toc instuments for it projects
TRANSCRIPT
TOC INSTRUMENTS FOR IT PROJECTSEstimate twice less and meet the estimation with no loss of quality or extra resources
Date: November 11 2015
Prepared By: Ievgeniy Vyshegorodtsev
TABLE OF CONTENTS
• Common issues for most of the projects
• Reasons analysis based on Critical Chain Method
• Painkiller instruments
Evgeniy Vyshegorodtsev PM Ciklum Solutions 2
What’s your POV?
No matter how long it takes to perform each separate task within the project - it is important to finish all the project in time.
Evgeniy Vyshegorodtsev PM Ciklum Solutions 3
● Projects last longer than planned, sometimes much longer● Constantly acceding the budget● Client delay their payments● Scope creep. Clients are adding functionality to fixed scope and issue change requests● Team has to overtime● Resources are not available on time (even if scheduled and booked in advance)● Required documents are not available when needed (SRS, UX/UI designs, source materials,
Readme files, etc)● Change of priorities● Tremendous efforts to achieve intermediate results● People assigned to multiple projects● The number of projects is increased by the management
COMMON PAIN POINTS
Evgeniy Vyshegorodtsev PM Ciklum Solutions 4
So much in common General problem is in how we manage
Positive outcome – typical solutions could be used to make projects faster and within the budgets
COMMON PAIN POINTS
Evgeniy Vyshegorodtsev PM Ciklum Solutions 5
REASONS ANALYSIS
3 REASONS that inevitably cause pain on the project
Play to guess
You know it - you name it
REASONS ANALYSIS
Evgeniy Vyshegorodtsev PM Ciklum Solutions 7
Stopping the task before it’s completion to take up another one, perceived as more urgent and of higher priority.
Effect: Direct loss of productivity due to need to come back to the previous task and memorise the progress at the time of switch
Worse case scenario - Delay Domino effectstop of one task delays the next tasks in a row
Impact: project timeline increases
Bad multitaskingREASON 1: THE GAME
1234...
ABCD... ...
Evgeniy Vyshegorodtsev PM Ciklum Solutions 8
REASONS 2 and 3
Are mailny about this:
REASONS ANALYSIS
Evgeniy Vyshegorodtsev PM Ciklum Solutions 9
● Majority of people start dealing the task at full swing only at the very last moment before the deadline.
● Emerges when security time buffer is included into the time estimate● First we claim additional time (risk buffer) for some task “ - What if something goes
wrong?” ● When we get it - we feel very comfortable and think there is plenty of time, no urgency
(no real reason to start the work)● Start dealing the task when the deadline approaches
Effect: risk buffer is in fact wasted before starting dealing the task. It could be really vital in the end to overcome the unexpected impediments BUT IT’S ALREADY GONE
Impact: project delays even with the “fat”, secure and comfortable risk buffer. People are engaged more in the some projects and the bookings are delayed to other projects
REASON 2: Student syndrome
Evgeniy Vyshegorodtsev PM Ciklum Solutions 10
The other side:
If the risk buffer was added and not used before the task is performed - it won’t reported ready before the estimated completion time.
Reasons:1) Time is used for “polishing” and “perfection”2) Next time WHIF event may really happen3) Bad emotional signal: management won’t approve “fat” estimation next time
Parkinson's lawREASON 3:
Evgeniy Vyshegorodtsev PM Ciklum Solutions 11
We match our estimates - are we doing great indeed?
Because projects nature lies in variability a task that took 10h due to some circumstances, may take 15h or 25h next time, no matter how skilled the team is
If the estimation of task or project proves to be reliable (matches most of the times) - we waste a lot of time for risk buffering
Conclusion: there is an opportunity to reduce the project duration dramatically and increase the number of delivered projects without additional resources
THINK ABOUT IT
Evgeniy Vyshegorodtsev PM Ciklum Solutions 12
PAINKILLER INSTRUMENTS
Based on Critical Chain Methodology of Theory of Constraint
PAINKILLER INSTRUMENTS
Evgeniy Vyshegorodtsev PM Ciklum Solutions 14
Bad multitasking
Reduce the amount of projects (tasks) in progress by freezing the pipeline. Not less than 25% freeze could be sufficient.
● Increases the concentration on tasks● Fixes the prioritization● Minimizes the number of switches between tasks● No holy-war between PM’s for critical resources. Almost :)● Reduces Clients and Management pressure for change of
priorities● Developers aren’t able to choose between projects
Outcomes:Increase of the # of projects delivered on time, without delays even for freezed projects
PAINKILLER INSTRUMENTS
Evgeniy Vyshegorodtsev PM Ciklum Solutions 15
Comply project launch with the system constraint
After freezing the pipeline launch every new project in limited portions to keep the low # of projects IN PROGRESS
Chain capacity = weakest link capacity
PAINKILLER INSTRUMENTS
Evgeniy Vyshegorodtsev PM Ciklum Solutions 16
Planning Project buffer
● Not to waste additional time● Assure the short delivery time with confidence in it’s fulfilment
Define the longest chain of interdependent tasks and resources for entire project
Apply Critical Chain Method to get more realistic timeline, although Critical Chain Method looks more promising and optimistic
PAINKILLER INSTRUMENTS
Evgeniy Vyshegorodtsev PM Ciklum Solutions 17
CRITICAL PATH vs CRITICAL CHAIN
?
Evgeniy Vyshegorodtsev PM Ciklum Solutions 18
Planning Project buffer using Critical Chain Method
Reduce all estimates by up to 50% and place them in the Risk Buffer in the end of the projectAdd small Feeding buffers in points of integrating into Critical Chain
Risk buffer in the end of the project makes it maximum available for all tasks at the Critical Chain
Having a common buffer for all tasks make time allocated for each task TWICE smaller● less probability to trigger Stedents’ Syndrome or Parkinson’s law● less delays due to Bad Multitasking
Probability to face delays at any separate task is times higher, than facing delays at all stages
Feeding Buffer
Project Buffer
PLANNING PROJECT BUFFER
Evgeniy Vyshegorodtsev PM Ciklum Solutions 19
Buffer Consumption (%) / Progress of tasks on Critical Chain (%)Task managers report Estimate to Completion - total for all tasks on the Critical Chain is related to total Buffer consumed
For PM’s:● Easy to monitor● Observe trends● Take corrective actions
For HoU’s:● Easy to set priorities and allocate
resources (task in Red zone - higher priority, Green zone - can wait)
For Dev. Team:● Visual priority status - can take managerial
decisions without managers → operates faster, self-organised team
● Evident sign for raising a flag for help or escalation
USING PROJECT BUFFER FOR MANAGERIAL DECISIONS
Evgeniy Vyshegorodtsev PM Ciklum Solutions 20
Applying these 3 steps:● dramatically increases the flow of performed projects● 95% of projects are completed in time● Project duration decreases by 25-50%● More projects accomplished at the same period of time with NO
additional resources (higher margin, faster revenue)
Potential resistance to changes:● Hard to switch ideologically from launching as many projects as possible
to freezing the conveyor and postponing the projects until permitted by the system constraint.
● Cultural and mindset re-construction
Required alies:● Top management (C-level)● Head of Sales● Finance Dept
POTENTIAL RESULTS
Evgeniy Vyshegorodtsev PM Ciklum Solutions 21