tomlingtomlingprojects.com.my/wp-content/uploads/2016/10/company-profile2016.pdf · in 2001, he...
TRANSCRIPT
TOMLING
PROJECTS SDN. BHD. (952046-T)
Your Ideal Roofing Specialist
COMPANY PROFILE
Prepared by Ephraem Lee Kock Wei
August 2016
CONTENTS
1. INTRODUCTION ------------------------------------------------------------------------- 1
2. COMPANY INFORMATION ----------------------------------------------------------- 2
3. PRINCIPAL ACTIVITIES --------------------------------------------------------------- 3
4. ORGANIZATIONAL CHART ---------------------------------------------------------- 4
5. COMPANY LEADERSHIP & WORKFORCE --------------------------------------- 5
6. QUALITY OF MATERIALS ------------------------------------------------------------ 6
7. PROJECTS COMPLETED --------------------------------------------------------------- 8
8. COMPANY ASSOCIATE ---------------------------------------------------------------- 17
Appendix (i) Table Showing the Organization of the 6 Groups of Site Workers
Appendix (ii) Photographs of Projects
1 CP2016/R01
1. INTRODUCTION
Tomling Projects Sdn. Bhd. was registered in Malaysia on 8th July 2011 and since has been in operation in
the state of Sarawak.
The company has a professional team with more than 15 years of experience in designing a variety of steel
roof structure and in installation works. The company has developed its own steel roof truss system called
‘Tomling’.
The objective of the company is to meet high level of engineering and safety standards by using Australia
Standard License Software, and in its designs of steel roof structure.
In June 2016, the company has 74 employees. The company is registered as a CIDB (Construction Industry
Development Board) Malaysia License Contractor –Registration No. 0120150730-SR164934.
Details of Contractor Licences of the Company
Gred Kategori Pengkhususan
G3 Pembinaan Bangunan B04 – Kerja-kerja Pembinaan Bangunan
G3 Pembinaan Bangunan B15 – Pemasangan Bumbung
G3 Pembinaan Kejuruteraan Awam CE21 – Pembinaan Kejuruteraan Awam
2 CP2016/R01
2. COMPANY INFORMATION
REGISTERED OFFICE LOT 5959, 1ST FLOOR,
AND PRINCIPAL PLACE OF BUSINESS JALAN DESA INDAH 3,
BANDAR BARU PERMYJAYA,
98000 MIRI, SARAWAK.
CONTACT NUMBER (Tel) +6085 622902
(Fax) +6085 628506
(Mob) +6016 889 9672
E-MAIL ADDRESS [email protected]
GST REGISTRATION NUMBER 000184598528
BOARD OF DIRECTORS THOMAS SIEW WU
(Managing Director)
NGU LEH KING
(Director Secretary)
COMPANY SECRETARY KOH EK CHONG
(LS 0004766)
FINANCIAL AUDITORS HII KING HIONG & CO.
(AF: 0296)
- LOT 1131, 1ST FLOOR,
MIRI WATERFRONT
COMMERCIAL CENTRE, P.O. BOX
1500, 98008 MIRI, SARAWAK.
PRINCIPAL BANKERS PUBLIC BANK BERHAD
MALAYAN BANKING BERHAD
OCBC BANK MALAYSIA BERHAD
PAID-UP CAPITAL RM 100,000.00
3 CP2016/R01
3. PRINCIPAL ACTIVITIES
The principal activities of the company are in designing, trading, fabricating and installing Steel Roof Truss
System, and other related Roofing Works.
The company specializes in the roofing materials and installing works as the following:
Steel Roof Truss System
Sasilation or Insulation Layer
Metal Roof Sheet
Concrete Roof Tiles
Ridge Capping
Hip Capping
Barge Capping
Fascia Capping
Firewall Capping
Valley Gutter
Rain Gutter
Wall Flashing
Wall Cladding
GI Louvers and Metal Ceiling
4 CP2016/R01
THOMAS SIEW WU
(Managing Director)
KUAN PEI AI
(Account Manager)
KU NGUK FAH
(Account Executive)
TIONG SIEW TIENG
(Admin cum Purchaser)
KOH SU CHEN
(Account cum Admin Clerk)
THOMAS SIEW WU
(Project Manager)
MARY MOH MAR LI
(Quantity Surveyor)
LAW HUAI JUNG
(Project Supervisor 1)
HOU CHONG SING
(Lorry Driver 1)
SUGINO
(Group Leader 1)
12 Site Workers
- refer Appendix (i)
MOHAMMAD SODIQ
(Group Leader 2)
3 Site Workers
- refer Appendix (i)
CHAI NYUK CHANG
(Project Supervisor 2)
CHAI CHUN FATT
(Lorry Driver 2)
WONG MONG FOOK
(Lorry Driver 3)
SAIFI
(Group Leader 3)
3 Site Workers
- refer Appendix (i)
JUMITRI HALIM
(Group Leader 4)
30 Site Workers
- refer Appendix (i)
SIA PIK HWANG
(Project Supervisor 3)
SII HAW CHING
(Lorry Driver 4)
AHMAD BAWAZIR
(Group Leader 5)
4 Site Workers
- refer Appendix (i)
HANIS MUSTHOFA
(Group Leader 6)
4 Site Workers
- refer Appendix (i)
EPHRAEM LEE KOCK WEI
(Business Development Manager)
4. ORGANIZATIONAL CHART
5 CP2016/R01
5. COMPANY LEADERSHIP & WORKFORCE
5.1 Managing Director
The MD of the company, Mr. THOMAS SIEW WU, I/C No. 700523-13-5033, graduated with a HND
(Higher National Diploma) from Federal Institute of Technology in Kuala Lumpur in 1993, majoring in
Mechanical Engineering.
