About This Training
The purpose of this training is to provide user’s the knowledge to utilize the Tool Management in GQTS (Global Quality Tracking System) regarding the Vendor Tooling Asset Management (VTAM) system. The VTAM system was designed to streamline communication between suppliers and GM via a web interface on the GM SupplyPower portal. VTAM provides current detailed tool descriptions, and location for GM owned tools to suppliers and multiple GM internal organizations based upon business need. The VTAM process requires minimal changes to the current GM E-1810 processes and suppliers need to modify their process for providing detailed current vendor tooling information to GM which includes clear tooling breakdowns.
Global Purchasing & Supply Chain3
Enhancements & Key Points
• Operates/functions the same as all other GQTS modules. Web browser Internet Explorer required.
• Records can be created and kept in a “pending” status until all of the data fields have been completed and the supplier is ready to submit the record.
• All records will be approved by GM. If GM deems the data to be incomplete, the record will be rejected, with an email notification sent back to the supplier. Rejected Status email only / Approved Status email planned future enhancement date TBD.
• Popup message when the user selects ‘Remove Tool From GM1810’ it will allow the user to cancel the action. Completed 2011.
• An Approved Status GM1810 record is required before invoicing for payment of the GM tools.
Global Purchasing & Supply Chain4
Process • VTAM Approval is required prior to invoicing for tooling payment
• Supplier enters GM owned tools into VTAM system
• Note: For engineering changes, existing records should be amended
•There are approximately 12 data points required per tool, including a picture of the tool with the system generated asset number and Property of General Motors. There should be (2) two pictures, one of tool and the other picture must include the Tool ID or ID tag. (must be legible) See GPSC – GM Purchasing Request For Quote (RFQ) for both Advance Purchasing (AP) and Global Sourcing (GS), Supplier must meet the Supplier Quality Statement of Requirements – Vendor Tooling Asset Management.
• Supplier submits the record for GM approval
•GM analyst will review each record and approve or reject within approximately 3 business days.
• If rejected, supplier will receive an email with a detailed reason
Global Purchasing & Supply Chain5
Process (Continued)
• Supplier must check the status of their record in GQTS. If VTAM & PPAP are in Approved Status then the supplier submits paperwork (invoice, etc) to GM Disbursements. (see Tooling Payment Checklist)
• GM Disbursements reviews GM1810 Code status in GQTS and issues payment (1810 Code Approved Status)
Global Purchasing & Supply Chain6
VTAM Training - Contents
TOPIC PAGES
Access VTAM 7 - 19
Create GM1810 Records 20 - 35
Approve/Reject Process 36 - 38
Edit Tool Process 39 - 43
Delete Part Number From 1810 Record 44 - 48
Move Tools 49 - 56
After VTAM Approval 57 - 61
Print Function 62 - 64
Search Function 65 - 67
SQ Statement Of Requirements – Vendor Tooling Asset Management 68 - 73
Vendor Tool Identification Guidelines 74 - 75
Quick References 76 - 79
Frequently Asked Questions / Technical Issues / Help Contacts 80 - 87
Global Purchasing & Supply Chain7
Accessing the VTAM System
Global Purchasing & Supply Chain8
Access the VTAM System
• GM Users & Contractors log in (GM Socrates site)
• Browser requirements – Internet Explorer only
• Supplier log in (GMSP Covisint site)
• Log in to GM SupplyPower/Covisint
• Select Function “Quality” Select Application “Global Quality Tracking System” (GQTS)
• Select the “Tool Mgmt” tab to access the VTAM system
• Only registered GQTS users can access the VTAM system
Global Purchasing & Supply Chain9
Step 1: GM Users / Contractors – Use GM Socrates Global LinksClick on “Login”
Access VTAM - GM & ContractorsGM Users access via: socrates.gm.com
Select Global Links – select Supply Power Applications
Global Purchasing & Supply Chain10
Step 2: Find Application link – Search for Application GQTS –(Global Quality Tracking System)
Access VTAM – GM & Contractors
Global Purchasing & Supply Chain11
