title 02-155a-a001 technical specification for · pdf fileduring performance guarantee /...
TRANSCRIPT
TITLE
ST
BHEL –
E: TECHNCOND
EAM TURBINE2X50
– PS- PEM-PPE
NICAL SPECDENSATE POE GENERATOR00 MW NEW N
EI: NOIDA, SEC
IFICATION FOOLISHING UNR AND AUXILIANEYVELI TPP
CTOR 16A, UP-
OR NIT ARIES (NTA 2)P
SPE
VOL
SEC
REV
-201301
EC NO: PE-TS-4
LUME: II-B
CTION: C1
V NO: 00
402-155A-A001
DATE:
Page 116 of 495
TITLE
ST
BHEL –
E: TECHNCOND
EAM TURBINE2X50
– PS- PEM-PPE
NICAL SPECDENSATE POE GENERATOR00 MW NEW N
EI: NOIDA, SEC
IFICATION FOOLISHING UNR AND AUXILIANEYVELI TPP
CTOR 16A, UP-
OR NIT ARIES (NTA 2)P
SPE
VOL
SEC
REV
-201301
EC NO: PE-TS-4
LUME: II-B
CTION: C1
V NO: 00
402-155A-A001
DATE:
Page 117 of 495
TITLE
ST
BHEL –
E: TECHNCOND
EAM TURBINE2X50
– PS- PEM-PPE
NICAL SPECDENSATE POE GENERATOR00 MW NEW N
EI: NOIDA, SEC
IFICATION FOOLISHING UNR AND AUXILIANEYVELI TPP
CTOR 16A, UP-
OR NIT ARIES (NTA 2)P
SPE
VOL
SEC
REV
-201301
EC NO: PE-TS-4
LUME: II-B
CTION: C1
V NO: 00
402-155A-A001
DATE:
Page 118 of 495
TITLE
ST
BHEL –
E: TECHNCOND
EAM TURBINE2X50
– PS- PEM-PPE
NICAL SPECDENSATE POE GENERATOR00 MW NEW N
EI: NOIDA, SEC
IFICATION FOOLISHING UNR AND AUXILIANEYVELI TPP
CTOR 16A, UP-
OR NIT ARIES (NTA 2)P
SPE
VOL
SEC
REV
-201301
EC NO: PE-TS-4
LUME: II-B
CTION: C1
V NO: 00
402-155A-A001
DATE:
Page 119 of 495
TITLE
ST
BHEL –
E: TECHNCOND
EAM TURBINE2X50
– PS- PEM-PPE
NICAL SPECDENSATE POE GENERATOR00 MW NEW N
EI: NOIDA, SEC
IFICATION FOOLISHING UNR AND AUXILIANEYVELI TPP
CTOR 16A, UP-
OR NIT ARIES (NTA 2)P
SPE
VOL
SEC
REV
-201301
EC NO: PE-TS-4
LUME: II-B
CTION: C1
V NO: 00
402-155A-A001
DATE:
Page 120 of 495
TITLE
ST
BHEL –
E: TECHNCOND
EAM TURBINE2X50
– PS- PEM-PPE
NICAL SPECDENSATE POE GENERATOR00 MW NEW N
EI: NOIDA, SEC
IFICATION FOOLISHING UNR AND AUXILIANEYVELI TPP
CTOR 16A, UP-
OR NIT ARIES (NTA 2)P
SPE
VOL
SEC
REV
-201301
EC NO: PE-TS-4
LUME: II-B
CTION: C1
V NO: 00
402-155A-A001
DATE:
Page 121 of 495
TITLE
ST
BHEL –
E: TECHNCOND
EAM TURBINE2X50
– PS- PEM-PPE
NICAL SPECDENSATE POE GENERATOR00 MW NEW N
EI: NOIDA, SEC
IFICATION FOOLISHING UNR AND AUXILIANEYVELI TPP
CTOR 16A, UP-
OR NIT ARIES (NTA 2)P
SPE
VOL
SEC
REV
-201301
EC NO: PE-TS-4
LUME: II-B
CTION: C1
V NO: 00
402-155A-A001
DATE:
Page 122 of 495
TITLE
ST
BHEL –
E: TECHNCOND
EAM TURBINE2X50
– PS- PEM-PPE
NICAL SPECDENSATE POE GENERATOR00 MW NEW N
EI: NOIDA, SEC
IFICATION FOOLISHING UNR AND AUXILIANEYVELI TPP
CTOR 16A, UP-
OR NIT ARIES (NTA 2)P
SPE
VOL
SEC
REV
-201301
EC NO: PE-TS-4
LUME: II-B
CTION: C1
V NO: 00
402-155A-A001
DATE:
Page 123 of 495
TITLE
ST
BHEL –
E: TECHNCOND
EAM TURBINE2X50
– PS- PEM-PPE
NICAL SPECDENSATE POE GENERATOR00 MW NEW N
EI: NOIDA, SEC
IFICATION FOOLISHING UNR AND AUXILIANEYVELI TPP
CTOR 16A, UP-
OR NIT ARIES (NTA 2)P
SPE
VOL
SEC
REV
-201301
EC NO: PE-TS-4
LUME: II-B
CTION: C1
V NO: 00
402-155A-A001
DATE:
Page 124 of 495
TITLE
ST
BHEL –
E: TECHNCOND
EAM TURBINE2X50
LIST
– PS- PEM-PPE
NICAL SPECDENSATE POE GENERATOR00 MW NEW N
T OF MA
EI: NOIDA, SEC
IFICATION FOOLISHING UNR AND AUXILIANEYVELI TPP
ANDATO
CTOR 16A, UP-
OR NIT ARIES (NTA 2)P
RY SPAR
SPE
VOL
SEC
REV
-201301
RES
EC NO: PE-TS-4
LUME: II-B
CTION: C1
V NO: 00
AN
402-155A-A001
DATE:
NEXURE
E -V
Page 125 of 495
TITLE
ST
BHEL –
E: TECHNCOND
EAM TURBINE2X50
– PS- PEM-PPE
NICAL SPECDENSATE POE GENERATOR00 MW NEW N
EI: NOIDA, SEC
IFICATION FOOLISHING UNR AND AUXILIANEYVELI TPP
CTOR 16A, UP-
OR NIT ARIES (NTA 2)P
SPE
VOL
SEC
REV
-201301
EC NO: PE-TS-4
LUME: II-B
CTION: C1
V NO: 00
402-155A-A001
DATE:
Page 126 of 495
SCHEDULE - 9
PERFORMANCE GUARANTEE
)
DBa
THIS IS A PART OF TECHNICAL SPECIFICATION NO.PE-TS-402-155A-A001
Page 127 of 495
• 'I LAHMEYER ... INTERNATIONAL
2x500 MW. NNTPS. Neyveli CONTRACT-I SUPPLIES
INDIA STEAM TURBINE GENERATOR PACKAGE - NTA2
SCHEDULE-9
9 PERFORMANCE GUARANTEES
9.1 General
9.2
1. The contractor shall guarantee that the equipment supplied shall meet the ratings and performance requirements stipulated for various equipment covered in the Contract specifications.
