Page 1 of 17 ENGINEERING AND INFRASTRUCTURE DEPARTMENT MONTHLY REPORT TO: Town of Peace River Mayor and Council DATE: January and February 2020 (current to February 26, 2020) File: 12/201 The following monthly summary encompasses information that is current at the time of reporting. DIRECTORS NOTES POLICY, DIRECTIVES, PLANS AND ENGINEERING ADMINISTRATION 1. As time permits, The Director is working on the following initiatives: a. Professional Practice Management Plan; b. Environmental Master Plan; c. Asset Management Plan; d. Develop a Regional Resource Allocation and Representation Plan; e. Snow and Ice Management Policy; f. Utility Bylaw update and Utility Policy; and g. Neighbourhood Infrastructure Renewal Policy. HUMAN RESOURCES 1. New Staff a. No new staff this month 2. Staff moves: a. No staff to report. 3. Hiring for the following open positions in Engineering and Infrastructure: a. Facilities Maintenance Worker; b. Machine Operator 3 Lead; and c. Machine Operator 3.

Upload: others

Post on 10-May-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TO: Town of Peace River Mayor and Council DATE: January

Page 1 of 17

ENGINEERING AND INFRASTRUCTURE DEPARTMENT MONTHLY REPORT TO: Town of Peace River Mayor and Council DATE: January and February 2020 (current to February 26, 2020) File: 12/201 The following monthly summary encompasses information that is current at the time of reporting. DIRECTORS NOTES POLICY, DIRECTIVES, PLANS AND ENGINEERING ADMINISTRATION

1. As time permits, The Director is working on the following initiatives:

a. Professional Practice Management Plan; b. Environmental Master Plan; c. Asset Management Plan; d. Develop a Regional Resource Allocation and Representation Plan; e. Snow and Ice Management Policy; f. Utility Bylaw update and Utility Policy; and g. Neighbourhood Infrastructure Renewal Policy.

HUMAN RESOURCES

1. New Staff

a. No new staff this month

2. Staff moves: a. No staff to report.

3. Hiring for the following open positions in Engineering and

Infrastructure: a. Facilities Maintenance Worker; b. Machine Operator 3 Lead; and c. Machine Operator 3.

Page 2: TO: Town of Peace River Mayor and Council DATE: January

Page 2 of 17

SOLID WASTE MANAGEMENT AND RECYCLING

1. Operations this month: a. Minor collection issues only with same-week resolution.

PLANNING AND DEVELOPMENT DEVELOPMENT OFFICER

1. Received one (1) Development Permit: a. 1 – Home Occupation (Office), 1 – Demolition of house & garage damaged by fire, 1 –

Temporary Portable Sign

2. Worked the Referendum Advance Poll and Referendum Poll.

3. Met with Appraiser regarding potential development.

4. Cemetery inquires/requests – Four (4) Interments, 2 inquiries re plot locations

5. Began working on a new draft Cemetery Bylaw as time permits.

6. Archiving old Development/Building files.

7. Historical research for PRSD, Appraiser and Town infrastructure. Working with applicant and architect on potential land use bylaw amendment to add drive-thru to the Primary Commercial

8. Completed an Action Plan for items noted in the Safety Codes Council Building Accreditation Audit from Municipal Affairs.

9. Uploaded all required documentation for lawyer for Purple Rung Stop Work Order.

10. Began working on a new draft Cemetery Bylaw as time permits.

11. Finalizing year end reconciliations and starting new 2020 files

12. Archiving old Development/Building files.

13. Met with potential developer/builder for Anderson property.

14. Current Building Permit values as below:

Building Permit Values as of: February 29, 2020 Type Quantity Value to Date

Commercial 3 $28,900.00 Industrial

Page 3: TO: Town of Peace River Mayor and Council DATE: January

Page 3 of 17

Community / Institutional Residential 2 $105,000.00

PLANNING DEPARTMENT

Planning:

1. Downtown Beautification: a. Contacting utility companies for permission to wrap utility boxes – Telus and ATCO; b. Coordinated w Contractor regarding Downtown Parking Lot signs; c. Project meetings for downtown tree planting; and d. Banners of remembrance meeting.

2. Long Term Strategic Items:

a. Land Use Bylaw Rewrite – Significant Progress on Definitions section of bylaw, set up for LUB Districts Map; Continued progress on Specific Use Regulations;

b. Upper West Peace North Area Structure Plan (previously Citadel) – Progress drafting plan document, project meetings with project engineer, ASP meeting with landowner.

