tony regan, tri-zen international, singapore: global overview of the flng market
DESCRIPTION
Tony Regan, Principle Consultant, Tri-Zen International, Singapore delivered this presentation at the 2013 FLNG Forum in Perth. The two day conference brings attendees key insights into the technology and concepts that will unlock Australia’s stranded gas reserves. This event brings together case studies, keynote and technical presentations from the experts at the forefront of the Floating LNG projects. For more information about the forum, please visit the event website: http://www.informa.com.au/flngforum2013TRANSCRIPT
www.tri-zen.com
The FLNG Forum, Perth
3-4 December 2013
Global overview of the FLNG market
Tony Regan, Principal Consultant
Tri-Zen International, Singapore
www.tri-zen.com 2 2
Introduction to TRI-ZEN
TRI-ZEN is a consulting business focused on energy and utilities
We cover upstream & downstream, technical, commercial & financial
We offer a wide range of services:
Consulting
Strategy
Business Development
Project Management
Organizational Development
Alliances
Due diligence for M&A, project finance and IPO’s
Lead consultants located across Asia with a global extended network
Clients include the leading companies in energy and professional services
based in Asia, Europe & North America
ThyssenKrupp Uhde Energy & Power
ThyssenKrupp Uhde Energy & Power
Uhde Energy & Power, Oil and Gas Centre of Excellence based in UK, supporting regional Design centres including Uhde Australia.
A technical management consultancy providing multi-discipline technical support for major capital developments. The company has a significant track record of experience in the oil & gas, LNG and power sectors worldwide providing high quality project services to asset owners, operators and contractors in the oil, gas, LNG and renewables industries.
Core engineering design services focussed around process, facilities, utilities and structures with specialist services for due diligence and peer review, feasibility study, option appraisal, conceptual design and project management.
120 professional engineers, 20 LNG professionals
Experience gained from:
Over 30 LNG import terminals
Over 15 LNG liquefaction projects
13 Floating terminal projects (both FPSO’s and FSRU’s)
11 floating liquefaction projects (FLNG)
www.tri-zen.com 4
The Global LNG Market 2013
R/P = 98
R/P = 265 R/P = 41
Trinidad
Algeria
Nigeria
Abu Dhabi
Australia
Malaysia
Indonesia
LNG
Egypt
Eq. Guinea
Angola
Russia
Peru
Norway
Libya
Alaska
Yemen Brunei Oman
Qatar
Under construction
PNG
Global liquefaction capacity (nominal) of 287 million tonnes
www.tri-zen.com 5
The Global LNG Market 2013
R/P = 98
R/P = 265 R/P = 41
Trinidad
Algeria
Nigeria
Abu Dhabi
Australia
Malaysia
Indonesia
LNG
Egypt
Eq. Guinea
Angola
Russia
Peru
Norway
Libya
Yemen Brunei Oman
Qatar
Under construction
PNG
Nominal liquefaction capacity
Qatar the largest producer with 77 million tonnes capacity in two plants
www.tri-zen.com
LNG Imports
