![Page 1: (to be implemented in 2019) · 2019-03-21 · • Jakarta used to implement a 3 -in- 1Policy (HOV Lane) for 13 years, started in 2003.Limitation of this methods: - Violations are](https://reader034.vdocuments.site/reader034/viewer/2022042022/5e79a44f3b3ca708b879eca2/html5/thumbnails/1.jpg)
Indonesia ERP’s System
(to be implemented in 2019)
DR. Elly . A. Sinaga, MSc
Former Director General for Greater Jakarta Transport Authority, MoTInstitute of Transportation and Logistics
Trisakti
Brussel Belgium ; March 7, 2019
Road User Charging Conference
![Page 2: (to be implemented in 2019) · 2019-03-21 · • Jakarta used to implement a 3 -in- 1Policy (HOV Lane) for 13 years, started in 2003.Limitation of this methods: - Violations are](https://reader034.vdocuments.site/reader034/viewer/2022042022/5e79a44f3b3ca708b879eca2/html5/thumbnails/2.jpg)
Content
![Page 3: (to be implemented in 2019) · 2019-03-21 · • Jakarta used to implement a 3 -in- 1Policy (HOV Lane) for 13 years, started in 2003.Limitation of this methods: - Violations are](https://reader034.vdocuments.site/reader034/viewer/2022042022/5e79a44f3b3ca708b879eca2/html5/thumbnails/3.jpg)
3
![Page 4: (to be implemented in 2019) · 2019-03-21 · • Jakarta used to implement a 3 -in- 1Policy (HOV Lane) for 13 years, started in 2003.Limitation of this methods: - Violations are](https://reader034.vdocuments.site/reader034/viewer/2022042022/5e79a44f3b3ca708b879eca2/html5/thumbnails/4.jpg)
GREATER JAKARTA Motorcycle: 18.5 million units (74% ) Private car: 5.9 million units (24%) Buses : 512 thousand units (2%)
Number of Population : 31 millionNumber of Vehicle : 24.9 million
Jakarta Motor Cycles More Than Population
Population
Motor Cycle
Car
+3100 motor cycle/day…
Population vs Vehicles
CITY AREA (km2)DKI Jakarta 740.30
Bogor 2,489.71 Tangerang 1,274.54
Bekasi 1,694.86 Depok 200.29
![Page 5: (to be implemented in 2019) · 2019-03-21 · • Jakarta used to implement a 3 -in- 1Policy (HOV Lane) for 13 years, started in 2003.Limitation of this methods: - Violations are](https://reader034.vdocuments.site/reader034/viewer/2022042022/5e79a44f3b3ca708b879eca2/html5/thumbnails/5.jpg)
EXISTING MASS TRANSIT
No of Pax616.744/day
COMMUTER RAIL(Connecting Greater
Jakarta to downtown)
Number of Passenger1.014.632 /day
BRT
![Page 6: (to be implemented in 2019) · 2019-03-21 · • Jakarta used to implement a 3 -in- 1Policy (HOV Lane) for 13 years, started in 2003.Limitation of this methods: - Violations are](https://reader034.vdocuments.site/reader034/viewer/2022042022/5e79a44f3b3ca708b879eca2/html5/thumbnails/6.jpg)
PORTRAIT OF TRANSPORTATION SERVICES IN JABODETABEK
‘Showcase ’ of Services in the Industry
6
BUTUH
SERVICE RECOVERY
SERVICE FAILURE‘Poor Service Quality' of:• Safety• Security• Convenience & Comfort• Punctuality• Unscheduled
Unreliable Services
That is NEED
![Page 7: (to be implemented in 2019) · 2019-03-21 · • Jakarta used to implement a 3 -in- 1Policy (HOV Lane) for 13 years, started in 2003.Limitation of this methods: - Violations are](https://reader034.vdocuments.site/reader034/viewer/2022042022/5e79a44f3b3ca708b879eca2/html5/thumbnails/7.jpg)
PUBLIC TRANSPORT SHARE TARGET
7
PUBLIC TRANSPORT
2016 2019 2024 2029
24% 40% 50% 60%
Presidential Regulation 55/2018 for Greater Jakarta
