title: 20,000l tank and classroom refurbishments project ... · great hope primary school sits...
TRANSCRIPT
![Page 1: TITLE: 20,000L Tank and Classroom Refurbishments PROJECT ... · Great Hope Primary School sits right on top of a very steep hill so the pupils’ spend much of the day collecting](https://reader034.vdocuments.site/reader034/viewer/2022050215/5f616586450018670957c8e1/html5/thumbnails/1.jpg)
TITLE: 20,000L Tank and Classroom Refurbishments
END DATE: February 2015
Project Number: 084
PROJECT: Great Hope
LOCATION: Buikwe District
PROJECT OVERVIEW
TOTAL COST: $3,379
FUNDING: JET
JOB TYPE: External
FEEDBACK / COMMENTS
Great Hope Primary School sits right on top of
a very steep hill so the pupils’ spend much of
the day collecting water from the borehole.
The decision by JET to install a 20,000L water
tank located right outside their classrooms will
enable the children to spend much more time
everyday in class. The provision of blackboards
will also contribute to a better learning experi-
ence.
“Having blackboards makes teaching so
much easier. The children are very excited,
it is the first time they see a water tank and
a tap!” Headmaster