time impact short time impact long multi-cultural & trans-national equities single-culture...

8
TIME IMPACT SHORT TIME IMPACT LONG MULTI-CULTURAL & TRANS-NATIONAL EQUITIES SINGLE-CULTURE SINGLE-ORGANIZATION EQUITIES LEADERS DECIDE PEOPLE DECIDE TOP-DOWN COMMAND & CONTROL SECRET SOURCES & METHODS BOTTOM-UP INFORMATION-SHARING OPEN SOURCES & METHODS OBVIOUS DETAIL OBSCURE DETAIL OLD NEW Big Change #1

Upload: brian-dalton

Post on 27-Mar-2015

214 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: TIME IMPACT SHORT TIME IMPACT LONG MULTI-CULTURAL & TRANS-NATIONAL EQUITIES SINGLE-CULTURE SINGLE-ORGANIZATION EQUITIES LEADERS DECIDE PEOPLE DECIDE TOP-DOWN

TIME IMPACT SHORT

TIME IMPACT

LONG

MULTI-CULTURAL & TRANS-NATIONAL

EQUITIES

SINGLE-CULTURE SINGLE-ORGANIZATION

EQUITIES

LEADERS DECIDE

PEOPLE DECIDE

TOP-DOWN COMMAND & CONTROL

SECRET SOURCES & METHODS

BOTTOM-UP INFORMATION-SHARING

OPEN SOURCES & METHODS

OBVIOUS DETAIL

OBSCURE DETAIL

OLD

NEW

Big Change #1

Page 2: TIME IMPACT SHORT TIME IMPACT LONG MULTI-CULTURAL & TRANS-NATIONAL EQUITIES SINGLE-CULTURE SINGLE-ORGANIZATION EQUITIES LEADERS DECIDE PEOPLE DECIDE TOP-DOWN

The New Intelligence Gap: the difference between what you can know and what you can use!

INFORMATION

TIME

Actionable Intelligence

Available Information

Open source information is more complex than secrets…

Big Change #2

Page 3: TIME IMPACT SHORT TIME IMPACT LONG MULTI-CULTURAL & TRANS-NATIONAL EQUITIES SINGLE-CULTURE SINGLE-ORGANIZATION EQUITIES LEADERS DECIDE PEOPLE DECIDE TOP-DOWN

New Craft of Intelligence

I

Lessons of History

II

Global Coverage

III

National Intelligence

IV

Spies & Secrecy

China, Islam, Ethnic, Etc.

Cost-Sharing with Others--Shared Early Warning

Narrowly focused!

Harness distributed intelligence of Nation

Page 4: TIME IMPACT SHORT TIME IMPACT LONG MULTI-CULTURAL & TRANS-NATIONAL EQUITIES SINGLE-CULTURE SINGLE-ORGANIZATION EQUITIES LEADERS DECIDE PEOPLE DECIDE TOP-DOWN

SECRET BIG DATA

• NSA-NGA

• SAIC

• HARRIS

• NG-MS

NOT SECRET BIG DATA

• UN, Red Cross, NGOs…

• NASA , public geospatial

• Factiva

• LEXIS-NEXIS

SECRET DISTRIBUTED DATA

• Intelink

• ARDA

• ITIC

• JHU/APL

NOT SECRET DISTRIBUTED DATA

• CISCO

• Google/Libraries

• Amazon Inside the Book

• Napster Plus

Open Source Information System – External (OSIS-X)

SIPRNET

Page 5: TIME IMPACT SHORT TIME IMPACT LONG MULTI-CULTURAL & TRANS-NATIONAL EQUITIES SINGLE-CULTURE SINGLE-ORGANIZATION EQUITIES LEADERS DECIDE PEOPLE DECIDE TOP-DOWN

Credits: Mike Hayden, Original Concept; Robert Steele, Labels & OSINT-Ops-Other; Steve Edwards, Turned Upside Down

Point of Entry Raw Produces Actionable Intelligence

Processed Raw

OPINTEL

Finished Intelligence

Policy Package

Public Perception

HUMINT SIGINT IMINT MASINT OSINT OPS OTHER

HUMINT SIGINT IMINT MASINT OSINT OPS OTHER

Dots need to be connecting at every level,Including immediately upon ingestion.

Today, one third of the dots connect here.(Collect 2/3rd, spill half—some say 80%)

Page 6: TIME IMPACT SHORT TIME IMPACT LONG MULTI-CULTURAL & TRANS-NATIONAL EQUITIES SINGLE-CULTURE SINGLE-ORGANIZATION EQUITIES LEADERS DECIDE PEOPLE DECIDE TOP-DOWN

Conversion of Paper Documents to Digital Form

Automated Extraction of Data Elements From

Text and Images

Standardizing and Converting Data Formats

Processing Images, Video, Audio, Signal Data

Automated Foreign Language

Translation

Open Literature Non-Text Data Restricted Information

Detection of Alert Situations

Clustering and Linking of

Related Data

Statistical Analysis to Reveal

Anomalies

Detection of Changing Trends

Interactive Search and Retrieval of

Data

Graphic and Map-Based Visualization

of Data

Modeling and Simulations

Collaborative Work

Notetaking and Organizing Ideas

Structured Argument Analysis

Desktop Publishing and

Word Processing

Production of Graphics, Videos and

Online Briefings

Revision Tracking and Realtime Group

Review

NEW: Intelligent Network Enables Applications At All Points

OLD:

Page 7: TIME IMPACT SHORT TIME IMPACT LONG MULTI-CULTURAL & TRANS-NATIONAL EQUITIES SINGLE-CULTURE SINGLE-ORGANIZATION EQUITIES LEADERS DECIDE PEOPLE DECIDE TOP-DOWN

web browser application

web server

business logic

Many Oracle Servers

Many Other Servers

Many TeraText Servers

Many Domino Servers

• Largest software text system• Fuses information across 260

disparate database systems• Over 4 billion documents• Over 10,000 named users

Putting It All Together

INTELLIGENCE ARCHITECTURE:• incorporates open sources, on and off line• matches global real time knowledge to individual situations

NETWORK ARCHITECTURE:• processing in the bit stream• interoperation

SEMANTIC ARCHITECTURE:• text-capable• scaled

DELETED

DELETEDDELETED

Page 8: TIME IMPACT SHORT TIME IMPACT LONG MULTI-CULTURAL & TRANS-NATIONAL EQUITIES SINGLE-CULTURE SINGLE-ORGANIZATION EQUITIES LEADERS DECIDE PEOPLE DECIDE TOP-DOWN

Seven Intelligence Tribes:The Way Ahead

Military

Law Enforcement

Business

Academic

National

NGO &Media

Religions& Clans