3. Land Use Bylaw amendments: a. KFC Drive-thru amendment – prepared Land Use Bylaw amendment, circulated to neighbouring

landowners and municipalities, prepared public notices, RFD drafted and amendment presented to Council and received 3rd reading. Updated Land Use Bylaw map to show amendment.

4. Development: a. Met with developer, review proposed site plan for KFC development; b. Met with developer for detached garage development; and c. Provided information for and met with potential developer/builder for Anderson property.

5. IDP:

a. IDP referral policy drafted and RFDir prepared for Council.

6. Enforcement a. provided enforcement file to legal, working towards injunction to enforce Stop Order

7. Other Planning items:

a. Inputs for budget; b. Resident issue with blocks moved during light installation; c. Met with Art Club; d. Information requests:

i. Addressing; ii. Appraisal related information to appraiser;

iii. Setbacks; iv. Off-site levies; v. Uses in downtown; and

vi. Fencing requirements for demolition.

8. Staff training/onboarding – with Manager, Human Resources, File Management, Paybles.

Page 4: TO: Town of Peace River Mayor and Council DATE: January

Page 4 of 17

9. Worked the Referendum Advance Poll.

10. CPAA Board of Directors– Vice Chair North and Conference Committee

11. Subdivision Authority – AHJ assumed by the Town on January 1st. Finalized Administrative templates for

subdivision processing.

12. GIS a. Establish Standing Monthly meeting

with IT and CIT. b. Significant data reorganization on GIS

drive. c. Initiated update of recreation and snow

plowing data. d. Data provision to Communications for

Voyent communication project.

ENGINEERING CAPITAL PROJECTS

1. Capital projects completed to date:

a. No projects to report.

2. Capital projects currently in progress are: a. Neighbourhood Infrastructure Renewal (NIR) project; b. Crosswalk design for 98th Street; c. Regional Waterline project (Dixonville feeder) with County of

Northern Lights; d. Peace Regional Recreation Centre deficiencies; e. Reservoir 365 Replacement project; and f. Heavy equipment purchases.

3. Capital projects tendered are:

a. No projects tendered during this period.

4. Working on capital RFP/tenders for: a. Shaftesbury Sanitary Sewer System Parts 1 and 2 (2019 Project). Currently working on a

redesign for this project. b. Lift Station No. 4 (2020 project); c. Solid Waste Management; d. 3 year Contractor/Consultant Prequalification; and e. Water and Waste Water Security System Upgrade.

Page 5: TO: Town of Peace River Mayor and Council DATE: January

Page 5 of 17

OPERATIONS AND MAINTENANCE ENGINEERING

1. Operating projects completed to date are: a. No projects to report.

2. Operating projects currently in progress are:

a. Misery Mountain Ski Hill Pump Skid;

3. Operating projects tendered are: a. No tenders are currently in progress.

GIS / MAPPING

1. Engineering Tech assisting MMSA with mapping inputs and infrastructure map updates.

2. Working on the collector module for the GIS system. Purchased a new data collector that will work to import new data into the system.

3. Continuing to work on underground infrastructure layers for the GIS system.

4. Further GIS applications are being looked at including a workforce

application for work order management and an operations dashboard.

PUBLIC WORKS ROADS

1. The following Public Works programs are underway:

a. Sanding, blading and snow removal as required; and b. Grading gravel roads as required.

Page 6: TO: Town of Peace River Mayor and Council DATE: January

Page 6 of 17

WATER DISTRIBUTION

1. The following Public Works programs are underway: a. Watermain break repairs/ maintenance as required. b. Hydrant Maintenance and flushing program deferred

to 2020, pending flushing sequence recommendations.

c. Various c.c. repairs as required. d. Investigating water break on 98th Street with AB

Transportation and Bridge Construction Team. AB Transportation to complete as part of Bridge Contract. Estimated time of completion is Jun 2020.

e. RV truck fill station will require water line repairs for 2020;

f. Providing support on the Reservoir 365 project; g. Preparing to schedule residential/commercial appointments for turn-on of aqua-flow and

bleeders (freeze protection).

SANITARY SEWER COLLECTION

1. The following Public Works programs are underway: a. Resolving Resident sewer backup issues as required; b. Routine sewer flushing as required; c. Sewer flushing and CCTV investigation of sanitary sewer line on 94th Street deferred to 2020.

STORM SEWER COLLECTION

1. All storm gates are closed and being opened for ground water as required. and sign installation is completed.

2. The following Public Works programs are underway: a. Assess storm gates for future replacement. b. Cleaning of stormwater culverts, catch basins, and outfalls as

time permits.