6
0
50
100
150
200
250
300
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012
Million tonnes
N. America Cent & S. America Europe Asia Middle East
LNG demand grew by a CAGR of 8% between 2001 and 2010 – three times the rate of growth for gas
www.tri-zen.com
Liquefaction capacity under construction
7
Project Mill tonnes Start Up Operator
Arzew Algeria 4.7 2014 Sonatrach
PNG LNG Papua New Guinea 6.3 2014 ExxomMobil
Pacific Rubialas FLNG Colombia 0.5 2014 Exmar
Qld Curtis Australia 8.5 2014 BG
Donggi-Senoro Indonesia 2 2014 Mitsubishi
Australia Pacific T1-T2 Australia 9 2014/16 Origin/CP
Gladstone LNG Australia 7.8 2015 Santos
Sarawak FLNG Malaysia 1.2 2015 Petronas
MLNG Train 9 Malaysia 3.6 2015 Petronas
Gorgon T1-T3 Australia 15 2015/16 Chevron
Sabine Pass T1-2 USA 9 2015-17 Cheniere Energy
Sabine Pass T3-4 USA 9 Cheniere Energy
Prelude Australia 3.6 2016 Shell
Wheatstone Australia 8.6 2016 Chevron
Ichthys Australia 8.4 2016 INPEX
Total 97.2
Liquefaction capacity under construction
www.tri-zen.com 8
The Global LNG Market 2017
R/P = 98
R/P = 265 R/P = 41
Trinidad
Algeria
Nigeria
Abu Dhabi
Australia
Malaysia
Indonesia
LNG
Egypt
Eq. Guinea
Angola
Russia
Peru
Norway
Libya
Yemen Brunei Oman
Qatar
Under construction
PNG
Nominal liquefaction capacity
Australia overtakes Qatar as largest LNG producer
www.tri-zen.com
LNG Demand
9
Q1 11 Q2 11 Q3 11 Q4 11 Q1 12 Q2 12 Q3 12 Q4 12 Q1 13 Q2 13 Q3-13E
N. America 4.1 3.2 2.8 2.9 2.6 1.9 2.2 1.9 2.1 2.2 2.1
S. America 1.6 2.1 2.6 1.8 1.8 3.2 3.4 3.1 3 4 4.1
Europe 18.6 18.2 14.8 14.9 14.4 12.4 12.6 12.1 9.5 11 9.1
Asia 38.1 34.9 39.3 41.2 45.1 38.3 41.1 42 47.7 40.3 41.7
Middle East 0.2 1.6 1.4 0.4 0.1 1.3 1.5 0.6 0 1.1 1
Total 62.6 60 60.9 61.2 63.9 57.1 60.8 59.7 62.4 58.5 58
LNG Imports
Mill tonnes Q1 11 Q2 11 Q3 11 Q4 11 Q1 12 Q2 12 Q3 12 Q4 12 Q1 13 Q2 13 Q3 13
China 2.3 3.3 3.4 3.7 3.3 3.4 3.8 4.2 4.5 3.7 4.9
India 2.6 3.1 3.1 3.5 3.6 3.2 3.6 3.5 3.2 3.5 3.2
Indonesia 0.12 0.3 0.3 0.3 0 0
Japan 19.6 18.2 20.7 20.9 24 20.6 21.6 21 24.2 19.9 21.5
S Korea 11.2 7.2 7.5 10.1 11.1 7.4 7.9 9.8 12.2 9.2 8.1
Taiwan 2.5 3.1 3.6 2.9 2.9 3.4 3.6 2.9 2.9 3.4 3.7
Thailand 0.2 0.3 0.1 0.3 0.14 0.3 0.2 0.4 0.4 0.4
Total 38.2 35.1 38.7 41.2 45.2 38.3 41.1 41.9 47.7 40.2 41.8
Asian LNG Imports
www.tri-zen.com
Global LNG Demand Forecast
10
0
50
100
150
200
250
300
350
400
450
500
LNG Demand Forecast
Mill tonnes
North America Central Amer/Caribb South America Europe Asia Middle East
www.tri-zen.com
Reality check
Global liquefaction capacity, October 2013 291 million tonnes
Liquefaction capacity under construction 97 million tonnes
Existing plus under construction 388 million tonnes
LNG demand 2012 242 million tonnes
Estimated demand in 2020 450 million tonnes
Shortfall in liquefaction capacity 112 million tonnes*
Need another 10-16 new projects to come on stream by 2020!
*515 million tonnes of liquefaction capacity needed to meet demand of 464 million tonnes. Assumes liquefaction plants run at 90% capacity.