2. The contractor shall demonstrate and establish performance guarantee for various equipment and achieve performance guarantee values as per Contract Specification, at site in the presence of the Purchaser/Consultant for each unit individually.
3. Details of performance guarantee tests and method of computation of performance values shall be as per Contract Specification.
4. The Contractor shall' supervise and direct the operation during performance tests and shall take complete responsibility in this regard.
5. During performance tests, the Purchaser shall make available necessary normal operating & maintenance personnel.
6. The Contractor shall.provide and install all measuring instruments required for checking the guaranteed performance which are not included among the permanent measuring instruments of the system/sub-system. Such instruments shall be furnished by the Contractor on a temporary basis for the duration of the performance guarantee tests.
Performance Guarantee Values. Performance:/Acceptance Tests and performance I Non-Performance
Categories, Demonstration Liquidated Damages for Shortfall
of in
1. Performance and ratings of the various offered equipment, as covered in this specification. shall be guaranteed by the Contractor.
2. The guaranteed performance parameters furnished by the contractor in its offer. shall be without any tolerance values and all margins required for instrument inaccuracies and other uncertainties (permitted as per agreed test codes) and other uncertainties shall be deemed to have been included in the guaranteed figures.
3. The Contractor. during performance guarantee / acceptance test. shall demonstrate all the guarantees as covered in this Schedule. Contract price includes all costs associated with the tests.
4. Ambient conditions for guaranteed efficiency of steam turbine generator shall be as follows:
27°C
TG Vol·l, Co Page 72
D84
THIS IS A PART OF TECHNICAL SPECIFICATION NO.PE-TS-402-155A-A001
Page 128 of 495
)
.. 'I LAHMEYER .... INTERNATIONAL
2x500 MW, NNTPS, Neyveli CONTRACT-I SUPPLIES
9.3
T
INDIA STEAM TURBINE GENERATOR PACKAGE - NTA2
(b) Relative Humidity 71%
Note! No credit shall be given to the Contractor, in the evaluation of the results of the guarantee tests for performance predictions / guarantee etc. if the values achieved by the contractor for parameters indicated above are lower {or better) than those specified above,
5. The performance guarantee tests shall be conducted by the Contractor for each unit individually and liquidated damages for non-performance as indicated under thi.s schedule will be levied separately for each unit.
Performance Guarantee I Acceptance Test
l. The final test (performance guarantee! acceptance test) shall be conducted at site by the Contractor in presence of the Purchaser! Consultant. Such test will be completed, within a period of 3 (three) months after the successful completion of Trial Operation. Any extension of time beyond the above three months shall be mutually agreed upon. Purchaser will make all effort to release the machine for conducting the PG test provided the machine is ready for conducting PG test. The guarantee period! warranty period shall start Unit wise.
2. Instrumentation used, their accuracy class, their numbers & location etc. for carrying out performance guarantee I acceptance I demonstration tests shall be as per relevant codes and shall be subject to Purchaser's approval. In addition the values of parameters shall also be logged from the information system provided under Purchaser's DDCMIS (under Purchaser's scope) Tests will be conducted at specified load points.
3. Any special equipment, tools and tackles required for the successful completion of the performance guarantee I acceptance I demonstration tests shall be provided by the Contractor at his cost.
4. Guarantees Category wise
If equipment! system fail to meet the guarantees, all necessary modifications and! or replacements shall be carried out by the Contractor without any extra cost to the Purchaser so that the equipment ! system comply with the guaranteed requirements. However, if even after above modifications I replacements, the contractor is not able to demonstrate the guarantees within 90 days or within a reasonable period allowed by the Purchaser (reckoned from the date on which the tests have been completed) the Purchaser will have the right to the following:
(a) To reject the equipment I system ! plant and recover the payment already made
OR
to accept the equipment ! system ! plant after levying liquidated Damages (LD) as specified in this Schedule (These are termed as "Category - I" Guarantees)
-I, NTA2 085 Page 73
THIS IS A PART OF TECHNICAL SPECIFICATION NO.PE-TS-402-155A-A001
Page 129 of 495
)
• '1 LAHMEYER .... INTERNATIONAL
2x500 MW. NNTPS. Neyveli CONTRACT-I SUPPLIES
9.4
9.4.1
INDIA STEAM TURBINE GENERATOR PACKAGE - NTA2
(b) To reject the equipment / system / plant and recover the payment already made. (These are termed as "Category - II" Guarantees and conformance to the performance requirement is mandatory. Category -II Guarantees do not attract LD)
In addition to the above the Contractor shall demonstrate performance parameters indicated in CI.9.4.3, under Demonstration Guarantees, during the PG Tests
Schedule of Guarantees
Category-I. Guarantees: Liquidated Damages
S.No Description Parameter for Performance
Liquidated Damages Guarantee
1. Turbine Cycle For increase in every keal! kWh or Rs.2.27.10.000/- Iindian Heat rate in part there of in the guaranteed Rupees Two Crores Twenty kcal I kWh value. Seven Lakhs Ten Thousand
only)
2. Continuous For deficiency in every kW or part Rs 1.17.000/- (Indian TG output of there of by which the output, Rupees One Lakh Seventeen I
