I. Overview
II. Safety
III. Intake
IV. Sedimentation/Pump Tank
V. Pump
VI. Pipeline
VII. Storage Tank
VIII.Distribution System
IX. Maintenance
CONTENTS
2
![Page 3: Tingo Pucará Water Supply System OPERATION AND MAINTENANCE MANUAL 1](https://reader036.vdocuments.site/reader036/viewer/2022062308/56649d9f5503460f94a8987c/html5/thumbnails/3.jpg)
OVERVIEW
3
![Page 4: Tingo Pucará Water Supply System OPERATION AND MAINTENANCE MANUAL 1](https://reader036.vdocuments.site/reader036/viewer/2022062308/56649d9f5503460f94a8987c/html5/thumbnails/4.jpg)
PLAN VIEW
4
Intake
Sediment/
Pump Tank
Pump
Pipeline
Storage
Tank
Distribution
System
![Page 5: Tingo Pucará Water Supply System OPERATION AND MAINTENANCE MANUAL 1](https://reader036.vdocuments.site/reader036/viewer/2022062308/56649d9f5503460f94a8987c/html5/thumbnails/5.jpg)
CONTACT
5
Sistemas Electricos Industriales
Ave. 10 de Agosto N 64-349 y Bellavista
(Sector Parque de los Recuerdos)
Telefax: 2482-829 / 084-068-432
Quito – Ecuador
Grimasa
Av. 10 de Agosto (50-63) N36-177 y NN UU
Telefono: 2 245-041 Fax: 2 273-020
Quito
e-mail: [email protected]
Ferreteria San Agustin
Calle Quito y Hnos. Pdez (esq.)
Telfs.: 099 830 434 / 2812-797
Fax: (03) 2802-156
Latacunga - Ecuador
Dismaconcobre CIA. LTDA.
Valladolid N24-611 y av. La Coruna
Telefax: 2228-315 / 2235-207 / 2905-374
e-mail: [email protected]
Quito – Ecuador
Acero Comercial Ecuatoriano S.A.
Av. La Prensa N45-14 y Telégrafo 1
Telf.: 2454 333 / Fax: 2454 455
E-mail: [email protected]
Interconstruc
![Page 6: Tingo Pucará Water Supply System OPERATION AND MAINTENANCE MANUAL 1](https://reader036.vdocuments.site/reader036/viewer/2022062308/56649d9f5503460f94a8987c/html5/thumbnails/6.jpg)
SAFETY
6
![Page 7: Tingo Pucará Water Supply System OPERATION AND MAINTENANCE MANUAL 1](https://reader036.vdocuments.site/reader036/viewer/2022062308/56649d9f5503460f94a8987c/html5/thumbnails/7.jpg)
• Fill in holes and trenches at the end of every day
SAFETY
7
![Page 8: Tingo Pucará Water Supply System OPERATION AND MAINTENANCE MANUAL 1](https://reader036.vdocuments.site/reader036/viewer/2022062308/56649d9f5503460f94a8987c/html5/thumbnails/8.jpg)
• All valves should be opened and closed slowly to avoid damage
SLOWLY
SAFETY
8
![Page 9: Tingo Pucará Water Supply System OPERATION AND MAINTENANCE MANUAL 1](https://reader036.vdocuments.site/reader036/viewer/2022062308/56649d9f5503460f94a8987c/html5/thumbnails/9.jpg)
• When entering a tank, always work with a partner:
• When entering a tank, the valve or switch controlling the flow into the tank should be off, and the person in the tank should lock it out:
SAFETY
9
Lock
![Page 10: Tingo Pucará Water Supply System OPERATION AND MAINTENANCE MANUAL 1](https://reader036.vdocuments.site/reader036/viewer/2022062308/56649d9f5503460f94a8987c/html5/thumbnails/10.jpg)
PUMP
10
![Page 11: Tingo Pucará Water Supply System OPERATION AND MAINTENANCE MANUAL 1](https://reader036.vdocuments.site/reader036/viewer/2022062308/56649d9f5503460f94a8987c/html5/thumbnails/11.jpg)
Turning the Pump On (Manual Mode):1. Inspection: Examine the pump and wiring, look for damaged wires
in contact with metal piping or water. 2. Turning ON, Manual Mode: turn the knob from the OFF to the
MANUAL Position. The green light should turn ON.