www.tri-zen.com
Projects Planning to take Final Investment Decision in 2013
12
Project Country Mill tn FID Start up Shareholders
Fishermans Ldg Australia 3.0 2013 2014 LNG Ltd HQCEC
Timor Sea Australia 2.0 2012 2016 PTT
Scarborough Australia 6.0 2013 2016 BHP, ExxonMobil
Arrow LNG Australia 8.0 2013 2017 Shell, PetroChina
Browse Australia 15.0 2013 2018 Woodside, BP, Shell, PetroChina, MIMI
Gorgon T4 Australia 5.2 2013 2017 Chevron, Shell, ExxonMobil, Osaka Gas, Tokyo Gas, Chubu Elec
BC LNG Export Canada 1.8 2012 2014 LNG Partners, Hasla First Nation
Kitimat LNG Canada 10.0 2013 2017 Apache, Chevron
Abadi Indonesia 2.5 2013 2018 Inpex, Shell
Eq. Guinea T2 Eq. Guinea 4.4 2012 2016 Marathon,Sonagas, Mitsui, Marubeni, Union Fenosa, GALP
Tannguh T3 Indonesia 3.8 2013 2018 BP, MI Berau, CNOOC, Nippon Oi l , KG Berau, LNG Japan, Ta l i sman
Tamar FLNG Israel 3.0 2013 2015 Noble Energy, DorGas, Isramco, Pangea & Delek
Sabah FLNG Malaysia 1.5 2013 2016 Petronas
Mocambique Mocambique 20.0 2013 2018 Anadarko, ENI
Brass Nigeria 10.0 2013 2017 NNPC, ENI, ConocoPhillips, Total
Vladivostok Russia 10.0 2013 2017 Gazprom, Itochu, Japex, Inpex, Marubeni
Yamal Russia 15.0 2012 2016 Novatek, Total
Freeport LNG USA 13.2 2012 2017 Freeport LNG, Macquarie
Sabine Pass T3/4 USA 9.0 2013 2017 Cheniere
Lavaca Bay TX USA 3.0 2013 2016 Excelerate (FLSO)
146.4
Projects planning to take Final Investent Decision (FID) in 2013
Very slow progress. Only one of these projects (Sabine Pass Train 3 & 4) has actually
taken FID so far this year
www.tri-zen.com
US$/tonne capacity
13
NWS T4
Darwin T1
NWS T5
Pluto T1 Gorgon
PNG LNG QCCLNG
GLNG
Icthys
Wheatstone
Pluto T2 Browse
0
500
1000
1500
2000
2500
3000
3500
2002 2004 2006 2008 2010 2012 2014 2016 2018 2020
Start up date
Aus Pacific
Increased project costs
www.tri-zen.com
Projects under construction
14
Leader Topsides LNG Hull Storage Project status Location
(Constructor) Liquefaction mtpa Containment m3 Project
Shell Technip 3.6 Barge 220,000 + FEED completed 2009 Australia
(Samsung) Shell DMR Membrane 90,000 LPG + Sanctioned May 2011 Prelude
126,000 Condensate Start Up 2017
Petronas Technip/Linde 1.2 Barge FEED completed 2012 Malaysia
(DSME) MR Membrane Sanctioned 2012 Sarawak
Start up Q4 2015
Exmar Black & Veatch 0.5 Barge 16,100 + Sanctioned 2012 Colombia
(Wison) SMR floating storage Start up Q1 2015 Pacific Rubiales
www.tri-zen.com
Shell - Prelude
15 years of research
1.6 million man hours working on
the engineering challenges
Front End Engineering & Design
awarded Samsung-Technip in July
2009
Final Investment Decision May
2011
Built at Samsung Heavy
Industries’s Geoje shipyard in
South Korea
Liquefaction – Shell DMR
Enters service 2016
15
Shell has entered into a Master Service Agreement with Technip and Samsung for the design, construction and installation of multiple floating liquefied natural gas facilities over a period of up to fifteen years
www.tri-zen.com
FLNG - Prelude
Designed to be on site for 25 years
To be located in the Browse Basin 200
km off Western Australia
Will tap into 3 Tcf gas reserves in
Prelude, Concerto & Libra fields
5.3 mill tonnes of liquids producing:
3.6 mtpa of LNG
1.3 mtpa of condensate