In 2001, he joined UAC Steel Systems Sdn. Bhd., a well-known company in the construction of steel roof
truss system and related roofing works in Kuala Lumpur, as a Project Engineer.
In 2006, he was invited by Hasmit Shield Roofing Manufacture Sdn. Bhd., an associate of Goldmyne
Hardware Sdn. Bhd. in Brunei Darussalam to be a business partner of a newly established company. This
career advancement has given him the opportunity to further excel as the company was awarded and had
completed numerous major housing and commercial projects in Brunei Darussalam.
In 2011, after exploring the potential of the construction market in Sarawak, Sabah and Wilayah
Persekutuan Labuan, Thomas decided to return to his home state Sarawak and to focus on the Sarawak’s
construction market. He then founded ‘Tomling Projects Sdn. Bhd.’
5.2 Qualification of Roofing Supervisors &Installers
In June 2016, Tomling Projects Sdn. Bhd. has a team of 3 Project Supervisors and 6 groups with a total of
62 Site Workers. All of them are highly trained professional installers in roofing works. All of them have
attended Green Card Programme under CIDB and are holders of Construction Personnel Card (Green Card).
The Managing Director, Mr. Thomas Siew Wu is also personally involved in enhancing their efficiency and
productivity.
5.3 The Organization of the 6 Groups of Site Workers
The total number of site workers are divided into 6 groups, each with a group leader. The details as in
Appendix (i)
6 CP2016/R01
6. QUALITY OF MATERIALS
The company regards the quality of materials as the most important for high level of strength and flexibility
in the designs of steel roof truss system. The certified advantages and quality assurance of the Galvanized
Steel Coils/Sheets from our principal suppliers are as follows:-
6.1. Supplier 1: FIW STEEL SDN. BHD. (Company No. 3835-P)
Certified by SIRIM QAS International Sdn. Bhd.
Certified by MS ISO 9001:2008
Approval from Jabatan Bomba dan Penyelamat, Malaysia
Conforming with Japanese Industrial Standard – JIS G3302 ASTM A653
High tensile and high yield strength with guaranteed minimum of 550Mpa.
Corrosion resistance ASTM B 117: 500 hours – 0% white rust
Stack test results: 98% humidity, 49 Degree Celsius, 800 hours, 1 kgs pressure: 0% white rust
Mechanical Properties
Longitudinal Tensile Guaranteed Typical
Yield Strength, Mpa 550 min 600 – 750
Tensile Strength, Mpa 550 min 600 – 750
Elogation (%) – 2 – 7
Chemical Composition
Element Guaranteed Typical
Carbon (C) 0.15 max 0.03 – 0.06
Manganese (Mn) 0.60 max 0.12 – 0.34
Phosphorus (P) 0.10 max 0.009 – 0.019
Sulphur (S) 0.05 max 0.003 – 0.014
Supply Condition
Coating Mass : Z20, Z22
Surface Finish : Minimised Spangle
Surface Treatment : Clear Resin Coating
Oiling : Not Oiled, Dry
7 CP2016/R01
6.2. Supplier 2: YKGI HOLDINGS BHD. (Company No. 32939-U)
(Formerly known as Yung Kong Galvanising Industries Berhad)
Certified by SIRIM QAS International Sdn. Bhd.
Certified by MS ISO 9001:2008
Approval from Jabatan Bomba dan Penyelamat, Malaysia
Conforming with Japanese Industrial Standard – JIS G3302-Z12/Z18
High tensile strength with the range of 400 – 450Mpa.
Zinc coating mass with 275 g/m2.
Photographs showing Galvanized Steel Coils
8 CP2016/R01
7. PROJECTS UNDERTAKEN BY TOMLING
The company has successfully been awarded and completed the followings major housing and commercial
projects in Miri, Bintulu, Sibu & Kuching.
