(to be published in the gazette of india, part-ii, and...
TRANSCRIPT
FORM – I
[Vide Notification dated 1st December, 2009]
For Proposed Expansion of Existing Hospital Project
PRAVARA RURAL HOSPITAL
At
LONI BK, TAL. RAHATA, DIST. AHMENDNAGAR
Of
M/s. Pravara Medical Trust
Prepared by
GREEN CIRCLE, INC.
221, 2nd Floor, Hariom Plaza, Behind Omkareshwar Temple,
M.G. Road, Borivali (E), Mumbai - 400066
Tele No.: 022-28943090. Fax No.: 022-28943060
E- mail: [email protected]
M/s. Pravara Medical Trust Form-I
2
FORM – I
(I) BASIC INFORMATION
Sr.
No.
Particulars Details
1 Name of the project/s Expansion of Existing Hospital
2 S. No. in the schedule 8 (a)
3 Proposed capacity/area/length/tonnage to
handled/command area/lease area/number
wells to be drilled
Total Plot Area 5,06,040 m2
FSI area (Please
provide)
Existing: 8,291 m2
Proposed: 16,053
m2
Non FSI area (Please
provide)
Existing: 2,087 m2
Proposed: 4,393 m2
Total Construction BUA
[FSI + Non FSI area]
Existing: 10,378
m2
Proposed:20,446
m2 Total: 30,824
m2
4 New/Expansion/Modernization Expansion Project
5 Existing Capacity/Area etc. 9, 470 m2
6 Category of Project i.e. 'A' or 'B' ‘B2’ Category
7 Does it attract the general condition? If yes,
please specify. No
8 Does it attract the specific condition If’ yes,
please specify. No
9 Location
Plot/Survey/Khasra No. Gat No. 515
Village Loni Bk
Tehsil Rahata
District Ahmendnagar
State Maharashtra
10 Nearest railway station/airport along with
distance in kms
Nearest Railway Station : Belapur Railway
station 20.54 km
Nearest Airport : Shiradi airport 13.10 km
11 Nearest Town, city, District Headquarters
along with distance in kms. Nearest City : Loni Budruk, 01 km.
12 Village Panchayat, Zilla Parishad, Municipal
Corporation, Local body (complete postal
addresses with telephone nos. to be given) Town Planning authority
13 Name of the applicant Mr. Narayan Singh Pawar
14 Registered Address At. Pravara Medical Trust, Loni
Tele No. 02422-271277
15 Address for correspondence :
Name Mr. Narayan singh Pawar
Address Medical Superintendent, Pravara Rural
Hospital, Loni, Tal. Rahata,
Dist. Ahmednagar
Pin Code 413736
M/s. Pravara Medical Trust Form-I
3
Telephone No. 02422-271277
(II) ACTIVITY
1. Construction, operation or decommissioning of the Project involving actions,
which will cause physical changes in the locality (topography, land use, changes in
water bodies, etc.)
Sr.
No. Information/Checklist confirmation
Yes
/No
Details thereof (with approximate quantities
/rates, wherever possible) with source of
information data
1.1 Permanent or temporary change in land
use, land cover or topography including
increase in intensity of land use (with
respect to local land use plan)
No There will be no significant changes in existing
land use pattern by proposed project. The
proposed project is in accordance with the
approved Development Plan of Town Planning
authority.
1.2 Clearance of existing land, vegetation
and buildings?
Yes No clearance of existing vegetation.
1.3 Creation of new land uses? No No creation of new land uses is envisaged
There is no significant changes in existing
land use pattern.
1.4 Pre-construction investigations e.g.
bore houses, soil testing?
Yes Pre-construction investigations will be done
before construction.
16 Details of Alternative Sites examined, if any
Location of these sites should be shown on a
topo sheet.
Not Applicable
17 Interlinked Projects None
18 Whether separate application of interlinked
project has been submitted?
No
19 If yes, date of submission Not Applicable
20 If no, reason Because at this stage only one project is under
consideration.
21 Whether the proposal involves
approval/clearance under: if yes, details of the
same and their status to be given.
(a) The forest (conservation) Act, 1980?
