Timber Projects for the Masses
LIAM DEWAR
IMAGE © EURBANLIAM DEWAR
Designing for Mass TimberDevelopers | General Contractors | End-Users
Visual | QualityExposed Structure?
Time | SpeedProgramme?
Cost | Net Lettable AreaWall Build-ups?
EurbanEarly Specialist Involvement - Design to Delivery
IMAGE © EURBANLIAM DEWAR
PM H
ANDO
VER
FORM
01
– O
RDER
NO
TIFI
CON
PR
OGR
AMM
E
APPR
OVA
LS
FORM
03
– G
A AP
PRO
VAL
GAT
E
APPR
OVA
LS
FORM
02
– 1st
GA
ISSU
E G
ATE
APPR
OVA
LS
FORM
04
– M
ATER
IAL
ORD
ER
GAT
E
SITE
HAN
DOVE
R SU
RVEY
LO
GIS
TICS
HAN
DOVE
R &
SIG
N-O
FF
FORM
06
– PR
OJE
CT C
LOSE
AS
-BU
ILT
& O
+M
APPR
OVA
LS
FORM
05
– O
RDER
CO
NFI
RMAT
ION
CO
ORD
INAT
ION
AU
DIT
IMAGE © EURBANLIAM DEWAR
Programme is Key
LIAM DEWAR IMAGE © EURBAN
Column System Party Wall System Honeycomb System
Structural Design Proposal is Key
IMAGE © EURBANLIAM DEWAR
Ensure Wall Design is Adequate
IMAGE © EURBANLIAM DEWAR
Verification of Fire ResistanceFire Test Approach to EN 13501-2
Careful!
IMAGE © EURBANLIAM DEWAR
Limit Exposed Structure
• Fire = thicker panel & wall!
• Implications on acoustics
• Panel joints / Grain direction
• Appearance Grade
• Finish (Planed or Sanded?)
IMAGE © EURBANLIAM DEWAR
Optimise Design for CostWastage v Speed on Site
IMAGE © EURBANLIAM DEWAR
Designing for ApprovalInsurers | Statutory Bodies| Structural Warranty Providers
Earth(quakes)
Water Fire
Air(tightness)
BRIEF
IMAGE © EURBANLIAM DEWAR
Detailing for Durability - StructureLift Shaft
Bolt-through connection of Support Channels
IMAGE © OTISLIAM DEWAR
Detailing for Durability - StructureLift Shaft
Bolt-through connection of Lifting Eye
LIAM DEWAR IMAGE © MERK TIMBER
Detailing for Durability - WaterProtection of Structure against Defective Insulation Layer
Breather Membrane
INSIDE
OUTSIDE
Detailing for Durability - WaterRemove Problem – Raise Timber Above Water
LIAM DEWAR IMAGE © EURBAN
Detailing for Durability - WaterBase Detail
LIAM DEWAR IMAGE © EURBAN
Detailing for Durability - WaterSolve Problem – Appropriate Waterproofing to Base
LIAM DEWAR IMAGE © EURBAN
Detailing for Durability - AirAirtightness
LIAM DEWAR IMAGE © EURBAN
Detailing for Durability - AirTape Panel Joints
LIAM DEWAR IMAGE © EURBAN
Managing Risk
LIAM DEWAR
LIAM DEWAR
LIAM DEWAR
Managing MoistureDelivery
LIAM DEWAR IMAGE © EURBAN
• 12% +/- 3% moisture content on delivery
• Hygroscopic material – responds to environment
Managing Moisture
LIAM DEWAR IMAGE © EURBAN
Managing Moisture
LIAM DEWAR IMAGE © EURBAN
Managing Moisture
LIAM DEWAR IMAGE © EURBAN
Managing MoistureInstallation
LIAM DEWAR IMAGE © EURBAN