The tables below show the various completed and on-going projects. Photographs are available from
Appendix (ii).
7.1. PROJECTS IN THE MIRI REGION
7.1.1. Green Summit Construction Sdn. Bhd.
No. Project Title Date of Completion
/ Status
1. SeveNew – 22 Units 3 Storey Shophouses on Lot 2950 – 2971, Block 2,
Jalan Pujut 7, 98000 Miri.
September 2012
2. The Height Residences – 18 Units 2 Storey Terrace Houses on Lot 1654
– 1663, 1666 – 1673, Jalan Cahaya, Off Jalan Miri-Bintulu, 98000 Miri.
April 2014
3. Green Imperiale – 10 Units 3 Storey Semi-Detached Houses on Lot
1682 – 1691, Jalan Pujut 1D, Off Jalan Miri-Pujut, 98000 Miri.
May 2014
4. The Height Residences – 14 Units 2 Storey Semi-Detached Houses on
Lot 1650 – 1653, 1664 – 1665, 1674 – 1681, Jalan Cahaya, Off Jalan
Miri-Bintulu, 98000 Miri.
June 2014
5. The Green Edge – 8 Units 2 Storey Semi-Detached Houses on Lot
10275 – 10282, Block 10, Jalan Geranit, Kuala Baram Land District,
98000 Miri.
December 2014
6. Senadin Gateway – 29 Units 3 Storey Commercial Shophouses on Lot
11637 – 11665, Block 5, (P/L) 10385, Jalan Maigold, Kuala Baram Land
District, 98000 Miri.
December 2015
7. A-Walk – 27 Units 3 Storey Shophouses on Lot 14562 – 14581, Block 5,
(P/L) 101, 103, 6212 & 3512, Jalan Airport, Off Jalan Miri-Bintulu,
98000 Miri.
March 2016
8. Niah Jaya – 1 Unit 2 Storey Supermarket on Lot 2058, (P/L) 1192,
Block 8, Niah Land District, Jalan Niah Suai, 98200 Batu Niah, Miri.
On-Going
9 CP2016/R01
7.1.2. HKT Excellent Realty Sdn. Bhd.
No. Project Title Date of Completion
/ Status
1. 95 Units 1 Storey Terrace Houses on Lot 9659 – 9674, 9676 – 9683,
9686 – 9687, 9689 – 9690, 9692 – 9694, 9696 – 9700, 9702, 9707 –
9744, 9749 – 9768, Jalan Lambir, Taman Jelita, 98000 Miri.
February 2015
2. 8 Units 1 Storey Semi-Detached Houses on Lot 9703 – 9704, 9705 –
9706, 9745 – 9746, 9747 – 9748, Jalan Lambir, Taman Jelita, 98000
Miri.
February 2015
7.1.3. Homelite Development Sdn. Bhd.
No. Project Title Date of Completion
/ Status
1. 18 Units 2 Storey Semi-Detached Houses on Lot 7977 – 7994, Jalan
Airport, Off Jalan Miri-Bintulu, Lambir Land District, 98000 Miri.
November 2013
2. 136 Units Car-Park Roof on Lot 2834, Liew View Park Apartment, Jalan
Airport, Off Jalan Miri-Bintulu, Lambir Land District, 98000 Miri.
December 2014
3. Homelite Resort – 2 Blocks of 5 Storey Apartment on Lot 14168, Block
5, Lambir Land District, 98000 Miri.
March 2015
4. 200 Units Car-Park Roof on Lot 1 – 121, 124 – 202, (P/L) 10142, Airport
Avenue Apartment, Jalan Airport, Lambir Land District, 98000 Miri.
May 2015
5. 33 Units Car-Park Roof on Lot 1 – 200, (P/L) 3 – 17, 27 – 29, 102 – 106,
107 – 108, 109 – 116, Liew View 4 Garden, Townhouse, Jalan Aru,
Lambir Land District, 98000 Miri.
August 2015
6. 191 Units Car-Park Roof on Lot 661, Airport Avenue Apartment, Jalan
Airport, Lambir Land District, 98000 Miri.
On-Going
10 CP2016/R01
7.1.4. JiajayaSdn. Bhd.
No. Project Title Date of Completion
/ Status
1. Serene Heights – 95 Units – 2 Blocks 12 Storey Apartment on Lot 734,
(P/L) 21, 1697, 8328, MCLD, Jalan Riam, 98000 Miri.
On-Going
2. Serene Sanctuary – 14 Units 2 ½ Storey Terrace Houses on Lot 14104 –
14111, 14381 – 14386, (P/L) 1773, Jalan Interhill, 98000 Miri.
On-Going
7.1.5. Kan Jia Development Sdn. Bhd.
No. Project Title Date of Completion
/ Status
1. Kan Jia Garden 1 – 21 Units 2 Storey Terrace Houses on Lot 7419 –
7421, 7424 – 7433, 7434 – 7441, Block 1, Jalan Sze Chuan, Off Jalan
Airport, Lambir Land District, 98000 Miri.