3. TURN OFF IMMEDEATLY if the red light comes on, OR if the pump pressure exceeds 475 PSI
PUMP
11
![Page 12: Tingo Pucará Water Supply System OPERATION AND MAINTENANCE MANUAL 1](https://reader036.vdocuments.site/reader036/viewer/2022062308/56649d9f5503460f94a8987c/html5/thumbnails/12.jpg)
Powering On the Pump (Auto Mode)1.) Inspection: Examine the pump and wiring, look for damaged wires in contact with metal piping or water.
2.) Turning ON, Auto Mode: Simply turn the knobFrom the OFF to the AUTO Position. The Green Light should Turn ON.
3.) Turning OFF, Auto Mode: Simply turn the knob from the Auto to the OFF Position.
TURN OFF IMMEDEATLY IF:If the Red Light Turns ON.OR the Pump Pressure Exceeds 475 PSI
12
![Page 13: Tingo Pucará Water Supply System OPERATION AND MAINTENANCE MANUAL 1](https://reader036.vdocuments.site/reader036/viewer/2022062308/56649d9f5503460f94a8987c/html5/thumbnails/13.jpg)
13
Trouble Shooting in Auto Mode1.) Inspection: Examine the lights on the front of the “Tablero” Green Light should Be ON, the Red Light, Cistern Empty Light and Supply Tank Full Light should be OFF.AT THIS TIME THE PUMP SHOULD BE ON
2.) Pump OFF, while in Auto Mode: If the Cistern water level is too low the Cistern Pump Light will be ON and the PUMP will turn OFF. If the Supply Tank water level is too high then the Supply Tank Full Light will be ON and the PUMP will Turn OFF.
Supply Tank Float SwitchCondition:PUMP ONSWITCH Normally CLOSEDPUMP OFF (Tank Full)SWITCH Normally OPEN
Cistern Float SwitchCondition:Switch Normally CLOSEDPUMP ONSWITCH OPENPUMP OFF (Cistern Empty)13
![Page 14: Tingo Pucará Water Supply System OPERATION AND MAINTENANCE MANUAL 1](https://reader036.vdocuments.site/reader036/viewer/2022062308/56649d9f5503460f94a8987c/html5/thumbnails/14.jpg)
Servicing The “Tablero”1.) Opening the “Tablero”: The “tablero” control unit should only be opened or serviced by the equipment vendor or an approved member of the Tingo Pucara Water Committee. A key is required to Open the “tablero” Control Unit 2.)Before opening the “tablero” turn Power OFF at the Pump House Service Panel. By Switching the two 50A breakers into the OFF Position.
Special Key Required“Tablero”
Pump House Service Panel
Move Breaker to OFF
14
![Page 15: Tingo Pucará Water Supply System OPERATION AND MAINTENANCE MANUAL 1](https://reader036.vdocuments.site/reader036/viewer/2022062308/56649d9f5503460f94a8987c/html5/thumbnails/15.jpg)
Servicing The “Tablero”3.) When the “Tablero” is OPEN: Upon opening the “tablero” the user may examine the subcomponents and wiring of the “tablero” for loose electrical connections or visible damage. The Pump Technician should take written notice of the damage and contact the equipment vendor. DO NOT ATTEMPT TO REMOVE PARTS FROM THE “TABLERO” UNLESS INSTRUCTED TO DO SO BY THE VENDOR.
Examine Relay Contacts for Damage.Relay Contacts are mechanical and haveA given life expectancy.
15
![Page 16: Tingo Pucará Water Supply System OPERATION AND MAINTENANCE MANUAL 1](https://reader036.vdocuments.site/reader036/viewer/2022062308/56649d9f5503460f94a8987c/html5/thumbnails/16.jpg)
PIPELINE
16
![Page 17: Tingo Pucará Water Supply System OPERATION AND MAINTENANCE MANUAL 1](https://reader036.vdocuments.site/reader036/viewer/2022062308/56649d9f5503460f94a8987c/html5/thumbnails/17.jpg)
Start Up:• Open the Shut off valve.
