POCKETS OF ACUTE POVERTY
• 67% of population is 15 – 64 year old (working age)
• General unemployment rate = 27.7%
• Youth unemployment rate = 37.2%
• Backlog in basic services (sanitation)
• Decline in certain economic sectorse.g. manufacturing
WHAT DOES THE NATIONAL DEVELOPMENT PLAN SAY?
• Need to deal with legacy of apartheid spatial form
• Infrastructure development is the back bone to economic development
• Need to focus on new sectors of the economy
• Promote social justice
HOW IS MMM PUTTING THESE INTO ACTION?
MTERF BUDGET OUTLOOK
CAPITALEXPENDITURE PER SOURCES
9
FINANCING - MANGUANG AND CENTLEC
Budget Year
2014/15
Budget Year
2015/16
Budget Year
2016/17
R R RExternal Loans 368,517,759 322,046,534 34,464,782Internal Generated Funds 328,753,646 342,164,037 359,231,479Public Contributions/Donations 19,267,015 20,952,879 22,744,351Grants and SubsidiesPublic Transport Infrastructure & Systems Grant 30,000,000 - -Department of Water Affairs 4,000,000 - -
USDG Grant 654,406,000 680,907,000 723,187,999
Integrated City Development 5,596,000 - -EPWP Incentive Grant 2,431,000 - -National Electrification Programme 26,491,228 20,175,438 22,807,018Provincial Human Settlement Grant 25,000,000 - -
Neighbourhood Development Partnership Grant 5,000,000 16,878,000 17,744,000
Total Grants and subsidies 752,924,228 717,960,438 763,739,017
1,469,462,648 1,403,123,888 1,180,179,629
CAPITALEXPENDITURE – 5 YEARS PLAN
10
FundingFundingFundingFunding SourcesSourcesSourcesSources 2014201420142014----15151515 2015201520152015----16161616 2016201620162016----17171717 2017201720172017----18181818 2018201820182018----19191919
GrantsGrantsGrantsGrants 752 m 717 m 763 m NYA NYA
External BorrowingExternal BorrowingExternal BorrowingExternal Borrowing 368 m368 m368 m368 m 322 m322 m322 m322 m 434 m434 m434 m434 m 600 m600 m600 m600 m 500500500500 mmmm
Loans 368 m 322 m 34 m 0 0
Bonds 0 0 400 m 600 m 500 m
Internal FundsInternal FundsInternal FundsInternal Funds 328 m328 m328 m328 m 342 m342 m342 m342 m 359 m359 m359 m359 m 570 m570 m570 m570 m 590 m590 m590 m590 m
Revenue 328 m 342 m 359 m 400 m 440 m
Surplus 170 m 150 m
TotalTotalTotalTotal 1.4 billion1.4 billion1.4 billion1.4 billion 1.3 billion1.3 billion1.3 billion1.3 billion 1.5 billion1.5 billion1.5 billion1.5 billion 1.11.11.11.1 billion + billion + billion + billion +
grantsgrantsgrantsgrants
1 billion + 1 billion + 1 billion + 1 billion +
grantsgrantsgrantsgrants
Capital Budget – 5 Years Historic Trends
11
Other 304 118 933 347 943 035 344 752 108 245 673 388 255 659 013
Grants 264 347 019 354 548 228 113 983 127 341 790 988 572 088 301
Actual Spent 568 465 952 702 491 263 458 735 235 587 464 376 827 747 314
Total Budget 880 865 907 928 321 425 797 710 869 821 546 339 995 070 777
Significant Projects Significant Projects Significant Projects Significant Projects –––– Land Parcels & Land Parcels & Land Parcels & Land Parcels &
NodesNodesNodesNodes
PlanningPlanningPlanningPlanning 2014201420142014----15151515 2015201520152015----16161616 2016201620162016----17171717
Airport Node R90 m R100 m R51 m
Cecilia Park R20 m R40 m
Brandkop R17 m
Thaba Nchu Node R15 m R30 m
Botshabelo Node R25 m R46 m
Pedestrianisation R12 m R25 m R20 m
12
Significant Projects Significant Projects Significant Projects Significant Projects ––––
Sanitation Sanitation Sanitation Sanitation 2014201420142014----15151515 2015201520152015----16161616 2016201620162016----17171717
Sanitation Sanitation Sanitation Sanitation ---- BulkBulkBulkBulk
