to date 23.03environmentclearance.nic.in/writereaddata/online/eds/23... · 2018. 3. 23. · 3rd...

24
To Date 23.03.2018 Member Secretary Expert Appraisal Committee II Infrastructure Development, Coastal Regulation Zone, Building/Construction and Miscellaneous projects Ministry of Environment, Forest and Climate Change Indira Paryavaran Bhawan, 3rd Floor, Vayu Wing, Jor Bagh Road, Aliganj, New Delhi-110 003. Subject- Reply of queries raised towards Expansion of Group Housing Project “Arihant Ambar” At Plot No. Gh-16 C, Sector-1, Greater Noida, U.P. by M/s. Citycon Buildwel Pvt. Ltd.- File No. 21- 253/2017-IA-III Dear Sir, With reference to the above-referred subject and EAC Minutes of Meeting (MoM), dated November 30 th 2017, our point-wise reply of the queries are as follows:- S.No. Queries Reply 1 A certificate from the local body supplying water, specifying the total annual water availability with the local authority, the quantity of water already committed, the quantity of water allotted to the project under consideration and the balance water available. This should be specified separately for ground water and surface water sources, ensuring that there is no impact on other users. Water required for the project will be sourced from GNIDA . Attached as Annexure 1. 2 The Air Quality Index shall be calculated for base level air quality. The air Quality Index of the project site is 151. 3 A detailed report on compliance to ECBC norms. Our project is green building certified. Copy of the certificate is attached as Annexure 2. 4 A detailed traffic management and traffic decongestion plan to ensure that the current level of service of the roads within a 05 kms radius of the project is maintained and improved upon after the implementation of the project. This plan should be based on cumulative impact of all development and increased habitation being carried out or proposed to be carried out by the project or other agencies in this 05 Kms radius of the site in different scenarios of space and time and the This is an expansion project. • Main road connecting to the project site is 60 m and 24 m. • Separate entry exit will be provided Internal road width is 6 m wide. • Speed breakers proposed at the entry exit gate, at the entry/exit ramps of basements and at regular interval of the internal road. • Signage for speed limit restricted to 20 kmph will be displayed along the

Upload: others

Post on 12-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: To Date 23.03environmentclearance.nic.in/writereaddata/Online/EDS/23... · 2018. 3. 23. · 3rd Floor, Vayu Wing, Jor Bagh Road, Aliganj, New Delhi-110 003. Subject- Reply of queries

To Date 23.03.2018

Member Secretary

Expert Appraisal Committee II

Infrastructure Development, Coastal Regulation Zone,

Building/Construction and Miscellaneous projects

Ministry of Environment, Forest and Climate Change

Indira Paryavaran Bhawan,

3rd Floor, Vayu Wing, Jor Bagh Road, Aliganj,

New Delhi-110 003.

Subject- Reply of queries raised towards Expansion of Group Housing Project “Arihant Ambar” At Plot

No. Gh-16 C, Sector-1, Greater Noida, U.P. by M/s. Citycon Buildwel Pvt. Ltd.- File No. 21-

253/2017-IA-III

Dear Sir,

With reference to the above-referred subject and EAC Minutes of Meeting (MoM), dated November 30th

2017, our point-wise reply of the queries are as follows:-

S.No. Queries Reply

1 A certificate from the local body supplying

water, specifying the total annual water

availability with the local authority, the

quantity of water already committed, the

quantity of water allotted to the project under

consideration and the balance water available.

This should be specified separately for ground

water and surface water sources, ensuring that

there is no impact on other users.

Water required for the project will be

sourced from GNIDA . Attached as

Annexure 1.

2

The Air Quality Index shall be calculated for

base level air quality.

The air Quality Index of the project site is

151.

3 A detailed report on compliance to ECBC

norms.

Our project is green building certified. Copy

of the certificate is attached as Annexure 2.