(b) The wildlife (protection) Act, 1972?
(c) C.R.Z Notification, 1991?
No, The proposal does not involve any of this
approval/clearance.
22 Whether there is any government order /
policy relevant/ relating to the site?
No
23 Forest land involved (hectares) No, there will not be any forest land involved.
24 Whether there is any litigation pending
against the project and/or land in which the
project is propose to be set up?
(a) Name of the Court
(b) Case No.
(c) Orders/directions of the Court, if any and
its relevance with the proposed project.
No. there is no litigation pending against the
project or land in which the project is proposed
to be set up.
M/s. Pravara Medical Trust Form-I
4
1.5 Construction works? Yes Proposed project consist of hospital buildings.
1.6 Demolition works? No No demolition work involves.
1.7 Temporary sites used for construction
works or housing of construction
workers?
No Temporary shelters and sanitation facilities for
construction workers are required.
1.8 Above ground buildings, structures or
earthworks including linear
structures, cut and fill or excavations.
Yes Total excavation quantity will be very small &
shall be used for refilling.
1.9 Underground works including mining
or tunneling?
No No underground works including mining or
tunneling involved.
1.10 Reclamation works? No Not Applicable
1.11 Dredging? No No Dredging shall be required as no offshore
area is involved.
1.12 Offshore structures? No No Offshore structures involved as no offshore
area is involved.
1.13 Production and manufacturing
processes?
No No such production or manufacturing
processes will be carried out.
1.14 Facilities for storage of goods or
materials.
No Raw materials required for construction shall
be stored at the camp-sites during construction
phase.
1.15 Facilities for treatment or disposal of
solid waste or liquid effluents?
Yes On site OWC is proposed for treatment of
Biodegradable solid waste and the
compost will be used as manure in garden.
Non Biodegradable waste will be handed
over to authorized vendor for final
disposal.
Biomedical Waste generated during
operation of hospitals will be properly
segregated and handed over to authorized
MPCB vendor for treatment.
Onsite Sewage Treatment Plant (STP) is
proposed to treat the generated sewage and
reuse the treated sewage within project for
landscaping and flushing.
Onsite Effluent Treatment Plant is
provided to treat trade effluent coming
from laundry.
1.16 Facilities for long term housing of
operational workers?
Yes The Project is Hospital with an estimated
occupancy of 1275 Nos. of Beds.
1.17 New road, rail or sea traffic during
construction or operation?
Yes A temporary increase in traffic may result
during construction phase due to transport of
personnel/ materials/ equipment.
During operation, based on occupancy road
traffic will be additional.
1.18 New road, rail, air waterborne or
other transport infrastructure
including new or altered routes and
stations, ports, airports etc?
No It is intended to make maximum use of existing
road network for mobilization of man and
materials.
M/s. Pravara Medical Trust Form-I
5
1.19 Closure or diversion of existing
transport routes or infrastructure
leading to changes in traffic
movements?
No There will not be any closure or diversion of
existing transportation routes.
1.20 New or diverted transmission lines or
pipelines?
Yes New transmission as well as pipelines shall be
required for facilitating various infrastructure
utilities for the residential building.
1.21 Impoundment, damming, culverting,
realignment or other changes to the
hydrology of watercourses or
aquifers?
No No changes in the hydrology of watercourses
/aquifers are envisaged.
1.22 Stream crossings? No There is no stream running around adjacent to
the site.
1.23 Abstraction or transfers of water from
ground or surface waters?
No Tanker water may be used as one of the source
of water for construction, for which necessary
permission from regulatory authority should be
obtained.
1.24 Changes in water bodies or the land
surface affecting drainage or run-off?
No The site shall be restored back to normal after
construction and surface run off from site shall
be channelized through storm water drains and
utilized for ground water recharge hence no
change in drainage pattern envisaged.
1.25 Transport of personnel or materials
for construction, operation or
decommissioning?
Yes Road transport will be used for transportation of
materials for construction phase.
During operation phase the road transport shall
be utilized by the floating population for
transportation.
1.26 Long-term dismantling or
decommissioning or restoration
works?