North Eastern-WWTW (15ml/day) and
1,8 km outfall sewer
R43,4 m
Addition of 10ml to Sterkwater WWTW R40 m R40 m R46,5 m
Bloemspruit WWTW Phase 2 R5 m R20 m R70 m
Botshabelo and Thaba Nchu VIP
Eradication Projects
R66,3 m
13
Significant Projects Significant Projects Significant Projects Significant Projects SocialSocialSocialSocial ServicesServicesServicesServices 2014201420142014----15151515 2015201520152015----16161616 2016201620162016----17171717
Relocation of Zoo R14,9 m R41,2 m R12,8 m
Regional Park – Thaba Nchu R20, 5 m R12 m R24,5 m
Human SettlementsHuman SettlementsHuman SettlementsHuman Settlements
Informal Settlements Strategy R19,2 m
Acquisition of land – Sepane R12 m
Rural DevelopmentRural DevelopmentRural DevelopmentRural Development
- 4 X Broilers establishment
- 4 X Egg layers establishment
- 4 x Piggeries establishment
- 2 x Fencing of camps
- 2 x Community Garden
R 8.4 m
14
Significant Projects Significant Projects Significant Projects Significant Projects ----
WaterWaterWaterWaterBulkBulkBulkBulk WaterWaterWaterWater 2014201420142014----15151515 2015201520152015----16161616 2016201620162016----17171717
Water networks to stands R20 m R10 m
Longridge Reservoir supply
line 8.3 km
R42,1 m
Thaba Nchu and Botshabelo R28,6 m
Upgrading of Maselspoort
WTW
R26,8 m R40 m R35 m
Refurbishment of Water Supply
Systems
R10 m R20 m R30 m
Maselspoort water recycling R10 m R37,9 m R20 m
Water Demand Management R136 m R148 m R26,8 m
15
Significant Projects Significant Projects Significant Projects Significant Projects ---- RoadsRoadsRoadsRoadsRoads and StormRoads and StormRoads and StormRoads and Storm----waterwaterwaterwater 2014201420142014----15151515 2015201520152015----16161616 2016201620162016----
17171717
Upgrading of Streets and Storm-water
R56.6 m R177,9 m
R255,6
m
Upgrading of Maphisa StreetR 29,4 m
Upgrading of Road 350 BotshableloR 23.2 m
Upgrading of Streets & Storm water
Tsongwana Batho R 2.7 m
Resealing of streetsR20 m R14,4 m R50,3 m
Rehabilitation of Botshabelo Road B3R 10 m - -
Heavy Rehabilitation of Kenneth Kaunda
Road R 12 m R 6 m -
Heavy Rehabilitation of Mc Gregor
Street - R 5 m R 5 m
Heavy Rehabilitation of Dan Pienaar
Drive R 3 m R6 m R 6 m
Upgrading of St Georges and First Ave
Intersection R 8 m - -
16
17
Significant Projects Significant Projects Significant Projects Significant Projects ---- ElectricityElectricityElectricityElectricity
BOTSHABELO: 132KV/33/11KV DC SUB F (WARD 27) 33,108,466 BULK ELECTRICITY SUPPLY
EXTENSION AND UPGRADING OF THE 11KV OVERHEAD NETWORK IN THE
PERI-URBAN AREAS (NORTHERN SUBURBS)25,318,063 BULK ELECTRICITY SUPPLY
REPLACEMENT OF 240mm XLPE BETWEEN SUB A AND H (WARD
BOTSHABELO)25,021,150 BULK ELECTRICITY SUPPLY
BOTSHABELO: 132KV LINE FROM DC AROUND WESTERN SIDE TO SOUTH OF
BOTSHABELO (WARD 27 – 34)22,173,900 BULK ELECTRICITY SUPPLY
PARK WEST, 132/33 T2B 45MVA (PARK WEST, GARDENIA PARK, UNIVATSTAS) 16,085,025 BULK ELECTRICITY SUPPLY
132KV NORTHERN RING FROM NOORDSTAD DC TO HARVARD DC
(NOORFSTAAD, PITSPOT & LANGHOVEN PARK, CECELIA PARK)15,700,000 BULK ELECTRICITY SUPPLY
PUBLIC ELECTRICITY CONNECTIONS (ALL WARDS) 62,964,245 ELECTRICITY RETICULATION
ELECTRIFICATION CONNECTIONS DME (CALEB MOTSHABI) 36,189,779 ELECTRICITY RETICULATION
KHAYELITSHA ELECTRIFICATION 31,119,113 ELECTRICITY RETICULATION
REPAIRS AND MAINTENANCE REPAIRS AND MAINTENANCE REPAIRS AND MAINTENANCE REPAIRS AND MAINTENANCE –––– EXPENDITUREEXPENDITUREEXPENDITUREEXPENDITURE
18
REPAIRSREPAIRSREPAIRSREPAIRS ANDANDANDAND MAINTENANCEMAINTENANCEMAINTENANCEMAINTENANCE ––––