Step 3: Reference Logon Screen: GM Supply Power / Covisint User ID & Password – click “Submit”
Access VTAM – GM & Contractors & Suppliers
Global Purchasing & Supply Chain12
Step 4: Click on “Tool Mgmt” tab
Access VTAM – GM & Contractors
Global Purchasing & Supply Chain13
Access VTAMInitial VTAM Screen
Global Purchasing & Supply Chain14
Access VTAM - Suppliers
Suppliers will access via https://gmsupplypower.covisint.com Step 1: Go to the
link above and “Login”
Step 2: Enter GM Supply Power/Covisint User ID & Password – click “Submit”
Global Purchasing & Supply Chain15
Step 3: Click on Application link
Access VTAM - Suppliers
Global Purchasing & Supply Chain16
Access VTAM – Suppliers
Step 4: Find Application link – Search for Application GQTS –(Global Quality Tracking System)
Global Purchasing & Supply Chain17
Step 5: Reference Logon Screen: GM Supply Power / Covisint User ID & Password – click “Submit”
Access VTAM – GM & Contractors & Suppliers
Global Purchasing & Supply Chain18
Step 6: Click on “Tool Mgmt” tab
Access VTAM – GM Contractors & Suppliers
Global Purchasing & Supply Chain19
Access VTAM – GM & Contractors & SuppliersInitial VTAM Screen
Global Purchasing & Supply Chain20
Creating GM1810 Records
Global Purchasing & Supply Chain21
Creating New RecordsOverview
• Every GM owned tool needs to be entered into VTAM
• You should create a new GM1810 record for initial tools only (new tools, new programs)
• A Valid part/duns combination can only be added to (1) GM1810 record
• The part number(s) on the tooling purchase order and the corresponding PPAP approved part number, if different, must be on the same GM1810 record
• Pictures of each tool are required. System generated Tool ID numbers and “Property of General Motors ” should be readable and permanent. Picture one is a close-up of the Tool ID number and Property of General Motors, the 2nd picture is the complete tool picture that the tool ID can be seen as indicated in picture one. (See GM Vendor Tool Identification Guidelines)
Global Purchasing & Supply Chain22
Create GM1810
Step 1: Enter Current Part Number
Step 2: Click on “Query Duns Code”
Step 4: Select “Manage Tools” from drop down
Step 5: Click on “Action”
Step 3: Select Duns Code from drop down
Step 1: Enter Family of Part Numbers separated by comma or carriage return and proceed to Step 4.
OR
Global Purchasing & Supply Chain23
Create GM1810
777777777
777777777
SUPPLIER NAME INC
SUPPLIER NAME INC
777777777 SUPPLIER NAME INC
Step 2: Select “Create/Update Selected Records” and press “Action”
Step 1: Select all part numbers made off the tool family
Global Purchasing & Supply Chain24
Create GM1810Creating/Adding Tools
All Fields RequiredStep 1: Complete all fields. Note; Country of Orgin- Manufacturing location of tool
Supplier can select either “Contracted Location” or “Alternate Location”. If “Alternate Location” is selected from the drop down, press “Go” and a pop-up box will appear. Supplier can enter Duns code for tool location or physical address. Note: If Duns entered is not in GM system, an error message will appear. In this case, enter address. See next slide.
Step 2: Select “Create/Update Tool” from drop down
Step 3: Click on “Action”. Tools will be created and will appear below
Global Purchasing & Supply Chain25
Tool Location
Pop-up Box
If tool is not located at contracted location, select “Alternate Location” and press “Go”.
If tier location has a Duns code, enter Duns.
If tier location does not have a Duns code, enter name, address, city, state, country.
If Duns code is not in GM system, you will get an error message. If this occurs, enter name, address, city, state, country.
Click “Update”
Global Purchasing & Supply Chain26
Add Picture
Two pictures of each tool must be added prior to submitting for approval. Picture of the tool and another picture showing the tool ID or tool tag. Must be legible.
Step 1: Click in Select box so a check mark appears
Step 2: Select “Create File Attachment” from drop down
Step 3” Click on “Action”
NOTE: THE PICTURE MUST BE AN ACTUAL PICTURE OF THE TOOL. IT MUST SHOW THAT THE TOOL IS MARKED WITH THE VTAM SYSTEM GENERATED TOOL ID NUMBER AND “PROPERTY OF GM”
Global Purchasing & Supply Chain27
Add Picture Step 1: Select document type- Either “Close- up” or “Complete Tool”.