No Proposed project does not involve any long-
term dismantling or decommissioning or
restoration works.
1.27 Ongoing activity during
decommissioning which could have
an impact on the environment?
No There is no impact on environment during
decommissioning since project does not
involve any decommissioning.
1.28 Influx of people to an area in either
temporarily or permanently?
No No influx of people during construction phase
since hutments are provided for the laborers
employed during construction phase at the
camp site itself.
During operation phase permanent influx of
people shall be around 4695 Persons is
expected.
1.29 Introduction of alien species? No The green belt as per the requirements of
MoEF/CPCB will be developed. Only native
species will be planted so no introduction of
alien species is anticipated.
1.30 Loss of native species or genetic
diversity?
No Deforestation is not involved, only site
clearance shall be taken up to clear thorny
bushes or surrounding vegetation and care shall
be taken to avoid loss of any native species or
genetic diversity.
M/s. Pravara Medical Trust Form-I
6
1.31 Any other actions? No No other actions/activities envisaged
2. Use of Natural resources for construction or operation of the Project (such as
land, water, materials or energy, especially any resources which are non-
renewable or in short supply):
Sr.
No.
Information/checklist confirmation Yes
/No
Details thereof (with approximate quantities
/rates, wherever possible) with source of
information data
2.1 Land especially undeveloped or
agricultural land (ha)
No The existing land use pattern of the plot is a non
agriculture zone which shall be converted to
Residential zone after proposed construction.
2.2 Water (expected source & competing
users) unit: KLD (m3/day)
Yes CONSTRUCTION PHASE:
Source:
Drinking purpose: Grampanchayat/Tanker Water
Construction purpose: Tanker
Domestic = 10 m3/day
Construction = 20 m3/day
Total Demand = 30 m3/day
OPERATION PHASE:
Dry Season
Fresh Water: 427.55 m3/day
Domestic Use: 422.55 m3/day
Recycled water (Flushing): 264 m3/day
Recycled water(Gardening): 49 m3/day
Total Water requirement: 737.55 m3/day
Excess treated water: 277 m3/day
Wet Season
Fresh Water: 427.55 m3/day
Domestic Use: 422.55 m3/day
Recycled water (Flushing): 264 m3/day
Recycled water(Gardening): 0 m3/day
Total Water requirement: 691.55 m3/day
Excess treated water: 326 m3/day
M/s. Pravara Medical Trust Form-I
7
2.3 Minerals (MT) No Not applicable
2.4 Construction material – stone,
aggregates, sand / soil (expected source
– MT)
Yes The raw material required for construction purpose
shall be Cement, RMC, Sand, Aggregates, brick,
Steel, stone etc. The exact quantities of each shall
be furnished during detailed engineering.
2.5 Forests and timber (source – MT) No Not applicable
2.6 Energy including electricity and fuels
(source, competing users) Unit: fuel
(MT), energy (MW)
Yes Total power consumption for residential
buildings
Source of Supply: M.S.E.D.C.L.
Connected Load: Existing: 789 KW
Proposed: 1350 KW
No. Of Transformers: 1 no. x 750 KVA,
DG Sets: Number and capacity of the DG sets
to be used – 1 No. x 750 KVA, 2 Nos. x 500
KVA
Fuel Requirement (Diesel)- 240 lit./hr
2.7 Any other natural resources (use
appropriate standard units)
No Not Applicable
3. Use, storage, transport, handling or production of substances or materials,
which could be harmful to human health or the environment or raise concerns
about actual or perceived risks to human health.
Sr.
No.
Information/Checklist confirmation Yes/
No
Details thereof (with approximate
quantities / rates, wherever possible) with
source of information data
3.1 Use of substances or materials, which
are hazardous (as per MSIHC rules) to
human health or the environment (flora,
fauna and water supplies)
Yes The expected hazardous wastes shall be
lubricating oil & grease, required to prevent
friction in mechanical parts and spent oils,
drums etc. The quantities used shall be very
low (<2000 lit/year) and these chemicals /
materials shall be handled as per Hazardous
waste handling (2008) rules.