• Materials set-down on site
• Materials will get wet
• Allow time to dry out
Managing MoistureCompletion
LIAM DEWAR IMAGE © EURBAN
• Seal valleys
• Install temporary drains
Managing MoisturePost-Installation
LIAM DEWAR IMAGE © EURBAN
• If prolonged exposure to rain
• Moisture meter readings:
• Target < 15%
Managing MoistureDrying Out
LIAM DEWAR IMAGE © EURBAN
• Good ventilation
• Expose surfaces
• Clean site
• End grain sealer
Managing Building ServicesDesign Co-ordination
LIAM DEWAR IMAGE © EURBAN
IMAGE © EURBANLIAM DEWAR
Managing Exposed SurfacesTemporary Weather Protection
Fairmule House, London, 2005Quay 2c | Eurban, 4 installers
IMAGE © QUAY 2CLIAM DEWAR – TIMBER FOR THE MASSES
IMAGE © QUAY 2CLIAM DEWAR – TIMBER FOR THE MASSES
Fairmule House
LIAM DEWAR – TIMBER FOR THE MASSES IMAGE © EURBAN
Fairmule House
IMAGE © EURBAN
Fairmule HouseSite
LIAM DEWAR – TIMBER FOR THE MASSES
LIAM DEWAR – TIMBER FOR THE MASSES IMAGE © EURBAN
Fairmule House
IMAGE © EURBAN
Fairmule House
LIAM DEWAR – TIMBER FOR THE MASSES
IMAGE © EURBAN
Fairmule House
LIAM DEWAR – TIMBER FOR THE MASSES
IMAGE © EURBAN
Fairmule House
LIAM DEWAR – TIMBER FOR THE MASSES
IMAGE © ED REEVE
Fairmule HouseLifting Points
LIAM DEWAR – TIMBER FOR THE MASSES
IMAGE © ED REEVE
Fairmule House
LIAM DEWAR – TIMBER FOR THE MASSES
IMAGE © EURBAN
Fairmule House
LIAM DEWAR – TIMBER FOR THE MASSES
IMAGE © EURBAN
Fairmule House
LIAM DEWAR – TIMBER FOR THE MASSES
IMAGE © ED REEVE
Fairmule House
LIAM DEWAR – TIMBER FOR THE MASSES
IMAGE © EURBAN
Fairmule HouseTeam of 4 Installers
LIAM DEWAR – TIMBER FOR THE MASSES
IMAGE © EURBAN
Fairmule House
LIAM DEWAR – TIMBER FOR THE MASSES
IMAGE © EURBAN
Fairmule House
LIAM DEWAR – TIMBER FOR THE MASSES
IMAGE © EURBAN
Fairmule HouseFloors
IMAGE © EURBAN
Fairmule HouseInstallation
LIAM DEWAR – TIMBER FOR THE MASSES
IMAGE © EURBAN
Fairmule House
LIAM DEWAR – TIMBER FOR THE MASSES
IMAGE © EURBAN
Fairmule House
LIAM DEWAR – TIMBER FOR THE MASSES
IMAGE © EURBAN
Fairmule House
LIAM DEWAR – TIMBER FOR THE MASSES
IMAGE © EURBAN IMAGE © EURBAN
Fairmule House
LIAM DEWAR – TIMBER FOR THE MASSES
IMAGE © EURBAN
Fairmule House
LIAM DEWAR – TIMBER FOR THE MASSES
IMAGE © QUAY2C
Fairmule House
LIAM DEWAR – TIMBER FOR THE MASSES
IMAGE © EURBAN
Fairmule HouseLift Shaft
LIAM DEWAR – TIMBER FOR THE MASSES
IMAGE © EURBAN
Fairmule HouseLift Shaft
LIAM DEWAR – TIMBER FOR THE MASSES
Fairmule House
LIAM DEWAR – TIMBER FOR THE MASSES IMAGE © EURBAN
IMAGE © EURBAN
Fairmule HouseLift Shaft
LIAM DEWAR – TIMBER FOR THE MASSES
IMAGE © EURBAN
Fairmule House
LIAM DEWAR – TIMBER FOR THE MASSES
