Historic building gets new life on campus CUSTOMER: State of New Hampshire APPLICATION: Chilled water LOCATION: Concord, NH CONTRACTOR: SAM Mechanical Services, LLC The industrial-style Tobey Building on the New Hampshire Hospital campus in Concord, NH, was renovated and is now considered to have one of the most state-of-the-art HVAC systems in the U.S. SAM Mechanical Services, LLC, a commercial plumbing and HVAC company in New Hampshire, helped the facility and Lavalle Brensinger Architects design and install the new HVAC system. This unique, green cooling system significantly reduces cooling costs. Power plants that serve New Hampshire must keep their output stable in order to provide needed electricity during peak daytime hours, but during off-peak hours overnight, the unused electricity goes to waste. As a result, local power plants provide special pricing during off-peak hours, which is metered separately. The off-peak ice storage production cooling system uses this reduced-rate electricity to greatest advantage. The system uses chillers to make and store ice in underground tanks overnight. During the day, when other buildings of comparable size have chiller systems running full bore, the Tobey Building is saving money by cooling with a recirculating water loop integrated into the underground ice tanks. SAM Mechanical installed Viega MegaPress fittings for the chilled water applications, an additional savings factor for the building. “We had several miles of pipe on each floor,” said Steve April, owner of SAM Mechanical. “It was a green design concept where everyone else’s bid went with geothermal.” An efficient system all around, the time required to transition the Tobey Building to this unique system was critical, given the number of components that had to come together to make it happen and perform to required specifications. The Tobey job, which had thousands of fittings, saved at least 50% of piping installation time.

Upload: viega-llc

Post on 25-Jul-2016

217 views

Category:

Documents


0 download

DESCRIPTION

Historic building gets new life on campus

TRANSCRIPT

Page 1: Tobey building

Historic building gets new life on campus

CUSTOMER: State of New Hampshire

APPLICATION: Chilled water

LOCATION: Concord, NH

CONTRACTOR: SAM Mechanical Services, LLC

The industrial-style Tobey Building on the New Hampshire Hospital campus in Concord, NH, was renovated and is now considered to have one of the most state-of-the-art HVAC systems in the U.S.

SAM Mechanical Services, LLC, a commercial plumbing and HVAC company in New Hampshire, helped the facility and Lavalle Brensinger Architects design and install the new HVAC system.

This unique, green cooling system significantly reduces cooling costs. Power plants that serve New Hampshire must keep their output stable in order to provide needed electricity during peak daytime hours, but during off-peak hours overnight, the unused electricity goes to

waste. As a result, local power plants provide special pricing

during off-peak hours, which is metered separately. The off-peak ice storage production cooling system uses this reduced-rate electricity to greatest advantage.

The system uses chillers to make and store ice in underground tanks overnight. During the day, when other buildings of comparable size have chiller systems running full bore, the Tobey Building is saving money by cooling with a recirculating water loop integrated into the underground ice tanks.

SAM Mechanical installed Viega MegaPress fittings for the chilled water applications, an additional savings factor for the building.

“We had several miles of pipe on each floor,” said Steve April, owner of SAM Mechanical. “It was a green design concept where everyone else’s bid went with geothermal.”

An efficient system all around, the time required to transition the Tobey Building to this unique system was critical,

given the number of components that had to come together to make it happen and perform

to required specifications.

The Tobey job, which had thousands of fittings, saved at least 50% of piping installation time.”

Page 2: Tobey building

“From our perspective we were able to pipe it up in less time and overall less cost using Viega MegaPress fittings,” April said. “It cuts labor in so many ways and removes the sometimes-frequent problem of threading and cutting equipment that’s not working properly. The Tobey job, which had thousands of fittings, saved at least 50% of piping installation time.”

Viega has the only press system for black iron pipe installations that covers hydronic applications with MegaPress and Viega MegaPressG for gas systems.

With system-matched tools and jaws, connections are made in less than seven seconds, making Viega MegaPress suitable for virtually any type of project. For the Tobey Building, where time and quality counted, SAM Mechanical trusted Viega to get the job done right the first time.

“I would encourage anyone considering using Viega MegaPress to do it,” April said. “At the end of the day a big job can have a substantial savings especially in labor. As far as the Tobey Building, with that many fittings, it was important to choose a product that wouldn’t leak, giving me peace of mind that I was helping keep this historical building safe and secure for decades to come.”

For more information on Viega system solutions, visit www.viega.us, or call toll free: 800-976-9819.

©2015 Viega LLC

...it was important to choose a product that wouldn't leak, giving me peace of mind...”