TOLEDO COLLINS PARK WTP 40 MGD PLANT ADDITION DESIGN CONSIDERATIONS AND CHALLENGESKurt Smith, PE & Jack Kane, PE - ARCADIS
Jim Donnell, PE - City of ToledoSeptember 28, 2017
© Arcadis 2017
Purpose:h
20 MGD Redundancy- Allow basin maintenance year round
yt
20 MGD Capacity- Address OEPA significant deficiency
Collins Park WTP – 40 MGD Plant Addition
© Arcadis 2017
Kurt SmithProject Manager
Collins Park WTP – Process Flow Schematic
© Arcadis 2017
DES
IGN
CO
NSI
DER
ATIO
NS
• Pumped rapid mix
• Flocculation
• Sedimentation
• Effluent troughs
• Algae skimmers
• Recarbonation
• Ozone connection
• GAC Filters
CH
ALL
ENG
ES • Tight site constraints• Other contractors• Utility relocations• Security
• Maintenance of plant operations (MOPO)• Interconnections to
existing East Plant
• Preservation of Lagoon E
CO
ST S
AVIN
GS
MEA
SUR
ES • Sedimentation basin size reduction
• 3D CAD benefits• Design• Construction• Post Construction
• Prequalification of contractors
• Low bids
Collins Park WTP – 40 MGD Plant Addition
© Arcadis 2017
VERTICAL RAPID MIXER ALTERNATIVE
RAPID MIX PUMP
© Arcadis 2017
WATER CHAMP RAPID MIX ALTERNATIVE
© Arcadis 2017
PUMPED RAPID MIXING SYSTEM
10” DISCHARGE
12” SUCTION
RAPID MIX PUMP
• Rapid mix pump rated for 2,000 gpm at 37’ head with 30 Hp motor
East Plant
© Arcadis 2017
PUMPED RAPID MIXING SYSTEM• East & West Plant rapid mix channels rated for 80 MGD each
OVER BAFFLE
UNDER BAFFLE
8’ X 15.5’ CHANNEL (TYPICAL)
ALUM FEED
© Arcadis 2017
PUMPED RAPID MIXING SYSTEM• Mixing energy exceeds 10-States Standards G-value of 750 fps/ft
ALUM FEED10” DISCHARGE PIPE
INJECTION DIFFUSER NOZZLE
© Arcadis 2017
PUMPED RAPID MIXING SYSTEM
RAPID MIX PUMP
West Plant
© Arcadis 2017
FLOCCULATION BASINS
10” DISCHARGE PIPE
BASIN 7 FLOC DRIVES
LIME SLURRY SPLITTER BOX
SODA ASH SPLITTER BOX
BASIN 8FLOC BASIN
© Arcadis 2017
FLOCCULATION BASINS
ALUM FEED10” DISCHARGE PIPE
INJECTION DIFFUSER NOZZLE
Basins 1 – 6 Upgrades• Equipment
interchangeable with Basins 7 & 8
© Arcadis 2017
SEDIMENTATION BASINS
10” DISCHARGE PIPE
Basins 1 – 6 Upgrades• Equipment interchangeable
with Basins 7 & 8
SLUDGE CROSS COLLECTOR
SLUDGE DRAGS
© Arcadis 2017
EFFLUENT LAUNDER BUILDING
10” DISCHARGE PIPE
INJECTION DIFFUSER NOZZLE
EFFLUENT SUBMERGED
ORIFICE WEIRS (TYPICAL)
© Arcadis 2017
EFFLUENT LAUNDER BUILDING
10” DISCHARGE PIPE
INJECTION DIFFUSER NOZZLE
FLOATABLES ALGAE SKIMMERS
(TYPICAL)
© Arcadis 2017
RECARBONATION BASINS
10” DISCHARGE PIPE
INJECTION DIFFUSER NOZZLE
CO2 DIFFUSERS(TYPICAL)
© Arcadis 2017
OZONE FACILITY CONNECTION
10” DISCHARGE PIPE
KNOCKOUT WALL FOR OZONE INFLUENT CONDUIT
SETTLED WATER CONDUIT GATES FOR
OZONE EFFLUENT CONDUIT
© Arcadis 2017
GAC Filters
INJECTION DIFFUSER NOZZLE
Filter Media Pilot• 12” Sand
Effective size• 0.45 – 0.55 mm
• 24” GAC Effective size
• 1.0 – 1.2 mm
Underdrains• Leopold XA
– IMS 200 caps
© Arcadis 2017
SITE CONSTRAINTS – OTHER CONTRACTORS• Probable Project Costs
– Basin 7 $ 37,200,000– Basin 8 $ 33,400,000– TOTAL $ 70,600,000
• Schedule Basin 7 & Basin 8
• Operational by April 2020
© Arcadis 2017
SITE CONSTRAINTS – OTHER CONTRACTORS• Probable Project Costs
– Basin 7 $ 37,200,000– Basin 8 $ 33,400,000
• Other Concurrent Projects– CPEU $ 17,000,000
• Schedules Basin 7 & Basin 8
• Operational by April 2020 CPEU
• Operational by Sept. 2018
© Arcadis 2017
SITE CONSTRAINTS – OTHER CONTRACTORS• Probable Project Costs
– Basin 7 $ 37,200,000– Basin 8 $ 33,400,000
• Other Concurrent Projects– CPEU $ 17,000,000– Ozone $ 40,000,000– TOTAL $127,600,000