0.4 mtpa of LPG
Subsea equipment – FMC,
Technologies, Technip
Turret - SBM Offshore
Controls – Emerson
Compressors – GE
Heat exchanger – Air Products
16
Prelude:
Shell 72.5%
INPEX 17.5%
KOGAS 10%
488 m x 74 m – Largest Floating Structure to Date, 600,000t Topsides
www.tri-zen.com
Petronas – FLNG 1
Sarawak
To be located 180 km off Bintulu
Gas from Kanowit field
LNG capacity 1.2 mtpa
FEED Completed Feb 2012 by
Technip/Daewoo
Sanctioned March 2012
Start up planned Q4 2015
Construction – DSME, Okpo Korea
External Turret Moored
Liquefaction – Mixed Refrigerant
Membrane Storage
Tandem transfer
17
Petronas FLNG 1:
Petronas 100%
www.tri-zen.com
Exmar – Pacific Rubiales
Floating Liquefaction Regasification &
Storage Unit (FLRSU)
Offshore Columbia (Caribbean)
Gas from La Creciente Field (onshore)
LNG 0.5 mtpa (70 MMSCFD)
LNG Storage 14,000 m3 Type C tank
plus 140,000 m3 floating storage
Liquefaction – SMR - Black & Veatch
PRICO
EPCIC – Wison Offshore, Shanghai
Tolling basis for 15 years
Planned start 2014
LNG Supply to Caribbean Islands
18
Pacific Rubiales:
Pacific Rubiales Energy Corp 100%
FLRSU:
Exmar 100%
www.tri-zen.com
FLNG Projects
19
Early proposed projects were off West Africa but focus switched to Australia
Now going global – Malaysia, Indonesia, Iraq, Israel, Colombia and USA
FLNG
Firm
Existing
Proposed
PNG
AUSTRALIA
Greater Sunrise, 3.5 mtpa
Bonaparte, 2 mtpa
Shell/Prelude, 3.5 mtpa
Scarborough, 6 mtpa
Echuca Shoals,
1.5 mtpa
Abadi, 2.5 mtpa
INDONESIA
TIMOR LESTE PTT Cash Maple, 2 mtpa
Evans Shoal, Hoegh/DSME, 3 mtpa
Petronas FLNG, 1.2 mtpa
Petronas FLNG 1.5 mtpa
Others:
Iraq, Shell, Mitsubishi 2 mtpa
Israel, Noble, Delek, DSME
Colombia, Exmar 0.5 mtpa
USA , Excelerate 3 mtpa, Main Pass 24 mtpa
Browse, 12 mtpa
www.tri-zen.com
Proposed FLNG projects
20
Proposed
Country Project MTPA FID Start up Partners
Australia Greater Sunrise 4 2020 Woods ide, Shel l , ConocoPhi l l ips , Osaka Gas
Australia Cash Maple 2 2013 2016 PTT
Australia Bonaparte 2 2015 2018 GDF Suez, Santos
Australia Scarborough/Pi lbara 6 2014 2020 ExxonMobi l , BHP
Canada BC FLNG - Douglas Channel 0.7 2015 Hais la Nation and Douglas Channel Services
Indonesia Abadi 2.5 2015 2018 Inpex, Shel l
Israel Tamar 3 2013 2018 Noble Energy, DorGas , Is ramco, Pangea, Delek, Avner
Malaysia FLNG2 - Sabah LNG 1.5 2013 2016 Petronas
USA Port Lavaca 4 2013 2018 Excelerate Energy, RWE
USA G of M FLNG 1 2014 2017 EDF Trading, Exmar
26.7
www.tri-zen.com Confidential
Status FEED/Pre FEED stage
21
Country Project MTPA FID Start Up Sponsors
FEED complete
USA Lavaca Bay 3 2013 2018 Excelerate, RWE
FEED in progress
Canada BC LNG Export Co-Op 0.7 2015 Hais la Nation and Douglas Channel Gas Services
Indonesia Abadi 2.5 2013 2018 Inpex, Shel l
Malaysia Sabah LNG 1.5 2013 2016 Petronas
Pre FEED complete
Australia Cash Maple 2 2013 2016 PTT
Pre FEED in progress
Australia Bonaparte 2 2014 2018 GdF Suez Santos
Israel Tamar 3 2013 2015 Noble Energy, DorGas , Is ramco, Pangea & Delek
Eight projects at the Pre-FEED/FEED stage
www.tri-zen.com Confidential
Excelerate - USGC
Excelerate Energy’s FLSO
Lavaca Bay near Galveston, Texas
Capacity 3 mtpa LNG
LNG storage 250,000 m³
Fully integrated gas processing plant.