500 MW determined by the test, falls short Thousand only) of the guarantee figure.
3. Total Auxiliary For every kW increase or part Rs. 1.99.0001- (Indian Power thereof from the Guaranteed value Rupees One Lakll Ninety
Consumption including
Nine Thousand only)
MDBFP
4. Total Auxiliary For every kW increase or part Rs. 1.99.000/- (Indian Power thereof from the Guaranteed value Rupees One Lakh Ninety
Consumption Nine Thousand only) excluding MDBFP
9.4.2 Category-I. Guarantees: Performance Guarantees Attracting Liquidated Damages
Value inclusive of design, .
manufacture and all other S.No Particulars Unit
Tolerances including . . measurement uncertainty
Ii) Gross Heat Rate: Turbine Cycle Gross Heat rate in kcall Turbine Cycle Heat Rate ~
kcal I kWh under rated steam conditions at 81 mm kWh 1929.3 kcal/kWHr Hg (abs) design back pressure with zero make up at Refer HBD: PE-DC-J14-100-500 MW unit load, design CW temperature and CW flow
N151.REV.03
Iii) TG Output: Continuous TG output of 500 MW MW 500MW under rated steam condition at 81mm Hg labs) design back pressure with 3 % makewup (including 0.5% blow down and 2_5% non recoverable auxiliary steam) and design CW temperature and CWflow.
OS6 Page 74
THIS IS A PART OF TECHNICAL SPECIFICATION NO.PE-TS-402-155A-A001
Page 130 of 495
• LAHMEYER --'I INTERNATIONAL INDIA
2x500 MW, NNTPS, Neyveli CONTRACT-I SUPPLIES
STEAM TURBINE GENERATOR PACKAGE - NTA2
S.No
(iii)
Particulars Unit
..
Total Auxiliary Power Consumption including MDBFP: This shall include all the following working kW electrical drives of TG & auxiliaries running at continuous output of 500 MW, 3% make-up and 81 mmHg (a) back pressure (within the contractors scope), design CW temperature and CW flow
• Condensate Extraction Pumps {CEP}
• Motor Driven Boiler Feed Pump (MDBFP)
• •
Condenser Air Evacuation pump
Control oil Pump (NA)
• DMCW Pumps
• ACW pumps
• LP Drain Condensate Pump (If provided)- NA
(iv) Total Auxiliary Power Consumption excluding kW 'MDBFP: This will include all the following working electrical drives of TG & auxiliaries except motor driven BFP running at continuous output of 500 MW, 3% make·up and 81 mmHg (a) back pressure (within the contractors scope) design CW temperature and CW flow.
1.· Condensate Extraction Pumps
2. Condenser Air Evacuation pump
3. Control oil Pump (NA)
4. OM CW
5. ACW pumps
6. LP .Drain Condensate Pump (If provided- NA
Value inclusive of design, manufacture and all other
Tolerances including measurement uncertainty
8618*kW
1989*kW
il-Guaranteed auxiliary power consumption IS only for the auxiliaries listed above.
9.4.3 Category-II. Guarantees (conformance to Guarantees is mandatory)
Value Inclusive of design, S;
Particulars Unit manufacture and all other
No. toler'ances including .' . , .. measurement uncertainity
a) Final feed water temperature °C 255.2°C
b) Total cooling water requirement in M3/Hr 55,750 the condenser at a cooling water temperature of 34°C
c) Dissolved oxygen at Condenser cc/litre 0.Q15 & 0.005 respectively outlet and Deaerator outlet.
d) Generator and excitation system - Refer Generator Data Sheet parameters
TG NTA2 Page 75
DS7
I
I I I I
I I
I
THIS IS A PART OF TECHNICAL SPECIFICATION NO.PE-TS-402-155A-A001
Page 131 of 495
• 'I LAHMEYER ,.. INTERNATIONAL
2x500 MW, NNTPS, Neyveli CONTRACT-I SUPPLIES
INDIA STEAM TURBINE GENERATOR PACKAGE - NTA2
Value Inclusive of design, S. Pa'rticulars Unit
manufacture and all other No tolerances including
measurement uncertainity
e) Excitation system respons~ ratio . >2 and 170% and field forcing capability
fl Temperature rise in the Generator °C As per IEC-34 and excitation system
gl Hydrogen leakage m3 /day 12
h) Maximum continuous generator kW 500,000 capability under all normal operating condition (e.g. frequency varying between 50 Hz M5% to + 3%).
il The max. permissible noise level dBA 85 shall not exceed 85 dB (AI at a distance as specified in the specification.
iI Each CEP shall be guaranteed for As Yes
capacity, head, efficiency, NPSH applicable and power input to motor at best efficiency point at shop. The best efficiency point shall correspond to 100 % TGMCR conditions.
kl Each BFP shall be guaranteed for As Yes
capacity, head, efficiency, NPSH applicable and power input to motor at best efficiency point at shop. The best efficiency point shall correspond to 100 % TGMCR conditions.