3. Completed monitoring of river freeze-up water levels. FLEET MAINTENANCE

1. Fleet Maintenance are working on the following activities:

a. Ongoing maintenance and vehicle checks; b. Receiving new 1T truck under fleet leasing program; and c. Vehicle and equipment repair on-going.

Page 7: TO: Town of Peace River Mayor and Council DATE: January

Page 7 of 17

FACILITIES MAINTENANCE

1. In addition to normal building maintenance activities, Facilities Maintenance are working on:

a. Fire Alarm System repairs completed at the Airport, Library and Town Hall;

b. Exterior repairs to storage buildings at Public Works/Fire Training yard site on-going;

c. Coordinating Janitorial contract; d. Coordinating gas meter work on the Al Adair Rec Centre; and e. Facilities maintenance as required.

PUBLIC SANITATION AND GENERAL LABOUR

1. Support for Community Services projects as required.

2. Public Works/Fire Training yard site clean up of all

materials, improved storage and inventoried as part of the asset management inventory plan on-going.

3. All Public Works hand/ mechanical tools, light equipment and materials to be inventoried and re-inventoried semi-annually as part of the asset management inventory plan;

4. Christmas decorations coming down after Spring time change.

5. Ice surface maintenance is ingoing.

WATER AND WASTEWATER OPERATIONS WATER TREATMENT PLANT

1. The water treatment staff are working on the following tasks/operations:

a. Day to day testing and operations. Routine preventative maintenance;

b. Working on chlorine and sulphuric acid tanks as part of WTP equipment upgrades;

c. Working on coagulant tank liner issue; and d. Automation upgrades completed to convert landline to

cell radio system.

Page 8: TO: Town of Peace River Mayor and Council DATE: January

Page 8 of 17

WATER RESERVOIR / BOOSTER STATIONS

1. Major items in these areas were: a. Working on Reservoir 365 Replacement project

with Engineering; b. Transformer changeout at Reservoir 475 being

planned. Generator will be running during that time. Commissioning for Reservoir 475 completed and operator training being conducted;

c. Looking at security options for water/wastewater facilities; and

d. Automation upgrades completed to convert landline to cell radio system. PLC replaced in Reservoir 475 as part of Dixonville project.

AIRPORT RESERVOIR

1. No issues to report. WATER METERING

1. Significant items in this area were:

a. Ongoing meter maintenance and replacements; b. Reviewing options for automated communications via cell towers; and c. Creating and actioning list for water meter maintenance. There has

been a recent increase in faulted meter bases that Operations is investigating.

WASTEWATER TREATMENT PLANT

1. Ongoing work in this area included: a. Day to day testing, operations and

maintenance; b. Automation upgrades completed to

convert landline to cell radio system.

Page 9: TO: Town of Peace River Mayor and Council DATE: January

Page 9 of 17

WASTEWATER LIFT STATIONS

1. Significant items in this area were: a. Day to day testing and operations; and b. Looking at rail replacement in Lift Station No. 3. c. Automation upgrades completed to convert landline to cell

radio system. Only need to complete Lift Station No. 1 scheduled for 2020.

SANITARY SEWER TRANSFER STATION

1. No items to report. WASTE WATER DRYING BED AND LEACHATE POND

1. Road repairs completed and upcoming warranty

inspection being arranged.

Page 10: TO: Town of Peace River Mayor and Council DATE: January

Page 10 of 17

CAPITAL PROJECTS

DEPARTMENT CAPITAL PROJECT

YEAR

PROJECT No. PROJECT DESCRIPTION STATUS

Public Works

2016 CE005 Pat's Creek Phase II Project Complete. Scope change approved to determine future mitigation options, cost and subsequent Engineering. Possible 2020 project.

2017 CE007 99th Street Slide

Remediation Project Substantially complete. Stormwater management changes complete. Warranty inspection being arranged.

CE011 Neighbourhood Inf. Program 2017-2021

Engineering phase being completed for 2021 project. Ramping up to complete remainder of south end work less river road.

2018

2019 TBA Crosswalk Upgrade on 98 Street Engineering in completed. Equipment purchased for Spring 2020 installation.

2020

Water / Wastewater

2017

CW003 Reservoir 475 Construction work being coordinated with Dixonville Regional Water Line project. New Reservoir addition complete except for transformer upgrade. Working on system automation.

CW004 Res. 365 Decommissioning / Replacement

Project underway. Tie-ins to existing infrastructure complete. Pouring concrete for Reservoir.