October 2014
2. Kan Jia Garden 1 –12 Units 2 Storey Semi-Detached Houses on Lot
7407 – 7414, 7422 – 7423, 7442 – 7443, Block 1, Jalan Sze Chuan, Off
Jalan Airport, Lambir Land District, 98000 Miri.
November 2014
3. 10 Units 2 Storey Semi-Detached Houses on Lot 3003 – 3012, Block 2,
Jalan Getah Off Jalan Pujut 4C, 98000 Miri.
February 2016
4. Kan Jia Garden 2 – 12 Units 2 Storey Semi-Detached Houses on Lot
8225 – 8230, 8235 – 8236, 8289 – 8290, 8297 – 8298, Jalan Sze Chuan,
Off Jalan Airport, 98000 Miri.
April 2016
7.1.6. Naim Land Sdn. Bhd.
No. Project Title Date of Completion
/ Status
1. Snowbell Phase 1 – 36 Units 1 Storey Semi-Detached Houses on Lot
1998 – 2015, 2044 – 2061, Desa Bahagia, Bandar Baru Permyjaya, 98000
Miri.
September 2012
2. Maple Phase 1 – 100 Units 1 Storey Terrace Houses on Lot 2064 – 2163,
Desa Bahagia, Permyjaya, 98000 Miri.
December 2012
11 CP2016/R01
3. Pine – 40 Units 2 Storey Semi-Detached Houses on Lot 1953 – 1966,
1969 – 1976, 1979 – 1996, Desa Bahagia, Bandar Baru Permyjaya, 98000
Miri.
January 2013
4. Snowbell Phase 2 – 42 Units 1 Storey Semi-Detached Houses on Lot
2816 – 2857, Desa Bahagia, Permyjaya, 98000 Miri.
January 2013
5. Pine Phase 1 – 28 Units 2 Storey Semi-Detached Houses on Lot 2016 –
2043, Desa Bahagia, Permyjaya, 98000 Miri.
January 2013
6. 20 Units 2 Storey Semi-Detached Houses on Lot 5899 – 5902, 8133 –
8142, 8228 – 8233, Permyjaya, 98000 Miri.
January 2013
7. Maple Phase 2 – 82 Units 1 Storey Terrace Houses on Lot 2894 – 2975,
Desa Bahagia, Permyjaya, 98000 Miri.
January 2013
8. Tacsonia – 11 Units 2 Storey Detached Houses on Lot 7453 – 7463,
Desa Pujut 2, Permyjaya, 98000 Miri.
January 2013
9. Valeries – 20 Units 2 Storey Semi-Detached Houses on Lot 5759 – 5762,
5799 – 5814, Desa Pujut 2, Permyjaya, 98000 Miri.
April 2013
10. Angelica – 5 Units 2 Storey Detached Houses on Lot 5368, 5757, 5758,
5763, 5892, Desa Pujut 2, Permyjaya, 98000 Miri.
June 2013
11. Strawflower – 30 Units 2 Storey Semi-Detached Houses on Lot 3335 –
3336, 7747 – 7760, 8151 – 8164, Desa Pujut 2, Bandar Baru Permyjaya,
98000 Miri.
October 2013
12. 67 Units 2 Storey Shophouses & 12 Units 3 Storey Shophouses on Lot
8620 – 8631, 8638 – 8684, 8691 – 8698, 8632 – 8637, 8685 – 8690, Desa
Pujut 1, Bandar Baru Permyjaya, 98000 Miri.
November 2013
13. 81 Units 2 Storey Shophouses on Lot 3076 – 3156, Block 13, Desa
Bahagia, Permyjaya, 98000 Miri.
November 2013
14. Oak – 14 Units 2 Storey Detached Houses on Lot 1952, 1967, 1968,
1977, 1978, 1997, 1998, 3023, 3024, 3049, 3050, 3075, 3159, 3174, Desa
Bahagia, Permyjaya, 98000 Miri .
December 2013
15. 51 Units 2 Storey Shophouses on Lot 7216 – 7266, Desa Murni,
Permyjaya, 98000 Miri.
December 2013
16. Pine Phase 2 – 72 Units 2 Storey Semi-Detached Houses on Lot 2999 –
3022, 3025 – 3048, 3051 – 3074, Desa Bahagia, Permyjaya, 98000 Miri.
December 2013
17. Hazel – 192 Units 1 Storey Terrace Houses on Lot 3197 – 3294, 3371 –
3464, Block 13, Desa Bahagia, Permyjaya, 98000 Miri.