I) Air-conditioning System: Inside Temp: 23 ± 1°C and RH
conditions of air conditioned 55 ± 5%
premises
ml Ventilation System: Temperature Temp: Not more than
Saturation efficency ambient temp for evaporative cooled areas-
Pressurization Not less than 90% 2 to 3mm WC
nl TG Hall EOT Crane: Full load and Tonnes IT) Full load 1 05/25T on
25% over load on hoisting and long hoisting and long and cross
and cross traverse motion traverse motion and 131.25/31.25T on hoisting motion
0) Condensate Polishing Unit: Design . As required As per Specification
flow rate through the polisher Requirements
units, Ionic Concentrations of Effluent, Dissolved solid and Suspended solids.
Page 76
088
THIS IS A PART OF TECHNICAL SPECIFICATION NO.PE-TS-402-155A-A001
Page 132 of 495
• 'I LAHMEYER .... INTERNATIONAL
2x500 MW, NNTPS, Neyveli CONTRACT-I SUPPLIES
INDIA STEAM TURBINE GENERATOR PACKAGE - NTA2
Value Inclusive of design, S.
Particulars Unit manufacture and all other
No tolerances including measurement uncertainity
p) DG sets:
• MeR Generation kVA 1500 kVA
• Fuel consumption m3/h 202 Gms/kwlm)-hr with Tolerance as per ISO 3146/ BS 5514
q) Elevators: Speed and load test Speed shall be 1 m/s for TG hall elevator and service building elevator. Over Load I test shall be at 110% of the I
. elevator load capacity
9.4.4 Demonstration Guarantees
S. Value Inclusive of design, manufacture and
No Particulars Unit all other tolerances including
. measurement uncertainty
a) Gross Heat rate at VWO, keal/kWh Turbine Cycle Heat Rate in kcal/kWHr I 100% MCR, 80% MCR and 60% MeR conditions
VWO 100% 80% 60% I for 0%: make~up and 0% 1920.0 1929.3 1974.5 2055.0 c--auxiliary steam For -- For Information
Information
Refer HBDs PE-DC-J 14-1 OO-N 151, N152, N153 & N167 (Rev.03)
b) Gross Heat rate at VWO, keal/kWh Not Guaranteed 100% MCR, 80% MCR and 60% MeR conditions for 3% make-up and 0% auxiliary steam (reading obtained from 0% make-up ean be used with correction curve for 3 % make-up).
e) HP Turbine exhausts mm of Hg As per HBDs pressure & temperature. /oG
d) . Pressure. drop between kg/em'la) Total pressure drop only across HP first HP Heater inlet and Heaters IHPH 5A + HPH 6A) : 2.5 top HP Heater outlet kg/sq.cm (At GUarantee condition) flanges
e) Combined pressure drop kg/em'la) Pressure drop across condenser flanges = in condenser tube, water 3.8MWC box, and inlet and outlet Pressure drop across Terminal point for piping. This shall be CW System shall be 7 MWC measured in between intake and discharge point of the CWo system and
TG Vol·1 (~ "'~ <?~
~m t "(..L "J ~ \ ~() nt'f ,(,I, ;j~2 Page 77 ~- ~g,- ,p. 089 ~ -:.:J '* -k ~~:P'-l"'? ~
THIS IS A PART OF TECHNICAL SPECIFICATION NO.PE-TS-402-155A-A001
Page 133 of 495
• 'I LAHMEYER ... INTERNATIONAL
2x500 MW, NNTPS, Neyveli CONTRACT-I SUPPLIES
INDIA STEAM TURBINE GENERATOR PACKAGE - NTA2
S. Value Inclusive of design, manufacture and
No Particulars Unit all other tolerances including
measurement uncertainty
also at the Contractor's terminal points with cleanliness factor of 0.90.
9.5 Liquidated Damages for Non Performance
1. Should the results of the PG test show that the Steam Turbine Generator has failed to meet its guarantee, the Contractor shall carry out the modification at its own cost, if considered, necessary, to meet the guaranteed values. In such a case the performance and guarantee tests shall be repeated by the Contractor within one (1) month from the date the equipment is ready for retest. If the specified guarantees are not established within 90 days of notification by the Purchaser, the Purchaser may at his discretion reject the equipment and recover the payments already made or accept the equipment after assessing the liquidated damages payable at the rates specified in CI 9.4.1 of this Schedule for each steam turbine generator. The recovery of such amount shall be from the amounts due to the Contractor. These liquidated damages shall be prorated for fractional parts of the deficiencies.
2. Specific performance guarantees which attract liquidated damages are detailed in CI.9.4.1 of this schedule.
3. Other performance parameters as detailed in Clause 9.4.3 and 9.4.4 of this schedule, which do not attract liquidated damages, shall be termed as demonstration parameters. Demonstration parameters I capabilities shall be demonstrated during the trial operation period/guarantee tests of the respective system/equipment as per the detailed test procedure to be approved by the Purchaser/Consultant.
