    Term Project SIM4300 (Software Project Management) Semester 2 2012/2013

    Duration Type Assignment/Activities Submission Date

    in LMS

    Evaluation

    W1-W3 Individual What is Software Project

    Management?

    Finding should be based on (5-

    10) articles from journals in

    the years of (2009-2013) only.

    Report (1) to be

    submitted together

    with Turnitin report

    by 8th March in LMS

    10%

    W4-W5 Individual What are issues in Software

    Project Management?

    Finding should be based on (5-

    10) articles from journals in

    the years of (2009-2013) only.

    Report (2) to be

    submitted together

    with Turnitin report

    by 22nd March in

    LMS

    10%

    W6-W9 Group Survey of Software Project

    Management practices inorganization in Malaysia.

    Choose 4-5 organizations

    (combination of government

    and private organization from

    various industries).

    Design questionnaires for the

    survey

    (Each group is to

    preparequestionnaires on the

    implementation of

    SPM sources from

    articles only).

    Questions will be

    finalized on 29th

    March Class

    exercise)

    Each group is to plan

    on the organizationselected for the

    survey.

    Data collection

    input in excel file by

    26th April in LMS

    40%

    W10-W12 Group Data Analysis

    Data Interpretation

    Report

    Data Analysis

    Data Interpretation.

    Final Report (3) to be

    submitted together

    with Turnitin report

    by 17th May in LMS

    30%

    W13-W14 Group Presentation Slides for Group

    presentation to be

    7%

  • 7/27/2019 Timeline of Software Project Management for Software Engineering Student

    2/3

    2

    Duration Type Assignment/Activities Submission Date

    in LMS

    Evaluation

    submitted together

    with Turnitin report

    by 31st May in LMS

    Individual Reflective Evaluation Report (4) of whatyou have learned for

    the past 14 weeks

    submitted together

    with Turnitin report

    by31st May in LMS

    3%

    Total 100%

    Reports Format:

    Report Content and format

    Report (1) Introduction

    o Background

    Discussion (The definition, process, activities, critical success factors)

    o You could organize your understanding in a tabular form

    o Find a common understanding of what is Software Project

    Management

    Summary

    o Derive to your own conclusion based on your findings from your

    critical analysis of the articles

    References

    o Include all your references (5 articles) and other additional

    materials that you cite and refer in producing your report.

    Report (2) Introduction

    o Background

    Discussion (The issues reported from the articles)

    o You could organize your findings of reported issues in a tabular

    form

    o Find a common understanding of what are main and common

    issues of Software Project Management reported in the article

    o Identify/Highlight the solution or what and how these issues were

    addressed or overcome.

    o Related work done in SPM

    Summaryo Critical analysis of the issues and how these are addressed, and

    what is your opinion on the issues and related work to address

    these issues

    References

    o Include all your references (5-10 articles) and other additional

    materials that you cite and refer in producing your report.

  • 7/27/2019 Timeline of Software Project Management for Software Engineering Student

    3/3

    3

    Report (3) Introduction

    o Background

    o Introduction to SPM (Combined works of individuals in your

    group)

    o Issues (Problems) of SPM (Combined works of individuals in your

    group)

    o Related work on SPM (Combined works of individuals in your

    group)

    Discussion on your design on data collection

    o Data collection method

    o Data analysis method (statistic/descriptive etc)

    o Who are your respondents demographic analysis

    o Objective of your survey (to survey on the SPM implementation

    in an organization

    o Data analysis

    o Data interpretation and findings

    Summary

    o Finding and discussions

    References

    o Include all your references (5-10 articles) and other additional

    materials that you cite and refer in producing your report.

    Slide Prepare in PPT format (group work)

    Contents :

    o Introduction to SPM (Combine work of individuals in your group)

    o Issues (Problems) of SPM (Combine work of individuals in your

    group)

    o Related work on SPM (Combine work of individuals in your group)

    o Surveyo Findings

    o Summary

    o References

    Slides (20-25 no. of slides)

    Report (4) Lesson learned

    o List what you have learned or gain for the past 14 weeks

    Turnitin : (Plagiarism detection and deterrent)

    Please create a student account in Turnitin. (Refer to our Library)

    Class Id/Password : 6160832/yusmadi

    Group : Should consist between 3 to 5 students only