IMAGE © EURBAN
Fairmule House
LIAM DEWAR – TIMBER FOR THE MASSES
IMAGE © EURBAN
Fairmule House
LIAM DEWAR – TIMBER FOR THE MASSES
IMAGE © EURBAN
Fairmule HouseExposed Structure
LIAM DEWAR – TIMBER FOR THE MASSES
IMAGE © EURBAN
Fairmule HouseWall & Floor Build-ups
Wall Structure: 85-135mmFloor Structure: 170mm
LIAM DEWAR – TIMBER FOR THE MASSES
IMAGE © QUAY2C
Fairmule HouseExposed Structure
LIAM DEWAR – TIMBER FOR THE MASSES
Fairmule HouseFront & Side Elevation
IMAGE © QUAY2CLIAM DEWAR – TIMBER FOR THE MASSES
IMAGE © QUAY2C
Fairmule HouseRear Elevation
LIAM DEWAR – TIMBER FOR THE MASSES
IMAGE © QUAY2C
Fairmule House
LIAM DEWAR – TIMBER FOR THE MASSES
IMAGE © QUAY2C
Fairmule House
LIAM DEWAR – TIMBER FOR THE MASSES
CLIENTAqua Properties
ARCHITECTQuay 2c Architects
CONCRETE ENGINEER
TIMBER ENGINEEREurban
MAIN CONTRACTORNone (Construction Management)
TIMBER CONTRACTOREurban/ m2
ACCOMMODATION11 Flats + 7 office Units
FLOOR AREA11,485 ft2
INSTALLATION PERIOD6 weeks
MATERIALS USEDCrosslam / Glulam / LVL / Steel
MANUFACTURER Merk Timber
COMPONENT THICKNESSES80, 115, 135mm (Walls); 170mm (Floors, Roof)
LIAM DEWAR – TIMBER FOR THE MASSES
Fairmule House, London, 2005Project Data
LIAM DEWAR IMAGE © EURBAN
Bridport House, London, 2010Karakusevic Carson | Eurban
LIAM DEWAR IMAGE © KARAKUSEVIC CARSON
Bridport HouseLocation
LIAM DEWAR IMAGE © KARAKUSEVIC CARSON
Bridport HouseDesign Problem
LIAM DEWAR IMAGE © KARAKUSEVIC CARSON
Bridport HouseSolution
LIAM DEWAR IMAGE © KARAKUSEVIC CARSON
Bridport HouseAlternative Option in Mass Timber Construction
LIAM DEWAR IMAGE © KARAKUSEVIC CARSON
Bridport HouseUnit Mix
LIAM DEWAR IMAGE © KARAKUSEVIC CARSON
Bridport HouseUnit Arrangement
01 02 03 04 05 06 07 08 09 10 11
12
01 02 03 04 05 06 07 08 09 10 11
12
D
C
B
A
D
C
B
A
D D
C C
B B
A A
01
01
02
02
03
03
04
04
05
05
06
06
07
07
08
08
09
09
10
10
11
11
12
12
LIAM DEWAR
Bridport HouseEngineering Challenges
• Different layout of the loadbearing elements
• Overall shrinkage
• Overall stability
• Fire / Acoustic
• Logistics of a very tight site
LIAM DEWAR IMAGE © EURBAN
Bridport HouseLoadbearing Separating-Wall Structure
01 02 03 04 05 06 07 08 09 10 11
12
01 02 03 04 05 06 07 08 09 10 11
12
D
C
B
A
D
C
B
A
D D
C C
B B
A A
01
01
02
02
03
03
04
04
05
05
06
06
07
07
08
08
09
09
10
10
11
11
12
12
LIAM DEWAR IMAGE © EURBAN
Bridport HouseLoadbearing Structure
LIAM DEWAR IMAGE © EURBAN
Bridport HouseShrinkage
OVERALL LONG TERMSHRINKAGE 18mm
OVERALL LONG TERMSHRINKAGE 29mm
≈ 40% LESS SHRINKAGE
LIAM DEWAR IMAGE © EURBAN
Bridport HouseShrinkage
LIAM DEWAR IMAGE © EURBAN