*****
f9a Page 78
THIS IS A PART OF TECHNICAL SPECIFICATION NO.PE-TS-402-155A-A001
Page 134 of 495
TITLE:
STEA
BHEL
TECHNICONDE
AM TURBINE G2X500
L – PS- PEM-PP
ICAL SPECIFENSATE POLGENERATOR A0 MW NEW NE
DAT
PEI: NOIDA, SE
FICATION FORLISHING UNITAND AUXILIAREYVELI TPP
ASHEET
ECTOR 16A, UP
R T IES (NTA 2)
T-A
SPE
VOL
SEC
REV
P-201301
EC NO: PE-TS-4
LUME: II-B
CTION: C1
V NO: 00
402-155A-A001
DATE:
1
Page 135 of 495
1.0(i) (ii) (iii)
2.0(i) (ii)
(iii)
(iv)
(v)
(vi)
(vii(vii(ix)
(x)
2.1(i) (ii) (iii)(iv)(v) (vi)(vii
3.03.1a. (i) (ii) (iii)
(iv)
(v)
(vi)b. (i) (ii) (iii)
0 DESCRIP No. of un Capacity
) Total flowunits
0 CONDEN No. of co Capacity
vessel ) Flow thro
vessel pe) Operating
polisher s Design p
service v) Design co
service vi) Design Tii) Type of v) Material o
Shell Head Inside pro
1 AIR-BLO
Number p Type
) Duty ) Capacity
Pressure) Capacity i) Material o
0 EXTERN1 REGENE
RESIN S Number Design T
) Design P
) Material o
Shell
Head ) Inside pro
) Design co
CATION Number Design T
) Design P
TITLE:
STEA
PTION OF TGnits
of each unit w in all the se
NSATE POLIondensate pol
of each cond
ough each coer unit g pressure ofservice vesseressure of eaessel ode of each cessel
Temp. vessels of constructio
otection
OWERS FOR per unit
and head e gauge
and head/Noof constructio
AL REGENEERATION VEEPARATION
emperature Pressure
of constructio
otection
ode RESIN REG
emperature Pressure
BHEL
TECHNICONDE
AM TURBINE G2X500
G UNIT FOR
rvice vessels
SHER SERVlisher servicedensate polis
ndensate pol
f each condenel ach condensa
condensate p
on
RESIN MIXI
oise Level on
ERATION FASSELS
N AND CATIO
on
ENERATION
L – PS- PEM-PP
ICAL SPECIFENSATE POLGENERATOR A0 MW NEW NE
WHICH CON
s of each
VICE VESSELe vessel her service
isher service
nsate
ate polisher
polisher
NG (SERVIC
ACILITIES
ON RESIN RE
N VESSEL
PEI: NOIDA, SE
FICATION FORLISHING UNITAND AUXILIAREYVELI TPP
NDENSATE PTwo (2) 500 MW 1209.580
LS PER UNIT Three (2X50% of tot
604.79 To
21.19 kg/c
38 kg/cm
ASME sec
65 0 C Cylindrica
Carbon sCarbon sInside line
CE VESSELSTwo (2x10Rotary, TwIntermittenAs requireOne per bAs requireCasing – CLobe – CaShaft – Ca
EGENERATIOOne (1) no500C Design pwhich theMaximumline of puplus static
Carbon stGr. 70 Carbon stInside line
ASME sec
One (1) no500C Design pwhich theMaximumline of puplus static
ECTOR 16A, UP
R T IES (NTA 2)
POLISHING
t/hr (VWO, 3
T : X50%) tal condensat
ones per hour
cm 2 (a)
2 (g)
c VIII div 1
al or spherical
teel plates toteel plates to
ed with Natura
AREA) PER00%) with acowin Lobe, oil nt ed blower ed/80 dB (A) Cast Iron GRast Iron GR Farbon Steel to
ON VESSELo. vessel com
ressure shale vessel ma expected prmps shall be
c head at pum
teel plates to
teel plates to ed with Natura
c VIII div 1/ IS
o. vessel com
ressure shale vessel ma expected prmps shall be
c head at pum
SPE
VOL
SEC
REV
P-201301
IS TO BE PR
3% Make Up c
te flow per un
r
l
o SA 516 Gr.o SA 516 Gr.al Rubber [4.
R UNIToustic enclosfree, positive
Max. at one mR FG 260 to ISFG 260 to IS 2o EN 8
mmon for 2 x
ll be the maay be subjeressure for vee based on thmp suction.( M
IS 2062 / Ca
IS 2002 Gr. 2al Rubber [4.
S 2825
mmon for 2 x
ll be the maay be subjeressure for vee based on thmp suction. .(
EC NO: PE-TS-4
LUME: II-B
CTION: C1
V NO: 00
ROVIDED :
condition)
nit
. 70
. 70 5 mm thick in
ure. displacemen
meter S 210 210
500 MW Unit
aximum expeected plus 5essels placedhe shut-off h
Min.8 kg/cm2(
rbon steel pl
2A / SA 516 G5 mm thick in
500 MW Unit
aximum expeected plus 5essels placedhe shut-off hMin.8 kg/cm2
402-155A-A001
DATE:
n (3) layers]
nt
ts
ected pressu5% extra md in the disc
head of the p(g).)
lates to SA 5
Gr. 70 n (3) layers]
ts
ected pressu5% extra md in the disc
head of the p2(g).)