3.2 Changes in occurrence of disease or
affect disease vectors (e.g. insect or
water borne diseases)
No Not Applicable
3.3 Affect the welfare of people e.g. by
changing living conditions?
Yes Employment opportunities for the local
people will increase. The living condition
and welfare of the people will improve.
3.4 Vulnerable groups of people who could
be affected by the project e.g. hospital
patients, children, the elderly etc.,
No Not Applicable
3.5 Any other causes No Not Applicable
M/s. Pravara Medical Trust Form-I
8
4. Production of solid wastes during construction or operation or decommissioning
Sr.
No.
Information/Checklist
confirmation
Yes
/No
Details thereof (with approximate quantities/rates,
wherever possible) with source of information
data.
4.1 Spoil, overburden or mine wastes No Not Applicable
4.2 Municipal waste (domestic and or
commercial wastes)
Yes Waste generation in the Pre-Construction &
Construction phase:
Waste generation : 35 kg /day
Quantity of the top soil to be preserved :
Disposal of the construction way debris:
Construction debris, Waste concrete and broken
bricks will be utilized in low-land leveling,
secondary concrete, below roads. Some quantity of
Excavation soil will be use for backfilling and
remaining will be hand over to authorized vendor.
Waste generation in the operation Phase:
Biodegradable waste: 1267.65 kg/day
Non Biodegradable waste: 845.1 kg/day
E – waste: very less amount
Hazardous waste: spent oil or oil grease for DG
sets paints etc.
Biomedical waste (Kg/month) (If applicable) :
Existing: 5600 Kg/month
Proposed: 3980 Kg/month
STP Sludge: 60.6 kg/ day
ETP Sludge: 8 kg/ day
Mode of Disposal of waste:
Dry waste: Handed over to authorize recycler for
further handling and disposal.
Wet waste: Will be converted to compost using
Organic Waste Converter [SMART 500
MECHANICAL COMPOSTER: 1 Nos.]
E – waste : Handed over to authorized Vendor
Hazardous waste : Handed over to authorized
Vendor
Biomedical waste (If applicable): Handed over
to M/s. Bioclean systems india pvt. ltd.
Ahmednagar
STP Sludge (Dry sludge) : Will be used as
manure for gardening
ETP Sludge: Handed over to authorized vendor.
4.3 Hazardous wastes (as per
Hazardous Waste Management
Rules)
No Not Applicable because proposed project is a
construction project. However, very small quantity of
hazardous waste including spent oil or grease for DG
sets and other machineries shall be generated which
will be handled as per hazardous wastes
M/s. Pravara Medical Trust Form-I
9
Sr.
No.
Information/Checklist
confirmation
Yes
/No
Details thereof (with approximate quantities/rates,
wherever possible) with source of information
data.
(management and handling) Rules.
4.4 Other industrial process wastes No Not Applicable
4.5 Surplus product No Not Applicable
4.6 Sewage sludge or other sludge
from effluent treatment
Yes Sludge about 60.6 kg/day from STP will be
generated and will be used as manure for gardening
purpose.
4.7 Construction or demolition wastes Yes Construction debris shall be generated during
construction phase which used for leveling of low
lying areas or base course of approach roads.
4.8 Redundant machinery or
equipment
No No redundant machinery as the construction and
other equipments involved shall be transported out of
the project area once the construction work is over.
4.9 Contaminated soils or other
materials
No Not Applicable
4.10 Agricultural wastes No Not Applicable
4.11 Other solid wastes No Not Applicable
5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)
Sr.
No.
Information/Checklist
confirmation
Yes/
No
Details thereof (with approximate
quantities/rates, wherever possible) with source
of information data
5.1 Emissions from combustion of
fossil fuels from stationary or
mobile sources
Yes During Construction phase emission of Fossil fuels
shall be from use of Construction machineries,
vehicles and DG Sets. During Operation phase
emission will be from use of DG sets on power
break down and vehicles for transportation.
5.2 Emissions from production
processes
No No processes involving production.
5.3 Emissions from materials handling
including storage or transport
Yes Dusting may occur during loading and unloading of
cement bags, sand etc. however suitable mitigation
measures like sprinkling of water etc may be carried
out to control dusting.