Note- Complete Tool photo is required per Tooling SOR – GQTS change TBD
Step 2: Select “Browse” and search for your picture file.
Note: Acceptable file types are jpg, png, bmp or gif
Step 3: Enter description and press “Attach” Note: A file description can only be entered at the time of file upload.
If successful, the following will appear. Press “OK” to add additional pictures. Press “Cancel” to return to the tool line-up.
Global Purchasing & Supply Chain28
Delete Picture To Delete a Picture
Step 1: Click on the Picture Available
Step 2: Select file you want to Delete then Scroll down and click on Delete File
X
Global Purchasing & Supply Chain29
Delete Tool
‘Remove Tool From GM 1810’
Global Purchasing & Supply Chain30
Delete Tool ‘This action will PERMANENTLY DELETE your tool & your tool ID number from the system, are you sure you want to DELETE? To DELETE select ‘OK’, if you don’t want to delete select ‘Cancel ’ (Select ‘OK’ – deletes the tool number) Select ‘Cancel’ and the record remains the same.
Global Purchasing & Supply Chain31
Add PO Numbers
777777777
777777777
SUPPLIER NAME INC
SUPPLIER NAME INC
777777777 SUPPLIER NAME INC
Note: A GM1810 record must be created prior to adding PO numbers. If a GM1810 record has not yet been created, you will be directed to the “Create Tool” screen
Step 1: Select 1 part number on the PO. All other parts associated with the same GM1810 will automatically be selected
Step 3: Select “Add/Update Tool PO” and press “Action”
Step 2: Enter tool PO number.GPS tool PO’s should be the first 8 characters of the PO number. (ex. 0PMW03R9). Do not use spaces, hyphens, ect.
Global Purchasing & Supply Chain32
Instructions For Changing/Deleting PO Numbers
1. Enter GQTS, enter Part, 1810, Duns etc. and as normal and click on the Action button to take you to the Record
2. Check the select box next to the part number, go to the select action drop list, select “Delete PO Number” , Click on the Action Button
The following popup screen will appear (larger view next slide)
Global Purchasing & Supply Chain33
Instructions For Changing/Deleting PO Numbers
The following popup screen will appear
Global Purchasing & Supply Chain34
3. All PO associated with the 1810 number are shown with a selection button. 4. If you want to change the PO, the user selects the PO number to be changed, enter the new PO number in the box and click on the Update button. The system will go back to the Record Selection screen with the changed PO number in the PO drop box. 5. If you want to delete a PO, the user selects the PO to be changed and clicks the Delete button. The system returns to Record Selection screen and the PO number will no longer appear in the PO drop box.
Instructions For Changing/Deleting PO Numbers (continued)
Global Purchasing & Supply Chain
987654321 SUPPLIER NAME INC
987654321 SUPPLIER NAME INC
987654321 SUPPLIER NAME INC
987654321 SUPPLIER NAME INC
35
Submit Record For Approval
Step 1: Select parts numbers for submission. All part numbers associated with the GM1810 will automatically be selected.
Step 2: Select “Submit for Approval” and press “Action”
Step 3: Status will change from “Pending” to “Pending Approval”
Global Purchasing & Supply Chain36
Approve/Reject Process
Global Purchasing & Supply Chain37
Approve/Reject Process • GM will approve/reject records within 3 business days.
• Once approved, GM1810 status will show approved. Upon PPAP approval then the supplier will be able to invoice for payment. You will not need to send in the “.csv” form. Financial Shared Services will review the GM1810 code status in GQTS.
• If rejected, the email address associated with the supplier log-on ID will receive an email stating the reason for the rejection.
• Supplier will need to correct the issue and resubmit for approval. (see below for status types)
987654321 SUPPLIER NAME INC
987654321 SUPPLIER NAME INC
987654321 SUPPLIER NAME INC
987654321 SUPPLIER NAME INC
Status types are:Pending- Supplier can modify information and submit when requirements are metPending Approval- Waiting for GM approvalApproved- GM1810 is approved by GM and supplier can invoice or submit for paymentRejected – GM1810 record has been reviewed and rejected by the GM VTAM Analyst.
Global Purchasing & Supply Chain38
Rejected Status• If rejected, the email address associated with the supplier log-on ID will receive an email
stating the reason for the rejection.