1
ure to argin. harge
pumps
516
ure to argin. harge
pumps
Page 136 of 495
(iv)
(v)
(vi)c. (i) (ii) (iii)
(iv)
(v)
(vi)3.2(i) (ii) (iii)(iv)(v)(vi)(vii
(vii(ix)(x)
(xi)(xii3.3a) (i) (ii) (iii)(iv)
(v)(vi)(vii(vii(ix)1) 2) (ix)
b)
(i) (ii) (iii)(iv)
) Material o Shell
Head ) Inside pro
) Design co
MIXED R Number Design T
) Design P
) Material o Shell
Head ) Inside pro
) Design co2 ACID AN
PUMPS Number r
) Type ) Location ) Capacity ) Liquid to i) Material o
of wettedii) Casing, I) Shaft ) Accessor
each pum) Pressure i) Type of s3 CHEMICA
ALKALI Nos. requ Type
) Service ) Concentr
media. ) Capacity ) Suction ci) Pressure ii) Type of s) Materials Casing,
Shaft ) Accessor
each pum CHEMICA
Number r Type
) Useful ca) Materials
TITLE:
STEA
of constructio
otection
ode RESIN STORA
emperature Pressure
of constructio
otection
ode ND ALKALI T
required
and head be handled of constructio parts of pummpeller
ries required fmp Dampener
shaft sealing AL HANDLINTRANSFER
uired
ration of work
& head condition Dampener
shaft sealing s of constructi
impeller
ries required fmp AL TANKS
required
apacity s of constructi
BHEL
TECHNICONDE
AM TURBINE G2X500
on
AGE VESSE
on
TRANSFER PACID TTwo (2---------------------------30 -33
on mps
PolyprHarde
for Couplietc. ---------Mecha
NG, PREPAR PUMPS (FO
Two (2HorizoInterm
king 5-48%
10 M3/FloodeOne peMecha
on StainleStainle
for Couplietc. ALKALTANK One (1---------Capac
on ShDi(IS
L – PS- PEM-PP
ICAL SPECIFENSATE POLGENERATOR A0 MW NEW NE
L
PUMPS TRANSFER 2x100%) ---------------Ho------------------------------------
3 % HCL
ropylene ned carbon sing guard, dra
------------------anical Seal RATION & DOOR ALAKLI P2x100%) ontal, centrifugittent Sodium Hyd
/hr, 10 MWCed er pump anical Seal
ess Steel – 31ess Steel -410ng guard, dra
LI PRARATIO
1) ------------------
city = 125% rehell-MS as pesh end – MS
S 2062 Gr A/B
PEI: NOIDA, SE
FICATION FORLISHING UNITAND AUXILIAREYVELI TPP
Carbon stGr. 70 Carbon stInside line
ASME sec One (1) no500C Design pwhich theMaximumline of puplus static Carbon stGr. 70 Carbon stInside line
ASME sec
PUMPS AT
orizontal Cen-----------Outd-----10 cum /
4
Ssteel EN8 Sain plug, vent
---------One p
OSING SYSTPREPARATIO
gal
droxide (NaOH
16 0 ain plug, vent
ON ALTA
-----Vertical Cequirement foer IS 2062 Gr
as per IS 200B with rubber
ECTOR 16A, UP
R T IES (NTA 2)
teel plates to
teel plates to ed with Natura
c VIII div 1/ IS
o. vessel com
ressure shale vessel ma expected prmps shall be
c head at pum
teel plates to
teel plates to ed with Natura
c VIII div 1 / I
ALKALI TRATwo (2x100%ntrifugal--------door-------------hr and head –48% NaOH
Stainless SteStainless Stet valve, suctio
er pump------
TEMON)
H)
t valve, suctio
KALI MEASUANK
Cylindrical Atmor single rege
B. 02 Gr 2A
r lining inside
SPE
VOL
SEC
REV
P-201301
IS 2062 / Ca
IS 2002 Gr. 2al Rubber [4.
S 2825
mmon for 2 x
ll be the maay be subjeressure for vee based on thmp suction. .(
IS 2062 / Ca
IS 2002 Gr. 2al Rubber [4.
S 2825
ANSFER PUM%) ------------------------------------–as per syste
eel (SS) – 316eel -410 on hoses, isol
-----------------
on hoses, isol
URING
mospheric disneration
[4.5 mm thick
EC NO: PE-TS-4
LUME: II-B
CTION: C1
V NO: 00
rbon steel pl
2A / SA 516 G5 mm thick in
500 MW Unit
aximum expeected plus 5essels placedhe shut-off hMin.8 kg/cm2
rbon steel pl
2A / SA 516 G5 mm thick in
MPS
-------- ------ em req.--------
6
lation valves,
----------
ation valves,
ACID MEASTANK
shed end------
k in (3) layers
402-155A-A001
DATE:
lates to SA 5
Gr. 70 n (3) layers]
ts
ected pressu5% extra md in the disc
head of the p2(g))
lates to SA 5
Gr. 70 n (3) layers]
------------------
y- type strain
y- type strain
URING/DAY
------------------
s
1
516
ure to argin. harge
pumps
516
--
ners
ners
--------
Page 137 of 495
(v)
(vi)
(vii
(vii
c) (i) (ii)
(iii)
(iv)(v)(vi)
(vii
(vii(ix)
(x)(xi)(xii(xii
(xiv(xv(xv
(xv
3.4(i) (ii) (iii)
(iv)(v)(vi)(vii (vii(ix)(x)
(xi)(xii(xii(xiv
) Vent, Oveconnectio
) Stirrer
i) Dissolvintank
ii) Accessor
DOSING Number Type
) Whether required
) Accessor) Pressure ) External s
valve (in inbuilt saf
i) Maximumspeed pe
ii) MATERIA) Liquid En
Valves, Vvalve spr
) Diaphrag) Packing i) Shaft ii) Worm & w
applicablev) Connectiv) Cross hevi) Capacity
vii) Accessoreach pum
4 ACTIVAT Number Type
) Design P
) Capacity ) Velocity ) Bed depti) Material o
Shell Head
ii) Inside pro) Design co) Influent D
Material ) Manhole i) Sight Winii) Hand holv) Accessor
TITLE:
STEA
erflow, drain on
g Basket per
ries
PUMPS
suction strain
ries Dampener safety relief addition to fety valve)
m pump strokeer minute AL OF CONSnd (Pump HeaValve housingring etc.). m
worm wheel(ie) ng rod ad guide & Head
ries required fmp TED CARBO
Pressure
th of constructio
otection ode
Distributor
ndows e ries
BHEL
TECHNICONDE
AM TURBINE G2X500
Slow sgear. SMateriaStainle---------ConstrBasket
Fume level tr
ACID D TwoSimpledisplac
ner ---------
One peTwo (P
e
STRUCTION ad, g,
polypro
if
Capabrequire
for Coupligauges
N FILTER FOOne (1VerticaDesignsubjecdischahead a10 m3/15m/hr1200m
on CarbonCarbonInside IS 282SS 316
Two (2One (1One (1Manho
L – PS- PEM-PP
ICAL SPECIFENSATE POLGENERATOR A0 MW NEW NE
speed stirrer dSpeed of stirral of Construc
ess Steel – 31------------ (50-ruction of eact = Stainless
absorbers, caransmitter, op
DOSING PUMo (2x100%) ex positive discement. ------- Yes ----
er pump Polypropylene
opylene
ble of meetinged (with 20% ng guard, dras, pulsation dOR ALKALI1) al cylindrical wn pressure shcted plus 5% earge line of puat pump suctio/hr r
mm activated c
n steel platesn steel plateslined with Na
25 6
2) nos minimu1) no. in back1) no. of 150 mole, vent, drai
PEI: NOIDA, SE
FICATION FORLISHING UNITAND AUXILIAREYVELI TPP
driven by motrer = 200 rpmction of each 16. -60 mesh B.Sch Dissolving Steel 316.