April 2014
18. Snowbell Phase 3 – 36 Units 1 Storey Semi-Detached Houses on Lot
3160 – 3173, 3175 – 3196, Block 13, Desa Bahagia, Permyjaya, 98000
Miri.
June 2014
12 CP2016/R01
19. Juniper – 8 Units 2 Storey Detached Houses on Lot 8712, 8721 – 8722,
8731, 8762 – 8763, 8766 – 8767, Desa Murni, Permyjaya, 98000 Miri.
December 2014
20. Arista – 94 Units 2 Storey Semi-Detached Houses on Lot 8702 – 8711,
8713 – 8720, 8723 – 8730, 8758 – 8761, 8764 – 8765, 8768 – 8829, Desa
Murni, Permyjaya, 98000 Miri.
January 2015
21. 56 Units 3 Storey Shophouses on Lot 6067 – 6122, Pusat Bandar
Permyjaya, Block 11, Kuala Baram Land District, 98000 Miri.
March 2015
22. 52 Units 3 Storey Shophouses on Lot 6123 – 6174, Pusat Bandar
Permyjaya, Block 11, Kuala Baram Land District, 98000 Miri.
August 2015
23. 288 Units 4 Storey Medium-Cost Apartment on Lot 839, Block 13, Desa
Bahagia, Permyjaya, 98000 Miri.
November 2015
24. Lime Flower – 28 Units 2 Storey Semi-Detached Houses on Lot 5151 –
5194, (P/L) 3841, South Lake, Permyjaya, 98000 Miri.
December 2015
25. Winter Green – 23 Units 2 Storey Detached Houses on Lot 5149 – 5150,
5159 – 5162, 5171 – 5176, 5185 – 5190, 5195 – 5199, (P/L) 3841, South
Lake, Permyjaya, 98000 Miri.
March 2016
26. 40 Units 1 Storey Semi-Detached Houses on Lot 5293 – 5324, 5327 –
5334, (P/L) 3841, South Lake, Permyjaya, 98000 Miri.
On-Going
7.1.7. Polar Light Sdn Bhd.
No. Project Title Date of Completion
/ Status
1. Curtin Water – 36 Units 1 Storey Semi-Detached Houses on Lot 9080 –
9097, 9122 – 9139, Block 5, Jalan Desa Senadin, KBLD, 98000 Miri.
February 2014
2. Curtin Water – 19 Units 2 Storey Terrace Houses on Lot 9218 – 9236,
Block 5, Jalan Desa Senadin, KBLD, 98000 Miri.
March 2015
3. Curtin Water – 30 Units 1 Storey Semi-Detached Houses on Lot 9581 –
9594, 9600 – 9615, Phase 6, Jalan Desa Senadin, KBLD, 98000 Miri.
March 2016
4. Curtin Water – 24 Units 1 Storey Semi-Detached Houses on Lot 9569 –
9580, 9616 – 9627, Block 5,Jalan Desa Senadin, KBLD, 98000 Miri.
On-Going
5. Curtin Water – 16 Units 2Storey Semi-Detached Houses on Lot 9156 –
9171, Block 5,Jalan Desa Senadin, KBLD, 98000 Miri.
On-Going
13 CP2016/R01
7.1.8. Real Status Sdn. Bhd.
No. Project Title Date of Completion
/ Status
1. CitiCondo – 2 Blocks 9 Storey Condominium (Type A) on Lot 2349,
(P/L) 657 & 966, Block 17, Jalan Cahaya, 98000 Miri.
July 2014
2. CitiCondo – 1 Blocks 8 Storey Condominium (Type A) on Lot 2349,
(P/L) 657 & 966, Block 17, Jalan Cahaya, 98000 Miri.
November 2014
7.1.9. Riaplus Sdn. Bhd.
No. Project Title Date of Completion
/ Status
1. 77 Units 3 Storey Shophouses at Jalan Airport on Lot 8811 – 8887, Jalan
Airport, Lambir Land District, 98000 Miri.
August 2014
2. Miri 101 – 54 Units 3 Storey Shophouses on Lot 3513 – 3566, Jalan
Miri-Pujut, Miri Concession Land District, 98000 Miri.
July 2015
3. Riam Mega E-Mart – 1 Unit One-Stop Shopping Mall at Jalan Miri By
Pass, Off Jalan Airport, 98000 Miri.
On-Going
4. 1 Block of 6 Storey Apartment on Lot 8755, Jalan Miri By Pass, Lambir
Land District, 98000 Miri.
On-Going
7.1.10. Yeohing Construction Sdn. Bhd.
No. Project Title Date of Completion
/ Status
1. 10 Units 1 Storey Semi-Detached Houses on Lot 7685 – 7688, 7709 –
7714, Block 1, Jalan Sze Chuan, Off Jalan Airport, 98000 Miri.