TRENDSTRENDSTRENDSTRENDS
19
SPATIAL REFORM
IMPLEMENTATION OF N8 CORRIDOR
INFRASTRUCTURE DEVELOPMENT & ECONOMIC
OPPORTUNITIES
SPATIAL REFORM
Jan 2013
SPATIAL REFORM
Oct - 2013
SPATIAL REFORM
- largest and most bold land development programme in the province since 1994
- well over 30 million square meters of land being released (3000 hectares)
- airport development node is the largestmunicipal owned and driven airportcity project within SADC region
CECELIA 124 ha
BRANDKOP 140 ha
PELLISIER 62 ha
BRANDKOP 5/702256 ha
AIRPORT NODE700 ha
CITY FOOTPRINTMAJOR LAND PARCEL BEING RELEASED
• Professional services
- town planners- engineers- architects- quantity surveying- environmentalists- geologists- economists - landscaping- etc etc etc
• Construction companies
• Property developers
• Material suppliers
• Financial institutions
• Entrepreneurs
• Academic & research institutions
- 45,000 direct jobs to be created in the site service reticulation phase alone (short-medium)
- phenomenal growth will occur in construction industry (material supplies, plant, skills)
- down stream benefits / spin off e.g. employment opportunities
AIRPORT DEVELOPMENT NODE: AN EXAMPLE
AIRPORT DEVELOPMENT NODE
• 2000 hectares of mixed development
• to be developed in two phases
LOCATION
URBAN STRUCTURE PLAN
N8
WHAT IS 700 HACTARES?
N8 AIRPORT NODE
N8
Railway
• 1,553 km of electrical cables to be laid
• 160 km of roadside curbing will be laid
• 72 km of tarred road to be constructed
• 32 km of water pipes to be laid
• 24 km of storm water pipes
• 5,000 tones of cement will be used
• 11,000 construction jobs to be created
NB: above is for phase 1 alone
WATER AND SANITATION PROJECTS FOR
2014/15/16/17
Basic Sanitation Programme
Main objective is to eradicate over 56 000 VIP, Pit and bucket toilets in Botshabelo and Thaba Nchu and Bloemfontein.
In order to upgrade the areas of Bloem, Botshabelo and Thaba Nchu to waterborne service a funding of approximately R2.52billion will be required.
The City has given itself a six year target to eradicate the VIP toilets Mangaung.
Construction Programme 2013/19
The North Eastern development area has the largest need for additional storage capacity due to continuous development.
This project is for the construction of a 35Ml Reservoir on Naval Hill.
The project is currently 95% complete.
This is the first phase of a planned 70 Ml additional reservoir capacity for Bloemfontein and will be the main supply reservoir to the N8 corridor development.
The design for the second phase will be done in the 2014/15 financial year.
Bulk Water Supply Works to N8
• N8 corridor development
• curb outward growth (settlement edge)
• target strategically locate vacant or underdeveloped land
• Have commenced and due for completion approx 18 months
New North-Eastern Waste Water Treatment Works
• Construction of a 15 Ml/day Works
• Construction on the NE- WWTW has commenced in February 2013
• The project is currently 70% complete
The project is a multi year project and will continu e in 2014/15.
Extension to Sterkwater WWTWs
• This project is for the extension of the current Sterkwater WWTWs that is currently running at its full capacity.
• Civil Construction is 95% complete
• This project will double the capacity of the Sterkwater WWTW to 20 Ml/day.
• This WWTW serve approximately 26 500 low income dwelling units from the south eastern area of Bloemfontein (Vista Park and Hillside View)
The design for the second phase will be done in the 2014/15 financial year.