CW004 Reservoir 365 Fire Protection Pumps Project underway. Pumps ordered.

CW004 Backup Generator – Reservoir 365 Project underway. Generator shop drawings being reviewed.

2018

CS006 Lift Station 4 Consultant working on tender documents. Tender in April 2021.

CS008 Shaftesbury Sewer Main Part 1 Project in redesign.

CS009 Shaftesbury Sewer Main Part 2 Project in redesign.

CS010 Lift Station 5 Upgrade Project deferred to future year pending other SCF funding.

CS011 STP Aeration Tank Cleaning Engineering Consultant working on tender for February 2020.

2019 TBA WTP Equipment Project in progress. Coagulant tanks being replaced. Chemical treatment skids

being ordered. TBA PRV Replacement Deferred to 2020.

2020

Page 11: TO: Town of Peace River Mayor and Council DATE: January

Page 11 of 17

Community Services

2017 CR001 Peace Regional Recreation Centre Work substantially complete. Working to complete deficiencies.

2018 CR005 Saddleback Playground

Replacement Construction of Phase 1 is complete.

CR015 Upper West Peace Trail On hold pending capital budget discussions.

2019 TBA PRRC Equipment and Furnishings

AV Project awarded and underway. Coordinating with PRRC construction contract. Wireless system being organized to order materials. Security system installed and operational.

2020

STRATEGIC PLAN KEY PERFORMANCE INDICATORS

Strategic Goal Target Total

Length (m)

Target Length

(m) Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec

Total YTD (m)

% Target Complete

YTD

Sewer Flushing

Clean 12% of sanitary sewer system annually

63,700 637 0 0 0 0 0 0 0 0 0 0 0 0 0 0%

Street Sweeping

Complete primary sweeping of asphalt roads and alleys by June

84,861 84,861 0 0 0 0 0 0 0 0 0 0 0 0 0 0%

Water Distribution System Annual Replacement

Renew 1% water distribution system annually.

80,500 805 0 0 0 0 0 0 0 0 0 0 0 0 0 0%

Page 12: TO: Town of Peace River Mayor and Council DATE: January

Page 12 of 17

Sanitary Sewer Collection System Annual Replacement

Renew 1% sanitary system collection system annually.

63,700 637 0 0 0 0 0 0 0 0 0 0 0 0 0 0%

Storm Sewer System Annual Replacement

Renew 1% storm sewer system annually

21,500 215 0 0 0 0 0 0 0 0 0 0 0 0 0 0%

Strategic Goal Target Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec

Running Average

YTD (Apr-Oct)

Pothole Patching

Address 90% of reported potholes within 30 days

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

ENGINEERING AND INFRASTRUCTURE STATISTICS

Item Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec Total to

Date (m3)

Water Produced (m3) 138,278 0 0 0 0 0 0 0 0 0 0 0 138,278

Wastewater Treated (m3) 100,758 0 0 0 0 0 0 0 0 0 0 0 100,758

Water Produced – Wastewater Treated (m3)

37,520 0 0 0 0 0 0 0 0 0 0 0 37,520

SOLID WASTE MANAGEMENT

Page 13: TO: Town of Peace River Mayor and Council DATE: January

Page 13 of 17

Page 14: TO: Town of Peace River Mayor and Council DATE: January

Page 14 of 17

Page 15: TO: Town of Peace River Mayor and Council DATE: January

Page 15 of 17

DECEMBER - TOPR CURBSIDE RESI DIVERSION

DECEMBER - TOPR CURBSIDE RESI WASTE

DECEMBER - TOPR CURBSIDE RESI WASTE & DIVERSION

DECEMBER - TOPR CURBSIDE RESI DIVERSION ( % )

12.43 94.04 106.47 11.67%

YTD - TOPR CURBSIDE RESI DIVERSION YTD - TOPR CURBSIDE RESI WASTE YTD - TOPR CURBSIDE RESI WASTE &

DIVERSION YTD - TOPR CURBSIDE RESI

DIVERSION ( % )

122.06 1,614.37 1,736.43 7.03%

Page 16: TO: Town of Peace River Mayor and Council DATE: January

Page 16 of 17

Page 17: TO: Town of Peace River Mayor and Council DATE: January

Page 17 of 17

ENGINEERING AND INFRASTRUCTURE CONCERNS

Previous Month Year to Date Concerns Submitted for Previous Month 84 84 Concerns Addressed and Closed 56 56 Concerns Still Open 28 28