Turn the lever slowly to avoid damage.
OPENCLOSED
SLOWLY
PIPELINE
17
![Page 18: Tingo Pucará Water Supply System OPERATION AND MAINTENANCE MANUAL 1](https://reader036.vdocuments.site/reader036/viewer/2022062308/56649d9f5503460f94a8987c/html5/thumbnails/18.jpg)
PIPELINE
Maintenance:• Every six months, turn
ball valves slowly on and off, 3 or 4 times to make sure they are not stuck.
• If any valves are leaking, fix them right away.
18
SLOWLY
![Page 19: Tingo Pucará Water Supply System OPERATION AND MAINTENANCE MANUAL 1](https://reader036.vdocuments.site/reader036/viewer/2022062308/56649d9f5503460f94a8987c/html5/thumbnails/19.jpg)
PIPELINE
Maintenance (Continued):• After every storm, walk
along the pipeline and look for any signs of dirt washing away
• Fill in any bad areas right away
19
![Page 20: Tingo Pucará Water Supply System OPERATION AND MAINTENANCE MANUAL 1](https://reader036.vdocuments.site/reader036/viewer/2022062308/56649d9f5503460f94a8987c/html5/thumbnails/20.jpg)
Maintenance (Continued):• Look for any sign of
water leaking along pipeline
• Look for holes, muddy or wet spots, and areas where dirt is washing away
• Fix leaks right away
PIPELINE
20
![Page 21: Tingo Pucará Water Supply System OPERATION AND MAINTENANCE MANUAL 1](https://reader036.vdocuments.site/reader036/viewer/2022062308/56649d9f5503460f94a8987c/html5/thumbnails/21.jpg)
STORAGE TANK
21
![Page 22: Tingo Pucará Water Supply System OPERATION AND MAINTENANCE MANUAL 1](https://reader036.vdocuments.site/reader036/viewer/2022062308/56649d9f5503460f94a8987c/html5/thumbnails/22.jpg)
Shut Down Procedure:
1. Open the clean-out valve
2. Close the distribution valve
12
STORAGE TANK
22
![Page 23: Tingo Pucará Water Supply System OPERATION AND MAINTENANCE MANUAL 1](https://reader036.vdocuments.site/reader036/viewer/2022062308/56649d9f5503460f94a8987c/html5/thumbnails/23.jpg)
Shut Down Procedure (Continued)
3. Remove all solids, and keep solids away from drain.
STORAGE TANK
23
![Page 24: Tingo Pucará Water Supply System OPERATION AND MAINTENANCE MANUAL 1](https://reader036.vdocuments.site/reader036/viewer/2022062308/56649d9f5503460f94a8987c/html5/thumbnails/24.jpg)
Shut Down Procedure (Continued)
4. Thoroughly wash with disinfectant like bleach
5. Rinse the tank with clean water
STORAGE TANK
24
![Page 25: Tingo Pucará Water Supply System OPERATION AND MAINTENANCE MANUAL 1](https://reader036.vdocuments.site/reader036/viewer/2022062308/56649d9f5503460f94a8987c/html5/thumbnails/25.jpg)
Normal Operation:• Check that water is not coming out of overflow pipe. If water is coming from the overflow pipe, turn off the pump and check the float switch.
STORAGE TANK
25
![Page 26: Tingo Pucará Water Supply System OPERATION AND MAINTENANCE MANUAL 1](https://reader036.vdocuments.site/reader036/viewer/2022062308/56649d9f5503460f94a8987c/html5/thumbnails/26.jpg)
Start Up Procedure:
1. Close the Clean-Out Valve
2. Open the distribution Valve
12
STORAGE TANK
26
![Page 27: Tingo Pucará Water Supply System OPERATION AND MAINTENANCE MANUAL 1](https://reader036.vdocuments.site/reader036/viewer/2022062308/56649d9f5503460f94a8987c/html5/thumbnails/27.jpg)
Start Up Procedure (Continued):
3. Check to make sure
the float switch is
working correctly.
