TIDEWAY OFFSHORE SOLUTIONS
GENERAL INFORMATION
3
Tideway in a nutshell:
TIDEWAY | GENERAL INFORMATION
Leading world class contractor
In the high precision rock dumping (fall pipe vessel) market
We aim to be
A full service provider for oil & gas pipeline and power cable
installation projects
Our activities
Rock placement, Landfalls & Outfalls, Offshore Dredging,
Power Cable Installation, & Subsea works
ACTIVITIES & EQUIPMENT
5
TIDEWAY | ACTIVITIES
Protection & Stabilisation Services
Pipeline / Cable Crossings
Seabed Preparation
Freespan Correction
Platform Scour Protection
Windfarm Scour Protection
Special Applications
Rock placement Landfalls &
Outfalls Offshore Dredging
Cable Installation
6
Length 154.6 m. – Breadth 32.2 m. – Draught loaded 7.74 m. - Loading cap. 19,000 t.
Working depth max. 2,000 m. – Cruising speed 15 knots - Class LR DP II, ICE
Length 139 m. – Breadth 32m. – Draught loaded 6.60 m. – Loading capacity 11,500 t.
Cruising speed 12 knots – Class ABS / DP II
Length 162 m. – Breadth 38m. – Draught loaded 6.34 m. – Loading capacity 18,000 t.
Cruising speed 12 knots – Class LR / DP II
TIDEWAY | EQUIPMENT
FPV Flintstone
FPV Rollingstone
FPV Seahorse
Rock placement Landfalls &
Outfalls Offshore Dredging
Cable Installation
7
TIDEWAY | ACTIVITIES
Cofferdams
Groynes
Pulling Winch & Wire
Wire Lay & Pipe Pull
Nearshore Dredging
Backfilling & Trench Re-instatement
Directional Drilling / Microtunneling
Rock placement Landfalls &
Outfalls Offshore Dredging
Cable Installation
8
TIDEWAY | ACTIVITIES
Pre-lay Dredging
Post-Lay Burial
Seabed Preparation
Pre-sweeping sandwaves
Rock placement Landfalls &
Outfalls Offshore Dredging
Cable Installation
9
TIDEWAY | ACTIVITIES
From continent to continent From OWFs to shore Infield cables between WTGs
Rock placement Landfalls &
Outfalls Offshore Dredging
Cable Installation
10
TIDEWAY | EQUIPMENT
New Asset:
MPV Living Stone
(Q1 2017)
Post-lay trencher
CBT1100
Rock placement Landfalls &
Outfalls Offshore Dredging
Cable Installation
11
TIDEWAY | EQUIPMENT
Rock placement Landfalls &
Outfalls Offshore Dredging
Cable Installation
Length 161 m. – Breadth 32.2m. – Draught loaded 6.5 m. – Loading capacity 10,000 t of cable (2x5,000 t turntables)
Cruising speed 13.4 knots – DP III – 2x600 m3 LNG plant tanks
12
TIDEWAY | EQUIPMENT
Rock placement Landfalls &
Outfalls Offshore Dredging
Cable Installation
13
TIDEWAY | EQUIPMENT
Rock placement Landfalls &
Outfalls Offshore Dredging
Cable Installation
• 2x400kW Electro-Hydraulic power packs
• 1750mm wide heavy duty track gear
• Heavy duty chain cutter system –
o 2.3m trench depth @ 4m MBR
• Rear mounted dual jetting swords –
o 3m trench depth @ 3m MBR
• TSS Dual track cable tracking system
• Capable of simultaneous or post-lay burial survey
PAST EXPERIENCE
15
TIDEWAY | PAST EXPERIENCE
Rock Placement Landfalls & Outfalls Offshore Dredging Cable Installation
• DONG Energy /
Gwynt Y Mor OWF
• DONG Energy /
Walney I & II OWF
• DONG / Gunfleet
Sands DEMO
• BP / Claire
Development
• Energy /
Westermostrough
• 100s more…
• BP / Magnus EOR
Project
• PVDSA / Gasoducto
Dragon / Cigma
• Chevron /
Wheatstone
Trunkline Shore Pull
• Gazprom /
Nordstream Project
• Shell / Corrib Field
Development
• Chevron /
Wheatstone Project
• Cardon IV SA / Perla
Early Field
Development
• RWE / Breagh Field
Development
• BritNed Cable
project
• Babbage Project
• GDF Suez / Q13a-A
Development
• Northwind /
Northwind OWF
• C-Power / Thornton
Bank OWF
• Statnett / NorNed
HVDC Cable
Interconnector
Project
CURRENT & FUTURE PROJECTS
17
TIDEWAY | CURRENT & FUTURE PROJECTS
Gode Wind 1+2 Race Bank Innogy Nordsee 1 Merkur
•Germany
•DONG Energy /
GeoSea
•Scour protection
around 42 and
55 monopile
foundations
•UK
•DONG Energy
•Scour protection
around 62 of 91
monopile
foundations
•Germany
•Nordsee One /
GeoSea
•Scour protection
for monopile
foundations
•Germany
•Merkur Offshore
/ GeoSea
•Scour protection
for monopile
foundations
18
SUB-CONTRACT SERVICES
TIDEWAY | PAST EXPERIENCE
General Mobilisation &
Demobilisation Execution
• Engineering works
• Skilled and semi-
skilled labour
• Engineers
• Inspectors
• Admin
• Accommodation on
shore
• Office space
• Taxi/shuttle services
• Welding shop
• More…
• Port services /
facilities (incl.
agents, bunkering,
etc)
• Diving services
• Small tools /
hardware
• Electrical services
• More...
• Trenching & Burial
• Pull-in works
• Survey
• Route Clearance
• Cable supply /
manufacture
• Testing and
commissioning
• UXO clearance
• HDD
• Rock supply
• Survey
• Conveyor belt
maintenance
• ROV services
• CTVs, multicats,
tugs, barges
• Cable protection
system
• Earth moving
equipment services