4 A detailed traffic management and traffic

decongestion plan to ensure that the current

level of service of the roads within a 05 kms

radius of the project is maintained and

improved upon after the implementation of the

project. This plan should be based on

cumulative impact of all development and

increased habitation being carried out or

proposed to be carried out by the project or

other agencies in this 05 Kms radius of the site

in different scenarios of space and time and the

This is an expansion project.

• Main road connecting to the project site

is 60 m and 24 m.

• Separate entry exit will be provided

Internal road width is 6 m wide.

• Speed breakers proposed at the entry

exit gate, at the entry/exit ramps of

basements and at regular interval of the

internal road.

• Signage for speed limit restricted to 20

kmph will be displayed along the

Page 2: To Date 23.03environmentclearance.nic.in/writereaddata/Online/EDS/23... · 2018. 3. 23. · 3rd Floor, Vayu Wing, Jor Bagh Road, Aliganj, New Delhi-110 003. Subject- Reply of queries

traffic management plan shall be duly validated

and certified by the State Urban Development

department and the P.W.D. and shall also have

their consent to the implementation of

components of the plan which involve the

participation of these departments.

internal roads.

• One way internal traffic movement is

proposed.

• Parking norm as per local regulation

5 The permission of the CGWA for abstraction of

ground water and for basement/excavation

dewatering.

This is an vertical expansion project so

permission of CGWA for basement/

excavation dewatering is not required and

Without getting approval from CGWA,

Ground water will not be extracted at any

stage of the project.

6 A certificate of adequacy of available power

from the agency supplying power to the

project along with the load allowed for the

project.

Power assurance letter is attached as

Annexure 1.

7 A certificate from the competent authority for

discharging treated effluent/ untreated

effluents into the Public sewer/

disposal/drainage systems along with the final

disposal point.

Assurance for the same has already been

obtained by GNIDA.

8 A certificate from the competent authority

handling municipal solid wastes, indicating the

existing civic capacities of handling and their

adequacy to cater to the M.S.W. generated

from project.

Municipal solid waste will be handled by

GNIDA.

We trust that you will find the above clarifications / replies in-line with your requirements and looking

forward to get the environmental clearance for the project at the earliest.