5.4 Emissions from construction
activities including plant and
equipment.
No During Construction phase emission of Fossil fuels
shall be from use of Construction machineries,
vehicles and DG Sets.
5.5 Dust or odors from handling of
materials including construction
materials, sewage and waste.
Yes Dusting will occur during transportation and
handling of construction materials however suitable
mitigation measures like sprinkling of water etc may
be carried out to control dusting.
No odor problem will occur from solid waste since
proper segregation and treatment is proposed for the
project.
5.6 Emissions from incineration of
waste
No Not applicable as incineration will not be involved.
M/s. Pravara Medical Trust Form-I
10
Sr.
No.
Information/Checklist
confirmation
Yes/
No
Details thereof (with approximate
quantities/rates, wherever possible) with source
of information data
5.7 Emissions from burning of waste
in open air (e.g. slash materials,
construction debris)
No No burning of debris shall be allowed.
5.8 Emissions from any other sources No Not envisaged
6. Generation of Noise and Vibration, and Emissions of Light and Heat
Sr.
No.
Information/Checklist
confirmation
Yes/
No
Details there of (with approximate
quantities/rates, wherever possible) with source
of information data with source of information
data
6.1 From operation of equipment e.g.
engines, ventilation plant, crushers
Yes Noise expected during operation of DG set shall be
around 65 dBA however DG sets shall be used only
as backup in case of power failure. Further proper
acoustic measures shall be provided along with DG
sets to reduce the noise and vibrations.
6.2 From industrial or similar
processes
No No industrial or similar processes involved.
6.3 From construction or demolition Yes There will be marginal increase in noise upto 65 dB
(A) during construction work and it shall be
localized to work site. The activities will be
restricted to the daytime. Personnel protective
equipment will be provided and their proper usage
will be ensured for eardrum protection of the
workers.
6.4 From blasting or piling No No blasting or piling involved.
6.5 From construction or operational
traffic
Yes There will be marginal noise generation from
vehicle movement. However, the noise levels will
be less than 65 dB (A). Further suitable mitigation
measures shall be proposed to reduce the noise
generated as a result of construction or operation
traffic.
6.6 From lighting or cooling systems No Not Applicable
6.7 From any other sources No Not Applicable
7. Risks of contamination of land or water from releases of pollutants into the ground
or into sewers, surface waters, groundwater, coastal waters or the sea:
Sr.
No.
Information/Checklist
confirmation
Yes
/No
Details thereof (with approximate
quantities/rates, wherever possible) with source
of information data
M/s. Pravara Medical Trust Form-I
11
Sr.
No.
Information/Checklist
confirmation
Yes
/No
Details thereof (with approximate
quantities/rates, wherever possible) with source
of information data
7.1 From handling, storage, use or
spillage of hazardous materials
No The collection and treatment and disposal of
hazardous waste will be as per hazardous waste
(Management & Handling) amendment rule, 2008
and hence no adverse impact on land environment
is envisaged.
7.2 From discharge of sewage or
other effluents to water or the
land (expected mode and place of
discharge)
No The wastewater generation during operation phase
will be 617.89 m3/day, During dry season treated
sewage will be 587 m3/day out of which 310 m3/day
will be recycled and reused for flushing and
landscaping purposes and balance 277 m3 /day shall
be discharge to Municipal drain.
7.3 By deposition of pollutants
emitted to air into the land or into
water.
No Flue gas emissions from DG set will be within the
prescribed limits. Adequate stack height shall be
provided for dispersion of the pollutants/ emissions.
7.4 From any other sources No Not applicable
7.5 Is there a risk of long term build
up of pollutants in the
environment from these sources?
No The only emissions shall be from DG sets which
shall be operated in case of power failure. Further
adequate stack height shall facilitate dispersion of
pollutants hence no risk of built of pollutants shall
occur.
The flue gas emissions from DG sets will be strictly
in conformity to the limits stipulated by CPCB.
Also the stack height will be in accordance with
CPCB stipulations.
The sewage will be treated and reused; hence no
impact on land or water bodies is anticipated.