![Page 8: (to be implemented in 2019) · 2019-03-21 · • Jakarta used to implement a 3 -in- 1Policy (HOV Lane) for 13 years, started in 2003.Limitation of this methods: - Violations are](https://reader034.vdocuments.site/reader034/viewer/2022042022/5e79a44f3b3ca708b879eca2/html5/thumbnails/8.jpg)
MRT / Subway
PUBLIC TRANSPORT
DEVELOPMENT
LRT / Monorail
BRT / Busway
Waterways
3 in 1
TRAFFIC RESTRAINT
Road PricingJAKARTA
TRANSPORTATIONMASTERPLAN
Parking Restraint
NETWORK CAPACITY
IMPROVEMENT
Park and Ride
Road Network
Pedestrianized/NMV
ATCS / ITS
THREESTRATEGIES IN
JAKARTA TRANSPORTATION
MASTERPLAN(Governor Decree103/2007)
![Page 9: (to be implemented in 2019) · 2019-03-21 · • Jakarta used to implement a 3 -in- 1Policy (HOV Lane) for 13 years, started in 2003.Limitation of this methods: - Violations are](https://reader034.vdocuments.site/reader034/viewer/2022042022/5e79a44f3b3ca708b879eca2/html5/thumbnails/9.jpg)
![Page 10: (to be implemented in 2019) · 2019-03-21 · • Jakarta used to implement a 3 -in- 1Policy (HOV Lane) for 13 years, started in 2003.Limitation of this methods: - Violations are](https://reader034.vdocuments.site/reader034/viewer/2022042022/5e79a44f3b3ca708b879eca2/html5/thumbnails/10.jpg)
MASS PUBLIC TRANSPORT DEVELOPMENT
BRT/BUSWAY/HOVMRT/HST/
COMMUTER RAILLRT / MONORAIL
• 13 CORRIDOR OPERATED• CORRIDOR 13 (ELEVATED)• JR /RESIDENCE CONNEXION• JA/AIRPORT CONNEXION• HOV/BUS LANE IN TOLL ROAD
(BOS and Contra Flow)
• NORTH-SOUTH CORRIDOR • EAST-WEST CORRIDOR• AIRPORT RAIL• HIGH SPEED TRAIN• DDT (DOUBLE-DOUBLE TRACK)• JABODETABEK COMMUTER RAIL
• 7 LINES LRT DKI JAKARTA, PRIORITY CORRIDOR DEVELOPMENT
• DEVELOPMENT OF LRT JABODEBEK CENTRAL GOVERNMENT
![Page 11: (to be implemented in 2019) · 2019-03-21 · • Jakarta used to implement a 3 -in- 1Policy (HOV Lane) for 13 years, started in 2003.Limitation of this methods: - Violations are](https://reader034.vdocuments.site/reader034/viewer/2022042022/5e79a44f3b3ca708b879eca2/html5/thumbnails/11.jpg)
MASS TRANSPORTATION DEVELOPMENT 2016 2017 2018 2019 2020 2021 2022
MRT NORTH - SOUTH PHASE I (LEBAK BULUS - BUNDARAN HI) March2019
MRT NORTH - SOUTH PHASE II (BUNDARAN HI - ANCOL TIMUR) July 2022
LRT Jakarta Gov / JAKPRO (VELODROME - KELAPA GADING) March2019
LRT MoT / ADHI KARYA (CAWANG - CIBUBUR, CAWANG - BEKASI TIMUR, CAWANG - DUKUH ATAS)
March2019
LRT JABABEKA (Bekasi Timur - Delta Mas) 2020
AIRPORT RAILWAY (EXPRESS - VIA PLUIT) 2020
AIRPORT RAILWAY (COMMUTER LINE - VIA BATU CEPER) 2018
HIGH-SPEED TRAIN (JAKARTA – BANDUNG) June 2019
AUTOMATIC PEOPLE MOVER SYSTEM ( SOEKARNO HATTA) 2018
MASS TRANSPORTATION DEVELOPMENT TIME FRAME
![Page 12: (to be implemented in 2019) · 2019-03-21 · • Jakarta used to implement a 3 -in- 1Policy (HOV Lane) for 13 years, started in 2003.Limitation of this methods: - Violations are](https://reader034.vdocuments.site/reader034/viewer/2022042022/5e79a44f3b3ca708b879eca2/html5/thumbnails/12.jpg)
Push - Pull Policy Transport Demand Management
![Page 13: (to be implemented in 2019) · 2019-03-21 · • Jakarta used to implement a 3 -in- 1Policy (HOV Lane) for 13 years, started in 2003.Limitation of this methods: - Violations are](https://reader034.vdocuments.site/reader034/viewer/2022042022/5e79a44f3b3ca708b879eca2/html5/thumbnails/13.jpg)
PUSH_PULL POLICY ACCELERATE PUBLIC TRANSPORT SHIFT
MRT development is expected to give high impact to traffic improvement, but needs much cost and time.