arbon dioxideperating platfo
MPS AL
splacement h
------------------
One) Tw
------
SS
-------- Ha........
.......
g regenerationmargin).
ain plug, ventdampener etc
with dished ehall be the maextra margin.umps shall beon. .( Min.8 k
carbon + 300
s to IS 2062 s to IS 2062 atural Rubber
um each of Dwash spacemm dia for ren, sample co
ECTOR 16A, UP
R T IES (NTA 2)
Requ
tor drive and max stirrer and ag
S.)-------------M
e absorber, morm, ladders,
LKALI DOSINTwo (2x100%ydraulically o
---
ne per pumpwo (SS:316)
------------ 100
S316
P.T.P.T.
ardened steel... Manganes
...... Mangane............. Bro
n of one catio
t valve, isolatic.
nd bottom aximum expec Maximum ex
e based on thkg/cm2(g).)
0mm Gravel s
r [4.5 mm thic
avit type and
emoval of actinnection, lev
SPE
VOL
SEC
REV
P-201301
uired
reduction
gitator =
Material of
manhole, ventlifting lugs et
NG PUMPS%) operated diap
0 ----------------
F.E F.E EN 8 (BS:97
se Bronze......
ese Bronze...onze........... on/Anion and
on valves, Y-
cted pressurexpected presse shut-off hea
support
ck in (3) layers
500 mm dia.
ivated carbonel transmitter
EC NO: PE-TS-4
LUME: II-B
CTION: C1
V NO: 00
, drain, samptc.
phragm type P
-----
70)-------- .......
......
one mixed be
- type straine
e to which thesure for vessad of the pum
s]
.
n r, operating p
402-155A-A001
DATE:
NA
NA
ple connection
Positive
ed unit; head
rs, pressure
e vessel may els placed in
mps plus static
latform, ladde
1
n,
as
be the c
ers,
S
Page 138 of 495
3.5(i) (ii)
(iii)
(iv)
(v)
(vi)(vii
(vii(ix)
3.6(i) (ii) (iii)(iv)(v)(vi)
(vii(vii(ix)
(x)3.7(i) (ii) (iii)(iv)(v)(vi)
(vii(vii(ix)
(x)3.8(i) (ii) (iii)(iv)(v)(vi)
(vii
5 ALKALI Number Type/Cap
) Temperabe heated
) Design P
) Material o Shell Head
) Burn out i) Inside pro
ii) Design co) Accessor
6 D.M. WA Number Type
) Operation) Capacity ) Suction c) Material o casing, im Shaft shaft sleei) Packing sii) Pump Sp) Accessor
each ) Pressure7 D.M. WA
Number Type
) Operation) Capacity ) Suction c) Material o casing, im Shaft shaft sleei) Packing sii) Pump Sp) Accessor
each ) Pressure8 AIR-BLO
Number Type
) Duty ) Capacity ) Pressure) Capacity
head/Noi
i) Material o
TITLE:
STEA
DILLUENT W
pacity
ture of alkali d
Pressure
of constructio
protection otection
ode ries
ATER PUMPS
n & head
condition of constructiompeller
eve material seal
peed ries required f
dampener ATER PUMPS
n & head
condition of constructiompeller
eve material seal
peed ries required f
dampener OWERS FOR
and head gauge and se Level
of constructio
BHEL
TECHNICONDE
AM TURBINE G2X500
lifting lWATER HEAT
One (1)Verticalregener
to To obta
Design subjectedischarhead at
on CarbonCarbonTo be pInside liC. ASME sManhollifting lu
S FOR RESINTwo (2xHorizonIntermitAs requFlooded
on SS 316SS 410SS 410MechanMaximu
for Commovalves, One nu
S FOR REGETwo (2xHorizonIntermitAs requFlooded
on SS 316SS 410SS 410MechanMaximu
for Commovalves, One nu
RESIN MIXITwo (2xRotary, IntermitAs requOne peAs requ
on Casing Lobe –
L – PS- PEM-PP
ICAL SPECIFENSATE POLGENERATOR A0 MW NEW NE
ugs (4 Nos mTING TANK ) l Cylindrical wration. ain temp. from
pressure shaed plus 5% ege line of pumt pump suctio
steel as per steel as per
provided by thined with Nat
sec VIII div 1 e, vent, drain
ugs (4 Nos miN TRANSFERx100%) ntal, centrifugttent uired d
nical type um 1500 rpmon base plateY-type strainmber per pum
ENERATION x100%) ntal, centrifugttent uired d
nical type um 1500 rpmon base plateY-type strainmber per pumNG (REGENx100%) with aTwin Lobe, o
ttent uired r blower
uired/80 dB (A
– Cast Iron GCast Iron GR
PEI: NOIDA, SE
FICATION FORLISHING UNITAND AUXILIAREYVELI TPP
minimum) etc.(HOT WATE
with dished en
m 25 deg C to
all be the maxxtra margin. mps shall be on. .( Min.8 kg
IS 2062 IS 2062
he bidder tural Rubber [
/ IS 2825. n, sample coninimum) etc.R
al
e, coupling guners etc. mp
al
e, coupling guners etc. mp ERATION ARacoustic encloil free, positi
A) Max. at on
GR FG 260 toR FG 260 to IS
ECTOR 16A, UP
R T IES (NTA 2)
R TANK)
nd with Electr
o 50 deg C at
ximum expecMaximum exbased on the
g/cm2(g).)