Length 338 meters
Breadth of 62 meters.
FEED is in an advanced phase and Excelerate expect to complete it by end 2012
Commissioning – 2017 (44 months from final investment decision)
22
Floating Liquefaction Storage Offloading
vessel (FLSO™)
“Can accommodate a wide range of gas compositions at its inlet making it well suited for virtually any application near shore or offshore”
www.tri-zen.com
INPEX - Abadi
Abadi field, Masela block, Indonesia
Pre FEED completed
FEED award expected Q4 2012
FID 2014
Start up 2017/18
LNG 2.5 mtpa
Dual FEED proposed:
Chiyoda, Saipem, Hyundai, SBM Offshore
JGC, Technip, Samsung
23
Abadi:
INPEX 60%
Shell 30%
Energi Mega Persada 10%
www.tri-zen.com Confidential
Petronas - Sabah
Unit 2 - Sabah
1.5 MTPA
2 FEEDs awarded, complete mid 2013
JGC/Samsung
MITC (MODEC/IHI/Toyo/CB&I)
Sanction planned late 2013
Start up planned Q4, 2016
Picture courtesy of Technip
www.tri-zen.com Confidential 25
•Timor Sea, Australia
•Gas supply - Montara, Cash, Maple
•Pre FEED 2011
•FEED ?
•FID ?
•LNG 2.5 mtpa
•25,000 m3 NGL
•25,000 m3 LPG
•Hull Length 320 m, width 60 m
•SPB Tanks SS
•Liquefaction - SMR (LiMuM)
•CO2 up to 10% mol
PTT - Cash/Maple
Cash/Maple:
PTT
www.tri-zen.com
GdF Suez – Bonaparte LNG
Bonaparte LNG off western Australia
Gas from Tern, Petrel & Frigate fields
Pre FEED by Doris & KBR
FEED expected 2013
FID 2014
Start up 2018
LNG production 2 mtpa
26
Bonaparte LNG
GdF Suez 60%
Santos 40%
www.tri-zen.com
Höegh LNG - Tamar
Tamar & Dalit fields off Israel
3.5 mtpa LNG
Produces LNG, LPG and NGL
Storage 190,000 m3 LNG
Membrane Tanks
Lummus Niche (N2/CH4)
Direct GT driven compressors
Pre Feed 2012 (KBR)
EPCIC – DSME
Construction - DSME
27
King LNG:
Tamar partners tbc
Höegh LNG tbc
DSME E&R tbc
www.tri-zen.com
SBM & Golar LNG;
Considering conversions – expected to be 6-12 months shorter schedule than new build;
0.5- 2.0 mtpa LNG
Both smaller scale - probably focused towards smaller developers;
Golar – FEED being done by Keppel
3 Possible Vessel Conversions;
Contract Value of $600m Quoted ;
SBM - Generic pre-FEED complete
28
Unconventional FLNG
www.tri-zen.com Confidential
Potential FLNG projects
29
Potential
Australia Browse 12 2014 2018 Woods ide, Shel l , PetroChina, MIMI
Australia Evans Shoal ENI, Shel l
Australia Echuca Shoal 1.5 Nexus Energy
Cameroun Gulf of Guinea 3 GDF Suez, SNH
Gabon Shel l
Iraq Basrah 2 Shel l Mitsubishi
Mauritanea Banda NW & West Tul low
Mocambique Rovuma Basin Pangea LNG
Namibia Kudu Ph 2 1.5 Tul low
Papua New Guinea PNG FLNG 3 2015 Hoegh, DSME, Petromin
Tanzania Block 1 BG, Statoi l
USA South Texas LNG 8 2018 Pangea LNG
USA Main Pass 24 2017 United Energy, Freeport-McMoRan Energy
USA Waller Point 1.25 Waller Energy
USA Port Arthur 3 2020 Sempra Energy
USA CE FLNG 1.5 2016 Cambridge Energy Holdings
60.8
www.tri-zen.com
Höegh LNG - PNG
PNG FLNG formed 2011 to monetise gas from Foreland Basin
1.6 – 2.0 mtpa LNG
Produces LNG, LPG and NGL
Storage 190,000 m3 LNG
Membrane Tanks
Lummus Niche (N2/CH4)
Direct GT driven compressors
Status: Generic FEED Complete
30
PNG FLNG:
Petromin 34%
Höegh LNG 33%
DSME E&R 33%
www.tri-zen.com
Total FLNG
Total FLNG concept
