Time Planning for our final film Time Planning: Shoot day 1: December 12 th Saturday 2015 13:00 – 17:00 Shoot day 2: December 15 th Tuesday 2015 9:00 – 16:00 Shoot day 3: December 18 th Friday 2015 13:00 – 17:00 Shoot day 4: December 22 nd Tuesday 2015 9:00 – 16:00 Shoot day 5: January 2 nd Saturday 2016 9:00 onwards Shoot day 6: January 6 th Tuesday 2016 9:00 onwards Shoot day 7: January 9 th Friday 2016 9:00 onwards (Additional shots needed Location shots in paticular) Weather Shoot day 1: H: 12° L: 8° Cloudy Weather Shoot day 2: H: 9° L: 4° Cloudy Weather Shoot day 3: H: 9° L: 4° Cloudy with a chance of rain at 3 Pm Weather Shoot day 4: H: 13° L: 11°

Upload: olivia-halpin

Post on 15-Feb-2017

129 views

Category:

Education


1 download

TRANSCRIPT

Page 1: Time Planning for our Final Film

Time Planning for our final film

Time Planning:Shoot day 1: December 12th Saturday 2015 13:00 – 17:00Shoot day 2: December 15th Tuesday 2015 9:00 – 16:00Shoot day 3: December 18th Friday 2015 13:00 – 17:00Shoot day 4: December 22nd Tuesday 2015 9:00 – 16:00Shoot day 5: January 2nd Saturday 2016 9:00 onwards Shoot day 6: January 6th Tuesday 2016 9:00 onwards Shoot day 7: January 9th Friday 2016 9:00 onwards (Additional shots needed Location shots in paticular)Weather Shoot day 1:H: 12° L: 8°CloudyWeather Shoot day 2:H: 9° L: 4°CloudyWeather Shoot day 3:H: 9° L: 4°Cloudy with a chance of rain at 3 PmWeather Shoot day 4:H: 13° L: 11°Light clouds with sunny intervalsWeather Shoot day 5:H: 13° L: 11°Sunny with minimal cloudsWeather Shoot day 6:H: 11° L: 9°

Page 2: Time Planning for our Final Film

Cloudy

Technical Equipment RequirementsSupplier/Contact Equipment needed.Russ Bennett/ Daisy Hopkins Media Samuel ward

SLR Canon EOS 500 D Camera, Tripod, Crane. Track.

Hazard list

No.1) Access / Egress2) Heavy loads 3) First aid 4) Fire5) Heat / cold / extreme weather 6) Water / proximity to water / tanks

Name Position Contact InformationMatthew Rose Lead Male Actor and

[email protected]

Millie Iron Camera Woman and Editor

[email protected]

Olivia Halpin Actress and Editor [email protected]

Niamh Mitchell Director and Editor [email protected]

Page 3: Time Planning for our Final Film

7) Camera work – technical facilities (handheld, camera cables, camera movement)8) Food

Hazard Number & level of risk

Mains risks Identified Controls to Minimise risk

1 low Access / Egress

The majority of filming is taking place on 15 Chivers road when we are filming here we are going to leave any spare equipment that will not be used during shots in a separate room to minimalize hazards and ensure that entry points are clear to walk in and out of. Also for the shots that are outside we will make sure that we are not obstructing members of the public and leave spare equipment and luggage to a separate team member at the side. On the shooting days we will carry out a separate risk assessment to ensure that it is a safe location for pedestrians.

2 low Heavy / Fragile loadsTo exclude the risk of damage to any of the equipment we have decided to drive to all of the filming locations this gets rid of any risks due to carrying heavy equipment.

3 low First aidIn case of an emergency and anybody getting hurt we have a medical kit near by and all members have been informed of the hospital and medical centres local to the locations.

4 Medium Fire safety

In case of any fires we can ensure the safety by maintaining a clear entry/ exit point to get out in emergencies. There is a key scene we need to be aware of when we film fire, we will ensure to maintain a safe environment for every member of the group by making sure flammable objects are kept away from the fire.

5 lowHeat / cold / extreme weather

When in the House location we will keep the heating on to ensure that we don’t get to hot or cold and will be able to change it for our personal preference. For the outside location we have planned to all wear the appropriate clothing materials suitable for the weather that day.

7 low

Technical facilities (Handhelds / camera cables / camera movement etc.)

All the equipment used for the shots will be handled carefully and evenly distributed to each team member when having to walk it to the location this will lower the risk of dropping it and will make it more efficient.

Page 4: Time Planning for our Final Film

8 low FoodHaving breaks half way through filming when in the House we can be provided with the food and also when filming outside we can go to a nearby shop and also provide our own lunch.

Transport by Car19th November 2015 (Thursday)

Niamh Arrange Transport with Matt, Olivia and Millie to arrive at east town park by 3:00pmMillie Wait for transport to arrive then get a lift with NiamhMatt Wait for transport to arrive then get a lift with NiamhOlivia Wait for transport to arrive then get a lift with NiamhEveryone will arrive at the location together and leave around 4:30, as it will be getting dark around this time. Please see attached map for any additional information.

Transport by Foot24th November 2015 (Tuesday)

Niamh Leave school at 11:00am with Matt, Olivia and Millie to walk to location.Millie Leave school with rest of the group at 11:00am.Matt Leave school with rest of the group at 11:00am.Olivia Leave school with rest of the group at 11:00am.Make sure to arrive at the location at 11:00 as a group to ensure plenty of time to get all of our shots done.