Hence no long term build up risk of pollutants in
the environment from these sources is anticipated.
7. Risk of accidents during construction or operation of the Project, which could
affect human health or the environment.
Sr.
No.
Information/Checklist
confirmation
Yes
/No
Details thereof (with approximate quantities/rates,
wherever possible) with source of information
data
8.1 From explosions, spillages, fires
etc from storage, handling, use
or production of hazardous
substances.
No Not Applicable
8.2 From any other causes No Not applicable
8.3 Could the project be affected by
natural disasters causing
environmental damage (e.g.
No Since the project falls under seismic zone – III and
the building will be designed as per seismic zone - III
norms.
M/s. Pravara Medical Trust Form-I
12
Sr.
No.
Information/Checklist
confirmation
Yes
/No
Details thereof (with approximate quantities/rates,
wherever possible) with source of information
data
floods, earthquakes, landslides,
cloudburst etc)?
8. Factors which should be considered (such as consequential development)
which could lead to environmental effects or the potential for cumulative
impacts with other existing or planned activities in the locality.
Sr.
No.
Information/Checklist
confirmation
Yes
/No
Details thereof (with approximate quantities/rates,
wherever possible) with source of information data
9.1 Lead to development of
supporting facilities, ancillary
development or development
stimulated by the project
which could have impact on
the environment e.g.:
• Supporting infrastructure
(roads, power supply, waste
or waste water treatment, etc.)
• housing development
• extractive industries
• supply industries
• other
No The project will set precedents for development of
transport, communication, infra-structure and other
developments in the area.
9.2 Lead to after-use of the site,
which could haven impact on
the environment
No The proposed project will have marginal & negligible
impact on the environment.
9.3 Set a precedent for later
developments
Yes The project shall set precedents for further
development of transport, communication, infra-
structure and other developments in the area.
9.4 Have cumulative effects due
to proximity to other existing
or planned projects with
similar effects
No As the environmental impact from the project is
marginal, no cumulative effects are envisaged.
(III) Environmental Sensitivity
Sr.
No.
Areas
Name
/Identity
Aerial distance (within 15 km) Proposed
project location boundary
1 Areas protected under
international conventions,
national or local legislation for
their ecological, landscape,
cultural or other related value.
None Not Applicable
2 Areas which are important or
sensitive for ecological reasons
- Wetlands, watercourses or
other water bodies, coastal
None Not Applicable
M/s. Pravara Medical Trust Form-I
13
Sr.
No.
Areas
Name
/Identity
Aerial distance (within 15 km) Proposed
project location boundary
zone, biospheres, mountains,
forests.
3 Areas used by protected,
important or sensitive species
of flora or fauna for breeding,
nesting, foraging, resting, over
wintering, migration.
None Not Applicable
4 Inland, coastal, marine or
underground waters.
None Not Applicable
5 State, National boundaries. None Not Applicable
6 Routes or facilities used by the
public for access to recreation
or other tourist, pilgrim areas.
None Not Applicable
7 Defense installations. None Not Applicable
8 Densely populated or built-up
area.
None Not Applicable
9 Areas occupied by sensitive
man-made land uses (hospitals,
schools, places of worship,
community facilities)
None Not Applicable
10 Areas containing important,
high quality or scarce resources
(ground water resources,
surface resources, forestry,
agriculture, fisheries, tourism,
minerals)
None Not Applicable
11 Areas already subjected to
pollution or environmental
damage. (those where existing
legal environmental standards
are exceeded)
None Not Applicable
12 Areas susceptible to natural
hazard which could cause the
project to present
environmental problems.
(earthquakes, subsidence,
landslides, erosion, flooding or
extreme or adverse climatic
conditions)
No Not Applicable
M/s. Pravara Medical Trust Form-I
14
"I hereby given undertaking that the data and information given in the application and
enclosures are true to the best of my knowledge and belief and I am aware that if any part
of the data and information submitted is found to be false or misleading at any stage, the
project will be rejected and clearance give, if any to the project will be revoked at our risk
and cost.
Date: 13.04.2016
M/s. Pravara Medical trust
(Authorized Signatory)