• Schedules CPEU
• Operational by Sept. 2018 Basin 7 & Basin 8
• Operational by April 2020 Ozone Facility
• Operational by July 2020
© Arcadis 2017
SITE CONSTRAINTS – OTHER CONTRACTORS• Additional Concurrent Projects
CPEU• Operational by Sept. 2018
Basin 7 & Basin 8• Operational by April 2020
Ozone Facility• Operational by July 2020
– Lagoon E Spent Lime Removal• Completion by April 2018
– Maintenance Facility• Completion by December 2018
– Basins 1 – 6 Upgrades• Start Construction Jan. 2020
© Arcadis 2017
SITE CONSTRAINTS – SECURITY & SOLUTIONS
© Arcadis 2017
SITE CONSTRAINTS – SECURITY & SOLUTIONS
© Arcadis 2017
Kurt SmithProject Manager
MAINTENANCE OF PLANT OPERATIONS (MOPO)
© Arcadis 2017
Kurt SmithProject Manager
PRESERVATION OF LAGOON E
© Arcadis 2017
Kurt SmithProject Manager
PRESERVATION OF LAGOON E & UTILITY RELOCATIONS
LIMITS OF EXISTING LAGOON E 2:1 SLOPE STRUCTURAL EMBANKMENT
BASIN 8 50 FEET
© Arcadis 2017
Kurt SmithProject Manager
PRESERVATION OF LAGOON E
EXISTING LAGOON CAPACITY
REDUCED FROM 41.8 MG TO 33 MG
OR 21% REDUCTION
© Arcadis 2017
Kurt SmithProject Manager
SEDIMENTATION BASIN SIZE REDUCTION
SPACE SAVINGS
FOR OZONE FACILITY
• Negotiations with OEPA– Based on historic plant
performance– Based on old design text
books 4 hours without sludge equipment
– Based on conservatism of 10-States Standards
• Cost Savings Benefits– Detention time reduced from
4 hours to 3 hours• ~ $5.8 M savings
– Provides space savings for new Ozone Facility
© Arcadis 2017
Kurt SmithProject Manager
3D CAD BENEFITSDESIGN PHASE- Excellent 3D visualization- Interactive tool with Owner
- Design progress meetings- Freedom Navisworks software (for the novice)
- Clash detection to:- Improve quality of bidding documents- Minimize change orders
- Bidding Phase- Provide to Contractors
© Arcadis 2017
Kurt SmithProject Manager
3D CAD BENEFITS CONSTRUCTION PHASE (CONTRACTOR)
- Quicker orientation of project estimators, managers & trades
- More efficient coordination of trade disciplines to resolves conflicts
- Decreases errors and corrections in field
- Higher reliability of expected field conditions and plan drawings
- Allows for more prefabrication offsite with higher quality and lower cost
- Reduce RFI’s and expedite construction schedule
- Creates a safer workplace
- Construction sequencing
© Arcadis 2017
Kurt SmithProject Manager
3D CAD BENEFITS POST CONSTRUCTION
- Develop 3D views for O&M Manuals
- CMMS (computerized maintenance management system)
- Add asset information to model for O&M/asset management
- Freedom Navisworks software (for the novice)- Interactive tool for operator and safety training
© Arcadis 2017
Kurt SmithProject Manager
PREQUALIFICATION OF CONTRACTORSPrequalification Process- Received 6 proposals- Short listed to 4 Contractors to bid
Evaluation Process- Bonding- Verifiable statement confirming financial wherewithal- Planned approach to the project- References- Construction Experience
- Water/wastewater projects- Large excavation
- Workforce & Workload- Corporate Health, Safety & Environmental Program
Control Quality and Risk Reduction
© Arcadis 2017
Kurt SmithProject Manager
LOW BIDSCONSTRUCTION BID RESULTS
BASIN 7 AND BASIN 8 PROJECTS
Description Basin 7 Basin 8
Engineer’s Estimate $37,740,000 $32,820,000
Average of Bids $36,337,865 $33,319,259
Low Bid $28,387,750 $26,694,200
Cost Below Average of Bids $7,950,115 $6,625,059
% Below Average of Bids 21.9% 19.9%
© Arcadis 2017
Thank you!