January 2014
2. 19 Units 2 Storey Terrace Houses on Lot 7689 – 7707, Block 1, Jalan Sze
Chuan, Off Jalan Airport, 98000 Miri.
December 2014
14 CP2016/R01
7.2. PROJECTS IN THE BINTULU REGION
7.2.1. Johabaru Development Sdn. Bhd.
No. Project Title Date of Completion
/ Status
1. 23 Units Industrial Buildings (Detached & Semi-Detached) on Lot 1,
2019, 2021, 2399, Lot 126, Kemena Land District, 97000 Bintulu.
September 2015
7.2.2. Kemena Holding Sdn. Bhd.
No. Project Title Date of Completion
/ Status
1. 16 Units 1 Storey Semi-Detached Houses on Lot 84 – 99, Happy Garden
Phase 3, 97000 Bintulu.
March 2014
2. 36 Units 2 Storey Semi-Detached Houses on Lot 10 – 21, 60 – 83, Happy
Garden Phase 3, 97000 Bintulu.
January 2015
3. 20 Units 2 Storey Terrace Houses on Lot 1 – 9, 49 – 59, Happy Garden
Phase 3, 97000 Bintulu.
January 2015
7.2.3. NCP Development Sdn. Bhd.
No. Project Title Date of Completion
/ Status
1. 23 Units 2 Storey Terrace Houses on Lot 9 – 14, 15 – 22, 42 – 50, Block
31, Kemena Land District, 97000 Bintulu.
October 2014
2. 10 Units 2 Storey Semi-Detached Houses on Lot 7 – 8, 34 – 41, Block
31, Kemena Land District, 97000 Bintulu.
October 2014
15 CP2016/R01
7.2.4. Sunmow Construction Sdn. Bhd.
No. Project Title Date of Completion
/ Status
1. LNG Train 9 Project – 11 Blocks of Worker Camps on Lot 2532, 7th
Mile, 97000 Bintulu.
April 2014
2. 31 Units 2 Storey Terrace Houses on Lot 61 – 91, 97000 Bintulu. August 2015
7.3. PROJECTS IN THE SIBU REGION
7.3.1. Oasrich Sdn. Bhd.
No. Project Title Date of Completion
/ Status
1. 20 Units 3 Storey Shophouses on Lot 2567 – 2586, Block 5, Seduan Land
District, 96000 Sibu.
Mach 2016
7.4. PROJECTS IN THE KUCHING REGION
7.4.1. Binasari Builders Sdn. Bhd.
No. Project Title Date of Completion
/ Status
1. 8 Units 2 Storey Semi-Detached Houses on Lot 1 – 8, Santubong, 93010
Kuching.
On-Going
7.4.2. Ecosteel Sdn. Bhd.
No. Project Title Date of Completion
/ Status
1. Cadangan Membina Sekolah Baru 20 Bilik Darjah Asrama, 8 Units
Rumah Guru Serta Lain-Lain di SMK Linga – Lot 903, Block 16, Bijat
Land District, 93500 Sri Aman.
May 2016
16 CP2016/R01
7.4.3. Giant Tree Sdn. Bhd.
No. Project Title Date of Completion
/ Status
1. 54 Units 2 Storey Semi-Detached Houses on Lot 1 – 2, 9 – 12, 19 – 66,
Muara Tebas Land District, 93010 Kuching.
October 2013
2. 80 Units 2 Storey Terrace Houses on Lot 81 – 160, Block 12, Muara
Tebas Land District, 93010 Kuching.
October 2013
7.4.4. Hong Hap Construction Sdn. Bhd.
No. Project Title Date of Completion
/ Status
1. 6 Units 1 Storey Detached Houses on Lot 8388, 8407, 8428, 8431, &
8448, (P/L) 717, Block 9, Jalan Pasir Pandak, Salak Land District,
Kuching.
June 2016
7.4.5. Imetal (M) Sdn. Bhd.
No. Project Title Date of Completion
/ Status
1. 56 Units 1 Storey Terrace Houses on Lot 1 – 56, (P/L) 762, Block 9,
Jalan Pasir Pandak, Salak Land District, 93010 Kuching.
On-Going
7.4.6. Mao Hock Sdn. Bhd.
No. Project Title Date of Completion
/ Status
1. Cadangan Pembinaan Bangunan Baru Blok Pentadbiran Akademik, &
Pusat Sehenti (Fasa 2) di Kolej Matrikulasi Sarawak, Kuching.
June 2016
17 CP2016/R01
8. COMPANY ASSOCIATE
Tomling Projects Sdn. Bhd. has, as its business associate, Tomling Engineering Sdn. Bhd. which was
established in March 2014, as the company’s main supplier of Galvanized Steel Products:
C-Purlin
Batten
Partition Channel
Ceiling Channel
Metal Roofing
Rain Gutter
Valley Gutter
Fascia Capping
Firewall Capping
Barge Capping
Wall Flashing
Louvers and etc.