Page 3: To Date 23.03environmentclearance.nic.in/writereaddata/Online/EDS/23... · 2018. 3. 23. · 3rd Floor, Vayu Wing, Jor Bagh Road, Aliganj, New Delhi-110 003. Subject- Reply of queries
Page 4: To Date 23.03environmentclearance.nic.in/writereaddata/Online/EDS/23... · 2018. 3. 23. · 3rd Floor, Vayu Wing, Jor Bagh Road, Aliganj, New Delhi-110 003. Subject- Reply of queries
Page 5: To Date 23.03environmentclearance.nic.in/writereaddata/Online/EDS/23... · 2018. 3. 23. · 3rd Floor, Vayu Wing, Jor Bagh Road, Aliganj, New Delhi-110 003. Subject- Reply of queries
Page 6: To Date 23.03environmentclearance.nic.in/writereaddata/Online/EDS/23... · 2018. 3. 23. · 3rd Floor, Vayu Wing, Jor Bagh Road, Aliganj, New Delhi-110 003. Subject- Reply of queries
Page 7: To Date 23.03environmentclearance.nic.in/writereaddata/Online/EDS/23... · 2018. 3. 23. · 3rd Floor, Vayu Wing, Jor Bagh Road, Aliganj, New Delhi-110 003. Subject- Reply of queries
Page 8: To Date 23.03environmentclearance.nic.in/writereaddata/Online/EDS/23... · 2018. 3. 23. · 3rd Floor, Vayu Wing, Jor Bagh Road, Aliganj, New Delhi-110 003. Subject- Reply of queries
Page 9: To Date 23.03environmentclearance.nic.in/writereaddata/Online/EDS/23... · 2018. 3. 23. · 3rd Floor, Vayu Wing, Jor Bagh Road, Aliganj, New Delhi-110 003. Subject- Reply of queries
Page 10: To Date 23.03environmentclearance.nic.in/writereaddata/Online/EDS/23... · 2018. 3. 23. · 3rd Floor, Vayu Wing, Jor Bagh Road, Aliganj, New Delhi-110 003. Subject- Reply of queries
Page 11: To Date 23.03environmentclearance.nic.in/writereaddata/Online/EDS/23... · 2018. 3. 23. · 3rd Floor, Vayu Wing, Jor Bagh Road, Aliganj, New Delhi-110 003. Subject- Reply of queries
Page 12: To Date 23.03environmentclearance.nic.in/writereaddata/Online/EDS/23... · 2018. 3. 23. · 3rd Floor, Vayu Wing, Jor Bagh Road, Aliganj, New Delhi-110 003. Subject- Reply of queries
Page 13: To Date 23.03environmentclearance.nic.in/writereaddata/Online/EDS/23... · 2018. 3. 23. · 3rd Floor, Vayu Wing, Jor Bagh Road, Aliganj, New Delhi-110 003. Subject- Reply of queries
Page 14: To Date 23.03environmentclearance.nic.in/writereaddata/Online/EDS/23... · 2018. 3. 23. · 3rd Floor, Vayu Wing, Jor Bagh Road, Aliganj, New Delhi-110 003. Subject- Reply of queries
Page 15: To Date 23.03environmentclearance.nic.in/writereaddata/Online/EDS/23... · 2018. 3. 23. · 3rd Floor, Vayu Wing, Jor Bagh Road, Aliganj, New Delhi-110 003. Subject- Reply of queries
Page 16: To Date 23.03environmentclearance.nic.in/writereaddata/Online/EDS/23... · 2018. 3. 23. · 3rd Floor, Vayu Wing, Jor Bagh Road, Aliganj, New Delhi-110 003. Subject- Reply of queries
Page 17: To Date 23.03environmentclearance.nic.in/writereaddata/Online/EDS/23... · 2018. 3. 23. · 3rd Floor, Vayu Wing, Jor Bagh Road, Aliganj, New Delhi-110 003. Subject- Reply of queries
Page 18: To Date 23.03environmentclearance.nic.in/writereaddata/Online/EDS/23... · 2018. 3. 23. · 3rd Floor, Vayu Wing, Jor Bagh Road, Aliganj, New Delhi-110 003. Subject- Reply of queries
Page 19: To Date 23.03environmentclearance.nic.in/writereaddata/Online/EDS/23... · 2018. 3. 23. · 3rd Floor, Vayu Wing, Jor Bagh Road, Aliganj, New Delhi-110 003. Subject- Reply of queries
Page 20: To Date 23.03environmentclearance.nic.in/writereaddata/Online/EDS/23... · 2018. 3. 23. · 3rd Floor, Vayu Wing, Jor Bagh Road, Aliganj, New Delhi-110 003. Subject- Reply of queries
Page 21: To Date 23.03environmentclearance.nic.in/writereaddata/Online/EDS/23... · 2018. 3. 23. · 3rd Floor, Vayu Wing, Jor Bagh Road, Aliganj, New Delhi-110 003. Subject- Reply of queries
Page 22: To Date 23.03environmentclearance.nic.in/writereaddata/Online/EDS/23... · 2018. 3. 23. · 3rd Floor, Vayu Wing, Jor Bagh Road, Aliganj, New Delhi-110 003. Subject- Reply of queries
Page 23: To Date 23.03environmentclearance.nic.in/writereaddata/Online/EDS/23... · 2018. 3. 23. · 3rd Floor, Vayu Wing, Jor Bagh Road, Aliganj, New Delhi-110 003. Subject- Reply of queries
Page 24: To Date 23.03environmentclearance.nic.in/writereaddata/Online/EDS/23... · 2018. 3. 23. · 3rd Floor, Vayu Wing, Jor Bagh Road, Aliganj, New Delhi-110 003. Subject- Reply of queries