Liquefaction 1 to 3.8 mtpa
Length 290-480 m
Can treat raw gas up to 17% CO2
BoD completed for 2.5 mtpa
Turret moored with header control
Liquefaction – N2
Storage 245,000 m 3 membrane, two rows
Tandem offloading
All electric drive
Pre FEED undertaken 2011
31
www.tri-zen.com
Hyundai FLNG
Hyundai FLNG concept
2.5 mtpa
Liquefaction Linde LIMUM SMR
L 355m, B 70m, D 35 m
Storage 193,800 m3 LNG (GTT Mark III Membrane, two row)
DNV Approval in Principle Nov 2011
Turret mooring
Side by side transfer LNG, tandem for condensate
32
www.tri-zen.com Confidential 33
Conceptual design
Hull Length = 400 m
Hull Width = 80 m
LNG 3 to 6 mtpa
Storage 350,000 m3 LNG
Membrane Tanks
Liquefaction CP Optimised Cascade
Technip undertaking conceptual study
FEED award by end 2013
ConocoPhillips FLNG
Potential locations - ConocoPhillips is aiming at the Timor Sea discoveries of Calidita and Barossa in joint venture with SK Energy and the Greater Poseidon in the offshore Western
Australia Browse basin.
ThyssenKrupp Uhde Energy & Power CAPEX & OPEX
CAPEX Metrics – care not all LNG-FPSOs are created equal!
OPEX
Production Cost $/MMBTU
LNG Value Chain
Options to Improve economics
Background Graph courtesy of FlexLNG
ThyssenKrupp Uhde Energy & Power
Significant variations depending on gas composition (high/low C3, C4, condensate) and CO2, N2 content
High liquids content considerably increases commercial attraction.
Shell’s 3.5 mtpa concept thought to attract bids at around $1,000/tpa.
Flex LNG indicating an estimate of $550-760/tpa for 2.0 mtpa liquefaction capacity (US$1.1 to 1.3 bn). OPEX indication US$110,000/day
CAPEX figures exclude field development costs. Cost figures still indicative until full design completed for specific location/resource.
35
What will FLNG cost
Early capital cost estimates
$ 600/tpa $ 1,200/tpa
Recent indicative cost
$ 1,000/tpa ± 30%
* Figures in US$
ThyssenKrupp Uhde Energy & Power
Recent CAPEX estimates
Recently completed front-end engineering and design (FEED) study estimates a cost of $540 per tonne per annum for Lavaca Bay project
“An FLNG inclusive of mooring is achievable in a range of $550-700 per tonne” Excelerate Energy
“CAPEX = 1000 USD per ton per annum (tpa) installed capacity” Kanfa Aragon for 2 mtpa LNG
4 mtpa LNG - Benign Metocean Environment ~$750/tpa, Severe Metocean Environment ~$900/tpa. ATP Oil & Gas Cylindrical hull
36
ThyssenKrupp Uhde Energy & Power
Indicative FLNG CAPEX
Building Block $ million
Hull & Accommodation 580
Turret 40
Gas Reception 70
Feed Gas Compression later
Gas Treatment 50
Gas Liquefaction 360
LPG Stabilisation option
Power Generation 80
Utility Systems 80
Offloading 10
Interconnecting Pipework 30
Total 1300 765 $/TPA
Contingency 30% 390
Owner's Costs 130
Total 1820 1071 $/TPA
Production 1.7 MTPA
CAPEX Depreciation (15 years) 71 $/T
CAPEX Depreciation (15 years) 1.4 $/MMBTU
Metric
Low Cost Scenario (1.7 MTPA, Lean Gas no LPG/Condensate
ThyssenKrupp Uhde Energy & Power
OPEX (Operating Cost) Components
Fuel Gas (Feed Gas)
What cost rate? Free of charge, nominal, lost LNG sales
Manning/Crew
80 People
Tugs
Assume 3 x 80-90 t pull
Maintenance
Offshore?