STORAGE TANK
Switch up:
Pump should be off
Switch down:
Pump should be on
27
![Page 28: Tingo Pucará Water Supply System OPERATION AND MAINTENANCE MANUAL 1](https://reader036.vdocuments.site/reader036/viewer/2022062308/56649d9f5503460f94a8987c/html5/thumbnails/28.jpg)
DISTRIBUTION SYSTEM
28
![Page 29: Tingo Pucará Water Supply System OPERATION AND MAINTENANCE MANUAL 1](https://reader036.vdocuments.site/reader036/viewer/2022062308/56649d9f5503460f94a8987c/html5/thumbnails/29.jpg)
DISTRIBUTION SYSTEM
29
Maintenance:
1. Walk the system and check for wet areas that could be leaks
![Page 30: Tingo Pucará Water Supply System OPERATION AND MAINTENANCE MANUAL 1](https://reader036.vdocuments.site/reader036/viewer/2022062308/56649d9f5503460f94a8987c/html5/thumbnails/30.jpg)
DISTRIBUTION SYSTEM
30
Maintenance (Continued):
2. Check for leaks at valve and PRV boxes visually and by feel.
![Page 31: Tingo Pucará Water Supply System OPERATION AND MAINTENANCE MANUAL 1](https://reader036.vdocuments.site/reader036/viewer/2022062308/56649d9f5503460f94a8987c/html5/thumbnails/31.jpg)
DISTRIBUTION SYSTEM
31
Maintenance (Continued):
3. Repair leaks and replace any defective valves or fittings.
![Page 32: Tingo Pucará Water Supply System OPERATION AND MAINTENANCE MANUAL 1](https://reader036.vdocuments.site/reader036/viewer/2022062308/56649d9f5503460f94a8987c/html5/thumbnails/32.jpg)
DISTRIBUTION SYSTEM
32
Maintenance (Continued):
4. Check that Flow Meters are working properly by opening the valve on the tap stand and watch that the meter is operating.
![Page 33: Tingo Pucará Water Supply System OPERATION AND MAINTENANCE MANUAL 1](https://reader036.vdocuments.site/reader036/viewer/2022062308/56649d9f5503460f94a8987c/html5/thumbnails/33.jpg)
DISTRIBUTION SYSTEM
33
Maintenance (Continued):
5. Attach pressure valve to each tap stand. Open valve and record the pressure.
![Page 34: Tingo Pucará Water Supply System OPERATION AND MAINTENANCE MANUAL 1](https://reader036.vdocuments.site/reader036/viewer/2022062308/56649d9f5503460f94a8987c/html5/thumbnails/34.jpg)
DISTRIBUTION SYSTEM
34
Maintenance (Continued):
6. Check for leaks at each tap stand, and repair or replace valves as needed.
![Page 35: Tingo Pucará Water Supply System OPERATION AND MAINTENANCE MANUAL 1](https://reader036.vdocuments.site/reader036/viewer/2022062308/56649d9f5503460f94a8987c/html5/thumbnails/35.jpg)
DISTRIBUTION SYSTEM
35
Maintenance (Continued):
7. Every six months, turn ball valves slowly on and off, 3 or 4 times to make sure they are not stuck. If any valves are leaking, fix them right away.
SLOWLY
![Page 36: Tingo Pucará Water Supply System OPERATION AND MAINTENANCE MANUAL 1](https://reader036.vdocuments.site/reader036/viewer/2022062308/56649d9f5503460f94a8987c/html5/thumbnails/36.jpg)
Maintenance (Continued):
8. Add permanent location stakes when new pipelines are installed.
DISTRIBUTION SYSTEM
36
![Page 37: Tingo Pucará Water Supply System OPERATION AND MAINTENANCE MANUAL 1](https://reader036.vdocuments.site/reader036/viewer/2022062308/56649d9f5503460f94a8987c/html5/thumbnails/37.jpg)
This manual was written by the members of the EWB-USA Pittsburgh Professional Chapter, for our friends in the
community of Tingo Pucará.