[8.0 mm thick
nnection, leve
ards, drain p
ards, drain p
REA) osure. ve displacem
e meter
o IS 210 S 210
SPE
VOL
SEC
REV
P-201301
ric heater / 12
alkali mixing
ted pressure pected press
e shut-off hea
k in (8) layers
el transmitter,
lug, vent valv
lug, vent valv
ment
EC NO: PE-TS-4
LUME: II-B
CTION: C1
V NO: 00
20% of water
feed out let w
to which the ure for vessed of the pump
] Suitable for
operating pla
ve, suction ho
ve, suction ho
402-155A-A001
DATE:
required for
within 5 hours
vessel may bels placed in tps plus static
temperature
atform, ladde
oses, isolation
oses, isolation
1
s.
be the c
70 0
rs,
n
n
Page 139 of 495
4.04.1(i) (ii) (iii)(iv)
(v)
4.2(i) (ii) (iii)(iv)
(v)5.0(i)
(ii)
(iii)
(iv)
(v)
(vi)
(vii
(vii(ix)6.0(i)
(ii)
(iii)
(iv)
7.0
0 EFFLUEN1 EFFLUEN
Number Material o
) No. of co) Capacity
compartm)
Gates
2 EFFLUEN Number Type
) Capacity ) Material o
of wettedpumps
) Pressure0 PIPING
Resin Tra
DM wate
) Acid pipin(All conce
) Alkali pip(All conce
Condensoutlet pipCPU draibypass, RRecircula
) Rinse wa& Pit.
i) Instrumenair line
ii) Piping for) Effluent d0 VALVES
Butterfly vof condenvessel
Butterfly vof condenvessel
) Ball valve
) Diaphrag
0 Safety Eq
TITLE:
STEA
NT DISPOSANT WASTE C
of Constructioompartments
of each ment
NT WASTE
& head of constructio
d parts of
dampener
ansfer piping
r line
ng entration) ing entration) ate inlet and
ping to CPU, in, CPU Rinse ation piping ater to hot we
nt air /service
r air blower disposal pipin valves at inlensate polishe
valves at outlnsate polishe
es
gm valve
quipments
BHEL
TECHNICONDE
AM TURBINE G2X500
Shaft – AL SYSTEM COLLECTION
One (1)on RCC .In
Two coAdequaConden
Two No
DISPOSAL PTwo noVerticalTo evac
on PP
One nu ASTM AMinimuVelocityASTM A CPVC
CPVC
CS as p
ll CS as p
e Hot dip
Hot dip ng HDPE
et er
Body- ADisc-CFEnd con
let er
Body- CDisc-CFEnd conBody- CBall-CFBody,BCompreTwo (2)boots, fwater dby the b
L – PS- PEM-PP
ICAL SPECIFENSATE POLGENERATOR A0 MW NEW NE
Carbon Stee
N SUMP (CIV) no. Pit with tnside lined wmpartments
ate to hold thensate Polishe
os (in bidder’
PUMPS s (1 working l Centrifugal cuate the eac
mber per pum
A 312 Gr. TP m Pipe Size: y: 2-3 m/s A 312 Gr. TP
per ASTM A 1
per ASTM A 1
MS galvaniz
MS galvaniz
A 216 WC B/CF8M nnections- WCF8M F8M nnections- WCF8M F8M onnet-Cast Iressor-SS. ) sets of safetface visors anrench showe
bidder.
PEI: NOIDA, SE
FICATION FORLISHING UNITAND AUXILIAREYVELI TPP
el to EN 8
VIL WORK Btwo (2) comp
with PVC she
e quantity of wer Mixed Beds
’s scope). MO
+ 1 Standby)
ch comp in fo
mp
304 sch 10S80 NB
316 sch 10S
106 GR. B
106 GR. B
ed (heavy gra
ed (heavy gra
CI
Wafer type.
Wafer type.
ron
ty equipment nd thick PVC r/safety show
ECTOR 16A, UP
R T IES (NTA 2)
BY CUSTOMEpartments ,comeet (3 mm thi
waste effluens of plus 20%
OC of the ga
)
ur (4) hrs.& h
S
S
ade).
ade).
comprising Pgauntlets sha
wer and eye b
SPE
VOL
SEC
REV
P-201301
ER)mmon for 2 xck).
t generated d overall marg
ates will be C
head shall be
PVC protectioall also be probath in regene
EC NO: PE-TS-4
LUME: II-B
CTION: C1
V NO: 00
x 500 MW Un
due to single gin.
Carbon Steel
e as per syste
on suits with hovided. Two neration area s
402-155A-A001
DATE:
its (by custom
regeneration
.
em requ
hoods, rubbernumber persoshall be provi
1
mer)
of
r onnel ded
Page 140 of 495