Bridport HouseShrinkage
LIAM DEWAR IMAGE © WILMOTT DIXON
Bridport House
LIAM DEWAR IMAGE © WILMOTT DIXON
Bridport House
LIAM DEWAR IMAGE © EURBAN
Bridport HouseOverall Stability
Crosswise
01 02 03 04 05 06 07 08 09 10 11
12
01 02 03 04 05 06 07 08 09 10 11
12
D
C
B
A
D
C
B
A
D D
C C
B B
A A
01
01
02
02
03
03
04
04
05
05
06
06
07
07
08
08
09
09
10
10
11
11
12
12
LIAM DEWAR IMAGE © EURBAN
Bridport HouseOverall Stability
Elevation
LIAM DEWAR IMAGE © EURBAN
Bridport HouseOverall Stability
LIAM DEWAR IMAGE © EURBAN
Bridport HouseOverall Stability
Lengthwise
0102030405060708091011
12
0102030405060708091011
12
D
C
B
A
D
C
B
A
DD
CC
BB
AA
01
01
02
02
03
03
04
04
05
05
06
06
07
07
08
08
09
09
10
10
11
11
12
12
LIAM DEWAR IMAGE © EURBAN
Bridport HouseOverall Stability
Lengthwise
LIAM DEWAR IMAGE © EURBAN
Bridport HouseOverall Stability
LIAM DEWAR IMAGE © EURBAN
Bridport HouseOverall Stability
LIAM DEWAR IMAGE © EURBAN
Bridport HouseFire & Acoustic Separation
01 02 03 04 05 06 07 08 09 10 11
12
01 02 03 04 05 06 07 08 09 10 11
12
D
C
B
A
D
C
B
A
D D
C C
B B
A A
01
01
02
02
03
03
04
04
05
05
06
06
07
07
08
08
09
09
10
10
11
11
12
12
LIAM DEWAR IMAGE © EURBAN
Bridport HouseFire & Acoustic Separation
LIAM DEWAR IMAGE © WILMOTT DIXON
Bridport HousePlasterboard for Fire Performance
LIAM DEWAR IMAGE © WILMOTT DIXON
Bridport HouseFloating Screed for Acoustic Performance
LIAM DEWAR IMAGE © EURBAN
Bridport HouseComponent Model
LIAM DEWAR IMAGE © WILMOTT DIXON
Bridport HouseOff-loading
LIAM DEWAR IMAGE © EURBAN
Bridport HouseMaterial Storage
LIAM DEWAR
Bridport HouseWeek 1
LIAM DEWAR
Bridport HouseWeek 6
LIAM DEWAR
Bridport HouseWeek 10
LIAM DEWAR
Bridport HouseCompletion
LIAM DEWAR IMAGE © IOANA MARINESCU
Bridport HouseBrickwork Cladding
LIAM DEWAR IMAGE © KARAKUSEVIC CARSON
Bridport HouseSite Comparison with Concrete
Concrete Frame Construction
236 concrete deliveries10 steel re-bar deliveries25 site operatives15 week site programme+3 weeks for external/party walls
Mass Timber Construction
30 Timber Deliveries1 Steel delivery7 Site operatives
10 week site programme (40% saving)
LIAM DEWAR
Bridport HouseCarbon Saving
Stored Carbon: 1,150 t CO2eq
Carbon Saving: 2,044 t CO2eq
Offset Period: 27 years
Effective Carbon Reduction Strategy
CLIENTHackney Borough Council
ARCHITECTKaracusevic Carson Architects
CONCRETE ENGINEERPeter Brett Associates
TIMBER ENGINEEREurban + Pirmin Jung
MAIN CONTRACTORWillmott Dixon Construction
TIMBER CONTRACTOREurban/ m2
ACCOMMODATION41 Residential Units
FLOOR AREA44,715 ft2
INSTALLATION PERIOD10 weeks
MATERIALS USEDCrosslam / Steel