• Supplier will need to correct the issue and resubmit for approval.• How do you get a VTAM record out of rejected status?
Go to the tools on the VTAM record and select one tool and temporarily change something on that tool record, we recommend either the weight or height.
Once you change it, go to the drop down menu and select: Create/Update tool and then hit the action button. That will put the record back to a Pending status.
Note: Since you changed the weight or height, you need to then change it back to the correct weight or height, so you need to repeat the above step again, to correct it.
Now you are in Pending status and you can correct your record and resubmit for approval.
Global Purchasing & Supply Chain39
Edit Tool Process
Global Purchasing & Supply Chain40
Edit Tool Quick Reference
Initial Tooling
Create New GM1810
Change Tool Information
Edit GM1810
Engineering ChangeNo Tooling Modification
Same Part Number
No VTAM Requirement
Engineering ChangeTooling ModificationNew Part Number
Add New Part No. to Existing
GM1810
Capacity Tool
Add Tool to Existing GM1810
Engineering ChangeNew Tool
New Part Number
Add New Part No. & New
Tool to Existing GM1810
Global Purchasing & Supply Chain41
Edit Tool•Editing function should be used for:
1. Managing engineering changes2. Updating Tool information (i.e., location, etc)
•You should not re-enter tools into VTAM for engineering changes/tool modifications. You should edit the existing tool that makes the subject part number. Do NOT create a new tool ID number for a tool on an existing VTAM record.
• Common Engineering Change Scenarios:
•For tool moves, see Move Tools Section
New P/NModify Existing Tooling
New Tooling VTAM Update
No No No No Update to VTAM
No Yes No Edit Existing GM1810 Code – add new PO
Yes No No No Update to VTAM
Yes Yes NoEdit Existing GM1810 Code - add new part
number(s) and new PO
Yes No YesEdit Existing GM1810 Code - add new part
number(s), add new tools, and new PO
Global Purchasing & Supply Chain42
Step 1: Enter new part number(s) and (1) part number from existing GM1810 code
Step 2: Press “Action” button
New Part Number; New PO; Modifications to Existing Tool(s).
Global Purchasing & Supply Chain
987654321 SUPPLIER NAME INC
987654321 SUPPLIER NAME INC
987654321 SUPPLIER NAME INC
987654321 SUPPLIER NAME INC
43
Step 1: Select part number with existing GM1810 Code
Step 2: Select new part numbers to be added to the existing GM1810 Code. Note: Part numbers being added must be under same DUNS as existing 1810 record.
Step 3: Select “Add Parts to Record” and press “Action”
Step 4: Select GM1810 part numbers
Step 5: Enter new Tooling PO number
Step 6: Select “Add PO No.” and press “Action”. Submit record for approval.
Global Purchasing & Supply Chain44
Delete Part Number GM 1810 Record
Global Purchasing & Supply Chain45
Delete Part Number GM 1810 Record
1810 Record must have more than one part numbers (two or more part numbers) on the record before you can delete the single part number from the record.
1. Select or find 1810 record
2. Select partNumber youWould like to Remove from1810 record
Global Purchasing & Supply Chain46
Delete Part Number GM 1810 RecordSelected part number 94750462 to be removed – note doesn’t have Shaded check box.
Another example Selected part number 15827256 to be removed – note doesn’t have Shaded check box.
The part numbers that are shaded WILL remain and WILL NOT be deleted from the 1810 record.
Global Purchasing & Supply Chain47
Delete Part Number GM 1810 Record
1. Select part Number you would like to Remove from 1810 record
2. Select Action: ‘Remove Parts From Record’Click ‘Action’
Global Purchasing & Supply Chain48
Delete Part Number GM 1810 Record
Note that you have successfullyRemoved Part Number 94750462From 1810 record #6.
Note that the three other part numbers for 1810 record #6 still remain.
Global Purchasing & Supply Chain49
Move Tools
Global Purchasing & Supply Chain50
Move ToolsOverview
• The supplier is responsible for maintaining accurate tool locations for all GM owned tooling in VTAM. If not sure how to do please contact you GM VTAM Analyst for help. Caution is needed you don’t want you delete the tool record and cause excessive work to recover.