© Arcadis 2017
Kurt SmithProject Manager
3D CAD BENEFITS
© Arcadis 2017
DES
IGN
CO
NSI
DER
ATIO
NS
• Pumped rapid mix
• Flocculation
• Sedimentation
• Effluent troughs
• Algae skimmers
• Recarbonation
• Ozone connection
• GAC Filters
CH
ALL
ENG
ES • Tight site constraints• Other contractors• Utility relocations• Security
• Maintenance of plant operations• Interconnections to
existing East Plant
• Preservation of Lagoon E
CO
ST S
AVIN
GS
MEA
SUR
ES • Sedimentation basin size reduction
• 3D CAD benefits• Design• Construction• Post-construction
• Pre-qualification of contractors
• Low bids
Collins Park WTP – 40 MGD Plant Addition
© Arcadis 2017
DES
IGN
CO
NSI
DER
ATIO
NS
• Pumped rapid mix
• Flocculation
• Sedimentation
• Effluent troughs
• Algae skimmers
• Recarbonation
• Ozone connection
• GAC Filters
CH
ALL
ENG
ES • Tight site constraints• Other contractors• Utility relocations• Security
• Maintenance of plant operations• Interconnections to
existing East Plant
• Preservation of Lagoon E
CO
ST S
AVIN
GS
MEA
SUR
ES • Sedimentation basin size reduction
• 3D CAD benefits• Design• Construction• Post-construction
• Pre-qualification of contractors
• Low bids
Collins Park WTP – 40 MGD Plant Addition
© Arcadis 2017
TitleText DESIGN PHASE
© Arcadis 2017
TitleText
© Arcadis 2017
Title
Text
© Arcadis 2017
TitleText
COST SAVINGSSDFD
SDFDSFSDFSDFDSFSDF
© Arcadis 2017
SITE CONSTRAINTS – OTHER CONTRACTORS
• Probable Project Costs– Basin 7 $ 37,200,000– Basin 8 $ 33,400,000
• Other Concurrent Projects– CPEU $ 17,000,000– Ozone $ 40,000,000– TOTAL $127,600,000
• Schedules CPEU
• Operational by Sept. 2018 Basin 7 & Basin 8
• Operational by April 2020
© Arcadis 2017
SITE CONSTRAINTS – OTHER CONTRACTORS
• Schedule Ozone Facility
• Operational by July 2020
• Probable Project Costs– Ozone Facility $37,200,000
© Arcadis 2017
TitleText
© Arcadis 2017
TitleText
© Arcadis 2017
Kurt SmithProject Manager
© Arcadis 2017
Kurt SmithProject Manager
• Probable Project Costs– Basin 7 $48,700,000– Basin 8 $43,400,000– TOTAL $92,100,000
© Arcadis 2017
Paragraph level• First level bullet
– Second level bullet• Third level bullet
Template Layout Tips
Logo protection zone
Text and images should not extend past blue lines. (Full size images would be an exception)
The grid is laid out in six columns and is designed to provide a flexible layout while still allowing for breathing room and white space.
To turn the guides on and off: right click > grids and guides > guides or Alt + F9.
To get bullets use ‘Increase list level’ or Shift + Alt + →
© Arcadis 2017
Guidance• Always ensure that if you are presented with an ‘Enable Content’ and / or
‘Enable Editing’ option/s on opening a document, that you DO enable the content and / or editing by clicking on the buttons presented
• There are sixteen layouts in each master (one with logo, and another without) to choose from to suit your needs and help keep your presentation consistent
• Incorporating slides from another presentation:
• Click on ‘New Slide’ on the ‘Slides’ ribbon group, under the ‘Home’ ribbon tab and scroll down and choose the layout you want to use
• Copy your slides (Ctrl + C) and insert a new blank slide layout in your new presentation and paste your slides (Ctrl + V) into your new presentation (not behind any of the other layouts, especially not behind the title or divider layouts)
• The small ‘Paste’ clipboard icon will appear at the bottom of the slides you have copied in, click on the arrow on the icon and choose ‘use destination theme’, this will ensure that your slides will use the correct colour pallet throughout the document
• You may need to correct some colour combinations, any other anomalies, and choose the layout design you require for each slide –i.e., Title and Content, Title only, Blank etc and a certain amount of tidying will normally be required
• You can also use the ‘Keep Source Formatting’ option – but ensure that you change the colour palette for the slides you have copied in to our Arcadis Brand palette.
• If you are still having problems try opening a blank new PowerPoint document (Ctrl +N) and paste your slides into this before pasting it into the new template
• Alternatively, you may need to copy each of the elements of the design into the new template individually using the ‘Paste Special / Unformatted Text’ option and reapply formatting in the new template – this may be long winded, but can often be safer and ensures more consistent application of the branding
• Kickers / takeaways should be short, sharp and to the point, the text size is set and should not be made smaller – if you do not need to use a kicker, please just delete the text box