Page 5: Time Planning for our Final Film

Transport by Car9th December 2015 (Tuesday)

Niamh Walk to local Tesco with group to arrive at bridge next to the store at 3:00pmMillie Walk to local Tesco with group to arrive at bridge next to the store at 3:00pmMatt Walk to local Tesco with group to arrive at bridge next to the store at 3:00pmOlivia Walk to local Tesco with group to arrive at bridge next to the store at 3:00pmArrive together and address the map before hand to know the directions to get to our locations.

Transport by Car26th November 2015 (Thursday)

Niamh Leave from school at 9:00am to get a lift to location with group. Do a short walk along a path to get to the location.Millie Get in the arranged lift with the rest of the group.Matt Get in the arranged lift with the rest of the group.Olivia Get in the arranged lift with the rest of the group.Make sure to leave by 9:00am to ensure we can have room to do all the shots planned with leftover time to edit.

Transport by Car1st December 2015 (Tuesday)

Niamh Arrange a lift to school alone to get needed equipment and wait for transport to Matts house.Millie Arrange a lift to school alone to get needed equipment and wait for transport to Matts house.Matt Stay at home and prepare the set for filming by getting props needed.Olivia Arrange a lift to school alone to get needed equipment and wait for transport to Matts house.Get to Matts house at 9:00am to be able to film for 2 hours and ensure that they can get back to school in time for lessons.

Transport by Car6th December 2015 (Saturday)

Niamh Walk to Niamh’s house at 4:30pm to get there when it is dark, to give the right effect we need.Millie Walk to Niamh’s house at 4:30pm to get there when it is dark, to give the right effect we need.Matt Walk to Niamh’s house at 4:30pm to get there when it is dark, to give the right effect we need.Olivia Walk to Niamh’s house at 4:30pm to get there when it is dark, to give the right effect we need.As it will be getting dark we will walking along the main road, see added map for any additional details.

Page 6: Time Planning for our Final Film

1. Head west towards Chalkstone Way

2. Turn left onto Chalkstone Way

3. At the roundabout take the 2nd exit onto Millfields way

4. Turn left to stay on Millfields Way

5. Turn right onto Chalkstone Way

6. At the roundabout, take the 1st exit onto coupals Rd and the destination will be on the left.

Shoot Day 1:From: Samuel Ward Academy, Chalkstone Way, Haverhill CB9 0LD, United Kingdom To: East Town Park Centre, Coupals Road, Haverhill CB9

Page 7: Time Planning for our Final Film

Shoot Day 2: From: Samuel Ward Academy, Chalkstone Way, Haverhill CB9 0LD, United KingdomTo: Chalkstone Way, Haverhill CB9 0AQ, UK

1. Head west towards Chalkstone Way

2. Turn left onto Chalkstone Way

Shoot Day 3:From: Samuel Ward Academy, Chalkstone Way, Haverhill CB9 0LD, United KingdomTo: Chalkstone Way, Haverhill CB9 0AT, UK

1. Head west towards Chalkstone Way

Page 8: Time Planning for our Final Film

1. Head west towards Chalkstone Way

Shoot Day 4:From: Samuel Ward Academy, Chalkstone Way, Haverhill CB9 0LD, United KingdomTo: 15 Chivers Rd, Haverhill CB9 9DS, UK

Page 9: Time Planning for our Final Film

Shoot Day 5:From: Samuel Ward Academy, Chalkstone Way, Haverhill CB9 0LD, United KingdomTo: 8 Chelmer Rd, Haverhill CB9 0AN, UK

Page 10: Time Planning for our Final Film

1. Head west towards Chalkstone Way

2. Turn left onto Chalkstone way

3. Turn right onto Chelmer Rd

Shoot Day 6:From: Samuel Ward Academy, Chalkstone Way, Haverhill CB9 0LD, United KingdomTo: 31 Wratting Rd, Haverhill CB9 0DA, UK

Page 11: Time Planning for our Final Film

Date Arrive Time: Ending Time: Props & Camera equipment:

Actors required Personnel

12/12/15 Scene 1: East Town Park

3:00pm 4:30pm SLR Canon E0S, Crane, Tripod.

Matt Rose Mille Iron (Camera Women)

Page 12: Time Planning for our Final Film

Niamh Mitchell (Director)Olivia Halpin (Co Director)Matt Rose (Actor)

15/12/15Scene 2: Chalkstone Estate

11:10am 1:00pm SLR Canon E0S Matt Rose Mille Iron (Camera Women)Niamh Mitchell (Director)Olivia Halpin (Co Director)Matt Rose (Actor)

18/12/15Scene 3: Bull field.

9:10am 11:00am SLR Canon E0S Matt Rose Mille Iron (Camera Women)Niamh Mitchell (Director)Olivia Halpin (Co Director)Matt Rose (Actor)

22/12/15Scene 4: Matts house

9:00am 3:00pm Alcohol, Fake Drugs, Tea Towel, Car.

SLR Canon E0S.

Matt Rose, Olivia Halpin

Mille Iron (Camera Women)Niamh Mitchell (Director)Olivia Halpin (Actress)

Page 13: Time Planning for our Final Film

Matt Rose (Actor)

2/1/16Scene 5:Niamh’s house

4:30am 6:00pm Garden Chimney Burner, Photos of actors.

SLR Canon E0S

Matt Rose Mille Iron (Camera Women)Niamh Mitchell (Director)Olivia Halpin (Co Director)Matt Rose (Actor)

6/1/16Scene 6: Wratting Road bridge

3:00pm 4:30pm SLR Canon E0S Matt Rose Mille Iron (Camera Women)Niamh Mitchell (Director)Olivia Halpin (Co Director)Matt Rose (Actor)