• The following 2 scenarios are described:
1. Tier 1 location change within same ultimate supplier
2. Tier 2/Tier X location change
• TOOL MOVES IN VTAM DO NOT REPLACE REQUIREMENTS RELATED TO EXISTING GM PROCESSES (i.e. PPAP, BTAB, etc).
• Note: Tool moves to new suppliers that are a result of a GM decision are handled by GM, with assistance from the suppliers.
Global Purchasing & Supply Chain51
Supplier Moving A Record To A Different Internal Duns Number
Must Contact Your GM VTAM Analyst
Global Purchasing & Supply Chain52
Global Purchasing & Supply Chain53
Global Purchasing & Supply Chain54
Global Purchasing & Supply Chain55
Move ToolsTier 2/ Tier X Move (Editing Tool Location)
777777777
777777777
SUPPLIER NAME INC
SUPPLIER NAME INC
777777777 SUPPLIER NAME INC
Step 1: Select part numbers from “Record Selection” screen
Step 2: Select “Create/Update Records” from drop down box
Step 3: Press “Action”
Global Purchasing & Supply Chain56
Move ToolsTier 2/ Tier X Move (Editing Tool Location)
Step 1: Select the tool that needs to be moved
Step 2: Revise Tool Location. Select either “Contracted Location” or “Alternate Location”
Step 3: Select “Create/Update Action” and press “Action”
Global Purchasing & Supply Chain57
After VTAM Approval
Global Purchasing & Supply Chain58
Global Purchasing & Supply Chain59
Part Walk Samples
Global Purchasing & Supply Chain60
Part Walk Samples
Global Purchasing & Supply Chain61
Part Walk Samples
Global Purchasing & Supply Chain62
Print Function
Global Purchasing & Supply Chain63
987654321 SUPPLIER NAME INC
987654321 SUPPLIER NAME INC
987654321 SUPPLIER NAME INC
987654321 SUPPLIER NAME INC
Step 1: Double click on GM1810 Code
Global Purchasing & Supply Chain64
Press “Export to PDF” and either save it to your computer, or open it and print for your records
Global Purchasing & Supply Chain65
Search Function
Global Purchasing & Supply Chain66
Search• There are many ways to search for data in the system.
• It is possible to search by part number, duns code, or GM1810 code.
Step 1: Enter data in 1 or 4 fields
Step 2: Press “Action” button
Global Purchasing & Supply Chain67
Search• The following screen will appear based on the data entered.
777777777
777777777
SUPPLIER NAME INC
SUPPLIER NAME INC
777777777 SUPPLIER NAME INC
Global Purchasing & Supply Chain68
GM Supplier Quality Statement of Requirements Vendor Tooling Asset Management
Global Purchasing & Supply Chain69
Global Purchasing & Supply Chain70
Global Purchasing & Supply Chain71
Global Purchasing & Supply Chain72
Global Purchasing & Supply Chain73
Global Purchasing & Supply Chain74
REQUIREMENTS
All tools must be marked containing the following minimum 2 pieces of information:
1)“Property of General Motors”
2)The Complete Vendor Tool Asset Management (VTAM) tool I.D. Number
Your options for doing so are to etch, stamp or engrave directly onto the tool or use a tag. If a tag is used, the following applies:
Tags must be attached to the tool using rivets or screws.
The information placed on the tag must be stamped or legibly engraved.
(Sample GMNA Min. Requirement)
In cases where the tool or tools are too small to etch, engrave, stamp or tag, place the tool or tools into a box or container. Then tag the container using the parameters set above.
NOTE: In the case where tools are made of hardened steel, these should be stamped or engraved with the necessary information prior to heat treatment.
Vendor Tool Identification Guidelines
System Generated #
Global Purchasing & Supply Chain75
Vendor Tool Identification Guidelines
UNACCEPTABLE PRACTICES: Tags that state “GM Owned” or just “GM”
Using paint or magic marker to place VTAM numbers directly on a tool or a onto a tag
The use of any adhesives, tape, soldering or welding is not allowed
Tag Engravings/ Stampings that are not legible
Incomplete information on the tag
Please check with your regional VTAM Analyst for specific Tool ID Guidelines.