Introduction of ERP is the most effective measure which realizes the Jakarta’s goal of easing traffic congestion
Drawn up by JICA Study Team
COST
![Page 14: (to be implemented in 2019) · 2019-03-21 · • Jakarta used to implement a 3 -in- 1Policy (HOV Lane) for 13 years, started in 2003.Limitation of this methods: - Violations are](https://reader034.vdocuments.site/reader034/viewer/2022042022/5e79a44f3b3ca708b879eca2/html5/thumbnails/14.jpg)
• Jakarta used to implement a 3 -in- 1Policy (HOV Lane) for 13 years, started in 2003. Limitation of this methods:
- Violations are difficult to detect
- High number of Car Jockey (Paid Extra Passengers)
- The corridors are still highly congested
• Since August 2016, the policy was changed into Odd- EvenPlate, as a transition phase before the ERP will be applied.
à So far good results
• Simultaneously we are now preparing ERP system, in the bidding
phase for contractor and operator (private sector)
TJ 9 30,55%
Corridor Length :
North - South : 9.3 km
East - West : 3.6 km
IndicatorsDuring
Odd-Even
Travel Time -16%
Average Speed 17%
Traffic Volume -15%
BRTPax
TJ 1 32,57%
TJ 6 27,17%
Odd and Even license plate Policy ( July 2016)From 3 in 1 (2003 - 2016) …
Young children (Jockey) observed earning cash by accompanying drivers within the zone
![Page 15: (to be implemented in 2019) · 2019-03-21 · • Jakarta used to implement a 3 -in- 1Policy (HOV Lane) for 13 years, started in 2003.Limitation of this methods: - Violations are](https://reader034.vdocuments.site/reader034/viewer/2022042022/5e79a44f3b3ca708b879eca2/html5/thumbnails/15.jpg)
THE IMPLEMENTATION OF ERP
q It is one of the traffic restrictionsstrategies, which are supposed to replacethe 3 in 1 or Odd Even policy.
q ERP is a 'congestion charging' that isimposed on private vehicles on certainroads and at certain times.
q ERP systems are organized in order tomanage traffic needs to improve theefficiency and effectiveness of the use ofroad spaces and control road traffic.
q The results of acceptance of theimplementation of ERP System will beused only for the cost of improving mass-based public transport services andimproving the performance of roadtraffic (earmarking policy).
![Page 16: (to be implemented in 2019) · 2019-03-21 · • Jakarta used to implement a 3 -in- 1Policy (HOV Lane) for 13 years, started in 2003.Limitation of this methods: - Violations are](https://reader034.vdocuments.site/reader034/viewer/2022042022/5e79a44f3b3ca708b879eca2/html5/thumbnails/16.jpg)
Map of the Traffic Restriction Plan (Local Regulation no 1 thn 2012)
![Page 17: (to be implemented in 2019) · 2019-03-21 · • Jakarta used to implement a 3 -in- 1Policy (HOV Lane) for 13 years, started in 2003.Limitation of this methods: - Violations are](https://reader034.vdocuments.site/reader034/viewer/2022042022/5e79a44f3b3ca708b879eca2/html5/thumbnails/17.jpg)
Government Regulation (PP) No. 32/2011 for Traffic Management and Engineering : A necessary step for implementing ERP in Jakarta’s CBD.
