title: 20,000l tank and classroom refurbishments project ... · great hope primary school sits...

1
TITLE: 20,000L Tank and Classroom Refurbishments END DATE: February 2015 Project Number: 084 PROJECT: Great Hope LOCATION: Buikwe District PROJECT OVERVIEW TOTAL COST: $3,379 FUNDING: JET JOB TYPE: External FEEDBACK / COMMENTS Great Hope Primary School sits right on top of a very steep hill so the pupils’ spend much of the day collecting water from the borehole. The decision by JET to install a 20,000L water tank located right outside their classrooms will enable the children to spend much more time everyday in class. The provision of blackboards will also contribute to a better learning experi- ence. “Having blackboards makes teaching so much easier. The children are very excited, it is the first time they see a water tank and a tap!” Headmaster

Upload: others

Post on 21-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TITLE: 20,000L Tank and Classroom Refurbishments PROJECT ... · Great Hope Primary School sits right on top of a very steep hill so the pupils’ spend much of the day collecting

TITLE: 20,000L Tank and Classroom Refurbishments

END DATE: February 2015

Project Number: 084

PROJECT: Great Hope

LOCATION: Buikwe District

PROJECT OVERVIEW

TOTAL COST: $3,379

FUNDING: JET

JOB TYPE: External

FEEDBACK / COMMENTS

Great Hope Primary School sits right on top of

a very steep hill so the pupils’ spend much of

the day collecting water from the borehole.

The decision by JET to install a 20,000L water

tank located right outside their classrooms will

enable the children to spend much more time

everyday in class. The provision of blackboards

will also contribute to a better learning experi-

ence.

“Having blackboards makes teaching so

much easier. The children are very excited,

it is the first time they see a water tank and

a tap!” Headmaster