Bulk Water Supply to Mangaung (45 Ml Longridge Reservoir and Pipe line)
• The new reservoir will supply water to approximately 18 000 new stands in the new Vista Park Development,
• 6 500 new stands in the Grasslands area and will improve the level of service to approximately 6500 existing stands in the Rocklands area.
• The project is a multi year project and will continue in 2014/15.
Physical Progress on Bulk Sanitation Supply
New Waste Water Treatment
Works
Sterkwater Waste Water
Treatment Works
Physical Progress on Bulk Water Supply
Casting concrete on the
reservoir wall
Pipeline route on the slopes of
Naval Hill
Physical Progress on Bulk Water Supply…
Excavation for the Longridge
pipeline
(45Ml Reservoir) Longridge
The second phase is implemented in the following areas in 2013/14/15:
Section F - Waterborne Sanitation and Bulk Sanitation
Section J and K- Waterborne Sanitation
Seroalo - Waterborne Sanitation
Bultfontein - Waterborne Sanitation
Bloemside 6 – Waterborne Sanitation
Basic Water and Sanitation Projects 2013/14/15 (3037 Sites)
Ref Number Area Description Budget
Bsh Botshabelo Section J (W1202A) 6CE R 12 000 000
Bsh Botshabelo Section J (W1202B) 6CE R 10 364 757
Sub-Total R 22 364 757
` Bsh Waterborne Sanitation in Section F & F Ext (W1202C) 6CE R 8 000 000
Thb Waterborne Sanitation in Section F & F Ext (W1202C) 6CE R 8 271 831
Sub-Total R 16 271 831
BshBotshabelo Section F & F Ext: Bulk Sewer Line (W1202D) 6CE R 12 000 000
R 12 000 000
Thb Seroalo, Thaba Nchu (W1202E) 6CE R 12 425 243
Sub-Total R 12 425 243
Bsh Botshabelo Section K (W1202F) 7CE R 15 000 000
Bsh Botshabelo Section K (W1202G) 6CE R 11 000 000
Sub-Total R 26 000 000
Thb Bultfontein 3 (W1202H) 6CE R 8 100 000
Sub-Total R 8 100 000
Total R 97 161 831
Current bulk water outlay
…• The current main source of water supply to the Mangaung Area is from the Welbedacht dam in the Caledon River.
• 145Ml/day is provided from the Welbedacht WTW.
• Water is transferred via Knelpoort dam, Rustfontein Dam, Mockesdam to the treatment works at Rustfontein (100Ml/day) and Maselspoort (110Ml/day).
• Related Costs estimated:
Item
Estimated Cost (R
million)
Novo Transfer Scheme and obtaining additional water from Welbedacht Dam
534
WC/WDM 340
Gariep to Knelpoort pipe line 2 940
Total 3 814
Bulk System Augmentation Plan (External New Bulk
Augmentation)Augmentation from Gariep Dam
Component M&E Cost Civil Cost
Abstraction Works and Low Lift Pump Station R 19 200 000 R 48 800 000
Low Lift and High Lift Pipelines - R 2 182 900 000
Surge Tank - R 5 000 000
High Lift Pump Station R 41 600 000 R 32 500 000
Water Treatment Plant R 232 000 000 R 348 000 000
Storage Reservoir - R 30 000 000
Sub-Totals R 292 800 000 R 2 647 200 000
TOTAL (VAT excluded) R 2 940 000 000
Source: Gariep Dam reconnaissance study May 2014
RELOCATION OF ZOO
RELOCATION OF ZOO
THABA NCHU REGIONAL PARK
REGIONAL PARK
REGIONAL PARK
PHASE 1 OF INTEGRATED PUBLIC TRANSPORT NETWORK (IPTN)
PHASE 1 CORRIDOR CONCEPT DEVELOPMENTMOSHOESHOE CORRIDOR
OPTION 2
THANKS
PEDESTRNISATION & BEAUTIFICATION
CBD NMT CONCEPT PROPOSALS FOR INNER CITY CORE REGENERATION PROJECT
BOTSHABELO URBAN REALM UPGRADE
THABA NCHU URBAN REALM UPGRADE PROJECT
THABA NCHU URBAN REALM UPGRADE PROJECT
THANK YOU