This regulation ensures that the local government will be the one to determine the technical and regulatory aspects of the their local ERP implementation.
![Page 18: (to be implemented in 2019) · 2019-03-21 · • Jakarta used to implement a 3 -in- 1Policy (HOV Lane) for 13 years, started in 2003.Limitation of this methods: - Violations are](https://reader034.vdocuments.site/reader034/viewer/2022042022/5e79a44f3b3ca708b879eca2/html5/thumbnails/18.jpg)
2017Open tender
2018Contract Signing
&Construction
(1 – 1,5 y)
2019Phase I
Implementation/ Operation
2021Phase II
Implementation/ Operation
TIME LINE
![Page 19: (to be implemented in 2019) · 2019-03-21 · • Jakarta used to implement a 3 -in- 1Policy (HOV Lane) for 13 years, started in 2003.Limitation of this methods: - Violations are](https://reader034.vdocuments.site/reader034/viewer/2022042022/5e79a44f3b3ca708b879eca2/html5/thumbnails/19.jpg)
![Page 20: (to be implemented in 2019) · 2019-03-21 · • Jakarta used to implement a 3 -in- 1Policy (HOV Lane) for 13 years, started in 2003.Limitation of this methods: - Violations are](https://reader034.vdocuments.site/reader034/viewer/2022042022/5e79a44f3b3ca708b879eca2/html5/thumbnails/20.jpg)
Impact of ERP
Vehicle Usage ERP Reduced
Congestion
Reduced Urban Sprawl
Improved Mobility
Fuel Saved
Local Income
Public Transport Fund
Reduced Pollution
![Page 21: (to be implemented in 2019) · 2019-03-21 · • Jakarta used to implement a 3 -in- 1Policy (HOV Lane) for 13 years, started in 2003.Limitation of this methods: - Violations are](https://reader034.vdocuments.site/reader034/viewer/2022042022/5e79a44f3b3ca708b879eca2/html5/thumbnails/21.jpg)
SITRAMP, in 2002, estimated the short term benefits of ERP implementation.
The benefit is measured in the form of savings in Vehicle Operating Costs (VOC) and Passenger Traveling Time Cost (TTC).
Based on SITRAMP’s assessment results, by charging 8,000 IDR (80c USD) will result in total savings of 390 billion Rupiah for the year of 2007, which accounts for 0.7% of Jakarta’s estimated GDP.
Approximately 41% of the total savings (around 160 billion rupiah) was from TTC savings and the rest was in the form of VOC savings.
![Page 22: (to be implemented in 2019) · 2019-03-21 · • Jakarta used to implement a 3 -in- 1Policy (HOV Lane) for 13 years, started in 2003.Limitation of this methods: - Violations are](https://reader034.vdocuments.site/reader034/viewer/2022042022/5e79a44f3b3ca708b879eca2/html5/thumbnails/22.jpg)
Long-term Effect of Private-mode CBD Cordon ERP
Based on the simulation results presented, all private-mode road pricing results in reduced residential and employment levels in the CBD+SBD area
X-axis: toll levels in thousands rupiah Y-axis: % of change in the number of residents/workers
![Page 23: (to be implemented in 2019) · 2019-03-21 · • Jakarta used to implement a 3 -in- 1Policy (HOV Lane) for 13 years, started in 2003.Limitation of this methods: - Violations are](https://reader034.vdocuments.site/reader034/viewer/2022042022/5e79a44f3b3ca708b879eca2/html5/thumbnails/23.jpg)
Long-term Effect of Car-only CBD Cordon ERP
Based on the simulation results presented in most toll levels, CBD+SBD residential and employment will increase. However, at 15K IDR it is found that, residential level will be reduced. X-axis: toll levels in thousands rupiah
Y-axis: % of change in the number of residents/workers
![Page 24: (to be implemented in 2019) · 2019-03-21 · • Jakarta used to implement a 3 -in- 1Policy (HOV Lane) for 13 years, started in 2003.Limitation of this methods: - Violations are](https://reader034.vdocuments.site/reader034/viewer/2022042022/5e79a44f3b3ca708b879eca2/html5/thumbnails/24.jpg)
Simulation Results Comparing Private mode and Car(at 15K IDR/1.5USD and 5K IDR/0.5USD for cars and motorcycles, respectively)
Note : Sign (+) and (-) in long term impact session indicate Concentration and dispersion effect in Jakarta (CBD+SBD Zones Respectively)
![Page 25: (to be implemented in 2019) · 2019-03-21 · • Jakarta used to implement a 3 -in- 1Policy (HOV Lane) for 13 years, started in 2003.Limitation of this methods: - Violations are](https://reader034.vdocuments.site/reader034/viewer/2022042022/5e79a44f3b3ca708b879eca2/html5/thumbnails/25.jpg)
Simulation Conclusion and Limitations
• Simpler tolling system alternatives that focus on cars only have a high performance (less urban sprawl) relative to that of the tolling system that targets both the private car and the motorcycle users.