MANUFACTURER Stora Enso Wood Products
COMPONENT THICKNESSES140, 160mm (Walls); 165-225mm (Floors, Roof)
LIAM DEWAR – TIMBER FOR THE MASSES
Bridport House, London, 2010Project Data
Cobalt Place, London, 2015AHMM | Eurban | 104 Residential Units, 170,000 ft2
LIAM DEWAR IMAGE © EURBAN
LIAM DEWAR
Cobalt PlaceDesign Proposal
IMAGE © EURBAN
LIAM DEWAR
Cobalt PlaceQuality Assurance – Early Design Involvement
IMAGE © EURBAN
LIAM DEWAR
Cobalt PlaceQuality Assurance – BIM
IMAGE © EURBAN
LIAM DEWAR
Cobalt PlaceQuality Assurance – Design Co-ordination
IMAGE © EURBAN
LIAM DEWAR
Cobalt PlaceQuality Assurance – Thorough Approvals Process
IMAGE © EURBAN
LIAM DEWAR
Cobalt PlaceQuality Assurance – Efficient Panelisation
IMAGE © EURBAN
LIAM DEWAR
Cobalt PlaceQuality Assurance – Planning & Sequencing
IMAGE © EURBAN
LIAM DEWAR
Cobalt PlaceQuality Assurance – Detailed Site Drawings
IMAGE © EURBAN
LIAM DEWAR
Cobalt PlaceQuality Assurance
IMAGE © EURBAN
• Leica Total Station to map building during construction• Control over angle and verticality from setting out to completion
Cobalt PlaceInstallation
LIAM DEWAR IMAGE © EURBAN
Cobalt PlaceInstallation Directly off Trailer
LIAM DEWAR IMAGE ©DAVID GRANDORGE
Cobalt Place
LIAM DEWAR IMAGE ©DAVID GRANDORGE
Cobalt PlaceInstallation
LIAM DEWAR IMAGE ©DAVID GRANDORGE
Cobalt PlaceDesign Co-ordination - Services
LIAM DEWAR IMAGE ©DAVID GRANDORGE
Cobalt PlaceFire Point
LIAM DEWAR IMAGE ©DAVID GRANDORGE
Cobalt PlaceStairs
LIAM DEWAR IMAGE ©DAVID GRANDORGE
Cobalt PlaceTemporary Lighting (Winter)
LIAM DEWAR IMAGE ©DAVID GRANDORGE
Cobalt PlaceWater
LIAM DEWAR IMAGE © EURBAN
Cobalt PlaceThird Moisture Reading – 14.7%
LIAM DEWAR IMAGE © EURBAN
Cobalt PlaceFit-Out
LIAM DEWAR IMAGE ©EURBAN
Cobalt PlaceFit-Out
LIAM DEWAR IMAGE ©EURBAN
Cobalt PlaceBrick Cladding
LIAM DEWAR IMAGE ©EURBAN
Cobalt PlaceBrick Cladding
LIAM DEWAR IMAGE ©EURBAN
Mass Appeal
LIAM DEWAR IMAGE © EURBAN
– Ideally suited for major regeneration work due to minimal dust and noise (considerate constructor)
– Ideally suited for public works due to timber content (wood first policy)
– Ideally suited for multi-storey projects due to structural properties
– Ideally suited for developer-led housing projects due to speed on site (early return on investment)
Social Housing, Cornebarrieu, 2011Perraudin Architecture | Promologis
LIAM DEWAR IMAGE © PERRAUDIN ARCHITECTURE
“All of a sudden, it didn’t bother me not being modern.”
QUOTE: ROLAND BARTHES
IMAGE © DAVID GRANDORGELIAM DEWAR – TIMBER FOR THE MASSES
Architecture Archive
Free the Tree
IMAGE © EURBAN