Tomling Engineering Sdn. Bhd. is located at Lot 1946 – 1947, Jalan Desa Senadin, Senadin Industrial
Estate, 98000 Miri, Sarawak, Malaysia. This company possesses its own production machineries and uses
high quality galvanized steel coils and/or sheets in conformation with Japanese Industrial Standard – JIS
G3302 ASTM A653 manufactured by FIW Steel Sdn. Bhd.
Supply Galvanized Steel Coils Supply Galvanized Steel Products
Tomling Engineering Factory
Appendix (i)
1
Table Showing the Organization of the 6 Groups of Site Workers
Group 1
Group Leader : Sugino
No. of Workers : 13
No. Name Date of Birth Nationality Work Permit No. (VP/TE)
1. SUGINO (Group Leader) 20th Jun 1972 Indonesia BPA/13011/33424
2. GIARTO 3rd Aug 1993 Indonesia JTK-MG-MI-50013-217(A)(4)
3. JOKO PURNOMO 23rd Mar 1991 Indonesia JTK-MG-MI-50013-217(A)(4)
4. MISTAM 19th Feb 1974 Indonesia BPA/13171/DABFH415929
5. MUHAMMAD NAILUL IMAN 12th Feb 1993 Indonesia JTK-MG-MI-50013-217(A)(4)
6. MUHAMMAD ROIS QODIR 29th May 1986 Indonesia JTK-MG-MI-50013-217(A)(4)
7. MULYONO WARTO 21st Feb 1979 Indonesia JTK-MG-MI-50013-217(A)(4)
8. PITOYO 6th Aug 1977 Indonesia JTK-MG-MI-50013-217(A)(4)
9. ROKHMAD EDISON 20th Apr 1988 Indonesia JTK-MG-MI-50013-217(A)(4)
10. SANUDIN 24th Oct 1967 Indonesia JTK-MG-MI-50011-57(A)(4)
11. SUPRIYADI 24th Aug 1993 Indonesia JTK-MG-MI-50013-217(A)(4)
12. SUPRIYANTO 24th Aug 1993 Indonesia JTK-MG-MI-50013-217(A)(4)
13. YOGGI RANGGA SAPUTRA 24th Jul 1993 Indonesia JTK-MG-MI-50013-217(A)(4)
Group 2
Group Leader : Mohammad Sodiq
No. of Workers : 4
No. Name Date of Birth Nationality Work Permit No. (VP/TE)
1. MOHAMMAD SODIQ (Group Leader) 23rd Dec 1986 Indonesia BPA/13011/CEAHL3606333
2. AHMAD MUSRIFIN 3rd Dec 1987 Indonesia JTK-MG-MI-50013-217(A)(4)
3. GUNAWI 15th Apr 1989 Indonesia JTK-MG-MI-50013-217(A)(4)
4. NYOMAN MAHFUDIN 7th Jun 1988 Indonesia JTK-MG-MI-50013-217(A)(4)
Group 3
Group Leader : Saifi
No. of Workers : 4
No. Name Date of Birth Nationality Work Permit No. (VP/TE)
1. SAIFI (Group Leader) 28th Apr 1982 Indonesia JTK-MG-MI-50013-217(A)(4)
2. ABBASIYAH 6th Jan 1993 Indonesia BPA/13011/EMARR3803334
3. ABD AZIZ 12th Jul 1984 Indonesia JTK-MG-MI-50013-217(A)(4)
4. MISBAHUL MUNIR 2nd May 1984 Indonesia BPA/13011/EMARR3803334
Appendix (i)
2
Group 4
Group Leader : Jumitri Halim
No. of Workers : 31
No. Name Date of Birth Nationality Work Permit No. (VP/TE)
1. JUMITRI HALIM (Group Leader) 31st Dec 1976 Indonesia JTK-MG-MI-50013-217(A)(4)
2. AHMAD RIPAI 11th Nov 1978 Indonesia BPA/13011/32641
3. AHMAD YANI 31st Dec 1981 Indonesia BPA/13011/33923
4. ANGKASAH JAY 13th May 1978 Indonesia JTK-MG-MI-50013-217(A)(4)
5. ASMAWIL 1st Jun 1988 Indonesia JTK-MG-MI-50011-57(A)(4)
6. AZWAN 15th Dec 1981 Indonesia **Pending for Approval**
7. DIAR 1st Jul 1989 Indonesia BPA/13011/32444
8. HAIDIR 31st Dec 1974 Indonesia BPA/13011/32444
9. HERMAN 10th Mar 1984 Indonesia JTK-MG-MI-50013-217(A)(4)
10. IHSAN 1st Jul 1986 Indonesia BPA/13171/CLAXR3408210