• Average daily Travel time saving also higher if ERP focus on cars only.
• In addition, the limited public bus service burdens the users in the form of the crowding cost of the public bus. By provide enough capacity on Public transport , it is expected that Motorcycle riders will shift to this more efficient mode, so making traffic will be easier.
• The simulation is done in 2015 (based on a study done in 2002), many of the assumptions made then needs to be updated to reflect present conditions.
![Page 26: (to be implemented in 2019) · 2019-03-21 · • Jakarta used to implement a 3 -in- 1Policy (HOV Lane) for 13 years, started in 2003.Limitation of this methods: - Violations are](https://reader034.vdocuments.site/reader034/viewer/2022042022/5e79a44f3b3ca708b879eca2/html5/thumbnails/26.jpg)
![Page 27: (to be implemented in 2019) · 2019-03-21 · • Jakarta used to implement a 3 -in- 1Policy (HOV Lane) for 13 years, started in 2003.Limitation of this methods: - Violations are](https://reader034.vdocuments.site/reader034/viewer/2022042022/5e79a44f3b3ca708b879eca2/html5/thumbnails/27.jpg)
According to Local Government Regulation No5/2015 ERP will be implemented only for 19,2 Km roadway for the first phase.
The ERP can be conducted if multiple (more than one choice ) public transportation are operated at the corridor/area. So it will be implemented after MRT are launched.
![Page 28: (to be implemented in 2019) · 2019-03-21 · • Jakarta used to implement a 3 -in- 1Policy (HOV Lane) for 13 years, started in 2003.Limitation of this methods: - Violations are](https://reader034.vdocuments.site/reader034/viewer/2022042022/5e79a44f3b3ca708b879eca2/html5/thumbnails/28.jpg)
ERP Specification defined by Governor Regulation No.149/2016 which defined that ERP system should use the technology of Dedicated Short Range Communication (DSRC) with frequency of 5,8 GHz.
In October 2016 Indonesia’s Competition Commission (KPPU) found that by specifying the use of DSRC with 5.8Ghz frequency reduces competition significantly, allowing only certain vendors to compete in the tender.
Whit this, the previous regulation was revised by a new Governor Regulation No.25/2017, allowing the use of any technology as long as:• It has been implemented successfully in other countries with good
results, • Obtained a certification from the Ministry of Communication and
Information and • Can be used for other purposes (e.g. parking, toll payment)
![Page 29: (to be implemented in 2019) · 2019-03-21 · • Jakarta used to implement a 3 -in- 1Policy (HOV Lane) for 13 years, started in 2003.Limitation of this methods: - Violations are](https://reader034.vdocuments.site/reader034/viewer/2022042022/5e79a44f3b3ca708b879eca2/html5/thumbnails/29.jpg)
The cost to build this system will be between IDR 4-5 trillion (USD 300-400 million).
ERP tender still on progress, it is coming to a short list of 3 companies.
![Page 30: (to be implemented in 2019) · 2019-03-21 · • Jakarta used to implement a 3 -in- 1Policy (HOV Lane) for 13 years, started in 2003.Limitation of this methods: - Violations are](https://reader034.vdocuments.site/reader034/viewer/2022042022/5e79a44f3b3ca708b879eca2/html5/thumbnails/30.jpg)