Global Purchasing & Supply Chain76
VTAM Quick Reference Topic: Adding Additional Part Numbers To An Existing Record
Global Purchasing & Supply Chain77
Global Purchasing & Supply Chain78
Global Purchasing & Supply Chain
VTAM Quick Reference Topic: Adding Additional Tools To A Record
79
Global Purchasing & Supply Chain80
VTAM Frequently Asked Questions
Global Purchasing & Supply Chain81
VTAM Frequently Asked Questions
Global Purchasing & Supply Chain82
VTAM Frequently Asked Questions
Global Purchasing & Supply Chain83
VTAM Frequently Asked Questions
Global Purchasing & Supply Chain84
Most Common Issues Resolution
Part number on the tooling PO was canceled/replace prior to PPAP approval
The supplier needs to make sure that if the PN on the tool PO was canceled & replaced prior to PPAP approval, then they must also add the new PN (that is PPAP approved) to the same VTAM record.
Part number on the tooling PO is a less finish (L/F) part number and is not PPAP approved. In many cases the color parts have an Approved PPAP status.
If the part number on the PO is a L/F part number and does not have an Approved PPAP status, , then the supplier must either approve the L/F part number or add one of the color part numbers with an Approved PPAP status to the same VTAM record.
The PPAP is done at a duns number different than the duns number on the tool PO.
The PPAP & VTAM MUST be entered into GQTS under the same duns number. If this is different than the duns number on the tooling PO, then the supplier should note that on the front of the invoice. In these situations, an RFA will be sent to the buyer requesting authorization to proceed.
Most Common Issues Resolution
Suppliers are not aware of the VTAM requirement. This requirement has been in place for all tool PO’s issued after 10/1/2006.
Refer to the VTAM Supplier Training presentation available in GM Supply Power.
The VTAM is created at a duns number different than the duns number on the tool PO and/or PPAP.
The PPAP & VTAM MUST be entered into GQTS under the same duns number. If this is different than the duns number on the tooling PO, then the supplier should note that on the front of the invoice. In these situations, an RFA will be sent to the buyer requesting authorization to proceed.
The VTAM record is created under the PN with Approved PPAP status, not the PN on the tooling PO
The part number from the tooling PO must be on an approved VTAM record. In addition, the PPAP approved part number, if different from the part number on the tool PO, must also be on the VTAM record.
The VTAM record is not in APPROVED status
Record must be in Approved status. Suppliers need to ensure this prior to submitting invoice.
Global Purchasing & Supply Chain85
Global Purchasing & Supply Chain86
For the buyers:
• Introduce the VTAM process to suppliers during TKO
• 1810 documentation MUST be included on Tool Order form
• Buyer Raise PO: Correct Part number & manufacturing DUNs combination must be on PO
• Buyer is first point of contact and responsible to resolve and escalate VTAM issues.
For SQE’s / VTAM Analyst
• Ensure PPAP completed in timely manner (GM SQE)
• Review and Approve GM 1810 Tool Management for completeness of information (GM VTAM Analyst)
For the Suppliers
• Suppliers are expected to utilize VTAM to manage their inventory of GM tools.
• Individual Tool Information Must Be Kept Up to Date.
• Invoices will not be paid unless VTAM process is followed: VTAM and PPAP approval required before submitting invoice for payment.
• Payment issues are relayed back to the buyer for resolution.
Global Purchasing & Supply Chain87
Questions or Problems?
• Email your Regional GM VTAM Analyst or contact your GM buyer for the specific VTAM contact person
• GM Only Help Desk Phone: (888) 337-2400
• GM Only use the iT Service Center – My IT Support - Use the Web to submit questions or report IT problems
• Supplier Help Desk must contact 1-866-273-5038 or 1-248-365-2525 or http://portal.covisint.com/web/supportauto/contactus
• Other questions email to: [email protected]
Global Purchasing & Supply Chain88
Closing
• VTAM Approval is Required for Payment don’t touch the 1810 record after you have invoiced – could delay payment.
• Suppliers are Expected to Utilize VTAM to Manage all their locations of the GM tools.
• Approved GM Business Tool Transfers consult regional GM BTAB coordinators and VTAM tool transfers contact GM VTAM Analyst (Internal and External transfers)
• Individual Tool Information Must Be maintained even after you have received payment for the GM tools.
(DO NOT DELETE the GM 1810 Record once you have been paid for the GM tool – the tools are GM Assets)
• GM Plans to Audit and Verify Tool Locations on a Regular Basis.