11. ISKANDAR ZULKARNAIN 23rd Apr 1990 Indonesia JTK-MG-MI-50013-217(A)(4)
12. JAELANI WAHI 1st Feb 1967 Indonesia JTK-MG-MI-50013-217(A)(4)
13. JOHAN SARIPUDIN 18th Mar 1989 Indonesia BPA/13011/FFBAP5142362
14. JULI APRIANTO 12th Jul 1992 Indonesia JTK-MG-MI-50013-217(A)(4)
15. MAHRUP 1st May 1977 Indonesia BPA/13011/32444
16. MUHAMAD LAZIM 1st Mar 1983 Indonesia BPA/13171/CLAXR3408210
17. MUHAMAD MUHIBBAN 22nd Nov 1983 Indonesia JTK-MG-MI-50013-217(A)(4)
18. MUHSIN MAKBUL 19th May 1995 Indonesia BPA/13171/CLAXR3408210
19. MUHTAR 31st Dec 1976 Indonesia JTK-MG-MI-50013-217(A)(4)
20. MUSTIADI 14th Feb 1982 Indonesia BPA/13171/CLAXR3408210
21. MUSTIADI 1st Jul 1984 Indonesia BPA/13011/27070
22. PURNA WIRAWAN 12th Dec 1979 Indonesia JTK-MG-MI-50013-217(A)(4)
23. RUMAWI 31st Dec 1953 Indonesia BPA/13011/28502
24. SAEFUL 17th Jul 1979 Indonesia BPA/13011/33424
25. SAHIDUN 18th Dec 1979 Indonesia BPA/13011/32641
26. SELAMAT 31st Dec 1975 Indonesia JTK-MG-MI-50013-217(A)(4)
27. SOLIHAN SUKAMIN KECIM 10th Nov 1978 Indonesia BPA/13011/EHBEJ4910334
28. TANGGAN 12th Oct 1981 Indonesia BPA/13011/32444
29. UDIN 31st Dec 1973 Indonesia BPA/13011/33424
30. WILDAN 31st Jul 1986 Indonesia JTK-MG-MI-50013-217(A)(4)
31. ZAINAL ABIDIN 31st Dec 1988 Indonesia BPA/13171/CLAXR3408210
Appendix (i)
3
Group 5
Group Leader : Ahmad Bawazir
No. of Workers : 5
No. Name Date of Birth Nationality Work Permit No. (VP/TE)
1. AHMAD BAWAZIR (Group Leader) 12th Dec 1974 Indonesia BPA/13011/CEAHL3606333
2. JAMILUDIN 14th Apr 1990 Indonesia JTK-MG-MI-50013-217(A)(4)
3. MUHAMAD FAJRIANTO 6th Feb 1988 Indonesia BPA/13011/33424
4. MUHAMAD SEFRIZAL DWI
TIRTANA
17th Sep 1991 Indonesia BPA/13011/FFBAP5142362
5. MUNAKIN 1st Jul 1972 Indonesia BPA/13171/CLAXR3408210
Group 6
Group Leader : Hanis Musthofa
No. of Workers : 5
No. Name Date of Birth Nationality Work Permit No. (VP/TE)
1. HANIS MUSTHOFA (Group Leader) 3rd Jan 1991 Indonesia BPA/13011/30812
2. AHMAD ZUHDI 22nd Apr 1995 Indonesia BPA/13011/CHBDK5346334
3. ANJAR PRASTOWO 30th Dec 1989 Indonesia BPA/13011/DEAZL0027334
4. KARNO 18th Oct 1969 Indonesia BPA/13171/DABFH415929
5. NUR BASIDIN 11th Nov 1989 Indonesia JTK-MG-MI-50013-217(A)(4)
Appendix (ii)
1
Photographs of Projects – Green Summit Construction Sdn. Bhd.
(SeveNew) (Green Imperiale)
(The Green Edge) (Senadin Gateway)
Photographs of Projects – HKT Excellent Realty Sdn. Bhd.
(HKT No. 1) (HKT No. 2)
Photographs of Projects – Homelite Development Sdn. Bhd.
(Homelite No. 1) (Homelite No. 2)
Appendix (ii)
2
Photographs of Projects – Naim Land Sdn. Bhd.
(Snowbell Phase 1) (Maple Phase 1) (Snowbell Phase 2)
(Pine Phase 1) (Naim No. 6) (Maple Phase 2)
(Strawflower) (Naim No. 12) (Naim No. 13)
(Oak) (Naim No. 15) (Pine Phase 2)
Appendix (ii)
3
(Hazel) (Snowbell Phase 3) (Juniper)
(Arista) (Naim No. 21) (Naim No. 22)
(Naim No. 23) (Lime Flower)
Photographs of Projects – Polar Light Sdn. Bhd.
(Curtin Water No. 1) (Curtin Water No. 2)