels so that the upper edges of the fix door glass panels enter the grooves of the door holders on the upper guide rail. Use four ST4x30 pan head self-tapping screws to fix the upper guide rail to the two #15 side posts. Tighten the two pan head self-tapping screws on the door holders so that the top of the two fix door glass panels is fixed to the 2 door holders.
(2)Place the fix door glass panels on the right ends of the lower guide rail so that the lower edge of each fix door glass panel enters the groove of the door holder, the side of each fix door glass panel enters the groove of the #15 post. Tighten the 2 pan head self-tapping screws on the 4 door holders so that the lower edges of the fix door glass panels are fixed to the two door holders.
#15 post
#15 post