Port?
Chemicals & Consumables
Possible Project Financing Costs
Interest & Insurance Exclude (Owner Dependent)
Picture courtesy of SBMLinde
ThyssenKrupp Uhde Energy & Power
OPEX (Operating Cost)
Component $ million/year
Fuel Gas (15% Gas Feed) 17 $1.5/MMBTU
Manning (120 people) 15
Maintenance (4% CAPEX) 38
Tugs 10
Base Support, Helicopters 10
Miscellaneous 10
Total 100
Production 1.7 MTPA
Production Cost 59 $/ton
Production Cost 1.2 $/MMBTU
Note: Excludes any project financing costs
Estimate 1.7 MTPA LNG Production
ThyssenKrupp Uhde Energy & Power
Production Cost Summary
$/MMBTU
FLNG CAPEX Depreciation 1.4
FLNG OPEX 1.2
FLNG Production Cost 2.6
Gas Feed Cost (Subsea) 2.0
Shipping Cost 1.0
Storage & Regas Cost 1.0
Total Cost 6.6
Lowest Cost Scenario 1.7 MTPA
ThyssenKrupp Uhde Energy & Power
Overall Production Cost - Lowest Cost Scenario
FLNG (say 2.6)
LNG Shipping (say 1.0)
Storage & Regas (say 1.0) 6.0
4.0
2.0
Gas Feed Cost (say 6.0)
$US/MMBtu (MCF)
Production Cost* 10.6 (LNG Selling Price typically US$15-17/MMBtu )
*Costs exclude Interest and Insurance
www.tri-zen.com Confidential
FLNG Projects
0
5
10
15
20
25
2014 2015 2016 2017 2018
FLNG units Mill tonnes
Pacific Rubiales Petronas I Shell, Prelude Petronas II Excelerate, USA
PTT Cash/Maple Noble/DSME, Israel Inpex/Shell, Abadi GdF Bonaparte
42
Three under construction, another six hope to take FID shortly. Potentially almost 20 mill tonnes production from FLNG units by 2018
www.tri-zen.com
Tangguh, 7.6 mtpa
PNG LNG, 6.3 mtpa
PNG
AUSTRALIA NWS Train 1 - 5, 16.3 mtpa
Darwin, 3.7 mtpa
Greater Sunrise, 4 mtpa
Bonaparte, 2 mtpa
Ichthys, 8.4 mtpa
Prelude, 3.6 mtpa
Pluto, 4.3 mtpa
Gorgon, 15 mtpa
Scarborough, 6-7 mtpa
Wheatstone, 8.6 mtpa
Fisherman’s Landing, 1.5 mtpa
Australia Pacific, 7 mtpa
Arrow Energy 8 mtpa
Gladstone, 7.8 mtpa
Queensland Curtis, 8.5 mtpa
Echuca Shoals, 1.5 mtpa
Abadi, 2.5 mtpa
INDONESIA
TIMOR LESTE
Bontang, 23 mtpa
Cash Maple, 2 mtpa
Evans Shoal, Hoegh/Talisman, 2 mtpa
Donggi Senoro, 2 mtpa
Browse 12 mtpa
The way to go - FLNG
FLNG (shown in red) becoming the norm for the development of offshore production
www.tri-zen.com
R/P = 98
R/P = 265 R/P = 41
FLNG Projects Firm Proposed
Iraq
Canada
USA
Colombia
Gabon
Namibia Mocambique
Israel
Malaysia
Indonesia
Australia
PNG
FLNG Projects
www.tri-zen.com 45
We add value
Strategy
Asset optimisation
Sector studies
Market studies
Forecasting
Commercial and technical studies
Commercial representation
New market entry
Detailed business cases
Project finance and management
Mergers & Acquisitions
Organisational Development
Based in Singapore with consultants
in:
Bangkok
Beijing